Page 1: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

SPS Synchrotron Light Monitor-BSR-Status

G. TRADE. Bravin, A. Goldblatt, F. Roncarolo

Page 2: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

2SPS BSR Status, G. Trad 04 /02/2015

Content

System Description Location Components

Commissioning SR Intensity

Status

Outlook Batmon Readings

Summary

Page 3: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

s

3

SystemDescription

Commissioning

Status

Outlook

SPSLayout

BSR

3SPS BSR Status, G. Trad 04 /02/2015

Page 4: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

SR Monitor

Light Source

SR extraction

Optical Systems Detector

SystemDescription

Commissioning

Status

Outlook

4SPS BSR Status, G. Trad 04 /02/2015

Page 5: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

• Critical wavelength emitted (even at the flat top energy 28 µm) is far from the detectable range

• Expected light results to be the Edge radiation

• Short distance between the two dipoles lead to interference phenomena

System DescriptionSystemDescription

Commissioning

Status

Outlook

5SPS BSR Status, G. Trad 04 /02/2015

Page 6: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

integrated energy per turn over the detectable range in function of the energy

α ɣ12.8

• From E≈400 GeV the emitted light is comparable to the LHC emitted by the LHC undulator at 450 GeV

• Therefore it is reasonable to foresee an SR monitor at flattop energy in the SPS

SR Source SimulationSystemDescription

Commissioning

Status

Outlook

6SPS BSR Status, G. Trad 04 /02/2015

Page 7: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

SystemDescription

Commissioning

Status

Outlook

s

80/ mm

96 mm

100

mm

SR Light

Towards optical system

Beam

axi

s

Mirr

or a

xis

View

Port

7SPS BSR Status, G. Trad 04 /02/2015

Page 8: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

SystemDescription

Commissioning

Status

Outlook

8SPS BSR Status, G. Trad 04 /02/2015

Page 9: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

Shielded Optical Table

Motorized Steering mirror

Extraction Mirror

SR Light

SystemDescription

Commissioning

Status

Outlook

9SPS BSR Status, G. Trad 04 /02/2015

Page 10: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

SystemDescription

Commissioning

Status

Outlook

10SPS BSR Status, G. Trad 04 /02/2015

Page 11: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

SR LightIntensified gated CCD(Motorized)

Filters : ND+ColorOn motorized wheel

Ocular Lens for zoom(motorized)

Apochromat Lens

SystemDescription

Commissioning

Status

Outlook

11SPS BSR Status, G. Trad 04 /02/2015

Page 12: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

Calibration Target for magnification

Calculation

SystemDescription

Commissioning

Status

Outlook

12SPS BSR Status, G. Trad 04 /02/2015

Page 13: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

Imaged SPS SR light for a bunch of 1011 protons over 4 SPS turnsalong the energy ramp.

SR Source MeasurementSystemDescription

Commissioning

Status

Outlook

13SPS BSR Status, G. Trad 04 /02/2015

Page 14: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

measured

predictedobserved

Measured SR intensity integrated over the detector area

SR Source MeasurementSystemDescription

Commissioning

Status

Outlook

14SPS BSR Status, G. Trad 04 /02/2015

Page 15: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

• Hardware Fully installed for a flattop measurement

• Software missing for a safe image acquisition with no expert tools

• Hardware missing for a continuous measurement along the ramp• (function generator for the gain control).

• If optimized acquisition could reach 30 frames per seconds (expert tools)

StatusSystem

Description

Commissioning

Status

Outlook

15SPS BSR Status, G. Trad 04 /02/2015

Page 16: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

OUTLOOK

Page 17: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

CROSS CALIBRATION WITH WS (s) FOR RESOLUTION MEASUREMENTS

17SPS BSR Status, G. Trad 04 /02/2015

Page 18: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

Dispersion is important in the horizontal planeNeeded a good (delta p)/p knowledge

18SPS BSR Status, G. Trad 04 /02/2015

Page 19: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

Possible Installation of a high frame rate digital camera (1000 fps)

SystemDescription

Commissioning

Status

Outlook

19SPS BSR Status, G. Trad 04 /02/2015

Page 20: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo

SPARE

Page 21: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo
Page 22: SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo