Raubex Construction & Raubex KZN (Pty) Ltd sponsored the implementing, training and mentoring of 15 + 1 vegetable tunnels for the poor & the vulnerable in Phase 7, Mangaung Free State region. Project initiated and managed by Spoudazo Enterprises, a registered Public Benefit Organisation in Bfn, South Africa.
Implementation period: March – September 2013.
![Page 2: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/2.jpg)
2
Spoudazo Enterprises Trust is a registered Public Benefit Organisation in Bloemfontein, South Africa with PBO no: 930037272
Focus areas of Spoudazo:• To provide for the poor
and the needy.• To further the interests
and well-being of the poor and the needy by means of providing them with Welfare, Humanitarian assistance, Health Care, Land & Housing, Education and Development services.
• To benefit previously disadvantaged individuals and/or communities who do not have access to funding, resources and education.
Project initiation & management by:
![Page 3: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/3.jpg)
This presentation offers:
Highlights of Raubex (Pty) Ltd’s 15 tunnels that were setup and managed by Spoudazo
Enterprises Trust in Phase 7, Mangaung during the period of March – October
2013.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
3
![Page 4: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/4.jpg)
4
The home of Samuel, one of the beneficiaries
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 5: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/5.jpg)
5
After identification of the sites and before setup, the soil gets prepared
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 6: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/6.jpg)
6
Setup of tunnels took place in March 2013 & April 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 7: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/7.jpg)
7
There were 2 teams that worked together in the setting up of the tunnels.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 8: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/8.jpg)
8
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo
Enterprises
Vegetable beds were prepared before planting took place in March 2013
![Page 9: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/9.jpg)
9
Planting the beet-root in straight rows
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 10: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/10.jpg)
10
Everyone helped with the planting of the seedlings
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 11: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/11.jpg)
11
Watering the seedlings & adding cutworm
bait to the beds.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 12: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/12.jpg)
Beetroot, spinach and cabbage were planted. Dry grass were placed on the beds to protect the seedlings from the heat, it helps to keep the soil moist after watering and it also helps in the restoration process of the soil.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
12
![Page 13: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/13.jpg)
13
After planting, the vegetable beds were sprayed for pesticides.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 14: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/14.jpg)
Our caretakers for the 16 tunnels from March – Oct 2013
14
![Page 15: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/15.jpg)
15
April 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
11 April 2013
![Page 16: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/16.jpg)
16
17 May 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 17: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/17.jpg)
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises 17
More on 17 May 2013
![Page 18: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/18.jpg)
18
20 June 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 19: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/19.jpg)
19
20 June 2013 - Ntate Motlatsi Masita is selling his spinach
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 20: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/20.jpg)
20
18 July 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 21: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/21.jpg)
21
More on 18 July 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 22: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/22.jpg)
22
Record Keeping during June & July
2013: The beneficiaries were
taught how to keep record of their own usage and of their
sales. Those who are illiterate indicates by a
“X” when they have eaten or sold crops.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 23: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/23.jpg)
23
22 August 2013 – look at Motlatsi’s cabbages!
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 24: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/24.jpg)
24
More on 22 August 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 25: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/25.jpg)
25
24 September 2013 Many of the cabbage beds were empty. It has been harvested.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 26: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/26.jpg)
26
Record Keeping by Anna Tholeng of her cabbage sales in September 2013
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 27: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/27.jpg)
27
Raubex’s visit to the Vegetable tunnels in Phase 7 on 2nd October 2013.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 28: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/28.jpg)
28
Trevor Dale, Koos & Thabo Raubeneheimer with Mamojake in Hhalefang’s tunnel
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 29: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/29.jpg)
29
2nd October 2013Thabo Raubenheimer in Motlatsi Masita’s tunnel.
Thabo Raubenheimer with Motlatsi and Johannes, the mentor of Motlatsi.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 30: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/30.jpg)
30
Mamojake, Thabo Raubenheimer & Enna in Mamojake’s tunnel. This is her second season, her tunnel was setup in
October 2012. She is a mentor for 4 tunnel owners and the overseer of all 21 tunnels in Phase 7.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 31: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/31.jpg)
31
Mamojake developed into an entrepreneur with the vegetable tunnel opportunity. With the income from the mentoring fees and sales of her
vegetables she enlarged her house and started a small shop that sells airtime and the basic groceries. She was the first beneficiary in Phase 7 in September 2012.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 32: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/32.jpg)
32
Certificates for the faithful caretaking of the tunnels were handed over on 5
October 2013. This certified them as the official owners of the tunnels.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 33: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/33.jpg)
Example of Certificate
When the sites are identified for sponsorship, an agreement is formed with the caretakers of the tunnels that they will be awarded with the tunnel after they have been faithful in the caretaking of the tunnel. They had to take responsibility and apply the training and mentoring skills.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises 33
![Page 34: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/34.jpg)
5 October 2013- Certificate Celebration
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises 34
![Page 35: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/35.jpg)
35
7 October 2013 – A workshop for the beneficiaries was held at Beudene Daycare for disabled teaching them how to preserve their huge harvest of beetroot which was to
much to consume at once.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 36: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/36.jpg)
36
The friends of phase 7 were empowered with a recipe, skills and knowledge to preserve
beetroot.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 37: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/37.jpg)
37
The residents of Phase 7 brought their own bottles and beetroot to the workshop. They went home with 20 x
bottled beetroot and the skill to preserve the remainder of their beetroot harvest at home.
March - October 2013 Vegetable Tunnels in Phase 7 initiated & managed by Spoudazo Enterprises
![Page 38: Spoudazo Enterprises - Highlights of Vegetable Township tunnels sponsored by Raubex Construction (Pty) Ltd & Raubex KZN in Mangaung area during March - October 2013](https://reader034.vdocuments.site/reader034/viewer/2022051207/53f937c88d7f7253318b4bb6/html5/thumbnails/38.jpg)
Thank you for your time!The mentoring team:
Elbie Louw, Meshack Eti, Mamojake, Ramoekoena, Elisha, Johannes & Enna
Project initiated & managed by Elbie Louw from Spoudazo Enterprises Photo’s by Elbie Louw 38