Splash Pad Tutorial
Final Splash Pad
Clearing and Leveling Area Digging for Water Vault Placement
Water Vault Deliver, Install and backfill Determine Elevations of pad Form Splash Pad Perimeter
Dig Plumbing Trenches and Set Drain Boxes Setting & Plumbing Collector
BoxesPlumb Collector Boxes to Tank
1 2
3 4 5
876
Page 1
952.445.5135 | 877.632.0503 | aquatix.playlsi.com© 2016
12
13 15
17 18
9 10
11
14
Page 2
Back Fill Pipe TrenchesSetting & Plumbing Embeds
Plumb to Embeds & Verify Elevation & Levels
Plumb to Structure Feed Locations & Extend of Piping to
Above Pad Surface
Plumb to Equipment System Lo-cations
Back Fill & Level Area, Allow for Thickened Slab Where
Structures are Mounted & Embeds to be Encapsulated in Concrete
Section Concrete Pad Area for Mul-tiple Pours as Needed
Install Rebar Pour Concrete
16
Slope to Collector Boxes
Splash Pad Tutorial
952.445.5135 | 877.632.0503 | aquatix.playlsi.com© 2016
24 25
22
Page 3
Mount Structures
Install Mechanical SystemOutfit Water Vault with Inlet
Loop, Sump Pump & Associated Plumbing
Install Studs & Anchors
21
Drill in for Stud Locators
23
Final Splash Pad
19 20
Medium Broom Finish Allow Concrete to Cure
Splash Pad Tutorial