SPIS-Elena - Tramways in Skåne

Light rail day, 8 november 2011

Marcus Horning, project manager, SPIS-Elena

Page 2: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Background the SPIS collaboration

• Common study (2007). Region Skåne, Malmö, Lund, Helsingborg and the National Railway Administration

• Analyzing:• Expected passengers • Economy • City development • Physical conditions in the

cities • Environmetal effects • Congestion • Regional development

Page 3: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Background the SPIS collaboration

• Cooperation is formalized in 2010 with political steering committee

• Partners: The Region of Skåne and the cities of Malmö, Lund and Helsingborg, in Sweden.

• The SPIS investment programme consists of the coordinated planning and implementation of a new tramway network in Lund, Malmö and Helsingborg.

Page 4: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Why joint venture?

•Rather small systems in each city

•One common system in the future

•Common maintenance and operation in the future

•Joint procurement – larger volume, better price

•The same technique for track and vehicles

•The same design principles

•The same design guidelines

Page 5: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Main projects in the SPIS- collaboration

New tramway line in LundNumber of lines: 1 lineNumber of stops: 9New trams: 8

New tramway lines in Malmö Number of lines: 2 linesNumber of stops: 35 New trams: 23

New tramway line in Helsingborg Number of lines: 1 lineNumber of stops: 13New trams: 11

Page 6: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Elena application fall 2010

ELENA application sent to EIB December 2010. May 2011 – application granted

•3,3 million euro til May 2014

•90 % Elena 10% divided by all parties

•25 times the leverage factor must be met before project period ends - this means an investment of 83 million euro

•Main purpose – to achieve energy efficient public transport!

Page 7: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Elena application fall 2010 – energy savings2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Energy saving Lund Bus -3304 -3304 -3304 -3304 -3304 -3304(MWh/yr) Tram 819 819 819 819 819 819Largescale public transport efforts and strategy* Reduced cartrips -5093 -8156 -9688 -10187 -10187 -10187Strategic largescale Mobility management* Reduced cartrips -3164 -5067 -6018 -6328 -6328 -6328

Total -10743 -15708 -18191 -19000 -19000 -19000Energy saving Malmö Bus -10192 -10192 -10192 -10192(MWh/yr) Tram 3526 3526 3526 3526Largescale public transport efforts and strategy* Reduced cartrips -13846 -22154 -26308 -27693Strategic largescale Mobility management* Reduced cartrips -8602 -13762 -16343 -17203

Total -29114 -42583 -49317 -51562Energy saving Helsingborg Bus -4760 -4760(MWh/yr) Tram 2048 2048Largescale public transport efforts and strategy* Reduced cartrips -11909 -12033Strategic largescale Mobility management* Reduced cartrips -7398 -7475

Total -22019 -22219-10743 -15708 -47305 -61583 -90337 -92781

Delays without ELENA regarding Energy savingsLund Total -10743 -15708 -18191 -19000 -19000 -19000

Malmö Total (opens 2018 instead) -29114 -42583

Helsingborg Total (open 2020 instead)

TOTAL Energy savings SPIS (MWh/yr) without ELENA -10743 -15708 -18191 -19000 -48114 -61583

Difference ELENA/without ELENA (percentage) 100 100 38 31 53 66

SPIS ELENASPIS Post-ELENA

TOTAL Energy saving SPIS (MWh/yr)

Page 8: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Aims and goals - with SPIS-Elena

•Energy efficient light rail in Skane – sustainable development

•Optimize the cooperation of the partners involved and the implementation – save time and money

•Investigate common questions – create synergy, one plattform

•Collectively communicate the project - open source

Page 9: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Consortium organisation Tramways in Skane

Political steering committee of SPIS

Head of chief committe of SPIS

WP 1 Project management of SPIS-Elena

WP 2 Vehicles

WP 3 Financing

WP 4 Design

WP 5 Main-

tenance

WP 6 Communication

Page 10: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Staff and SPIS-office

Recruting staff

•Project manager (100%)•Controller (50%)•Tendering expert (100%)•Tram expert (100%)•Project strategist (50%)•Communicator (100%)•Project coordinator 1 (100%)•Project coordinator 2 (100%)•Project coordinator 3 (100%)

Page 11: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

WP 1 Project management of SPIS-Elena Project plan - Content

•Coordinate and lead the work•Define administative processes•Budget and timeframe•Reporting•Budget - 142 000 euro

Page 12: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

WP 2 Vehicles

Project plan - Content

•Investigate system for – energy, technique, electricity etc•Defining maintence approach•Support for tendering preparation•Tendering•Ordering•Budget - 310 000 euro

Page 13: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

WP 3 Financing

Project plan - Content

•Financial strategy•Different financing alternatives•Negotiation package•Successive calculation•Investigation – traffic, stages, financing sources, alternative costs etc•Budget - 180 000 euro

Page 14: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

WP 4 Design

Project plan - Content

•Largest package•Links all WPs•Develop common standards – optimize together not seperatly•Define the most energy effective design – support model split to energy efficient public transport•Budget - 950 000 euro

Page 15: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

WP 5 Maintenance

Project plan - Content

•Long term package•Joint maintenance system – energy and resource effective life cycle•Innovative quality system – secures a reliable and attracitve system support the modal split•60 000 euro

Page 16: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

WP 6 Communication

Project plan - Content

•Joint communication strategy – better effect, exchange of knowledge, effective use of resources•Strategy which connects goals, challanges and opportunites•Communication plans – different target groups•(Budget – 200 000 euro not Elena funding)

Page 17: SPIS-Elena - Tramways in Skåne Light rail day, 8 november 2011 Marcus Horning, project manager, SPIS-Elena

Time plan

WP 1 Project managment

WP 2 Vehicles

WP 3 Finance

WP 4 Design

WP 5 Maintenance

WP 6 Communication

2011 2012 2013 2014Maj Juni

Today

EIB report