TABLE OF CONTENTS
Chapter 1 Page#
1.0 Introduction 6
1.1 Scope 61.2 Objective 7
1.3 Preliminary investigation 7
1.4 Fact finding techniques 7
1.4.1 Interviews 7
1.4.2 Summary of Interviews 7
1.4.3 Surveys 8
1.4.4 Summary of Surveys 8
1.5 Problems of the current system 8
1.6 Proposed solutions to the problems 8
1.6 Benefits of the proposed system 9
1.7 Conclusion 10
-
7/31/2019 Specimen Report
2/60
System Analysis and Design Group Project
2
Chapter 2 Page#
2.0 Feasibility 10
2.1 Technical Feasibility 11
2.1.1 Hardware 11
2.1.2 Software 11
2.1.3 Machines 11
2.2 Operational Feasibility 11
2.2.1 PIECES 11
2.3 Schedule feasibility 12
2.3.1 Task Description 13
2.4 Economic Feasibility 14
2.4.1 Cost-Benefits Analysis 15
2.4.2 Pay Back Analysis 15
2.4.3 Pay Back Analysis Graph 16
2.4.4 Explanation of Pay Back Analysis 16
2.4.5 Return on Investment Analysis 17
2.4.6 Explanation of Return on Investment Analysis 17
2.5 Conclusion 17
-
7/31/2019 Specimen Report
3/60
System Analysis and Design Group Project
3
Chapter 3 Page#
3.0 Data Flow Diagrams 18
3.1 Context Diagram 18
3.1.1 Explanation of Context Diagram 19
3.2 Level 0 Diagram 21
3.2.1 Explanation of Level 0 20
3.3 Level 1 Diagram 22
3.3.1 Explanation of Level 1 22
3.4 Data Dictionary 23
3.4.1 Data Flows 24
3.4.3 Data Store 33
3.4.4 Processes 35
3.4.5 Entities 39
Chapter 4 Page#
4.0 Sun Video Corporations Logo 41
4.1 Main Menu 42
4.2 Customer 43
4.3 Video Return 44
4.4 New Customer Registration 45
4.5 Customer Payment Details 45
4.6 Database Tables 46
4.6.1 Rent a Video Table 47
4.6.2 Payment Details Table 494.6.3 Customer Table 51
4.6.4 Video Returned Table 53
-
7/31/2019 Specimen Report
4/60
System Analysis and Design Group Project
4
Chapter 5 Page#
5.0 Gantt Chart 57
5.1 Conclusion 58
5.2 Reference 59
5.3 Appendix 60
-
7/31/2019 Specimen Report
5/60
System Analysis and Design Group Project
5
ACKNOWLEDGEMENT
In the beginning we would like to thank our GOD, the most merciful and beneficent, for
giving us the strength to complete this project with full determination.
My special thanks to my course instructor, Mrs. Ambreen Ahmed, without her help and
guidance we would not have been able to complete the report up to the mark and as well
if it was not for her support in the field of Microsoft acsses i dont think we would be
able to present the screen shots in a appropriate way.
-
7/31/2019 Specimen Report
6/60
System Analysis and Design Group Project
6
INTRODUCTION
This case study is about a video shop whose name us Sun Video Corporation. It has
expertise in video rental business. Their plan is to have a series of stores scatteredstrategically around a metropolitan area. As being expertise in the video rental business
they offer great deal for their customer and provide a competitive edge for their
competitors. In this case we are required to do the work of the system analyst and go
through each process which the system analyst performs.
SCOPE
As all of you know that as the world is advancing the need for new system have increased
in every organization old systems are being replaced by new system, the reason behind
this is that the organization demands excellent quality work more profit to be earned in
short term and to gain more market share as quick as they can and to kick their
competitors out of the market. New system is:
User Friendly
More Efficient
They provide you with the latest security (I.E Fire Wall)
U can use internet proving you with the better speed and quality so you could
send and receive important e-mails
As mentioned above that what the new system does, our prime target is to create a
new and reliable system for Sun Video Corporation as it is offering many facilities to
its customers and it is proving a competitive edge.
-
7/31/2019 Specimen Report
7/60
System Analysis and Design Group Project
7
OBJECTIVE
My objective is to make useful and user friendly system, so that non technical person can
also under stand it. It is easy for the company to use the system, providing the system thatwould be designed for the company will consists of high security software (zone alarm
version 9) so that no hacker can break inside the system and stole data and installing
latest version of antivirus (I.E McAfee version 8.0) so the system is virus free and the
data is secured
PRELIMINARY INVESTIGATION
After receiving the request from Sun Video Corporation regarding their system our team
started its work with the very basic step that was searching for the problem by the method
of fact and finding techniques and gather the information regarding the problem that
was faced by the Sun Video Corporation.
FACT FINDING TECHNIQUES
This stage involves Interviews, conclusion, Survey, conclusion problem of the current
system, proposed solution to the problem of the current solution conclusion
Interviews
This was the basic step taken by our team this main reason for conducting interview was
that we would know that what are the problem that the company is currently facing and
how is it affecting their business? Although taking interview is not an easy task but we
manage to do it some how.
Conclusion
As a part of our first step we conducted this session and went to various people like the
managing director the company, the sales manager, the cashier and asked them about the
problem that they were facing, so that the information that they provide us would be later
used on.
-
7/31/2019 Specimen Report
8/60
System Analysis and Design Group Project
8
Surveys
The second step that our group took was going on to surveys of different famous and
large video stores in order to see what is the main reason behind their success in the
market and what type of system are they currently using ad what are the benefits that they
are getting out of it?
Conclusion of Survey
Conducting survey was successes as it gave answer to most of are questions. Are prime
target was achieve we gathered all the relevant information and the irrelevant information
was discarded.
Problems with the current system
1. The problem that was detected and was commonly seen in the answer of
interviews was that all the work was done manually,
2. There were a lot of records being generated on papers, which was very
insecure if any thing happened to the store all the records would be destroyed
and that would provide the company in a great loss,
3. No proper security arrangements every one was accessible to the personal
records of every individual customer.
4. No privacy.
SOLUTION to the problems
After conducting the interviews and surveys it was observed that the company needed a
latest system, in order to improve its quality so there fore we came up with the new
system know as Video Rental System which was to use further to solve all the problems
of the users and the corporation.
-
7/31/2019 Specimen Report
9/60
System Analysis and Design Group Project
9
Advantages of the system to be introduced
By introducing this system the company would be in safe hands due to the latest software
installed in the system which would prevent it from data hacking.
1. All the personal records would have right of privacy, as passwords can be easily
generated with the help of password manager guide which is an 8 user guide, user
friendly software which tells the user how to create a password and to use it.
2. It more reliable, Fast and user friendly.
3. It can generate automatic backup of each customer records. Incase the original
one is deleted the system can provide the user with the back up.
4. It would be sending automatic notifications to the user who have rented videos for
$50.
5. It will contain software which will the user on which shelf on what location is the
particular video which the customer s looking for this will provide them with time
flexibility and the customer would also be satisfied with this service.
6. Introducing this software would facilitate new customer enrolling and renting
movies from Sunny Videos that will make them enjoy high profit.
-
7/31/2019 Specimen Report
10/60
System Analysis and Design Group Project
10
CONCULSION
After performing the necessary steps it was founded that sunny videos manual way of
working was more time consuming and it was not efficient to work with this system
as no privacy right were available. Being the system analyst it was decided that it is
necessary to introduce a new system for Sunny Video which is know as Sunny rental
Video
FEASIBILITY
Feasibility report means to identify the problem and summarizing the complete
objectives. It also creates broad data for the management team that would decide by
looking at the objects whether to move on the new phase or not. There are 4 types of
feasibility report which are mentioned below:
1. Technical
2. Operational
3. Economical
4. Schedule
-
7/31/2019 Specimen Report
11/60
System Analysis and Design Group Project
11
Technological or Technical feasibility
Under this process the (IT) company determines weather the company has technological
resources to compose or purchase the system. Thus we figured the technical feasibility
report; we came to know the system which is proposed to the Sun Cooperation can be
operated easily. The system replace the manually work and transform all the manually
data in to computerize form .which would augment productivity. Training sessions are
required for the employees to educate them to excel to the newly proposed system and to
further understand and use the built in software that are inside the system to prevent their
company from suffering great losses.
Operational feasibility
Operational feasibility helps to crack business problems and provide opportunities to
business .Our system would help users to use the system effortlessly, thus eliminating the
paper work. Through data entry the system would cradle all the records of the customers
and hence the transactions made by sun video can be seen through any interface of sun
video. Through this all the customers record would be maintain properly without fuss. It
would show all the records of payment received, due dates, and pending payments. This
system would be user- friendly which would enable employees to learn and operate the
system fester achieving productive results.
Pieces framework
Pieces stands for Performance, Information, Economy, Control, Efficiency, Services
Pieces has merely 6 points.
PerformanceThe currant system is not that fast and efficient which waste sundry time in paper work
even after that the transactions of the customers are not recorded properly thus arising
conflicts between management and employees and customers .Thus performance is
effected, through new system the whole thing would be computerized and the task would
be done rapidly hence augmenting performance levels.
-
7/31/2019 Specimen Report
12/60
System Analysis and Design Group Project
12
Information
The system will have its own data base through it the company can look and see all the
transactions of the customers thus having information about all it customers .
Economy
The system would be computerized, user friendly thus it would enhance productivity,
thus making the project economically strong. Perishing manually work thus codifying
and organizing the data of the customers properly. It would reduce the more workers,
thus cutting down the expanses and saving more money.
Control
Top management would have charge to control the system, thus it would decrease
pilfering , providing security . Thus every employee would have limited excess.
Efficiency
The system would be computerizes all over thus it would coup with all sinecures like data
entry, customer information, billing information resulting efficiency among employees
eventually satisfying customers .
Services
Our company would provide augment product or system thus in future if the sun
cooperation needs to have new tools we would provide them. Thus upgrading the system.
Schedule Feasibility.
Is that feasibility under which our company will meet its deadlines, and task to gratify
them? Under it we have set targets to finish what activity on which time.
-
7/31/2019 Specimen Report
13/60
System Analysis and Design Group Project
13
Task completing dates
Feasibility report would be done in 3 days including technical, economical,
operational, schedule.
Pieces framework would be done in 4 days which would include performance,
information, economy, control, efficiency and services.
Investigation of (PI) will be done in 2days
Requirements of users will be done in 2.5 days
Analysis of system needs would be done in 4days
Development and documenting the software would take 8days
Cost benefit analysis would be done in 2days
Payback analysis would be done in 1 day
All the diagrams e.g. pert chart, data flow, level zero diagrams would be done in
5days
Level 1 diagram would be done in 3days
Data store would be made in 1 day
All Entities software would be done in 4 days
Making of screenshots in 2 days
-
7/31/2019 Specimen Report
14/60
System Analysis and Design Group Project
14
Economical Feasibility
Under this feasibility we analysis weather benefits in making the new system are
more then the development cost. Is it profitable to take the task and make it? Will it
going to provide any benefits to the organization.
COST-BENEFIT ANALYSIS
Economic feasibility is performed by doing the cost-benefit analysis, which is the
process of identifying the financial benefits and costs associated with the
development of the project.
The evaluation of our project is being done on the following strategies
-
7/31/2019 Specimen Report
15/60
System Analysis and Design Group Project
15
PAYBACK ANALYSIS
It is the process in which the organization identifies the time period in which the
system would pay back for itself.
The costs in the development of this project and the profits attained are shown below:
Year Cost
Cumulative
cost Benefits
Cumulative
benefits
0 50,000 50,000 2,500 2,500
1 20,000 70,000 10,000 12,500
2 18,000 98,000 20,000 32,500
3 14,000 112,000 25,000 57,500
4 17,000 129,000 35,000 92,500
5 19,000 148,000 50,000 142,500
6 21,000 169,000 52,000 194,500
7 23,500 192,500 55,000 249,500
8 25,000 217,500 60,000 309,500
9 25,000 242,500 62,000 371,500
10 27,000 269,500 65,000 436,500
-
7/31/2019 Specimen Report
16/60
System Analysis and Design Group Project
16
0
50000
100000
150000
200000
250000
300000
350000
400000
450000
1 2 3 4 5 6 7 8 9 10 11
Year
Cost
Cumulative cost
Benefits
Cumulative benefits
PAYBACK ANALYSIS GRAPH
EXPLAINATION OF PAYBACK ANALYSIS
This graph was made on Microsoft Excel which helped in analyzing By the looking at the
above payback analysis graph it could be easily concluded that the system would payback
for itself in the 6th year after its development.
-
7/31/2019 Specimen Report
17/60
System Analysis and Design Group Project
17
RETURN ON INVESTMENT(ROI) ANALYSIS
ROI= (Total benefits Total costs) / Total costs
ROI= (436,500 - 269,500) / 269,500
ROI= 167,000 / 269,500
ROI= 0.61
EXPLAINATION OF ROI
According to the workings of the ROI the organization is getting 61% return on itsinvestment.
CONCLUSION
After performing different steps of feasibility it was concluded that our software is
feasible and easy to use for the company. Now we decided to move on to the design
phase.
-
7/31/2019 Specimen Report
18/60
System Analysis and Design Group Project
18
DATA FLOW DIAGRAMS
Data flow is known as a geographical figure of the data. DFD denotes the process which
takes place in a system .it even shows how data evolve around through an information
system.
CONTEXT DIAGRAM
-
7/31/2019 Specimen Report
19/60
System Analysis and Design Group Project
19
EXPLANATION OF CONTEXT DIAGRAM
The diagram says that the customers would interact with the system and it would show
his/her id, it would include whose payments are outstanding, whose payment are done,
whose videos are due. The new customer has to fill the form to avail membership for the
sun video. System would generate reports and management would be accountable to see
the report of the whole report... The accounts department would send cash which would
received by customers.
-
7/31/2019 Specimen Report
20/60
System Analysis and Design Group Project
20
EXPLANATION OF LEVEL 0 DATA FLOW DIAGRAM
This diagram was made by using viso .In this case the when the customer will give there
id, the system would show customer payments, dues, etc. Accounts deportment sends
cash. Customer record shows rental information to compose a report. Which would give
to the management of the sun video. This system have information when the video is
rented then its receipt is made and passed to the customers. Payment which are which are
received from the accounts department is updated in customers records. If the customers
comes to the bonus level those customers details are forwarded to the accounts
department which generates motley or yearly schemes or bonus letters for those desire
customers.
-
7/31/2019 Specimen Report
21/60
System Analysis and Design Group Project
21
LEVEL 0 DATA FLOW DIAGRAM
-
7/31/2019 Specimen Report
22/60
System Analysis and Design Group Project
22
LEVEL 1 DA TA FLOW DI AGRAM
EXPLANATION OF LEVEL 1 DATA FLOW DIAGRAM
In level 1 Data Flow Diagram, Customer Rental Record which is a data store sends
customers yearly details to the Create Yearly Bonus Letter. It advances to Free CouponsProcess which generates free coupons for the customer and both the items bonus letter
and free coupon goes to Create Customer Certificate. These three items that are coupons,
letter and certificate are sent directly to the customer.
-
7/31/2019 Specimen Report
23/60
System Analysis and Design Group Project
23
DATA DICTONARY
Date dictionary is just like a dictionary which contains meanings of words,
Data dictionary is made by the analysis to keep track and record of theinformation and thus it could be use further in future if required changes
in the system. Data dictionary contains the meanings of words which are used
in the system and data flow diagrams. It helps to
Deplete redundancy
Compose data flow in a constructive manner
Provide aid on data stored files and save it
Create deductive data flow processes
the data dictionary for this project is given below
-
7/31/2019 Specimen Report
24/60
System Analysis and Design Group Project
24
DDaattaa FFlloowwss
NNaammee :: ccuussttoommeerr ddeettaaiillss
DDeessccrriippttiioonn :: ddeettaaiillss ooffnneeww ccuussttoommeerrss
SSoouurrccee :: ccuussttoommeerr
DDeessttiinnaattiioonn :: aadddd ccuussttoommeerr
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ aaddddrreessss ++ tteelleepphhoonnee..
NNaammee :: ccuussttoommeerr ddeettaaiillss
DDeessccrriippttiioonn :: ddeettaaiillss ooffnneeww ccuussttoommeerrss
SSoouurrccee :: aadddd ccuussttoommeerr
DDeessttiinnaattiioonn :: ccuussttoommeerr rreennttaall rreeccoorrddss
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ ccuussttoommeerr iidd ++ aaddddrreessss ++
tteelleepphhoonnee nnuummbbeerr..
-
7/31/2019 Specimen Report
25/60
System Analysis and Design Group Project
25
NNaammee :: ccuussttoommeerr iinnffoo
DDeessccrriippttiioonn :: uuppddaattee ccuussttoommeerr rreennttaall rreeccoorrddss
SSoouurrccee :: vviiddeeoo rreettuurrnn
DDeessttiinnaattiioonn :: ccuussttoommeerr rreennttaall rreeccoorrddss
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ ccuussttoommeerr iidd ++ aaddddrreessss ++
tteelleepphhoonnee nnuummbbeerr ++ rreettuurrnneedd vviiddeeooss
-
7/31/2019 Specimen Report
26/60
System Analysis and Design Group Project
26
NNaammee :: ccuussttoommeerr//VViiddeeoo IIDD
DDeessccrriippttiioonn :: iiddeennttiiffiiccaattiioonn ooffccuussttoommeerr aanndd vviiddeeoo
SSoouurrccee :: ccuussttoommeerr
DDeessttiinnaattiioonn :: vviiddeeoo rreettuurrnn
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ aaddddrreessss ++ tteelleepphhoonnee ++
iiddeennttiiffiiccaattiioonn ccooddee..
NNaammee :: vviiddeeoo iinnffoo
DDeessccrriippttiioonn :: vviiddeeoo rreennttaall iinnffoorrmmaattiioonn
SSoouurrccee :: vviiddeeoo rreettuurrnn
DDeessttiinnaattiioonn :: vviiddeeoo rreennttaall rreeccoorrdd
DDaattaa SSttrruuccttuurree:: aavvaaiillaabbllee vviiddeeooss lliisstt ++ vviiddeeoo rreettuurrnneedd
-
7/31/2019 Specimen Report
27/60
System Analysis and Design Group Project
27
NNaammee :: ppaayymmeenntt//dduueess
DDeessccrriippttiioonn :: ddeettaaiillss ooffppaayymmeennttss
SSoouurrccee :: ccuussttoommeerr
DDeessttiinnaattiioonn :: ppaayymmeenntt rreecceeiivveedd
DDaattaa SSttrruuccttuurree:: aammoouunntt ooffppaayymmeenntt ++ mmooddee ooffppaayymmeenntt
++ccuussttoommeerr IIDD..
NNaammee :: rreecceeiipptt
DDeessccrriippttiioonn :: rreecceeiipptt oofftthhee ppaayymmeenntt mmaaddee
SSoouurrccee :: rreecceeiipptt ggeenneerraattiioonn
DDeessttiinnaattiioonn :: ccuussttoommeerr
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr IIDD ++ aammoouunntt ppaaiidd
-
7/31/2019 Specimen Report
28/60
System Analysis and Design Group Project
28
NNaammee :: ccuussttoommeerr iinnffoo
DDeessccrriippttiioonn :: uuppddaatteess tthhee rreennttaall rreeccoorrddss
SSoouurrccee :: ccuussttoommeerr rreennttaall rreeccoorrdd
DDeessttiinnaattiioonn :: rreecceeiipptt ggeenneerraattiioonn
DDaattaa SSttrruuccttuurree:: aammoouunntt oowweedd ++ ccuussttoommeerr IIDD
NNaammee :: ppaayymmeenntt rreecceeiivveedd uuppddaattee
DDeessccrriippttiioonn :: rreecceeiipptt oofftthhee ppaayymmeenntt mmaaddee
SSoouurrccee :: ppaayymmeenntt rreecceeiivveedd
DDeessttiinnaattiioonn :: ccuussttoommeerr rreennttaall rreeccoorrdd
DDaattaa SSttrruuccttuurree:: aammoouunntt ppaaiidd ++ bbaallaanncceess iiffaannyy lleefftt ++ ccuussttoommeerr IIDD..
-
7/31/2019 Specimen Report
29/60
-
7/31/2019 Specimen Report
30/60
System Analysis and Design Group Project
30
NNaammee :: ccuussttoommeerr rreennttaall iinnffoo
DDeessccrriippttiioonn :: ddeettaaiillss aabboouutt ccuussttoommeerrss
SSoouurrccee :: ccuussttoommeerr rreennttaall rreeccoorrdd
DDeessttiinnaattiioonn :: ccrreeaattee mmoonntthhllyy lleetttteerr ddiissccoouunntt ccoouuppoonn
DDaattaa SSttrruuccttuurree:: IIDD ++ ccooddee++ nnaammee ++ rreenntt ppaaiidd ++ ttyyppee ooffvviiddeeoo rreenntteedd..
NNaammee :: rreennttaall iinnffoo
DDeessccrriippttiioonn :: ddeettaaiillss aabboouutt tthhee mmoovviieess rreenntteedd
SSoouurrccee :: rreennttaall rreeccoorrdd
DDeessttiinnaattiioonn :: pprroodduuccee ccuussttoommeerr rreennttaall rreeppoorrtt
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ IIDD ++ rreenntt ppaaiidd..
-
7/31/2019 Specimen Report
31/60
System Analysis and Design Group Project
31
NNaammee :: rreeppoorrtt
DDeessccrriippttiioonn :: ddeettaaiillss aabboouutt tthhee ccuussttoommeerrss aanndd tthhee vviiddeeooss
SSoouurrccee :: pprroodduuccee ccuussttoommeerr rreennttaall rreeppoorrtt
DDeessttiinnaattiioonn :: mmaannaaggeemmeenntt
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ mmoovviieess rreenntteedd
NNaammee :: mmoonntthhllyy ccoouuppoonn lleetttteerr
DDeessccrriippttiioonn :: cceerrttiiffiiccaatteess pprroovviiddeedd ttoo ccuussttoommeerrss
SSoouurrccee :: ccrreeaattee mmoonntthhllyy lleetttteerr ddiissccoouunntt ccoouuppoonn
DDeessttiinnaattiioonn :: ccuussttoommeerr
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ CCuussttoommeerr IIDD
-
7/31/2019 Specimen Report
32/60
System Analysis and Design Group Project
32
NNaammee :: yyeeaarrllyy ccoouuppoonn lleetttteerr
DDeessccrriippttiioonn :: cceerrttiiffiiccaattee iissssuueedd yyeeaarrllyy
SSoouurrccee :: ccrreeaattee yyeeaarrllyy ffrreeee ccoouuppoonn
DDeessttiinnaattiioonn :: ccuussttoommeerr
DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ IIDD
-
7/31/2019 Specimen Report
33/60
System Analysis and Design Group Project
33
DDaattaa SSttoorree
NNaammee :: ccuussttoommeerr rreennttaall rreeccoorrdd
DDeessccrriippttiioonn :: aallll tthhee ddeettaaiillss ooffaa ccuussttoommeerr
IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss
PPaayymmeenntt rreecceeiivveedd uuppddaattee
CCuussttoommeerr iinnffoo
OOuuttppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo
RReennttaall iinnffoo
DDaattaa SSttrruuccttuurree :: ccuussttoommeerrss nnaammee ++ ccuussttoommeerr iiddss ++ aaddddrreesssseess ++
tteelleepphhoonnee nnuummbbeerrss ++ mmoovviieess rreenntteedd ++ aammoouunntt
bbaallaanncceess ++ aammoouunntt ppaaiidd
-
7/31/2019 Specimen Report
34/60
System Analysis and Design Group Project
34
NNaammee :: vviiddeeoo rreennttaall rreeccoorrdd
DDeessccrriippttiioonn :: aallll tthhee ddeettaaiillss ooffvviiddeeooss
IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss
PPaayymmeenntt rreecceeiivveedd uuppddaattee
CCuussttoommeerr iinnffoo
OOuuttppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo
RReennttaall iinnffoo
DDaattaa SSttrruuccttuurree :: ccuussttoommeerrss nnaammee ++ ccuussttoommeerr iiddss ++ aaddddrreesssseess ++
tteelleepphhoonnee nnuummbbeerrss ++ mmoovviieess rreenntteedd ++ aammoouunntt
bbaallaanncceess ++ aammoouunntt ppaaiidd
-
7/31/2019 Specimen Report
35/60
System Analysis and Design Group Project
35
PPrroocceesssseess
NNaammee :: aadddd ccuussttoommeerr
DDeessccrriippttiioonn :: rreeggiisstteerriinngg nneeww ccuussttoommeerrss
IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss
OOuuttppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss
PPrroocceessss SSppeecciiffiiccaattiioonn:: rreecceeiivveess ccuussttoommeerr ddeettaaiillss
vveerriiffiieess nneeww ccuussttoommeerrss
sseennddss ccuussttoommeerr rreennttaall ccaarrdd ttoo ccuussttoommeerr aanndd nneeww
ccuussttoommeerr iinnffoo ttoo ccuussttoommeerr rreeccoorrdd
-
7/31/2019 Specimen Report
36/60
System Analysis and Design Group Project
36
NNaammee :: vviiddeeoo rreennttaall
DDeessccrriippttiioonn :: mmaannaaggeess tthhee rreennttiinngg pprroocceessss
IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr//vviiddeeoo IIDD
OOuuttppuutt DDaattaa FFllooww :: vviiddeeoo iinnffoo
ccuussttoommeerr iinnffoo
PPrroocceessss SSppeecciiffiiccaattiioonn:: cchheecckkss rreeqquueesstt aanndd iissssuuee vviiddeeooss
sseennddss oouutt rreennttaall iinnffoo
NNaammee :: ppaayymmeenntt rreecceeiivveedd
DDeessccrriippttiioonn :: rreeccoorrddiinngg ccaasshh ttrraannssaaccttiioonnss
IInnppuutt DDaattaa FFllooww :: ppaayymmeenntt//dduueess
ccaasshh
OOuuttppuutt DDaattaa FFllooww :: ppaayymmeenntt rreecceeiivveedd uuppddaattee
PPrroocceessss SSppeecciiffiiccaattiioonn:: ttaakkeess iinn tthhee ppaayymmeennttss..
-
7/31/2019 Specimen Report
37/60
System Analysis and Design Group Project
37
NNaammee :: rreecceeiipptt ggeenneerraattiioonn
DDeessccrriippttiioonn :: mmaakkeess rreecceeiippttss
IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr iinnffoo
OOuuttppuutt DDaattaa FFllooww :: rreecceeiipptt
PPrroocceessss SSppeecciiffiiccaattiioonn:: ttaakkeess iinn ppaayymmeenntt iinnffoo aanndd sseennddss tthhee rreecceeiipptt ggeenneerraatteedd ttoo
tthhee ccuussttoommeerr
NNaammee :: ccrreeaattee mmoonntthhllyy lleetttteerr ddiissccoouunntt ccoouuppoonn
DDeessccrriippttiioonn :: pprroodduucceess mmoonntthhllyy rreeppoorrttss
IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo
OOuuttppuutt DDaattaa FFllooww :: mmoonntthhllyy ccoouuppoonn lleetttteerr
PPrroocceessss SSppeecciiffiiccaattiioonn:: cchheecckkss iinn ccuussttoommeerr ffiinnaall ddeettaaiillss aanndd sseennddss mmoonntthhllyy
ccoouuppoonnss ttoo vvaarriioouuss ccuussttoommeerrss
-
7/31/2019 Specimen Report
38/60
System Analysis and Design Group Project
38
NNaammee :: ccrreeaattee yyeeaarrllyy ffrreeee mmoovviiee ccoouuppoonn
DDeessccrriippttiioonn :: pprroodduucceess yyeeaarrllyy rreeppoorrttss
IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo
OOuuttppuutt DDaattaa FFllooww :: yyeeaarrllyy ccoouuppoonn lleetttteerr
PPrroocceessss SSppeecciiffiiccaattiioonn:: cchheecckkss iinn ccuussttoommeerr ffiinnaall ddeettaaiillss aanndd sseennddss yyeeaarrllyy
ccoouuppoonnss ttoo vvaarriioouuss ccuussttoommeerrss
NNaammee :: pprroodduuccee rreeppoorrtt
DDeessccrriippttiioonn :: mmaakkeess ffiinnaall rreeppoorrttss
IInnppuutt DDaattaa FFllooww :: rreennttaall iinnffooVViiddeeoo rreennttaall iinnffoo
OOuuttppuutt DDaattaa FFllooww :: rreeppoorrtt
PPrroocceessss SSppeecciiffiiccaattiioonn:: ttaakkeess iinn iinnffoo aabboouutt ccuussttoommeerr aanndd vviiddeeooss aanndd sseenndd tthhee
iinnffoo ttoo tthhee mmaannaaggeemmeenntt..
-
7/31/2019 Specimen Report
39/60
System Analysis and Design Group Project
39
EEnnttiittiieess
NNaammee :: CCuussttoommeerr
DDeessccrriippttiioonn :: ppeeooppllee wwaannttiinngg ttoo rreenntt vviiddeeoo
IInnppuutt DDaattaa FFllooww:: rreecceeiippttss
mmoonntthhllyy ccoouuppoonn lleetttteerr
yyeeaarrllyy ccoouuppoonn lleetttteerr
OOuuttppuutt DDaattaa FFllooww:: ccuussttoommeerr ddeettaaiillss
ccuussttoommeerr//vviiddeeoo IIDD
ppaayymmeenntt//dduueess
NNaammee :: aaccccoouunnttss ddeepptt
DDeessccrriippttiioonn :: mmaannaaggeess aallll tthhee ffiinnaannccee oofftthhee oorrggaanniizzaattiioonn aanndd tthhee ssyysstteemm
IInnppuutt DDaattaa FFllooww:: CCaasshh
OOuuttppuutt DDaattaa FFllooww:: ------
-
7/31/2019 Specimen Report
40/60
System Analysis and Design Group Project
40
NNaammee :: mmaannaaggeemmeenntt
DDeessccrriippttiioonn :: mmaannaaggeess tthhee oorrggaanniizzaattiioonn aanndd tthhee ssyysstteemm
IInnppuutt DDaattaa FFllooww:: mmaannaaggeemmeenntt rreeppoorrtt
OOuuttppuutt DDaattaa FFllooww:: ------
-
7/31/2019 Specimen Report
41/60
System Analysis and Design Group Project
41
Screen Shots
Our logo
This logo was designed with the help of adobe photo shop to provide a good
look for the system
-
7/31/2019 Specimen Report
42/60
System Analysis and Design Group Project
42
Main Screen:
-
7/31/2019 Specimen Report
43/60
System Analysis and Design Group Project
43
Video RENTAL FORM:
This form shows the video id and the customer id that what particular movie has been
issued by a particular customer
-
7/31/2019 Specimen Report
44/60
System Analysis and Design Group Project
44
Video RETURN FORM:
This form tells that whether the VCD that was issued by the customer has been returned
on the due date or not if not how much fine he has to pay for getting delayed.
-
7/31/2019 Specimen Report
45/60
System Analysis and Design Group Project
45
VCD/DVD DISCRIPTION FORM:
This tell the customer that the movie they are looking for in what category is it available
for (e.g in DVD or VCD)
-
7/31/2019 Specimen Report
46/60
System Analysis and Design Group Project
46
-
7/31/2019 Specimen Report
47/60
System Analysis and Design Group Project
47
NEW CUSTOMER ID FORM:
This is a plain form for a new customer to get enroll for the membership and start using
sun videos services.
-
7/31/2019 Specimen Report
48/60
System Analysis and Design Group Project
48
Table:
-
7/31/2019 Specimen Report
49/60
System Analysis and Design Group Project
49
This table shows the amount of customer that have been enrolled to use the services of
Sun Videos
-
7/31/2019 Specimen Report
50/60
System Analysis and Design Group Project
50
Bonus Table:
This table tells about how many customers have been enrolled in the bonus schemeintroduced by sun videos corporation.
-
7/31/2019 Specimen Report
51/60
System Analysis and Design Group Project
51
Rent a Video:
-
7/31/2019 Specimen Report
52/60
System Analysis and Design Group Project
52
This table shows that how man customer have taken the videos on rent.
-
7/31/2019 Specimen Report
53/60
System Analysis and Design Group Project
53
Payment Mode
This table shows that the fine that a particular customer has to pay when he extends his
return date and the video is over due
-
7/31/2019 Specimen Report
54/60
System Analysis and Design Group Project
54
Reports
Customer:
-
7/31/2019 Specimen Report
55/60
System Analysis and Design Group Project
55
Video Rental:
-
7/31/2019 Specimen Report
56/60
System Analysis and Design Group Project
56
Video Returned:
This shows how many movies have been returned by the customer plus it is
also showing the fine that if a customer gets late how much does he has to pay
-
7/31/2019 Specimen Report
57/60
System Analysis and Design Group Project
57
Gantt Chart
This chart is made before starting the actual work. This helps us to plan each and every
thing and go about it according to time and days
-
7/31/2019 Specimen Report
58/60
-
7/31/2019 Specimen Report
59/60
System Analysis and Design Group Project
59
REFERENCES
Reference By Book:
Kendall.J,(1999), System Analysis and Design, 4th edition, Prentice Hall
International,
Cashman.T, (2001), System Analysis and Design, Course Technology.
-
7/31/2019 Specimen Report
60/60
System Analysis and Design Group Project
APPENDIX
TASK SHEET
Members Work Division
1. Bilal Mubashir Context diagram, level 0, level 1, Gantt
chart. economic feasibility, designing the
system
2. Mohsin Wahid Context diagram, level 0, level 1,
Feasibility
3. Usman Saleem Introduction, technical feasibility,
operational feasibility, schedule feasibility.fact finding techniques, economic
feasibility, data dictionary.
4. Shoaib Mirza Technical feasibility, operational
feasibility, schedule feasibility.