    TABLE OF CONTENTS

    Chapter 1 Page#

    1.0 Introduction 6

    1.1 Scope 61.2 Objective 7

    1.3 Preliminary investigation 7

    1.4 Fact finding techniques 7

    1.4.1 Interviews 7

    1.4.2 Summary of Interviews 7

    1.4.3 Surveys 8

    1.4.4 Summary of Surveys 8

    1.5 Problems of the current system 8

    1.6 Proposed solutions to the problems 8

    1.6 Benefits of the proposed system 9

    1.7 Conclusion 10

  • 7/31/2019 Specimen Report

    2/60

    System Analysis and Design Group Project

    2

    Chapter 2 Page#

    2.0 Feasibility 10

    2.1 Technical Feasibility 11

    2.1.1 Hardware 11

    2.1.2 Software 11

    2.1.3 Machines 11

    2.2 Operational Feasibility 11

    2.2.1 PIECES 11

    2.3 Schedule feasibility 12

    2.3.1 Task Description 13

    2.4 Economic Feasibility 14

    2.4.1 Cost-Benefits Analysis 15

    2.4.2 Pay Back Analysis 15

    2.4.3 Pay Back Analysis Graph 16

    2.4.4 Explanation of Pay Back Analysis 16

    2.4.5 Return on Investment Analysis 17

    2.4.6 Explanation of Return on Investment Analysis 17

    2.5 Conclusion 17

  • 7/31/2019 Specimen Report

    3/60

    System Analysis and Design Group Project

    3

    Chapter 3 Page#

    3.0 Data Flow Diagrams 18

    3.1 Context Diagram 18

    3.1.1 Explanation of Context Diagram 19

    3.2 Level 0 Diagram 21

    3.2.1 Explanation of Level 0 20

    3.3 Level 1 Diagram 22

    3.3.1 Explanation of Level 1 22

    3.4 Data Dictionary 23

    3.4.1 Data Flows 24

    3.4.3 Data Store 33

    3.4.4 Processes 35

    3.4.5 Entities 39

    Chapter 4 Page#

    4.0 Sun Video Corporations Logo 41

    4.1 Main Menu 42

    4.2 Customer 43

    4.3 Video Return 44

    4.4 New Customer Registration 45

    4.5 Customer Payment Details 45

    4.6 Database Tables 46

    4.6.1 Rent a Video Table 47

    4.6.2 Payment Details Table 494.6.3 Customer Table 51

    4.6.4 Video Returned Table 53

  • 7/31/2019 Specimen Report

    4/60

    System Analysis and Design Group Project

    4

    Chapter 5 Page#

    5.0 Gantt Chart 57

    5.1 Conclusion 58

    5.2 Reference 59

    5.3 Appendix 60

  • 7/31/2019 Specimen Report

    5/60

    System Analysis and Design Group Project

    5

    ACKNOWLEDGEMENT

    In the beginning we would like to thank our GOD, the most merciful and beneficent, for

    giving us the strength to complete this project with full determination.

    My special thanks to my course instructor, Mrs. Ambreen Ahmed, without her help and

    guidance we would not have been able to complete the report up to the mark and as well

    if it was not for her support in the field of Microsoft acsses i dont think we would be

    able to present the screen shots in a appropriate way.

  • 7/31/2019 Specimen Report

    6/60

    System Analysis and Design Group Project

    6

    INTRODUCTION

    This case study is about a video shop whose name us Sun Video Corporation. It has

    expertise in video rental business. Their plan is to have a series of stores scatteredstrategically around a metropolitan area. As being expertise in the video rental business

    they offer great deal for their customer and provide a competitive edge for their

    competitors. In this case we are required to do the work of the system analyst and go

    through each process which the system analyst performs.

    SCOPE

    As all of you know that as the world is advancing the need for new system have increased

    in every organization old systems are being replaced by new system, the reason behind

    this is that the organization demands excellent quality work more profit to be earned in

    short term and to gain more market share as quick as they can and to kick their

    competitors out of the market. New system is:

    User Friendly

    More Efficient

    They provide you with the latest security (I.E Fire Wall)

    U can use internet proving you with the better speed and quality so you could

    send and receive important e-mails

    As mentioned above that what the new system does, our prime target is to create a

    new and reliable system for Sun Video Corporation as it is offering many facilities to

    its customers and it is proving a competitive edge.

  • 7/31/2019 Specimen Report

    7/60

    System Analysis and Design Group Project

    7

    OBJECTIVE

    My objective is to make useful and user friendly system, so that non technical person can

    also under stand it. It is easy for the company to use the system, providing the system thatwould be designed for the company will consists of high security software (zone alarm

    version 9) so that no hacker can break inside the system and stole data and installing

    latest version of antivirus (I.E McAfee version 8.0) so the system is virus free and the

    data is secured

    PRELIMINARY INVESTIGATION

    After receiving the request from Sun Video Corporation regarding their system our team

    started its work with the very basic step that was searching for the problem by the method

    of fact and finding techniques and gather the information regarding the problem that

    was faced by the Sun Video Corporation.

    FACT FINDING TECHNIQUES

    This stage involves Interviews, conclusion, Survey, conclusion problem of the current

    system, proposed solution to the problem of the current solution conclusion

    Interviews

    This was the basic step taken by our team this main reason for conducting interview was

    that we would know that what are the problem that the company is currently facing and

    how is it affecting their business? Although taking interview is not an easy task but we

    manage to do it some how.

    Conclusion

    As a part of our first step we conducted this session and went to various people like the

    managing director the company, the sales manager, the cashier and asked them about the

    problem that they were facing, so that the information that they provide us would be later

    used on.

  • 7/31/2019 Specimen Report

    8/60

    System Analysis and Design Group Project

    8

    Surveys

    The second step that our group took was going on to surveys of different famous and

    large video stores in order to see what is the main reason behind their success in the

    market and what type of system are they currently using ad what are the benefits that they

    are getting out of it?

    Conclusion of Survey

    Conducting survey was successes as it gave answer to most of are questions. Are prime

    target was achieve we gathered all the relevant information and the irrelevant information

    was discarded.

    Problems with the current system

    1. The problem that was detected and was commonly seen in the answer of

    interviews was that all the work was done manually,

    2. There were a lot of records being generated on papers, which was very

    insecure if any thing happened to the store all the records would be destroyed

    and that would provide the company in a great loss,

    3. No proper security arrangements every one was accessible to the personal

    records of every individual customer.

    4. No privacy.

    SOLUTION to the problems

    After conducting the interviews and surveys it was observed that the company needed a

    latest system, in order to improve its quality so there fore we came up with the new

    system know as Video Rental System which was to use further to solve all the problems

    of the users and the corporation.

  • 7/31/2019 Specimen Report

    9/60

    System Analysis and Design Group Project

    9

    Advantages of the system to be introduced

    By introducing this system the company would be in safe hands due to the latest software

    installed in the system which would prevent it from data hacking.

    1. All the personal records would have right of privacy, as passwords can be easily

    generated with the help of password manager guide which is an 8 user guide, user

    friendly software which tells the user how to create a password and to use it.

    2. It more reliable, Fast and user friendly.

    3. It can generate automatic backup of each customer records. Incase the original

    one is deleted the system can provide the user with the back up.

    4. It would be sending automatic notifications to the user who have rented videos for

    $50.

    5. It will contain software which will the user on which shelf on what location is the

    particular video which the customer s looking for this will provide them with time

    flexibility and the customer would also be satisfied with this service.

    6. Introducing this software would facilitate new customer enrolling and renting

    movies from Sunny Videos that will make them enjoy high profit.

  • 7/31/2019 Specimen Report

    10/60

    System Analysis and Design Group Project

    10

    CONCULSION

    After performing the necessary steps it was founded that sunny videos manual way of

    working was more time consuming and it was not efficient to work with this system

    as no privacy right were available. Being the system analyst it was decided that it is

    necessary to introduce a new system for Sunny Video which is know as Sunny rental

    Video

    FEASIBILITY

    Feasibility report means to identify the problem and summarizing the complete

    objectives. It also creates broad data for the management team that would decide by

    looking at the objects whether to move on the new phase or not. There are 4 types of

    feasibility report which are mentioned below:

    1. Technical

    2. Operational

    3. Economical

    4. Schedule

  • 7/31/2019 Specimen Report

    11/60

    System Analysis and Design Group Project

    11

    Technological or Technical feasibility

    Under this process the (IT) company determines weather the company has technological

    resources to compose or purchase the system. Thus we figured the technical feasibility

    report; we came to know the system which is proposed to the Sun Cooperation can be

    operated easily. The system replace the manually work and transform all the manually

    data in to computerize form .which would augment productivity. Training sessions are

    required for the employees to educate them to excel to the newly proposed system and to

    further understand and use the built in software that are inside the system to prevent their

    company from suffering great losses.

    Operational feasibility

    Operational feasibility helps to crack business problems and provide opportunities to

    business .Our system would help users to use the system effortlessly, thus eliminating the

    paper work. Through data entry the system would cradle all the records of the customers

    and hence the transactions made by sun video can be seen through any interface of sun

    video. Through this all the customers record would be maintain properly without fuss. It

    would show all the records of payment received, due dates, and pending payments. This

    system would be user- friendly which would enable employees to learn and operate the

    system fester achieving productive results.

    Pieces framework

    Pieces stands for Performance, Information, Economy, Control, Efficiency, Services

    Pieces has merely 6 points.

    PerformanceThe currant system is not that fast and efficient which waste sundry time in paper work

    even after that the transactions of the customers are not recorded properly thus arising

    conflicts between management and employees and customers .Thus performance is

    effected, through new system the whole thing would be computerized and the task would

    be done rapidly hence augmenting performance levels.

  • 7/31/2019 Specimen Report

    12/60

    System Analysis and Design Group Project

    12

    Information

    The system will have its own data base through it the company can look and see all the

    transactions of the customers thus having information about all it customers .

    Economy

    The system would be computerized, user friendly thus it would enhance productivity,

    thus making the project economically strong. Perishing manually work thus codifying

    and organizing the data of the customers properly. It would reduce the more workers,

    thus cutting down the expanses and saving more money.

    Control

    Top management would have charge to control the system, thus it would decrease

    pilfering , providing security . Thus every employee would have limited excess.

    Efficiency

    The system would be computerizes all over thus it would coup with all sinecures like data

    entry, customer information, billing information resulting efficiency among employees

    eventually satisfying customers .

    Services

    Our company would provide augment product or system thus in future if the sun

    cooperation needs to have new tools we would provide them. Thus upgrading the system.

    Schedule Feasibility.

    Is that feasibility under which our company will meet its deadlines, and task to gratify

    them? Under it we have set targets to finish what activity on which time.

  • 7/31/2019 Specimen Report

    13/60

    System Analysis and Design Group Project

    13

    Task completing dates

    Feasibility report would be done in 3 days including technical, economical,

    operational, schedule.

    Pieces framework would be done in 4 days which would include performance,

    information, economy, control, efficiency and services.

    Investigation of (PI) will be done in 2days

    Requirements of users will be done in 2.5 days

    Analysis of system needs would be done in 4days

    Development and documenting the software would take 8days

    Cost benefit analysis would be done in 2days

    Payback analysis would be done in 1 day

    All the diagrams e.g. pert chart, data flow, level zero diagrams would be done in

    5days

    Level 1 diagram would be done in 3days

    Data store would be made in 1 day

    All Entities software would be done in 4 days

    Making of screenshots in 2 days

  • 7/31/2019 Specimen Report

    14/60

    System Analysis and Design Group Project

    14

    Economical Feasibility

    Under this feasibility we analysis weather benefits in making the new system are

    more then the development cost. Is it profitable to take the task and make it? Will it

    going to provide any benefits to the organization.

    COST-BENEFIT ANALYSIS

    Economic feasibility is performed by doing the cost-benefit analysis, which is the

    process of identifying the financial benefits and costs associated with the

    development of the project.

    The evaluation of our project is being done on the following strategies

  • 7/31/2019 Specimen Report

    15/60

    System Analysis and Design Group Project

    15

    PAYBACK ANALYSIS

    It is the process in which the organization identifies the time period in which the

    system would pay back for itself.

    The costs in the development of this project and the profits attained are shown below:

    Year Cost

    Cumulative

    cost Benefits

    Cumulative

    benefits

    0 50,000 50,000 2,500 2,500

    1 20,000 70,000 10,000 12,500

    2 18,000 98,000 20,000 32,500

    3 14,000 112,000 25,000 57,500

    4 17,000 129,000 35,000 92,500

    5 19,000 148,000 50,000 142,500

    6 21,000 169,000 52,000 194,500

    7 23,500 192,500 55,000 249,500

    8 25,000 217,500 60,000 309,500

    9 25,000 242,500 62,000 371,500

    10 27,000 269,500 65,000 436,500

  • 7/31/2019 Specimen Report

    16/60

    System Analysis and Design Group Project

    16

    0

    50000

    100000

    150000

    200000

    250000

    300000

    350000

    400000

    450000

    1 2 3 4 5 6 7 8 9 10 11

    Year

    Cost

    Cumulative cost

    Benefits

    Cumulative benefits

    PAYBACK ANALYSIS GRAPH

    EXPLAINATION OF PAYBACK ANALYSIS

    This graph was made on Microsoft Excel which helped in analyzing By the looking at the

    above payback analysis graph it could be easily concluded that the system would payback

    for itself in the 6th year after its development.

  • 7/31/2019 Specimen Report

    17/60

    System Analysis and Design Group Project

    17

    RETURN ON INVESTMENT(ROI) ANALYSIS

    ROI= (Total benefits Total costs) / Total costs

    ROI= (436,500 - 269,500) / 269,500

    ROI= 167,000 / 269,500

    ROI= 0.61

    EXPLAINATION OF ROI

    According to the workings of the ROI the organization is getting 61% return on itsinvestment.

    CONCLUSION

    After performing different steps of feasibility it was concluded that our software is

    feasible and easy to use for the company. Now we decided to move on to the design

    phase.

  • 7/31/2019 Specimen Report

    18/60

    System Analysis and Design Group Project

    18

    DATA FLOW DIAGRAMS

    Data flow is known as a geographical figure of the data. DFD denotes the process which

    takes place in a system .it even shows how data evolve around through an information

    system.

    CONTEXT DIAGRAM

  • 7/31/2019 Specimen Report

    19/60

    System Analysis and Design Group Project

    19

    EXPLANATION OF CONTEXT DIAGRAM

    The diagram says that the customers would interact with the system and it would show

    his/her id, it would include whose payments are outstanding, whose payment are done,

    whose videos are due. The new customer has to fill the form to avail membership for the

    sun video. System would generate reports and management would be accountable to see

    the report of the whole report... The accounts department would send cash which would

    received by customers.

  • 7/31/2019 Specimen Report

    20/60

    System Analysis and Design Group Project

    20

    EXPLANATION OF LEVEL 0 DATA FLOW DIAGRAM

    This diagram was made by using viso .In this case the when the customer will give there

    id, the system would show customer payments, dues, etc. Accounts deportment sends

    cash. Customer record shows rental information to compose a report. Which would give

    to the management of the sun video. This system have information when the video is

    rented then its receipt is made and passed to the customers. Payment which are which are

    received from the accounts department is updated in customers records. If the customers

    comes to the bonus level those customers details are forwarded to the accounts

    department which generates motley or yearly schemes or bonus letters for those desire

    customers.

  • 7/31/2019 Specimen Report

    21/60

    System Analysis and Design Group Project

    21

    LEVEL 0 DATA FLOW DIAGRAM

  • 7/31/2019 Specimen Report

    22/60

    System Analysis and Design Group Project

    22

    LEVEL 1 DA TA FLOW DI AGRAM

    EXPLANATION OF LEVEL 1 DATA FLOW DIAGRAM

    In level 1 Data Flow Diagram, Customer Rental Record which is a data store sends

    customers yearly details to the Create Yearly Bonus Letter. It advances to Free CouponsProcess which generates free coupons for the customer and both the items bonus letter

    and free coupon goes to Create Customer Certificate. These three items that are coupons,

    letter and certificate are sent directly to the customer.

  • 7/31/2019 Specimen Report

    23/60

    System Analysis and Design Group Project

    23

    DATA DICTONARY

    Date dictionary is just like a dictionary which contains meanings of words,

    Data dictionary is made by the analysis to keep track and record of theinformation and thus it could be use further in future if required changes

    in the system. Data dictionary contains the meanings of words which are used

    in the system and data flow diagrams. It helps to

    Deplete redundancy

    Compose data flow in a constructive manner

    Provide aid on data stored files and save it

    Create deductive data flow processes

    the data dictionary for this project is given below

  • 7/31/2019 Specimen Report

    24/60

    System Analysis and Design Group Project

    24

    DDaattaa FFlloowwss

    NNaammee :: ccuussttoommeerr ddeettaaiillss

    DDeessccrriippttiioonn :: ddeettaaiillss ooffnneeww ccuussttoommeerrss

    SSoouurrccee :: ccuussttoommeerr

    DDeessttiinnaattiioonn :: aadddd ccuussttoommeerr

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ aaddddrreessss ++ tteelleepphhoonnee..

    NNaammee :: ccuussttoommeerr ddeettaaiillss

    DDeessccrriippttiioonn :: ddeettaaiillss ooffnneeww ccuussttoommeerrss

    SSoouurrccee :: aadddd ccuussttoommeerr

    DDeessttiinnaattiioonn :: ccuussttoommeerr rreennttaall rreeccoorrddss

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ ccuussttoommeerr iidd ++ aaddddrreessss ++

    tteelleepphhoonnee nnuummbbeerr..

  • 7/31/2019 Specimen Report

    25/60

    System Analysis and Design Group Project

    25

    NNaammee :: ccuussttoommeerr iinnffoo

    DDeessccrriippttiioonn :: uuppddaattee ccuussttoommeerr rreennttaall rreeccoorrddss

    SSoouurrccee :: vviiddeeoo rreettuurrnn

    DDeessttiinnaattiioonn :: ccuussttoommeerr rreennttaall rreeccoorrddss

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ ccuussttoommeerr iidd ++ aaddddrreessss ++

    tteelleepphhoonnee nnuummbbeerr ++ rreettuurrnneedd vviiddeeooss

  • 7/31/2019 Specimen Report

    26/60

    System Analysis and Design Group Project

    26

    NNaammee :: ccuussttoommeerr//VViiddeeoo IIDD

    DDeessccrriippttiioonn :: iiddeennttiiffiiccaattiioonn ooffccuussttoommeerr aanndd vviiddeeoo

    SSoouurrccee :: ccuussttoommeerr

    DDeessttiinnaattiioonn :: vviiddeeoo rreettuurrnn

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ aaddddrreessss ++ tteelleepphhoonnee ++

    iiddeennttiiffiiccaattiioonn ccooddee..

    NNaammee :: vviiddeeoo iinnffoo

    DDeessccrriippttiioonn :: vviiddeeoo rreennttaall iinnffoorrmmaattiioonn

    SSoouurrccee :: vviiddeeoo rreettuurrnn

    DDeessttiinnaattiioonn :: vviiddeeoo rreennttaall rreeccoorrdd

    DDaattaa SSttrruuccttuurree:: aavvaaiillaabbllee vviiddeeooss lliisstt ++ vviiddeeoo rreettuurrnneedd

  • 7/31/2019 Specimen Report

    27/60

    System Analysis and Design Group Project

    27

    NNaammee :: ppaayymmeenntt//dduueess

    DDeessccrriippttiioonn :: ddeettaaiillss ooffppaayymmeennttss

    SSoouurrccee :: ccuussttoommeerr

    DDeessttiinnaattiioonn :: ppaayymmeenntt rreecceeiivveedd

    DDaattaa SSttrruuccttuurree:: aammoouunntt ooffppaayymmeenntt ++ mmooddee ooffppaayymmeenntt

    ++ccuussttoommeerr IIDD..

    NNaammee :: rreecceeiipptt

    DDeessccrriippttiioonn :: rreecceeiipptt oofftthhee ppaayymmeenntt mmaaddee

    SSoouurrccee :: rreecceeiipptt ggeenneerraattiioonn

    DDeessttiinnaattiioonn :: ccuussttoommeerr

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr IIDD ++ aammoouunntt ppaaiidd

  • 7/31/2019 Specimen Report

    28/60

    System Analysis and Design Group Project

    28

    NNaammee :: ccuussttoommeerr iinnffoo

    DDeessccrriippttiioonn :: uuppddaatteess tthhee rreennttaall rreeccoorrddss

    SSoouurrccee :: ccuussttoommeerr rreennttaall rreeccoorrdd

    DDeessttiinnaattiioonn :: rreecceeiipptt ggeenneerraattiioonn

    DDaattaa SSttrruuccttuurree:: aammoouunntt oowweedd ++ ccuussttoommeerr IIDD

    NNaammee :: ppaayymmeenntt rreecceeiivveedd uuppddaattee

    DDeessccrriippttiioonn :: rreecceeiipptt oofftthhee ppaayymmeenntt mmaaddee

    SSoouurrccee :: ppaayymmeenntt rreecceeiivveedd

    DDeessttiinnaattiioonn :: ccuussttoommeerr rreennttaall rreeccoorrdd

    DDaattaa SSttrruuccttuurree:: aammoouunntt ppaaiidd ++ bbaallaanncceess iiffaannyy lleefftt ++ ccuussttoommeerr IIDD..

  • 7/31/2019 Specimen Report

    29/60

  • 7/31/2019 Specimen Report

    30/60

    System Analysis and Design Group Project

    30

    NNaammee :: ccuussttoommeerr rreennttaall iinnffoo

    DDeessccrriippttiioonn :: ddeettaaiillss aabboouutt ccuussttoommeerrss

    SSoouurrccee :: ccuussttoommeerr rreennttaall rreeccoorrdd

    DDeessttiinnaattiioonn :: ccrreeaattee mmoonntthhllyy lleetttteerr ddiissccoouunntt ccoouuppoonn

    DDaattaa SSttrruuccttuurree:: IIDD ++ ccooddee++ nnaammee ++ rreenntt ppaaiidd ++ ttyyppee ooffvviiddeeoo rreenntteedd..

    NNaammee :: rreennttaall iinnffoo

    DDeessccrriippttiioonn :: ddeettaaiillss aabboouutt tthhee mmoovviieess rreenntteedd

    SSoouurrccee :: rreennttaall rreeccoorrdd

    DDeessttiinnaattiioonn :: pprroodduuccee ccuussttoommeerr rreennttaall rreeppoorrtt

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ IIDD ++ rreenntt ppaaiidd..

  • 7/31/2019 Specimen Report

    31/60

    System Analysis and Design Group Project

    31

    NNaammee :: rreeppoorrtt

    DDeessccrriippttiioonn :: ddeettaaiillss aabboouutt tthhee ccuussttoommeerrss aanndd tthhee vviiddeeooss

    SSoouurrccee :: pprroodduuccee ccuussttoommeerr rreennttaall rreeppoorrtt

    DDeessttiinnaattiioonn :: mmaannaaggeemmeenntt

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ mmoovviieess rreenntteedd

    NNaammee :: mmoonntthhllyy ccoouuppoonn lleetttteerr

    DDeessccrriippttiioonn :: cceerrttiiffiiccaatteess pprroovviiddeedd ttoo ccuussttoommeerrss

    SSoouurrccee :: ccrreeaattee mmoonntthhllyy lleetttteerr ddiissccoouunntt ccoouuppoonn

    DDeessttiinnaattiioonn :: ccuussttoommeerr

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ CCuussttoommeerr IIDD

  • 7/31/2019 Specimen Report

    32/60

    System Analysis and Design Group Project

    32

    NNaammee :: yyeeaarrllyy ccoouuppoonn lleetttteerr

    DDeessccrriippttiioonn :: cceerrttiiffiiccaattee iissssuueedd yyeeaarrllyy

    SSoouurrccee :: ccrreeaattee yyeeaarrllyy ffrreeee ccoouuppoonn

    DDeessttiinnaattiioonn :: ccuussttoommeerr

    DDaattaa SSttrruuccttuurree:: ccuussttoommeerr nnaammee ++ IIDD

  • 7/31/2019 Specimen Report

    33/60

    System Analysis and Design Group Project

    33

    DDaattaa SSttoorree

    NNaammee :: ccuussttoommeerr rreennttaall rreeccoorrdd

    DDeessccrriippttiioonn :: aallll tthhee ddeettaaiillss ooffaa ccuussttoommeerr

    IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss

    PPaayymmeenntt rreecceeiivveedd uuppddaattee

    CCuussttoommeerr iinnffoo

    OOuuttppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo

    RReennttaall iinnffoo

    DDaattaa SSttrruuccttuurree :: ccuussttoommeerrss nnaammee ++ ccuussttoommeerr iiddss ++ aaddddrreesssseess ++

    tteelleepphhoonnee nnuummbbeerrss ++ mmoovviieess rreenntteedd ++ aammoouunntt

    bbaallaanncceess ++ aammoouunntt ppaaiidd

  • 7/31/2019 Specimen Report

    34/60

    System Analysis and Design Group Project

    34

    NNaammee :: vviiddeeoo rreennttaall rreeccoorrdd

    DDeessccrriippttiioonn :: aallll tthhee ddeettaaiillss ooffvviiddeeooss

    IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss

    PPaayymmeenntt rreecceeiivveedd uuppddaattee

    CCuussttoommeerr iinnffoo

    OOuuttppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo

    RReennttaall iinnffoo

    DDaattaa SSttrruuccttuurree :: ccuussttoommeerrss nnaammee ++ ccuussttoommeerr iiddss ++ aaddddrreesssseess ++

    tteelleepphhoonnee nnuummbbeerrss ++ mmoovviieess rreenntteedd ++ aammoouunntt

    bbaallaanncceess ++ aammoouunntt ppaaiidd

  • 7/31/2019 Specimen Report

    35/60

    System Analysis and Design Group Project

    35

    PPrroocceesssseess

    NNaammee :: aadddd ccuussttoommeerr

    DDeessccrriippttiioonn :: rreeggiisstteerriinngg nneeww ccuussttoommeerrss

    IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss

    OOuuttppuutt DDaattaa FFllooww :: ccuussttoommeerr ddeettaaiillss

    PPrroocceessss SSppeecciiffiiccaattiioonn:: rreecceeiivveess ccuussttoommeerr ddeettaaiillss

    vveerriiffiieess nneeww ccuussttoommeerrss

    sseennddss ccuussttoommeerr rreennttaall ccaarrdd ttoo ccuussttoommeerr aanndd nneeww

    ccuussttoommeerr iinnffoo ttoo ccuussttoommeerr rreeccoorrdd

  • 7/31/2019 Specimen Report

    36/60

    System Analysis and Design Group Project

    36

    NNaammee :: vviiddeeoo rreennttaall

    DDeessccrriippttiioonn :: mmaannaaggeess tthhee rreennttiinngg pprroocceessss

    IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr//vviiddeeoo IIDD

    OOuuttppuutt DDaattaa FFllooww :: vviiddeeoo iinnffoo

    ccuussttoommeerr iinnffoo

    PPrroocceessss SSppeecciiffiiccaattiioonn:: cchheecckkss rreeqquueesstt aanndd iissssuuee vviiddeeooss

    sseennddss oouutt rreennttaall iinnffoo

    NNaammee :: ppaayymmeenntt rreecceeiivveedd

    DDeessccrriippttiioonn :: rreeccoorrddiinngg ccaasshh ttrraannssaaccttiioonnss

    IInnppuutt DDaattaa FFllooww :: ppaayymmeenntt//dduueess

    ccaasshh

    OOuuttppuutt DDaattaa FFllooww :: ppaayymmeenntt rreecceeiivveedd uuppddaattee

    PPrroocceessss SSppeecciiffiiccaattiioonn:: ttaakkeess iinn tthhee ppaayymmeennttss..

  • 7/31/2019 Specimen Report

    37/60

    System Analysis and Design Group Project

    37

    NNaammee :: rreecceeiipptt ggeenneerraattiioonn

    DDeessccrriippttiioonn :: mmaakkeess rreecceeiippttss

    IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr iinnffoo

    OOuuttppuutt DDaattaa FFllooww :: rreecceeiipptt

    PPrroocceessss SSppeecciiffiiccaattiioonn:: ttaakkeess iinn ppaayymmeenntt iinnffoo aanndd sseennddss tthhee rreecceeiipptt ggeenneerraatteedd ttoo

    tthhee ccuussttoommeerr

    NNaammee :: ccrreeaattee mmoonntthhllyy lleetttteerr ddiissccoouunntt ccoouuppoonn

    DDeessccrriippttiioonn :: pprroodduucceess mmoonntthhllyy rreeppoorrttss

    IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo

    OOuuttppuutt DDaattaa FFllooww :: mmoonntthhllyy ccoouuppoonn lleetttteerr

    PPrroocceessss SSppeecciiffiiccaattiioonn:: cchheecckkss iinn ccuussttoommeerr ffiinnaall ddeettaaiillss aanndd sseennddss mmoonntthhllyy

    ccoouuppoonnss ttoo vvaarriioouuss ccuussttoommeerrss

  • 7/31/2019 Specimen Report

    38/60

    System Analysis and Design Group Project

    38

    NNaammee :: ccrreeaattee yyeeaarrllyy ffrreeee mmoovviiee ccoouuppoonn

    DDeessccrriippttiioonn :: pprroodduucceess yyeeaarrllyy rreeppoorrttss

    IInnppuutt DDaattaa FFllooww :: ccuussttoommeerr rreennttaall iinnffoo

    OOuuttppuutt DDaattaa FFllooww :: yyeeaarrllyy ccoouuppoonn lleetttteerr

    PPrroocceessss SSppeecciiffiiccaattiioonn:: cchheecckkss iinn ccuussttoommeerr ffiinnaall ddeettaaiillss aanndd sseennddss yyeeaarrllyy

    ccoouuppoonnss ttoo vvaarriioouuss ccuussttoommeerrss

    NNaammee :: pprroodduuccee rreeppoorrtt

    DDeessccrriippttiioonn :: mmaakkeess ffiinnaall rreeppoorrttss

    IInnppuutt DDaattaa FFllooww :: rreennttaall iinnffooVViiddeeoo rreennttaall iinnffoo

    OOuuttppuutt DDaattaa FFllooww :: rreeppoorrtt

    PPrroocceessss SSppeecciiffiiccaattiioonn:: ttaakkeess iinn iinnffoo aabboouutt ccuussttoommeerr aanndd vviiddeeooss aanndd sseenndd tthhee

    iinnffoo ttoo tthhee mmaannaaggeemmeenntt..

  • 7/31/2019 Specimen Report

    39/60

    System Analysis and Design Group Project

    39

    EEnnttiittiieess

    NNaammee :: CCuussttoommeerr

    DDeessccrriippttiioonn :: ppeeooppllee wwaannttiinngg ttoo rreenntt vviiddeeoo

    IInnppuutt DDaattaa FFllooww:: rreecceeiippttss

    mmoonntthhllyy ccoouuppoonn lleetttteerr

    yyeeaarrllyy ccoouuppoonn lleetttteerr

    OOuuttppuutt DDaattaa FFllooww:: ccuussttoommeerr ddeettaaiillss

    ccuussttoommeerr//vviiddeeoo IIDD

    ppaayymmeenntt//dduueess

    NNaammee :: aaccccoouunnttss ddeepptt

    DDeessccrriippttiioonn :: mmaannaaggeess aallll tthhee ffiinnaannccee oofftthhee oorrggaanniizzaattiioonn aanndd tthhee ssyysstteemm

    IInnppuutt DDaattaa FFllooww:: CCaasshh

    OOuuttppuutt DDaattaa FFllooww:: ------

  • 7/31/2019 Specimen Report

    40/60

    System Analysis and Design Group Project

    40

    NNaammee :: mmaannaaggeemmeenntt

    DDeessccrriippttiioonn :: mmaannaaggeess tthhee oorrggaanniizzaattiioonn aanndd tthhee ssyysstteemm

    IInnppuutt DDaattaa FFllooww:: mmaannaaggeemmeenntt rreeppoorrtt

    OOuuttppuutt DDaattaa FFllooww:: ------

  • 7/31/2019 Specimen Report

    41/60

    System Analysis and Design Group Project

    41

    Screen Shots

    Our logo

    This logo was designed with the help of adobe photo shop to provide a good

    look for the system

  • 7/31/2019 Specimen Report

    42/60

    System Analysis and Design Group Project

    42

    Main Screen:

  • 7/31/2019 Specimen Report

    43/60

    System Analysis and Design Group Project

    43

    Video RENTAL FORM:

    This form shows the video id and the customer id that what particular movie has been

    issued by a particular customer

  • 7/31/2019 Specimen Report

    44/60

    System Analysis and Design Group Project

    44

    Video RETURN FORM:

    This form tells that whether the VCD that was issued by the customer has been returned

    on the due date or not if not how much fine he has to pay for getting delayed.

  • 7/31/2019 Specimen Report

    45/60

    System Analysis and Design Group Project

    45

    VCD/DVD DISCRIPTION FORM:

    This tell the customer that the movie they are looking for in what category is it available

    for (e.g in DVD or VCD)

  • 7/31/2019 Specimen Report

    46/60

    System Analysis and Design Group Project

    46

  • 7/31/2019 Specimen Report

    47/60

    System Analysis and Design Group Project

    47

    NEW CUSTOMER ID FORM:

    This is a plain form for a new customer to get enroll for the membership and start using

    sun videos services.

  • 7/31/2019 Specimen Report

    48/60

    System Analysis and Design Group Project

    48

    Table:

  • 7/31/2019 Specimen Report

    49/60

    System Analysis and Design Group Project

    49

    This table shows the amount of customer that have been enrolled to use the services of

    Sun Videos

  • 7/31/2019 Specimen Report

    50/60

    System Analysis and Design Group Project

    50

    Bonus Table:

    This table tells about how many customers have been enrolled in the bonus schemeintroduced by sun videos corporation.

  • 7/31/2019 Specimen Report

    51/60

    System Analysis and Design Group Project

    51

    Rent a Video:

  • 7/31/2019 Specimen Report

    52/60

    System Analysis and Design Group Project

    52

    This table shows that how man customer have taken the videos on rent.

  • 7/31/2019 Specimen Report

    53/60

    System Analysis and Design Group Project

    53

    Payment Mode

    This table shows that the fine that a particular customer has to pay when he extends his

    return date and the video is over due

  • 7/31/2019 Specimen Report

    54/60

    System Analysis and Design Group Project

    54

    Reports

    Customer:

  • 7/31/2019 Specimen Report

    55/60

    System Analysis and Design Group Project

    55

    Video Rental:

  • 7/31/2019 Specimen Report

    56/60

    System Analysis and Design Group Project

    56

    Video Returned:

    This shows how many movies have been returned by the customer plus it is

    also showing the fine that if a customer gets late how much does he has to pay

  • 7/31/2019 Specimen Report

    57/60

    System Analysis and Design Group Project

    57

    Gantt Chart

    This chart is made before starting the actual work. This helps us to plan each and every

    thing and go about it according to time and days

  • 7/31/2019 Specimen Report

    58/60

  • 7/31/2019 Specimen Report

    59/60

    System Analysis and Design Group Project

    59

    REFERENCES

    Reference By Book:

    Kendall.J,(1999), System Analysis and Design, 4th edition, Prentice Hall

    International,

    Cashman.T, (2001), System Analysis and Design, Course Technology.

  • 7/31/2019 Specimen Report

    60/60

    System Analysis and Design Group Project

    APPENDIX

    TASK SHEET

    Members Work Division

    1. Bilal Mubashir Context diagram, level 0, level 1, Gantt

    chart. economic feasibility, designing the

    system

    2. Mohsin Wahid Context diagram, level 0, level 1,

    Feasibility

    3. Usman Saleem Introduction, technical feasibility,

    operational feasibility, schedule feasibility.fact finding techniques, economic

    feasibility, data dictionary.

    4. Shoaib Mirza Technical feasibility, operational

    feasibility, schedule feasibility.