Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF)

First registration August 2010

Edexcel NVQ/competence-based qualifications

Page 2: Specification - NVQ Level 6 Diploma in Construction Site

Edexcel, a Pearson company, is the UK’s largest awarding organisation offering vocational and academic qualifications and testing, to employers, training providers, colleges, schools, and other places of learning in the UK, and in over 85 countries worldwide.

Our specialist suite of qualifications include NVQs, Apprenticeships, WorkSkills, Functional Skills, Foundation Learning, as well as our exclusive range of BTECs, from entry level right through to Higher National Diplomas.

This qualification is offered as part of a Joint Awarding Body Partnership with construction industry professional bodies; the Chartered Institute of Building (CIOB), and the Institution of Civil Engineers (ICE), for whom the NVQs are steps to professional recognition.

www.ciob.org.uk

www.ice.org.uk

References to third party material made in this specification are made in good faith. Edexcel does not endorse, approve or accept responsibility for the content of materials, which may be subject to change, or any opinions expressed therein. (Material may include textbooks, journals, magazines and other publications and websites.)

Authorised by Roger Beard Prepared by John Crew

Publication Code N025079

All the material in this publication is copyright © Edexcel Limited 2011

Page 3: Specification - NVQ Level 6 Diploma in Construction Site

Contents

Qualification title covered by this specification 1

Key features of the Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) 2

What is the purpose of this qualification? 2

Who is this qualification for? 2

What are the benefits of this qualification to the learner and employer? 2

What are the potential job roles for those working towards this qualification? 2

What progression opportunities are available to learners who achieve this qualification? 3

What is the qualification structure for the Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF)? 4

How is this qualification graded and assessed? 11 Assessment Strategy 11

Types of evidence 12

Additional requirements 13

Centre recognition and approval 14 Centre recognition 14

Approvals agreement 14

Quality assurance 14

What resources are required? 14

Unit format 15

Units 17 Unit 1: Developing and maintaining good occupational working

relationships in the workplace 19

Unit 2: Allocating work and checking people’s performance in the workplace 25

Unit 3: Establishing, implementing and maintaining systems for managing health, safety and welfare in the workplace 31

Unit 4: Evaluating and selecting work methods to meet project or operational requirements in the workplace 41

Unit 5: Monitoring construction-related project activities in the workplace 51

Unit 6: Controlling project progress against agreed quality standards in the workplace 59

Page 4: Specification - NVQ Level 6 Diploma in Construction Site

Unit 7: Controlling project progress against agreed programmes in the workplace 67

Unit 8: Managing personal development in a construction-related workplace 77

Unit 9: Identifying and enabling learning opportunities for given work teams in the workplace 85

Unit 10: Contributing to the identification of work teams in the workplace 91

Unit 11: Establishing, controlling and monitoring environmental factors and sustainability in the workplace 97

Unit 12: Planning the preparation of the site for the project or operation in the workplace 105

Unit 13: Ensuring that work activities and resources meet project work requirements in the workplace 117

Unit 14: Identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace 125

Unit 15: Organising, controlling and monitoring supplies of materials in the workplace 135

Unit 16: Establishing and monitoring communication systems and organisational procedures in the workplace 143

Unit 17: Establishing project dimensional control criteria in the workplace 153

Unit 18: Controlling project quantities and costs in the workplace 161

Unit 19: Evaluating feedback information and recommending improvements in the workplace 171

Unit 20: Planning highways maintenance or repair activities in the workplace 179

Unit 21: Providing and monitoring construction-related customer service in the workplace 187

Unit 22: Managing the handover of the construction project in the workplace 195

Unit 23: Planning and scheduling the maintenance or remedial activities of property, systems or services in the workplace 201

Unit 24: Planning historical conservation/restoration activities in the workplace 213

Unit 25: Planning demolition activities in the workplace 221

Further information 229

Useful publications 229 How to obtain National Occupational Standards 229

Professional development and training 230

Page 5: Specification - NVQ Level 6 Diploma in Construction Site

Annexe A: Progression pathways 231 The Edexcel qualification framework for the Construction and the Built Environment sector 231

Annexe B: Quality assurance 235 Key principles of quality assurance 235

Quality assurance processes 235

Annexe C: Centre certification and registration 237 What are the access arrangements and special considerations for the qualification in this specification? 237

Annexe D: Additional requirements for qualifications that use the title NVQ within the QCF 239

Annexe E: Assessment Strategy 247

Page 6: Specification - NVQ Level 6 Diploma in Construction Site
Page 7: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

1

Qual

ific

atio

n t

itle

cov

ered

by

this

spec

ific

atio

n

This

spec

ific

atio

n g

ives

you t

he

info

rmation y

ou n

eed t

o o

ffer

the

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in C

onst

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

:

Qu

alifi

cati

on

tit

le

Qu

alifi

cati

on

N

um

ber

(QN

) A

ccre

dit

ati

on

st

art

date

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

500/9

454/3

01/0

8/2

010

This

qual

ific

atio

n h

as

bee

n a

ccre

dited

within

the

Qual

ific

ations

and C

redit F

ram

ework

(Q

CF)

and is

elig

ible

for

public

fundin

g a

s det

erm

ined

by

the

Dep

artm

ent

for

Educa

tion (

DfE

) under

Sec

tions

96 a

nd 9

7 o

f th

e Le

arnin

g a

nd S

kills

Act

2000.

The

qual

ific

atio

n t

itle

lis

ted a

bove

fea

ture

s in

the

fundin

g lis

ts p

ublis

hed

annual

ly b

y th

e D

fE a

nd t

he

regula

rly

updat

ed w

ebsi

te.

It w

ill a

lso a

ppea

r on t

he

Learn

ing A

ims

Dat

abas

e (L

AD

), w

her

e re

leva

nt.

You s

hould

use

the

QCF

Qualif

icat

ion N

um

ber

(Q

N),

when

you w

ish t

o s

eek

public

fundin

g f

or

your

lear

ner

s. E

ach

unit w

ithin

a

qual

ific

ation w

ill a

lso h

ave

a u

niq

ue

QC

F re

fere

nce

num

ber

, w

hic

h is

liste

d in t

his

spec

ific

ation.

The

QCF

qual

ific

atio

n t

itle

and u

nit r

efer

ence

num

ber

s w

ill a

ppea

r on t

he

lear

ner

s’ f

inal

cer

tifica

tion d

ocu

men

t. L

earn

ers

nee

d t

o

be

made

aw

are

of th

is w

hen

they

are

rec

ruited

by

the

centr

e an

d r

egis

tere

d w

ith E

dex

cel.

Page 8: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

2

Key features of the Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF)

This qualification:

• is nationally recognised

• is based on the ConstructionSkills National Occupational Standards (NOS). The NOS, Assessment Strategy and qualification structure is owned by ConstructionSkills.

What is the purpose of this qualification?

This qualification is appropriate for employees in the Construction and the Built Environment sector working across a broad range of areas. It is designed to assess occupational competence in the workplace where learners are required to demonstrate skills and knowledge to a level required in the construction industry.

Who is this qualification for?

This qualification is for all learners aged 18 and above who are capable of reaching the required standards.

Edexcel’s policy is that the qualification should:

• be free from any barriers that restrict access and progression

• ensure equality of opportunity for all wishing to access the qualification.

What are the benefits of this qualification to the learner and employer?

This qualification allows learners to demonstrate competence against National Occupational Standards which are based on the needs of the Construction and the Built Environment industry as defined by ConstructionSkills, the Sector Skills Council. As such it contributes to the development of skilled labour in the sector.

What are the potential job roles for those working towards this qualification?

• Construction supervisor

• Construction manager

Page 9: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

3

What progression opportunities are available to learners who achieve this qualification?

This qualification allows learners to demonstrate competence in construction site management at a level required by the Construction and the Built Environment industry. Learners can progress across the level and size of the Construction and the Built Environment competence and knowledge qualifications and into other occupational areas such as team leading and management.

Further information is available in Annexe A.

Page 10: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

4

What is the qualification structure for the Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF)?

Individual units can be found in the Units section. The QCF level and credit value are given on the first page of each unit.

Edexcel Level 6 NVQ Diploma in Construction Site Management - Building and Civil Engineering (Construction) – Learners must complete all units in groups A and B1 to achieve a total of 189 credits.

Edexcel Level 6 NVQ Diploma in Construction Site Management - Highways and Maintenance Repair (Construction) – Learners must complete all units in groups A and C1 to achieve 155 credits and a minimum of 17 credits from group C2 to achieve a minimum total of 172 credits.

Edexcel Level 6 NVQ Diploma in Construction Site Management - Residential Development (Construction) – Learners must complete all units in groups A and D1 to achieve 193 credits and a minimum of 8 credits from group D2 to achieve a minimum total of 201 credits.

Edexcel Level 6 NVQ Diploma in Construction Site Management - Conservation (Construction) – Learners must complete all units in groups A and E1 to achieve 175 credits and a minimum of 14 credits from group E2 to achieve a minimum total of 189 credits.

Edexcel Level 6 NVQ Diploma in Construction Site Management -Demolition (Construction) – Learners must complete all units in groups A and F1 to achieve 148 credits and a minimum of 31 credits from group F2 to achieve a minimum total of 179 credits.

Learners may also select additional units from group Z although they are not required to achieve the qualification. Credit from these units cannot be added to a pathway unless the minimum number of credits for the pathway has been attained.

Page 11: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

5

A - Mandatory units

D/600/7079 – Developing and maintaining good occupational working relationships in the workplace

D/600/7552 – Allocating work and checking people’s performance in the workplace

J/600/7318 – Establishing, implementing and maintaining systems for managing health, safety and welfare in the workplace

M/600/7328 – Evaluating and selecting work methods to meet project or operational requirements in the workplace

J/600/7335 – Monitoring construction related project activities in the workplace

F/600/7351 – Controlling project progress against agreed quality standards in the workplace

D/600/7356 – Controlling project progress against agreed programmes in the workplace

M/600/7359 – Managing personal development in a construction-related workplace

B - Building and Civil Engineering pathway

Learners must complete all units in groups A and B1 to achieve a total of 189 credits.

B1 - Mandatory units

H/600/7553 – Identifying and enabling learning opportunities for given work teams in the workplace

K/600/7554 – Contributing to the identification of work teams in the workplace

R/600/7323 – Establishing, controlling and monitoring environmental factors and sustainability in the workplace

M/600/7331 – Planning the preparation of the site for the project or operation in the workplace

Y/600/7338 – Ensuring that work activities and resources meet project work requirements in the workplace

Y/600/7341 – Identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace

H/600/7343 – Organising, controlling and monitoring supplies of materials in the workplace

J/600/7349 – Establishing and monitoring communication systems and organisational procedures in the workplace

Page 12: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

6

R/600/7354 – Establishing project dimensional control criteria in the workplace

H/600/7357 – Controlling project quantities and costs in the workplace

K/600/7358 – Evaluating feedback information and recommending improvements in the workplace

C - Highways and Maintenance Repair pathway

Learners must complete all units in groups A and C1 to achieve 155 credits and then select further units from group C2 to achieve a minimum total of 172 credits.

C1 - Mandatory units

H/600/7553 – Identifying and enabling learning opportunities for given work teams in the workplace

K/600/7554 – Contributing to the identification of work teams in the workplace

M/600/7555 – Planning highways maintenance or repair activities in the workplace

F/600/7558 – Providing and monitoring construction-related customer service in the workplace

Y/600/7338 – Ensuring that work activities and resources meet project work requirements in the workplace

Y/600/7341 – Identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace

H/600/7343 – Organising, controlling and monitoring supplies of materials in the workplace

H/600/7357 – Controlling project quantities and costs in the workplace

C2 - Optional units

Credit Value required: minimum 17.

R/600/7323 – Establishing, controlling and monitoring environmental factors and sustainability in the workplace

M/600/7331 – Planning the preparation of the site for the project or operation in the workplace

J/600/7349 – Establishing and monitoring communication systems and organisational procedures in the workplace

R/600/7354 – Establishing project dimensional control criteria in the workplace

Page 13: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

7

K/600/7358 – Evaluating feedback information and recommending improvements in the workplace

K/600/7361 – Managing the handover of the construction project in the workplace

D - Residential Development pathway

Learners must complete all units in groups A and D1 to achieve 193 credits and then select further units from group D2 to achieve a minimum total of 201 credits.

D1 - Mandatory units

H/600/7553 – Identifying and enabling learning opportunities for given work teams in the workplace

F/600/7558 – Providing and monitoring construction-related customer service in the workplace

R/600/7323 – Establishing, controlling and monitoring environmental factors and sustainability in the workplace

M/600/7331 – Planning the preparation of the site for the project or operation in the workplace

Y/600/7338 – Ensuring that work activities and resources meet project work requirements in the workplace

H/600/7343 – Organising, controlling and monitoring supplies of materials in the workplace

J/600/7349 – Establishing and monitoring communication systems and organisational procedures in the workplace

R/600/7354 – Establishing project dimensional control criteria in the workplace

K/600/7358 – Evaluating feedback information and recommending improvements in the workplace

H/600/7360 – Planning and scheduling the maintenance or remedial activities of property, systems or services in the workplace

K/600/7361 – Managing the handover of the construction project in the workplace

Page 14: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

8

D2 - Optional units

Credit Value required: minimum 8.

K/600/7554 – Contributing to the identification of work teams in the workplace

Y/600/7341 – Identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace

H/600/7357 – Controlling project quantities and costs in the workplace

E - Conservation pathway

Learners must complete all units in groups A and E1 to achieve 175 credits and then select further units from group E2 to achieve a minimum total of 189 credits.

E1 - Mandatory units

H/600/7553 – Identifying and enabling learning opportunities for given work teams in the workplace

J/600/7559 – Planning historical conservation/restoration activities in the workplace

Y/600/7338 – Ensuring that work activities and resources meet project work requirements in the workplace

Y/600/7341 – Identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace

H/600/7343 – Organising, controlling and monitoring supplies of materials in the workplace

J/600/7349 – Establishing and monitoring communication systems and organisational procedures in the workplace

R/600/7354 – Establishing project dimensional control criteria in the workplace

H/600/7357 – Controlling project quantities and costs in the workplace

H/600/7360 – Planning and scheduling the maintenance or remedial activities of property, systems or services in the workplace

Page 15: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

9

E2 - Optional units

Credit Value required: minimum 14.

K/600/7554 – Contributing to the identification of work teams in the workplace

F/600/7558 – Providing and monitoring construction-related customer service in the workplace

R/600/7323 – Establishing, controlling and monitoring environmental factors and sustainability in the workplace

M/600/7331 – Planning the preparation of the site for the project or operation in the workplace

K/600/7358 – Evaluating feedback information and recommending improvements in the workplace

K/600/7361 – Managing the handover of the construction project in the workplace

F - Demolition pathway

Learners must complete all units in groups A and F1 to achieve 148 credits and then select further units from group F2 to achieve a minimum total of 179 credits.

F1 - Mandatory units

F/600/7561 – Planning demolition activities in the workplace

R/600/7323 – Establishing, controlling and monitoring environmental factors and sustainability in the workplace

M/600/7331 – Planning the preparation of the site for the project or operation in the workplace

Y/600/7338 – Ensuring that work activities and resources meet project work requirements in the workplace

Y/600/7341 – Identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace

K/600/7361 – Managing the handover of the construction project in the workplace

Page 16: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

10

F2 - Optional units

Credit Value required: minimum 31.

H/600/7553 – Identifying and enabling learning opportunities for given work teams in the workplace

K/600/7554 – Contributing to the identification of work teams in the workplace

F/600/7558 – Providing and monitoring construction-related customer service in the workplace

H/600/7343 – Organising, controlling and monitoring supplies of materials in the workplace

J/600/7349 – Establishing and monitoring communication systems and organisational procedures in the workplace

H/600/7357 – Controlling project quantities and costs in the workplace

Z - Additional units

Learners need not take the units in this section to gain this qualification.

M/600/7555 – Planning highways maintenance or repair activities in the workplace

F/600/7558 – Providing and monitoring construction-related customer service in the workplace

J/600/7559 – Planning historical conservation/restoration activities in the workplace

F/600/7561 – Planning demolition activities in the workplace

R/600/7354 – Establishing project dimensional control criteria in the workplace

K/600/7358 – Evaluating feedback information and recommending improvements in the workplace

H/600/7360 – Planning and scheduling the maintenance or remedial activities of property, systems or services in the workplace

K/600/7361 – Managing the handover of the construction project in the workplace

Page 17: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

11

How is this qualification graded and assessed?

The overall grade for the qualification is a ‘pass’. The learner must achieve all the required units within the specified qualification structure.

To pass a unit the learner must:

• achieve all the specified learning outcomes

• satisfy all the assessment criteria by providing sufficient and valid evidence for each criterion

• show that the evidence is their own.

The qualification is designed to be assessed:

• in the workplace or

• in conditions resembling the workplace, as specified in the Assessment Strategy for the sector, or

• as part of a training programme.

Assessment Strategy

The Assessment Strategy for this qualification has been included in Annexe E. It has been developed by ConstructionSkills in partnership with employers, training providers, awarding organisations and the regulatory authorities. The Assessment Strategy includes details on:

• criteria for defining realistic working environments

• roles and occupational competence of assessors, expert witnesses, internal verifiers and standards verifiers

• quality control of assessment

• evidence requirements.

Evidence of competence may come from:

• current practice where evidence is generated from a current job role

• a programme of development where evidence comes from assessment opportunities built into a learning/training programme whether at or away from the workplace

• the Recognition of Prior Learning (RPL) where a learner can demonstrate that they can meet the assessment criteria within a unit through knowledge, understanding or skills they already possess without undertaking a course of learning. They must submit sufficient, reliable and valid evidence for internal and standards verification purposes. RPL is acceptable for accrediting a unit, several units or a whole qualification

• a combination of these.

Page 18: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

12

It is important that the evidence is:

Valid relevant to the standards for which competence is claimed

Authentic produced by the learner

Current sufficiently recent to create confidence that the same skill, understanding or knowledge persist at the time of the claim

Reliable indicates that the learner can consistently perform at this level

Sufficient fully meets the requirements of the standards.

Types of evidence

To successfully achieve a unit the learner must gather evidence which shows that they have met the required standard in the assessment criteria. Evidence can take a variety of different forms including the following examples:

• direct observation of the learner’s performance by their assessor (O)

• outcomes from oral or written questioning (Q&A)

• products of the learner’s work (P)

• personal statements and/or reflective accounts (RA)

• outcomes from simulation, where permitted by the Assessment Strategy (S)

• professional discussion (PD)

• assignment, project/case studies (A)

• authentic statements/witness testimony (WT)

• expert witness testimony (EPW)

• evidence of Recognition of Prior Learning (RPL).

Learners can use one piece of evidence to prove their knowledge, skills and understanding across different assessment criteria and/or across different units. It is, therefore, not necessary for learners to have each assessment criterion assessed separately. Learners should be encouraged to reference the assessment criteria to which the evidence relates.

Evidence must be made available to the assessor, internal verifier and Edexcel standards verifier. A range of recording documents is available on the Edexcel website www.edexcel.com. Alternatively, centres may develop their own.

Page 19: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

13

Additional requirements

The Joint Awarding Body and the SSC Working Practices Group have identified additional requirements that are needed to assess and quality assure qualifications placed on the QCF that use NVQ within their title. These requirements are shown in Annexe D: Additional requirements for qualifications that use the title NVQ within the QCF.

Page 20: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

14

Centre recognition and approval

Centre recognition

Centres that have not previously offered Edexcel qualifications need to apply for and be granted centre recognition as part of the process for approval to offer individual qualifications. New centres must complete both a centre recognition approval application and a qualification approval application.

Existing centres will be given ‘automatic approval’ for a new qualification if they are already approved for a qualification that is being replaced by the new qualification and the conditions for automatic approval are met. Centres already holding Edexcel approval are able to gain qualification approval for a different level or different sector via Edexcel online.

Approvals agreement

All centres are required to enter into an approvals agreement which is a formal commitment by the head or principal of a centre to meet all the requirements of the specification and any linked codes or regulations. Edexcel will act to protect the integrity of the awarding of qualifications, if centres do not comply with the agreement. This could result in the suspension of certification or withdrawal of approval.

Quality assurance

Detailed information on Edexcel’s quality assurance processes is given in Annexe B.

What resources are required?

Each qualification is designed to support learners working in the Construction and the Built Environment sector. Physical resources need to support the delivery of the qualification and the assessment of the learning outcomes and must be of industry standard. Centres must meet any specific resource requirements outlined in Annexe E: Assessment Strategy. Staff assessing the learner must meet the requirements within the overarching Assessment Strategy for the sector.

Page 21: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

15

Unit format

Each unit in this specification contains the following sections.

Unit title:

Unit reference number:

QCF level:

Credit value:

Guided learning hours:

Unit summary:

Assessment requirements/evidence requirements:

Assessment methodology:

Learning outcomes:

Assessment criteria:

Evidence type:

Portfolio reference:

Date:

The unit title is accredited on the QCF and this form of words will appear on the learner’s Notification of Performance (NOP).

All units and qualifications within the QCF have a level assigned to them, which represents the level of achievement. There are nine levels of achievement, from Entry level to level 8. The level of the unit has been informed by the QCF level descriptors and, where appropriate, the NOS and/or other sector/professional.

All units have a credit value. The minimum credit value is one, and credits can only be awarded in whole numbers. Learners will be awarded credits when they achieve the unit.

A notional measure of the substance of a qualification. It includes an estimate of the time that might be allocated to direct teaching or instruction, together with other structured learning time, such as directed assignments, assessments on the job or supported individual study and practice. It excludes learner-initiated private study.

This provides a summary of the purpose of the unit.

The assessment/evidence requirements are determined by the SSC. Learners must provide evidence for each of the requirements stated in this section.

Learning outcomes state exactly what a learner should know, understand or be able to do as a result of completing a unit.

The assessment criteria of a unit specify the standard a learner is expected to meet to demonstrate that a learning outcome, or a set of learning outcomes, has been achieved.

Learners must reference the type of evidence they have and where it is available for quality assurance purposes. The learner can enter the relevant key and a reference. Alternatively, the learner and/or centre can devise their own referencing system.

This provides a summary of the assessment methodology to be used for the unit.

The learner should use this box to indicate where the evidence can be obtained eg portfolio page number.

The learner should give the date when the evidence has been provided.

This code is a unique reference number for the unit.

Page 22: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

16

Page 23: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

17

Units

Page 24: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

18

Page 25: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

19

Unit 1: Developing and maintaining good occupational working relationships in the workplace

Unit reference number: D/600/7079

QCF level: 5

Credit value: 8

Guided learning hours: 27

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in developing and maintaining good occupational working relationships in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of developing and maintaining good occupational working relationships to be effective and reliable when confirming a learner’s competence

Workplace evidence of skills cannot be simulated.

Page 26: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

20

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 27: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

21

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Dev

elop,

mai

nta

in a

nd

enco

ura

ge

work

ing

rela

tionsh

ips

to p

rom

ote

good w

ill a

nd t

rust

.

1.1

pro

vide

info

rmat

ion a

nd a

dvi

ce a

bout

occ

upat

ional

work

act

ivitie

s an

d a

ssoci

ated

occ

upations

to

rele

vant

peo

ple

.

1.2

ex

pla

in m

ethods

and t

echniq

ues

on h

ow

to

mai

nta

in a

nd e

nco

ura

ge

work

ing r

elat

ionsh

ips

that

pro

mote

goodw

ill a

nd t

rust

with r

elev

ant

peo

ple

.

1.3

ex

pla

in t

he

fact

ors

that

enco

ura

ge

goodw

ill a

nd

trust

and h

ow

they

are

dev

eloped

.

Page 28: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

22

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Info

rm r

elev

ant

peo

ple

ab

out

work

act

ivitie

s in

an

appro

priat

e le

vel of det

ail,

with t

he

appro

pri

ate

leve

l of urg

ency

.

2.1

co

mm

unic

ate

the

follo

win

g w

ork

act

ivity

info

rmat

ion t

o r

elev

ant

peo

ple

follo

win

g

org

anis

atio

nal

pro

cedure

s:

appro

priat

e tim

esca

les

hea

lth a

nd s

afe

ty r

equirem

ents

co-o

rdin

atio

n o

f w

ork

pro

cedure

s.

2.2

ex

pla

in t

he

fact

ors

of,

met

hods

and d

iffe

rent

tech

niq

ues

of in

form

ing r

elev

ant

peo

ple

about

the

work

act

ivitie

s.

2.3

des

crib

e th

e ef

fect

s of not

info

rmin

g r

elev

ant

peo

ple

with t

he

expec

ted lev

el o

f urg

ency

.

2.4

lis

t th

e peo

ple

who w

ould

nee

d t

o b

e in

form

ed

about

the

work

act

ivitie

s an

d d

escr

ibe

the

appro

priate

lev

el o

f det

ail th

ey w

ould

exp

ect

to

rece

ive.

2.5

st

ate

the

fact

ors

that

const

itute

work

act

ivitie

s.

3

Offer

advi

ce a

nd h

elp t

o

rele

vant

peo

ple

about

work

act

ivitie

s an

d

enco

ura

ge

ques

tions,

re

ques

ts for

clar

ific

ation

and c

om

men

ts.

3.1

ad

vise

rel

evan

t peo

ple

about

the

diffe

rent

met

hods

of occ

upat

ional

work

act

ivitie

s in

ord

er t

o a

chie

ve

the

required

outc

om

e.

3.2

ex

pla

in t

he

tech

niq

ues

of en

coura

gin

g q

ues

tions,

re

ques

ts for

clar

ific

ation a

nd c

om

men

ts.

3.3

lis

t th

e ty

pes

of advi

ce a

vaila

ble

and d

escr

ibe

how

to

offer

advi

ce a

nd h

elp t

o p

eople

about

the

work

ac

tivi

ty.

Page 29: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

23

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Cla

rify

pro

posa

ls w

ith

rele

vant

peo

ple

and

dis

cuss

alter

nat

ive

sugges

tions.

4.1

under

take

reg

ula

r dis

cuss

ions

with r

elev

ant

peo

ple

ab

out

the

occ

upat

ional

work

act

ivity

and o

ther

occ

upat

ions.

4.2

ex

pla

in t

he

met

hods

of

clar

ifyi

ng a

lter

nat

ive

pro

posa

ls w

ith r

elev

ant

peo

ple

.

4.3

des

crib

e th

e m

ethods

of su

gges

ting a

lter

native

pro

posa

ls.

5

Res

olv

e diffe

rence

s of

opin

ion in w

ays

that

m

inim

ise

offen

ce a

nd

mai

nta

in g

oodw

ill,

trust

an

d r

espec

t.

5.1

dis

cuss

and a

gre

e w

ork

act

ivitie

s w

ith r

elev

ant

peo

ple

wher

e diffe

rence

s of opin

ion o

ccur

of th

e pro

pose

d m

ethod o

f w

ork

.

5.2

ex

pla

in t

he

met

hods

and t

echniq

ues

of re

solv

ing

diffe

rence

s of

opin

ion in w

ays

that

min

imis

e off

ence

an

d m

ain

tain

goodw

ill,

trust

and r

espec

t.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 30: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

24

Page 31: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

25

Unit 2: Allocating work and checking people’s performance in the workplace

Unit reference number: D/600/7552

QCF level: 5

Credit value: 9

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in allocating work and checking people’s performance in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of allocating work and checking people’s performance to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 32: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

26

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 33: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

27

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Confirm

the

pro

gra

mm

e or

oper

atio

ns

and s

ched

ule

s,

iden

tify

priorities

and

critic

al act

ivitie

s, a

nd p

lan

how

the

work

will

be

under

take

n.

1.1

id

entify

and e

valu

ate

the

priorities

and c

ritica

l ac

tivi

ties

in p

rogra

mm

es o

r oper

atio

ns

and

sched

ule

s, a

nd d

evis

e a

pla

n o

n h

ow

the

work

will

be

under

take

n.

1.2

ex

pla

in h

ow

to iden

tify

priorities

and c

ritica

l ac

tivi

ties

.

1.3

ex

pla

in m

ethods

of co

nfirm

ing p

rogra

mm

es o

r oper

atio

ns

and s

ched

ule

s.

1.4

des

crib

e how

the

pla

nnin

g o

f w

ork

can

be

under

take

n.

Page 34: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

28

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Allo

cate

work

to t

eam

m

ember

s, t

akin

g into

ac

count

thei

r cu

rren

t ci

rcum

stan

ces,

and b

rief

th

em o

n t

he

qual

ity

stan

dar

ds

or

leve

l ex

pec

ted.

2.1

ev

aluat

e and a

ssig

n w

ork

to t

eam

mem

ber

s an

d

carr

y out

brief

ings

taki

ng into

acc

ount

thei

r:

skill

s

know

ledge

exper

ience

work

load

.

2.2

des

crib

e how

to a

lloca

te w

ork

fai

rly

to t

eam

m

ember

s w

hils

t ta

king into

acc

ount

thei

r cu

rren

t ci

rcum

stan

ces.

2.3

ex

pla

in t

he

met

hods

and t

echniq

ues

on b

rief

ing

team

mem

ber

s ab

out

qual

ity

stan

dar

ds

or

leve

ls

expec

ted.

3

Monitor

the

pro

gre

ss a

nd

qual

ity

of

the

work

and

pro

vide

pro

mpt

and

const

ruct

ive

feed

back

.

3.1

ca

rry

out

chec

ks o

n t

he

pro

gre

ss a

nd q

ual

ity

of

work

bei

ng u

nder

take

n a

gai

nst

pro

gra

mm

es o

r oper

atio

ns

and s

ched

ule

s.

3.2

ca

rry

out

chec

ks o

n t

he

qual

ity

of w

ork

bei

ng

under

take

n a

gai

nst

qual

ity

standar

ds.

3.3

ex

pla

in m

ethods

of ch

ecki

ng t

he

pro

gre

ss o

f w

ork

ag

ainst

pro

gra

mm

es o

r oper

ations,

sch

edule

s an

d

the

work

agai

nst

qual

ity

stan

dar

ds.

3.4

pro

vide

feed

bac

k to

tea

m m

ember

s on t

he

pro

gre

ss

of w

ork

and s

tandar

ds

of qualit

y.

Page 35: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

29

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Motiva

te t

eam

mem

ber

s to

com

ple

te t

he

work

they

hav

e bee

n a

lloca

ted a

nd

pro

vide,

wher

e re

ques

ted

and p

oss

ible

, an

y ad

ditio

nal

support

and/o

r re

sourc

es.

4.1

re

view

and s

upply

additio

nal su

pport

and/o

r re

sourc

es w

her

e re

ques

ted b

y te

am m

ember

s.

4.2

ex

pla

in t

he

diffe

rent

way

s of m

otiva

ting t

eam

m

ember

s to

com

ple

te t

he

allo

cate

d w

ork

.

4.3

ex

pla

in w

ays

of pro

vidin

g a

dditio

nal

support

to

team

mem

ber

s an

d w

ays

of get

ting fee

dback

on

additio

nal

support

fro

m t

eam

mem

ber

s.

5

Iden

tify

unac

cepta

ble

or

poor

per

form

ance

, dis

cuss

th

e ca

use

(s)

and a

gre

e w

ays

of im

pro

ving

per

form

ance

with t

eam

m

ember

s.

5.1

ev

aluat

e poor

or

unacc

epta

ble

per

form

ance

for

giv

en w

ork

act

ivitie

s.

5.2

im

ple

men

t m

ethods

that

can

im

pro

ve p

erfo

rman

ce

of te

am m

ember

s.

5.3

des

crib

e th

e va

rious

met

hods

of id

entify

ing p

oor

or

unac

cepta

ble

per

form

ance

.

5.4

ex

pla

in w

ays

of

dis

cuss

ing t

he

cause

s of poor

per

form

ance

with t

eam

mem

ber

s an

d h

ow

to g

et

agre

emen

t on w

ays

of im

pro

ving p

erfo

rmance

.

Page 36: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

30

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Rec

ognis

e su

cces

sful

com

ple

tion o

f si

gnific

ant

pie

ces

of

work

or

work

ac

tivi

ties

by

team

/tea

m

mem

ber

s, a

nd a

dvi

se

resp

onsi

ble

peo

ple

.

6.1

dem

onst

rate

ways

of

reco

gnis

ing s

ucc

ess

and

pra

isin

g t

eam

mem

ber

s on s

ucc

essf

ul co

mple

tion o

f w

ork

.

6.2

ad

vise

res

ponsi

ble

peo

ple

on s

ucc

essf

ul co

mple

tion

of w

ork

.

6.3

des

crib

e w

ays

of

reco

gnis

ing c

om

ple

tion o

f si

gnific

ant

pie

ces

of

wor

k or

work

act

ivitie

s.

6.4

ex

pla

in e

ffec

tive

met

hods

of

advi

sing r

esponsi

ble

peo

ple

of th

e te

am

/tea

m m

ember

's s

ucc

esse

s.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 37: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

31

Unit 3: Establishing, implementing and maintaining systems for managing health, safety and welfare in the workplace

Unit reference number: J/600/7318

QCF level: 6

Credit value: 15

Guided learning hours: 50

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in establishing, implementing and maintaining systems for managing health, safety and welfare in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of establishing, implementing and maintaining systems for managing health, safety and welfare to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 38: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

32

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 39: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

33

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Enco

ura

ge

a cu

lture

of

hea

lth,

safe

ty a

nd w

elfa

re

on s

ite,

and iden

tify

and

imple

men

t im

pro

vem

ents

.

1.1

dev

elop initia

tive

s w

hic

h e

nco

ura

ge

a h

ealth,

safe

ty,

wel

fare

culture

and c

onsi

der

atio

n f

or

the

envi

ronm

ent.

1.2

ex

amin

e and a

nal

yse

curr

ent

syst

ems,

pro

cedure

s an

d faci

litie

s use

d o

r su

pplie

d f

or

hea

lth,

safe

ty a

nd

wel

fare

.

1.3

fa

cilit

ate

im

pro

vem

ent

met

hods

to h

ealth,

safe

ty

and w

elfa

re s

yste

ms,

pro

cedure

s an

d/o

r fa

cilit

ies.

1.4

ex

pla

in w

ays

that

the

culture

of

hea

lth,

safe

ty a

nd

wel

fare

can b

e pro

mote

d a

nd e

nco

ura

ged

.

1.5

ex

pla

in h

ow

opport

unitie

s to

im

pro

ve h

ealth,

safe

ty

and w

elfa

re c

ould

be

iden

tified

and h

ow

appro

priat

e re

com

men

dat

ions

can b

e m

ade.

1.6

outlin

e w

ho t

he

pro

motion o

f a

hea

lth,

safe

ty a

nd

wel

fare

culture

should

be

aim

ed a

t.

Page 40: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

34

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Allo

cate

hea

lth,

safe

ty a

nd

wel

fare

res

ponsi

bili

ties

w

hic

h c

om

ply

with c

urr

ent

legis

lation a

nd e

nsu

re s

ite

induct

ions

consi

sten

tly

info

rm p

eople

of

those

re

sponsi

bili

ties

.

2.1

ev

aluat

e hea

lth,

safe

ty a

nd w

elfa

re r

equirem

ents

of

pro

ject

s and d

eter

min

e num

ber

and t

ypes

of peo

ple

nee

ded

to c

om

ply

with c

urr

ent

legis

lation.

2.2

as

sign h

ealth,

safe

ty a

nd/o

r w

elfa

re r

esponsi

bili

ties

to

sel

ecte

d p

eople

.

2.3

ca

rry

out

regula

r in

duct

ion b

rief

ings

to info

rm t

hose

re

sponsi

ble

of th

eir

des

ignate

d d

uties

.

2.4

des

crib

e how

, an

d t

o w

hom

hea

lth,

safe

ty a

nd

wel

fare

res

ponsi

bili

ties

should

be

allo

cate

d.

2.5

ex

pla

in m

ethods

and t

echniq

ues

of co

nduct

ing s

ite

induct

ions

and lis

t ty

pic

al s

ubje

ct a

reas

that

should

be

cove

red.

2.6

ex

pla

in h

ow

and w

hy

site

induct

ions

can

consi

sten

tly

info

rm p

eople

of th

eir

resp

onsi

bili

ties

.

Page 41: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

35

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Ensu

re a

ccura

te a

nd

appro

priat

e notice

s and

haz

ard w

arn

ings

that

co

nfo

rm t

o c

urr

ent

legis

lation a

re m

ain

tain

ed.

3.1

id

entify

whic

h leg

isla

tion,

regula

tions,

codes

of

pra

ctic

e an

d o

ffic

ial guid

ance

applie

s to

rel

evan

t w

ork

are

as

and a

ctiv

itie

s to

det

erm

ine

types

and

loca

tions

of notice

s and h

azar

d w

arnin

gs.

3.2

ca

rry

out

regula

r in

spec

tions

of

rele

vant

are

as o

f w

ork

to c

onfirm

that

pla

ced n

otice

s an

d w

arnin

gs

are

acc

ura

te a

nd in t

he

corr

ect

loca

tions.

3.3

lis

t th

e ty

pes

of notice

s an

d h

azar

d w

arnin

gs

that

ap

ply

to r

elev

ant

work

are

as a

nd e

xpla

in h

ow

to

ensu

re t

hat

they

com

ply

with c

urr

ent

legis

lation.

3.4

ex

pla

in w

ays

that

acc

ura

te a

nd a

ppro

priat

e notice

s an

d h

azard

war

nin

gs

for

the

work

forc

e, v

isitors

and

the

public

can

be

main

tain

ed.

3.5

giv

e re

aso

ns

why

acc

ura

te a

nd a

ppro

priat

e notice

s sh

ould

be

rele

vant,

corr

ectly

pla

ced a

nd

mai

nta

ined

, and e

xpla

in p

oss

ible

conse

quen

ces

should

they

not

be.

Page 42: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

36

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Ensu

re h

ealth,

safe

ty a

nd

wel

fare

equip

men

t and

reso

urc

es a

re a

vaila

ble

an

d s

uff

icie

nt

to m

eet

curr

ent

legis

lation.

4.1

id

entify

req

uired

hea

lth,

safe

ty a

nd w

elfa

re

equip

men

t fo

r giv

en w

ork

are

as.

4.2

sp

ecify

hea

lth,

safe

ty a

nd w

elfa

re e

quip

men

t an

d

reso

urc

es f

or

work

act

ivitie

s th

at

mee

t th

e pro

ject

, org

anis

atio

nal

and s

tatu

tory

req

uirem

ents

.

4.3

im

ple

men

t m

ainte

nance

pro

cedure

s fo

r hea

lth,

safe

ty a

nd w

elfa

re p

rote

ctio

n e

quip

men

t an

d

reso

urc

es.

4.4

des

crib

e th

e ty

pes

of

hea

lth,

safe

ty a

nd w

elfa

re

equip

men

t an

d r

esourc

es t

hat

would

be

nee

ded

for

rele

vant

work

act

ivitie

s.

4.5

ex

pla

in w

ays

of

ensu

ring t

hat

hea

lth,

safe

ty a

nd

wel

fare

equip

men

t and r

esourc

es a

re a

vaila

ble

and

suff

icie

nt

for

the

pro

ject

.

4.6

ex

pla

in h

ow

to e

nsu

re t

hat

hea

lth,

safe

ty a

nd

wel

fare

equip

men

t and r

esourc

es c

om

ply

with

curr

ent

legis

lation.

Page 43: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

37

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Imple

men

t sy

stem

s w

hic

h

mee

t cu

rren

t le

gis

lation

requirem

ents

to iden

tify

haz

ards,

red

uce

ris

ks a

nd

mai

nta

in t

he

hea

lth,

safe

ty a

nd w

elfa

re o

f peo

ple

.

5.1

dev

ise

and/o

r apply

sys

tem

s to

giv

en w

ork

are

as

that

allo

ws

haz

ard iden

tifica

tion,

asse

ssm

ent

of

risk

s an

d a

doption o

f re

leva

nt

contr

ol m

ethods.

5.2

dev

ise

and/o

r apply

sys

tem

s to

giv

en w

ork

are

as

that

iden

tify

bre

aches

in h

ealth,

safe

ty a

nd w

elfa

re

requirem

ents

.

5.3

dev

ise

and/o

r apply

sys

tem

s to

giv

en w

ork

are

as

that

are

able

to a

llow

for

the

report

ing o

f acc

iden

ts,

emer

gen

cies

and n

ear

mis

ses.

5.4

ex

pla

in h

ow

sys

tem

s w

hic

h m

eet

curr

ent

legis

lation

requirem

ents

for

iden

tify

ing a

nd r

educi

ng h

azar

ds

should

be

imple

men

ted.

5.5

ex

pla

in m

ethods

that

can b

e use

d t

o im

ple

men

t sy

stem

s th

at c

an r

eport

and r

ecord

acc

iden

ts,

emer

gen

cies

and n

ear

mis

ses.

5.6

ex

pla

in w

ays

of m

ainta

inin

g t

he

wel

fare

of peo

ple

in

acco

rdan

ce w

ith c

urr

ent

legis

lation r

equirem

ents

.

Page 44: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

38

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Ensu

re h

aza

rds

are

iden

tified

and o

bta

in

info

rmat

ion o

n t

hei

r si

gnific

ance

.

6.1

ev

aluat

e giv

en w

ork

are

as a

nd iden

tify

any

haz

ard

s th

at

can a

ffec

t th

e w

ork

pla

ce a

nd s

urr

oundin

g

area

s.

6.2

det

erm

ine

the

signific

ance

of

iden

tified

haza

rds

within

the

work

pla

ce.

6.3

ex

pla

in r

elev

ant

met

hods

that

can

ensu

re h

azar

ds

are

fully

iden

tified

.

6.4

des

crib

e m

ethods

and t

echniq

ues

that

allo

w furt

her

in

form

atio

n a

bout

haza

rds

to b

e obta

ined

.

6.5

ex

pla

in t

he

met

hods

and fact

ors

that

det

erm

ine

the

signific

ance

of

haz

ard

s.

Page 45: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

39

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Ensu

re t

he

signific

ant

haz

ards

are

asse

ssed

to

iden

tify

the

resi

dual risk

s,

apply

the

princi

ple

s of

pre

vention t

o r

educe

the

risk

s an

d p

rovi

de

info

rmat

ion t

o a

ppro

priat

e peo

ple

.

7.1

ap

ply

the

follo

win

g p

rinci

ple

s of

pre

vention t

o

iden

tified

sig

nific

ant

haz

ards:

elim

inat

ion

contr

ol at

sourc

e

man

agem

ent

cum

ula

tive

pro

tect

ion

per

sonal

pro

tect

ive

equip

men

t.

7.2

id

entify

and a

nal

yse

any

resi

dual

ris

k or

risk

s an

d

apply

additio

nal

contr

ol m

easu

res

as

appro

priat

e.

7.3

in

form

appro

priate

peo

ple

about

required

haz

ard

contr

ols

and r

emai

nin

g r

isks

usi

ng v

arious

form

ats.

7.4

des

crib

e m

ethods

that

allo

w r

esid

ual risk

s to

be

iden

tified

.

7.5

ex

pla

in w

ays

of ap

ply

ing t

he

princi

ple

s of

pre

vention t

o iden

tified

rel

evan

t an

d s

ignific

ant

haz

ards.

7.6

ex

pla

in h

ow

ris

ks c

an b

e re

duce

d a

nd w

ays

that

in

form

atio

n c

an b

e pro

vided

to a

ppro

priat

e peo

ple

.

Page 46: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

40

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

8

Monitor

hea

lth,

safe

ty a

nd

wel

fare

sys

tem

s re

gula

rly

for

com

plia

nce

with

curr

ent

legis

lation.

8.1

en

sure

that

regula

r ch

ecks

are

car

ried

out

on

hea

lth,

safe

ty a

nd w

elfa

re s

yste

ms.

8.2

an

alys

e an

d r

ecord

spec

ial si

te c

onditio

ns

and

situ

atio

ns

whic

h d

o n

ot

com

ply

with r

egula

tions.

8.3

ap

ply

rel

evan

t m

easu

res

whic

h w

ill p

reve

nt

reocc

urr

ence

of

bre

ach

es t

o t

he

requirem

ents

of

hea

lth,

safe

ty a

nd w

elfa

re.

8.4

ex

pla

in m

ethods

and/o

r pro

cedure

s use

d t

o

regula

rly

monitor

hea

lth,

safe

ty a

nd w

elfa

re

syst

ems.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 47: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

41

Unit 4: Evaluating and selecting work methods to meet project or operational requirements in the workplace

Unit reference number: M/600/7328

QCF level: 6

Credit value: 11

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in evaluating and selecting work methods to meet project or operational requirements in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of evaluating and selecting work methods to meet project or operational requirements to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 48: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

42

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 49: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

43

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Ass

ess

and e

valu

ate

pro

ject

or

oper

atio

nal dat

a

in o

rder

to iden

tify

work

m

ethods.

1.1

ex

amin

e at

least

fiv

e of th

e fo

llow

ing t

ypes

of

pro

ject

or

oper

atio

nal dat

a t

hat

can

iden

tify

re

quired

work

met

hods:

conditio

ns

of

contr

act

bill

s of quantities

or

met

hods

of m

easu

rem

ent

spec

ific

atio

ns

dra

win

gs

hea

lth,

safe

ty a

nd e

nvi

ronm

enta

l pla

ns

pro

gra

mm

es a

nd s

ched

ule

s

org

anis

atio

nal

req

uirem

ents

inst

ruct

ions

and v

ariations

info

rmat

ion o

n m

ater

ials

surv

ey r

eport

s

des

ign d

ata

stat

uto

ry c

onse

nts

sub-c

ontr

act

or

arra

ngem

ents

and a

tten

dance

met

hod s

tate

men

ts a

nd/o

r ri

sk a

sses

smen

ts

safe

sys

tem

s of w

ork

.

Page 50: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

44

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1.2

ex

pla

in d

iffe

rent

met

hods

and t

echniq

ues

that

al

low

s th

e as

sess

men

t an

d e

valu

atio

n o

f ava

ilable

pro

ject

or

oper

atio

nal dat

a.

1.3

ex

pla

in h

ow

work

met

hods

can b

e id

entified

fro

m

the

ass

essm

ent

and e

valu

atio

n o

f pro

ject

or

oper

atio

nal dat

a.

1.4

giv

e re

aso

ns

why

pro

ject

or

oper

atio

nal data

nee

ds

to b

e as

sess

ed a

nd e

valu

ated

and e

xpla

in p

oss

ible

pro

ject

or

oper

atio

nal co

nse

quen

ces

should

this

not

be

under

take

n c

orr

ectly.

2

Obta

in a

dditio

nal

info

rmat

ion fro

m o

ther

so

urc

es in c

ases

wher

e th

e ava

ilable

pro

ject

or

oper

atio

nal dat

a is

insu

ffic

ient.

2.1

ca

rry

out

consu

ltations

with a

nd/o

r ex

amin

e at

le

ast

tw

o o

f th

e fo

llow

ing o

ther

sourc

es:

the

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

contr

act

ors

sub-c

ontr

act

ors

supplie

rs

regula

tory

auth

orities

tech

nic

al a

nd t

rade

liter

ature

those

aff

ecte

d b

y th

e pro

ject

.

2.2

ex

pla

in h

ow

additio

nal

info

rmat

ion fro

m o

ther

so

urc

es c

an b

e obta

ined

in c

ase

s w

her

e ava

ilable

pro

ject

dat

a is

insu

ffic

ient.

Page 51: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

45

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Iden

tify

work

met

hods

whic

h w

ill m

ake

the

bes

t use

of

reso

urc

es a

nd

mat

eria

ls a

nd m

eets

pro

ject

and c

urr

ent

legis

lation r

equirem

ents

.

3.1

es

tablis

h a

ran

ge

of

work

met

hods

for

rele

vant

pro

ject

s or

oper

ations

from

at

leas

t tw

o o

f th

e fo

llow

ing info

rmation s

ourc

es:

curr

ent

legis

lation,

Codes

of

Pra

ctic

e an

d o

ffic

ial

guid

ance

inve

stig

ative

res

earc

h

org

anis

atio

nal

pro

cedure

s

tech

nic

al a

nd t

rade

liter

ature

.

3.2

ex

pla

in d

iffe

rent

ways

that

allo

ws

com

pre

hen

sive

id

entifica

tion o

f w

ork

met

hods

from

poss

ible

in

form

atio

n s

ourc

es,

and w

ill m

ake

the

bes

t use

of

reso

urc

es a

nd m

ater

ials

for

typic

al p

roje

cts

or

oper

atio

ns.

3.3

ex

pla

in p

roce

dure

s th

at c

an iden

tify

work

met

hods

whic

h m

eets

pro

ject

or

oper

atio

nal

req

uirem

ents

an

d t

he

requirem

ents

of

curr

ent

legis

lation.

Page 52: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

46

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Eva

luat

e id

entified

work

m

ethods

agai

nst

tec

hnic

al,

envi

ronm

enta

l an

d p

roje

ct

or

oper

atio

nal

crite

ria a

nd

sele

ct a

ppro

priat

e m

ethods.

4.1

ex

amin

e and iden

tify

work

met

hods

for

a ra

nge

of

pro

ject

s or

oper

ations

usi

ng a

t le

ast

six

of

the

follo

win

g t

echnic

al,

envi

ronm

enta

l or

pro

ject

cr

iter

ia:

mat

eria

ls p

erfo

rman

ce a

nd a

vaila

bili

ty

hea

lth a

nd s

afe

ty

fire

pro

tect

ion

acce

ss

pla

nt,

equip

men

t or

mac

hin

ery

per

form

ance

and

avai

labili

ty

traf

fic

man

agem

ent

envi

ronm

enta

l is

sues

cost

ben

efit

curr

ent

legis

lation,

codes

of

pra

ctic

e an

d o

ffic

ial

guid

ance

cust

om

er a

nd u

ser

nee

ds

contr

act

req

uirem

ents

in t

erm

s of tim

e an

d

quan

tity

was

te m

anag

emen

t

sust

ain

abili

ty.

Page 53: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

47

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4.2

det

erm

ine

work

met

hods

for

a ra

nge

of pro

ject

s,

activi

ties

and/o

r oper

atio

ns

that

will

mee

t pro

gra

mm

e re

quirem

ents

.

4.3

ex

pla

in d

iffe

rent

ways

and t

echniq

ues

of ev

aluat

ing

iden

tified

work

met

hods

agai

nst

rel

evan

t te

chnic

al,

envi

ronm

enta

l an

d p

roje

ct c

rite

ria

to s

elec

t th

e bes

t or

appro

pri

ate

met

hod.

Page 54: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

48

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Ensu

re m

ethod

stat

emen

ts a

re a

ccura

te,

clea

r an

d c

onci

se,

and

acce

pta

ble

to a

ll th

e peo

ple

invo

lved

.

5.1

pro

duce

and/o

r ex

am

ine

a m

ethod s

tate

men

t an

d/o

r risk

ass

essm

ents

for

a ra

nge

of pro

ject

s,

activi

ties

or

oper

atio

ns.

5.2

co

nfirm

that

met

hod s

tate

men

ts a

nd/o

r ri

sk

asse

ssm

ents

are

acc

ura

te,

clea

r, c

onci

se a

nd

acce

pta

ble

for

the

pro

ject

, ac

tivi

ty o

r oper

atio

nal

nee

ds.

5.3

ex

pla

in s

uitab

le m

ethods

that

ensu

re m

ethod

stat

emen

ts a

nd/o

r risk

ass

essm

ents

der

ived

fro

m

the

sele

cted

work

met

hods

are

accu

rate

, cl

ear

and

conci

se.

5.4

ex

pla

in p

oss

ible

pro

cedure

s th

at

ensu

re t

hat

m

ethod s

tate

men

ts a

nd/o

r ri

sk a

sses

smen

ts a

re

acce

pta

ble

to a

ll th

e peo

ple

res

ponsi

ble

.

5.5

giv

e re

aso

ns

for

the

nee

d t

o e

nsu

re t

hat

sel

ecte

d

work

met

hods,

met

hod s

tate

men

t an

d/o

r risk

as

sess

men

ts a

re a

ccep

table

to a

ll th

e peo

ple

re

sponsi

ble

.

Page 55: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

49

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Rec

om

men

d a

nd p

rom

ote

th

e se

lect

ed w

ork

met

hod

for

pro

ject

s or

oper

atio

ns.

6.1

pre

sent

the

sele

cted

work

met

hod t

o a

nd g

ain

acce

pta

nce

by

at lea

st t

wo o

f th

e fo

llow

ing p

eople

re

sponsi

ble

:

the

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

contr

act

ors

consu

ltan

ts

sub-c

ontr

act

ors

supplie

rs

work

forc

e

inte

rnal

man

agem

ent.

6.2

ex

pla

in t

he

way

s an

d t

echniq

ues

of re

com

men

din

g

work

met

hods

to t

he

peo

ple

res

ponsi

ble

.

6.3

ex

pla

in d

iffe

rent

ways

of pro

moting s

elec

ted w

ork

m

ethods

to t

he

peo

ple

res

ponsi

ble

.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 56: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

50

Page 57: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

51

Unit 5: Monitoring construction-related project activities in the workplace

Unit reference number: J/600/7335

QCF level: 6

Credit value: 8

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in monitoring construction related project activities in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of monitoring construction related project activities to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 58: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

52

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 59: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

53

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Giv

e ad

equat

e notice

to a

ll th

e peo

ple

who w

ill b

e af

fect

ed a

bout

when

work

w

ill s

tart

, how

long it

will

ta

ke a

nd w

hen

it

will

fin

ish

and c

onfirm

all

dat

es in

writing.

1.1

pre

par

e w

ritt

en n

otice

s det

ailin

g a

bout

when

pro

ject

work

s st

arts

, ex

pec

ted d

ura

tions

and

pla

nned

fin

ishin

g o

r co

mple

tions

date

s.

1.2

pro

vide

peo

ple

affec

ted b

y pro

ject

work

s w

ith

writt

en n

otice

s ab

out

pro

ject

sch

edule

s.

1.3

outlin

e th

e ty

pe

of peo

ple

that

should

be

notified

of

work

sch

edule

s.

1.4

des

crib

e w

ays

and t

echniq

ues

of notify

ing p

eople

af

fect

ed b

y th

e w

ork

about

work

sch

edule

s.

1.5

ex

pla

in w

hy

adeq

uat

e notice

of

work

s sh

ould

be

giv

en t

o p

eople

affec

ted a

nd e

xpla

in p

oss

ible

co

nse

quen

ces

should

this

not

hap

pen

.

1.6

ex

pla

in h

ow

dat

es c

an b

e co

nfirm

ed a

nd w

hy

notifica

tion o

f w

ork

arr

angem

ents

and s

ched

ule

s sh

ould

be

in w

riting.

Page 60: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

54

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Com

munic

ate

and a

gre

e a

pro

gra

mm

e an

d m

ethod

with p

eople

who w

ill b

e doin

g t

he

work

that

in

tegra

tes

oper

atio

ns.

2.1

lia

ise

and c

om

munic

ate

with t

hose

under

taki

ng

spec

ifie

d w

ork

on r

elev

ant

pro

ject

s.

2.2

gai

n a

ppro

val w

ith r

elev

ant

work

ers

for

work

pro

gra

mm

es a

nd m

ethods

on c

onst

ruct

ion p

roje

cts.

2.3

ex

pla

in h

ow

and w

hy

pro

gra

mm

es a

nd m

ethods

should

be

agre

ed w

ith t

he

peo

ple

who w

ill b

e doin

g

the

work

.

2.4

des

crib

e m

ethods

and t

echniq

ues

of

com

munic

atin

g

pro

gra

mm

es a

nd m

ethods

to t

he

peo

ple

who w

ill b

e doin

g t

he

work

.

3

Iden

tify

, re

cord

and o

bta

in

info

rmat

ion r

equirem

ents

bef

ore

work

sta

rts.

3.1

so

urc

e in

form

atio

n r

elev

ant

to s

pec

ifie

d p

roje

cts

and a

ssem

ble

prior

to t

he

star

t of w

ork

.

3.2

ex

pla

in w

ays

that

info

rmat

ion r

equired

for

pro

ject

s ca

n b

e id

entified

, obta

ined

and r

ecord

ed b

efore

w

ork

sta

rts.

3.3

des

crib

e th

e ty

pes

of

info

rmat

ion t

hat

should

be

obta

ined

bef

ore

work

sta

rts

on t

ypic

al p

roje

cts.

Page 61: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

55

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Org

anis

e att

endan

ce f

or

sub-c

ontr

act

ors

in

acco

rdan

ce w

ith p

roje

ct

and c

ontr

actu

al

agre

emen

ts.

4.1

pla

n a

nd im

ple

men

t at

tendan

ce r

equirem

ents

that

m

eets

pro

ject

and c

ontr

actu

al re

quirem

ents

.

4.2

ar

range

and u

nder

take

mee

tings

with s

ub-

contr

act

ors

to d

iscu

ss p

roje

ct o

r co

ntr

act

re

quirem

ents

and a

tten

dan

ce.

4.3

ex

pla

in h

ow

att

endance

can

be

org

anis

ed b

y co

ntr

act

or

agre

emen

t fo

r su

b-c

ontr

acto

rs a

nd

atte

ndin

g w

ork

forc

e, in a

ccord

ance

with p

roje

ct

requirem

ents

and c

ontr

actu

al agre

emen

ts.

4.4

lis

t fa

ctors

that

aff

ect

typic

al pro

ject

req

uir

emen

ts.

4.5

ex

pla

in w

hy

atte

ndan

ce n

eeds

to b

e org

anis

ed for

contr

act

or

agre

emen

t fo

r su

b-c

ontr

acto

rs in

acco

rdan

ce w

ith p

roje

ct r

equirem

ents

and

contr

act

ual ag

reem

ents

.

Page 62: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

56

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Plan

and o

bta

in s

uff

icie

nt

reso

urc

es o

f th

e ap

pro

priat

e ty

pe

whic

h

will

mee

t th

e pro

ject

re

quirem

ents

and

tim

esca

les.

5.1

id

entify

and p

rocu

re a

t le

ast

thre

e of th

e fo

llow

ing

reso

urc

es f

or

rele

vant

pro

ject

s:

peo

ple

pla

nt,

equip

men

t or

mac

hin

ery

mat

eria

ls a

nd c

om

ponen

ts

sub-c

ontr

act

ors

info

rmat

ion.

5.2

ex

pla

in h

ow

to iden

tify

and p

lan t

he

use

of

reso

urc

es f

or

pro

ject

s an

d w

hy

reso

urc

e re

quirem

ents

should

be

pla

nned

.

5.3

ex

pla

in w

hy

ther

e is

a n

eed t

o p

lan t

he

use

of

reso

urc

es.

5.4

ex

pla

in m

ethods

and p

roce

dure

s th

at c

an e

nsu

re

suff

icie

nt

reso

urc

es a

re o

bta

ined

.

Page 63: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

57

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Org

anis

e and c

ontr

ol th

e si

te a

nd r

esourc

es s

o t

hat

co

nditio

ns

are

safe

, th

e si

te is

tidy

and c

reat

es a

fa

voura

ble

im

age

of th

e org

anis

atio

n,

its

pro

duct

s,

its

serv

ices

and t

he

pro

ject

.

6.1

im

ple

men

t an

d c

oord

inat

e w

ork

ing a

reas,

act

ivitie

s an

d r

esourc

es a

gai

nst

pro

ject

req

uirem

ents

that

al

low

sites

to b

e sa

fe a

nd t

idy.

6.2

co

ord

inat

e an

d im

pro

ve s

ite

oper

atio

ns

to p

roje

ct a

posi

tive

im

age

of pro

ject

s an

d r

elev

ant

org

anis

atio

ns.

6.3

des

crib

e w

ays

of

org

anis

ing a

nd c

ontr

olli

ng t

he

site

an

d r

esourc

es s

o t

hat

the

follo

win

g c

onditio

ns

are

met

:

the

site

is

safe

the

site

is

tidy

a fa

voura

ble

im

age

of th

e org

anis

atio

n is

crea

ted

a fa

voura

ble

im

age

of th

e pro

duct

s in

use

and

bei

ng p

roduce

d is

crea

ted

a fa

voura

ble

im

age

of th

e se

rvic

es b

eing

pro

vided

is

crea

ted.

6.4

ex

pla

in w

hy

ther

e is

a n

eed t

o o

rgan

ise

and c

ontr

ol

the

site

and r

esourc

es.

Page 64: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

58

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Dev

elop c

ontingen

cy p

lans

to m

eet

spec

ial

requirem

ents

to m

inim

ise

dis

ruption t

o t

hose

lik

ely

to b

e af

fect

ed b

y th

e w

ork

s pro

gra

mm

e.

7.1

id

entify

any

spec

ial re

quirem

ents

that

may

affe

ct

the

work

s pro

gra

mm

e or

surr

oundin

g a

reas

on

rele

vant

pro

ject

s.

7.2

im

ple

men

t pla

ns,

base

d o

n t

he

resu

lts

of

spec

ial

contingen

cy iden

tifica

tion,

that

will

min

imis

e dis

ruption t

o t

hose

aff

ecte

d b

y th

e w

ork

pro

gra

mm

e.

7.3

del

egate

tas

ks t

o o

ther

tea

m m

ember

s to

im

ple

men

t th

e dev

eloped

contingen

cy p

lans.

7.4

outlin

e how

to d

evel

op p

lans

to m

eet

spec

ial

requirem

ents

and c

ontingen

cies

.

7.5

ex

pla

in w

hy

ther

e is

a n

eed t

o d

evel

op p

lans

to

mee

t sp

ecia

l re

quirem

ents

and c

ontingen

cies

.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 65: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

59

Unit 6: Controlling project progress against agreed quality standards in the workplace

Unit reference number: F/600/7351

QCF level: 6

Credit value: 10

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in controlling project progress against agreed quality standards in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of controlling project progress against agreed quality standards to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 66: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

60

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 67: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

61

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Iden

tify

and inte

rpre

t qual

ity

standar

ds

from

av

aila

ble

info

rmation,

and

pas

s th

em t

o p

eople

re

sponsi

ble

for

thei

r im

ple

men

tation b

efore

th

ey s

tart

work

.

1.1

gat

her

a r

ange

of

sourc

es w

hic

h w

ill iden

tify

qual

ity

stan

dar

ds

for

giv

en p

roje

cts.

1.2

ex

amin

e co

llect

ed s

ourc

es a

nd d

efin

e re

quis

ite

qual

ity

standar

ds.

1.3

pro

vide

peo

ple

res

ponsi

ble

with r

elev

ant

qual

ity

stan

dar

ds

prior

to w

ork

sta

rtin

g.

1.4

des

crib

e w

her

e an

d h

ow

qual

ity

stan

dar

ds

for

giv

en

pro

ject

s ca

n b

e def

ined

.

1.5

ex

pla

in h

ow

qual

ity

stan

dar

ds

can b

e id

entified

and

inte

rpre

ted.

1.6

ex

pla

in w

ays

that

qual

ity

stan

dar

ds

can b

e pas

sed

on t

o p

eople

res

ponsi

ble

for

imple

men

ting t

hem

bef

ore

sta

rtin

g w

ork

on a

contr

act.

Page 68: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

62

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Spec

ify

clea

rly

and

unam

big

uousl

y th

e re

sponsi

bili

ties

whic

h

indiv

idual

s hav

e fo

r m

ainta

inin

g q

ual

ity

stan

dar

ds.

2.1

pro

duce

a s

ite

qual

ity

pla

n o

r pro

cedure

show

ing

indiv

idual

res

ponsi

bili

ties

in a

ccord

ance

with q

ual

ity

stan

dar

ds.

2.2

ex

pla

in h

ow

res

ponsi

bili

ties

can

be

spec

ifie

d t

o

indiv

idual

s hav

ing t

o m

ainta

in q

ual

ity

stan

dar

ds,

an

d w

ho t

hose

indiv

idual

s m

ay

be

for

giv

en

pro

ject

s.

2.3

giv

e re

aso

ns

why

the

resp

onsi

bili

ties

whic

h

indiv

idual

s hav

e fo

r m

ainta

inin

g q

ual

ity

stan

dar

ds

nee

d t

o b

e sp

ecifie

d.

2.4

ex

pla

in m

ethods

that

allo

w f

or

the

pro

duct

ion o

f si

te q

ual

ity

pla

ns

or

pro

cedure

s in

acc

ord

ance

with

the

qualit

y st

andar

ds.

3

Set

up s

yste

ms

to insp

ect

and c

ontr

ol th

e qual

ity

of

the

work

.

3.1

es

tablis

h a

nd im

ple

men

t sy

stem

s th

at

can insp

ect

ongoin

g w

ork

and c

om

ple

ted w

ork

.

3.2

des

crib

e ty

pes

of

syst

ems

and m

ethods

that

can

be

imple

men

ted t

o c

hec

k qualit

y st

andar

ds.

3.3

ex

pla

in h

ow

sys

tem

s fo

r in

spec

ting a

nd c

ontr

olli

ng

the

qualit

y of w

ork

and r

ecord

ing t

he

outc

om

es

should

be

set

up.

3.4

giv

e re

aso

ns

why

syst

ems

for

insp

ecting a

nd

contr

olli

ng t

he

qual

ity

of w

ork

and r

ecord

ing o

f th

e outc

om

es n

eed t

o b

e se

t up.

Page 69: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

63

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Reg

ula

rly

chec

k th

at w

ork

co

nfo

rms

to t

he

des

ign

requirem

ents

and t

he

spec

ifie

d q

ual

ity

stan

dar

ds.

4.1

ar

range

insp

ections

of ongoin

g a

nd c

om

ple

ted w

ork

on g

iven

pro

ject

s.

4.2

re

cord

acc

epta

nce

and r

ejec

tion c

rite

ria

for

giv

en

pro

ject

act

ivitie

s fr

om

insp

ection a

ctiv

itie

s.

4.3

ex

pla

in m

ethods

that

chec

k th

at w

ork

confo

rms

to

des

ign r

equirem

ents

and t

he

spec

ifie

d q

ualit

y st

andar

ds.

5

Iden

tify

work

whic

h fai

ls

to m

eet

the

requirem

ents

an

d s

pec

ifie

d q

ualit

y st

andar

ds

and im

ple

men

t co

rrec

tive

act

ion.

5.1

es

tablis

h,

thro

ugh inve

stig

atio

n a

nd c

om

pariso

n

with q

ualit

y st

andar

ds,

work

that

is

iden

tified

as

sub-s

tandar

d.

5.2

pla

n a

nd a

rran

ge

appro

priate

corr

ective

act

ions.

5.3

des

crib

e w

ays

that

iden

tifies

and r

ecord

s w

ork

that

fa

ils t

o m

eet

the

requirem

ents

and s

pec

ifie

d q

ualit

y st

andar

ds.

5.4

ex

pla

in h

ow

to im

ple

men

t co

rrec

tive

act

ion w

her

e w

ork

fai

ls t

o m

eet

the

requirem

ents

and s

pec

ifie

d

qual

ity

standar

ds.

Page 70: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

64

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Info

rm d

ecis

ion-m

ake

rs

about

signific

ant

variat

ions

of qual

ity

stan

dar

ds

and r

ecom

men

d

solu

tions

they

nee

d t

o

mak

e an

d a

ctio

ns

they

nee

d t

o t

ake

.

6.1

co

mm

unic

ate

with d

ecis

ion m

ake

rs a

bout

iden

tified

si

gnific

ant

variat

ions

of qual

ity

stan

dar

ds

on g

iven

w

ork

act

ivitie

s.

6.2

su

gges

t act

ions

and s

olu

tions

to d

ecis

ion-m

aker

s th

at t

ake

into

acc

ount

the

follo

win

g:

qual

ity

standar

ds

effe

cts

of

qual

ity

on t

he

pro

gra

mm

e

effe

cts

of

qual

ity

on s

afet

y

effe

cts

of

qual

ity

on f

inis

hed

pro

duct

.

6.3

ex

pla

in m

ethods

and t

echniq

ues

that

can

be

use

d

to info

rm d

ecis

ion-m

aker

s ab

out

signific

ant

variat

ions

in q

ual

ity

stan

dar

ds

that

may

aff

ect

pro

gra

mm

e, s

afet

y im

plic

atio

ns

and t

he

finis

h t

o

the

pro

duct

.

6.4

ex

pla

in h

ow

solu

tions,

whic

h d

ecis

ion-m

ake

rs n

eed

to m

ake

about

signific

ant

vari

atio

ns

in q

ualit

y st

andar

ds

and a

dvi

ce o

n t

he

act

ions

they

nee

d t

o

take

, ca

n b

e re

com

men

ded

.

6.5

ex

pla

in w

ays

of

reco

mm

endin

g im

pro

vem

ents

to

dec

isio

n-m

aker

s, a

nd w

hy

reco

mm

endat

ions

should

be

made.

Page 71: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

65

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Iden

tify

conflic

ts b

etw

een

qual

ity

standar

ds

and

refe

r th

em t

o d

ecis

ion-

make

rs f

or

reso

lution.

7.1

es

tablis

h c

onflic

ts b

etw

een g

iven

qual

ity

stan

dar

ds

and o

ngoin

g w

ork

act

ivitie

s.

7.2

co

mm

unic

ate

suffic

ient

info

rmation a

bout

qual

ity

stan

dar

d c

onflic

ts t

o d

ecis

ion m

aker

s.

7.3

ex

pla

in h

ow

conflic

ts b

etw

een q

ual

ity

stan

dar

ds

can

be

iden

tified

.

7.4

des

crib

e how

conflic

ting q

ualit

y st

andar

ds

can b

e re

ferr

ed t

o d

ecis

ion m

ake

rs f

or

reso

lution.

8

Iden

tify

im

pro

vem

ents

fr

om

fee

dbac

k re

ceiv

ed

and r

ecom

men

d t

hem

to

dec

isio

n-m

aker

s.

8.1

an

alys

e w

ork

act

ivitie

s fr

om

rec

eive

d f

eedbac

k ag

ainst

pro

ject

req

uirem

ents

and e

stab

lish w

her

e im

pro

vem

ents

to q

ual

ity

stan

dar

ds

can b

e m

ade.

8.2

co

mm

unic

ate

sugges

ted im

pro

vem

ents

to q

ual

ity

stan

dar

ds

to d

ecis

ion m

aker

s.

8.3

ex

pla

in h

ow

im

pro

vem

ents

in q

ual

ity

stan

dar

ds

from

fee

dbac

k ca

n b

e id

entified

.

8.4

des

crib

e w

ays

that

rec

om

men

ded

im

pro

vem

ents

ca

n b

e m

ade

to d

ecis

ion-m

ake

rs.

Page 72: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

66

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

9

Agre

e am

endm

ents

to t

he

pro

ject

qual

ity

stan

dar

ds

and r

ecord

them

ac

cura

tely

.

9.1

es

tablis

h a

nd g

ain a

ppro

val on c

han

ges

that

can

be

mad

e to

pro

ject

qual

ity

stan

dard

s w

ith d

ecis

ion

mak

ers.

9.2

docu

men

t in

suff

icie

nt

det

ail

and a

ccura

cy in t

he

corr

ect

form

at,

appro

ved c

han

ges

mad

e on p

roje

ct

qual

ity

standar

ds.

9.3

ex

pla

in h

ow

agre

ed a

men

dm

ents

to t

he

pro

ject

qual

ity

standar

ds

with d

ecis

ion-m

aker

s ca

n b

e m

ade.

9.4

ex

pla

in m

ethods

that

allo

ws

for

the

reco

rdin

g o

f am

endm

ents

to p

roje

ct q

ual

ity

stan

dar

ds.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 73: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

67

Unit 7: Controlling project progress against agreed programmes in the workplace

Unit reference number: D/600/7356

QCF level: 6

Credit value: 11

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in controlling project progress against agreed programmes in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of controlling project progress against agreed programmes to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 74: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

68

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 75: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

69

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Dev

elop a

nd im

ple

men

t sy

stem

s to

monitor

and

reco

rd t

he

pro

gre

ss o

f th

e pro

ject

agai

nst

the

agre

ed

pro

gra

mm

e(s)

.

1.1

pla

n a

sys

tem

that

mee

ts o

rgan

isat

ional

re

quirem

ents

that

will

monitor

and r

ecord

work

pro

gre

ss for

giv

en p

roje

cts.

1.2

in

vest

igate

and m

onitor

the

pro

gre

ss o

f giv

en

pro

ject

s agai

nst

agre

ed p

rogra

mm

es u

sing a

t le

ast

fo

ur

of

the

follo

win

g s

yste

ms:

visu

al in

spec

tion(s

)

reso

urc

e re

cord

s

site

insp

ection r

eport

s

contr

act

or’s

report

cert

ifie

d p

aym

ents

site

mee

tings

org

anis

atio

nal

pro

cedure

s

man

agem

ent

report

s

ben

chm

ark

s

com

pariso

n w

ith p

roje

ct r

equirem

ents

.

1.3

docu

men

t findin

gs

of

monitoring s

yste

ms

on g

iven

pro

ject

s usi

ng w

ritt

en,

gra

phic

al a

nd e

lect

ronic

fo

rmats

.

Page 76: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

70

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1.4

ex

pla

in h

ow

sys

tem

s fo

r m

onitoring a

nd r

ecord

ing

the

pro

gre

ss o

f pro

ject

s ag

ainst

agre

ed

pro

gra

mm

es c

an b

e dev

eloped

.

1.5

giv

e re

aso

ns

why

syst

ems

that

monitor

and r

ecord

pro

ject

pro

gre

ss a

gai

nst

agre

ed p

rogra

mm

es

should

be

dev

eloped

.

2

Colle

ct p

rogre

ss

info

rmat

ion r

egula

rly

and

sum

marise

it

for

rele

vant

peo

ple

.

2.1

gat

her

and a

ccum

ula

te info

rmation o

n w

ork

pro

gre

ss o

f giv

en p

roje

cts

on a

pla

nned

fre

quen

t bas

is.

2.2

pre

sent

a s

um

mar

y of

findin

gs

on w

ork

pro

gre

ss in

suitab

le f

orm

ats

to r

elev

ant

peo

ple

.

2.3

ex

pla

in w

ays

that

info

rmat

ion o

n w

ork

pro

gre

ss c

an

regula

rly

be

colle

cted

.

2.4

ex

pla

in w

ays

of

accu

rate

ly s

um

mar

isin

g p

rogre

ss

info

rmat

ion t

o r

elev

ant

peo

ple

.

2.5

outlin

e w

ho w

ould

nee

d t

o b

e in

form

ed a

bout

work

pro

gre

ss o

n g

iven

pro

ject

s.

Page 77: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

71

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Iden

tify

inad

equat

e or

inap

pro

pri

ate

reso

urc

es,

info

rm r

elev

ant

peo

ple

, an

d s

pec

ify

and o

bta

in

alte

rnat

ive

reso

urc

es.

3.1

ex

amin

e w

ork

act

ivitie

s on g

iven

pro

ject

s in

ord

er

to iden

tify

inad

equat

e or

inap

pro

priat

e re

sourc

es.

3.2

in

form

rel

evan

t peo

ple

in s

uff

icie

nt

det

ail usi

ng

appro

priat

e fo

rmat

s w

her

e in

adeq

uat

e or

inap

pro

priat

e re

sourc

es h

ave

bee

n iden

tified

.

3.3

so

urc

e an

d o

bta

in a

lter

nat

ive

reso

urc

es t

hat

mee

t pro

ject

req

uirem

ents

.

3.4

ex

pla

in w

ays

that

inadeq

uat

e and inap

pro

priat

e re

sourc

es c

an b

e id

entified

.

3.5

ex

pla

in d

iffe

rent

met

hods

that

can

info

rm r

elev

ant

peo

ple

about

inad

equat

e an

d inap

pro

priat

e re

sourc

es.

3.6

ex

pla

in d

iffe

rent

met

hods

of

spec

ifyi

ng a

nd

obta

inin

g a

lter

nat

ive

reso

urc

es.

Page 78: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

72

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Iden

tify

and q

uan

tify

any

dev

iations

from

pla

nned

pro

gre

ss w

hic

h h

ave

occ

urr

ed,

or

whic

h m

ay

occ

ur,

that

could

dis

rupt

the

pro

gra

mm

e.

4.1

in

spec

t w

ork

act

ivitie

s ag

ain

st p

lanned

pro

gre

ss t

o

iden

tify

dev

iations

that

hav

e occ

urr

ed o

r w

hic

h m

ay

occ

ur.

4.2

an

alys

e w

ork

act

ivity

insp

ection r

esults

and

quan

tify

curr

ent,

or

pre

dic

ted,

dev

iations

that

could

dis

rupt

the

agre

ed p

rogra

mm

e.

4.3

lis

t an

d d

escr

ibe

fact

ors

that

can c

reat

e dev

iations

in p

lanned

pro

gre

ss o

n t

ypic

al p

roje

cts.

4.4

ex

pla

in h

ow

dev

iations

from

pla

nned

pro

gre

ss,

whic

h h

as

occ

urr

ed a

nd w

hic

h m

ay o

ccur,

can

be

iden

tified

.

4.5

ex

pla

in h

ow

dev

iations

from

the

pla

nned

pro

gre

ss,

whic

h m

ay d

isru

pt

the

pro

gra

mm

e, c

an b

e id

entified

.

4.6

ex

pla

in w

ays

that

dev

iations

from

pla

nned

pro

gre

ss

can b

e quantified

.

4.7

giv

e re

aso

ns

why

dev

iations

from

pla

nned

pro

gre

ss

nee

d t

o iden

tified

and q

uan

tified

.

Page 79: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

73

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Inve

stig

ate

the

circ

um

stan

ces

of

any

dev

iations

thoro

ughly

and

agre

e an

d im

ple

men

t ap

pro

priat

e co

rrec

tive

ac

tion.

5.1

ex

amin

e and a

nal

yse

the

circ

um

stan

ces

of an

y id

entified

dev

iations

to p

lanned

pro

gre

ss o

n g

iven

pro

ject

s.

5.2

co

ncl

ude,

gai

n a

ppro

val an

d im

ple

men

t co

rrec

tive

ac

tions

wher

e dev

iations

to p

lanned

pro

gre

ss h

ave

bee

n iden

tified

.

5.3

ex

pla

in h

ow

cir

cum

stan

ces

of dev

iations

from

pla

nned

pro

gre

ss c

an b

e in

vest

igat

ed.

5.4

ex

pla

in w

ays

that

corr

ective

act

ion for

dev

iations

from

pla

nned

pro

gre

ss w

ith r

elev

ant

peo

ple

can

be

agre

ed.

5.5

ex

pla

in h

ow

agre

ed c

orr

ective

act

ion for

dev

iations

from

pla

nned

pro

gre

ss c

an b

e im

ple

men

ted.

5.6

giv

e re

aso

ns

why

corr

ective

act

ions

must

be

agre

ed.

Page 80: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

74

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Rec

om

men

d o

ptions

to

rele

vant

peo

ple

that

aim

to

main

tain

or

impro

ve

cost

and p

rogre

ss.

6.1

id

entify

and a

nal

yse

pro

ject

pro

gre

ss a

gain

st

pla

nned

pro

gre

ss f

or

giv

en p

roje

cts.

6.2

su

gges

t a r

ange

of

alte

rnat

ives

that

will

mai

nta

in

and im

pro

ve p

roje

ct p

rogre

ss,

to r

elev

ant

peo

ple

usi

ng a

ppro

priat

e fo

rmat

s.

6.3

ex

pla

ins

met

hods

that

allo

w r

ecom

men

d o

ptions

that

will

hel

p t

he

pro

ject

pro

gre

ss.

6.4

ex

pla

in w

hy

reco

mm

endat

ions,

that

will

min

imis

e in

crea

ses

in c

ost

and t

ime

and h

elp t

he

pro

ject

pro

gre

ss,

nee

d t

o b

e m

ade.

7

Info

rm r

elev

ant

peo

ple

ab

out

changes

to t

he

oper

atio

nal pro

gra

mm

e,

and r

esourc

e nee

ds,

and

sugges

t th

e dec

isio

ns

and

actions

that

nee

d t

o b

e ta

ken t

o m

ainta

in

pro

gre

ss.

7.1

id

entify

chan

ges

that

nee

d t

o b

e m

ade

to t

he

oper

atio

nal pro

gra

mm

e fo

llow

ing inve

stig

atio

ns

of

work

act

ivitie

s and r

esourc

e use

on g

iven

pro

ject

s.

7.2

an

alys

e an

d d

eter

min

e ac

tions

that

nee

d t

o b

e ta

ken t

o m

ainta

in p

rogre

ss.

7.3

pro

vide

options

to r

elev

ant

peo

ple

that

allo

w

pro

ject

pro

gre

ss t

o b

e m

ainta

ined

.

7.4

ex

pla

in m

ethods

that

can

reg

ula

rly

info

rm r

elev

ant

peo

ple

about

chan

ges

to o

per

ational

pro

gra

mm

es

and d

emands

on r

esourc

es.

7.5

ex

pla

ins

way

s an

d t

echniq

ues

of su

gges

ting

dec

isio

ns

and a

ctio

ns

that

nee

d t

o b

e ta

ken t

o

mai

nta

in p

rogre

ss.

Page 81: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

75

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

8

Iden

tify

im

pro

vem

ents

to

pro

gre

ss fro

m fee

dback

re

ceiv

ed a

nd r

ecom

men

d

them

to r

elev

ant

peo

ple

.

8.1

se

ek,

colle

ct a

nd c

olla

te info

rmat

ion o

n w

ork

pro

gre

ss o

n g

iven

pro

ject

s.

8.2

an

alys

e co

llate

d info

rmat

ion t

o iden

tify

im

pro

vem

ents

that

can

be

mad

e to

the

work

pro

gre

ss o

n g

iven

pro

ject

s.

8.3

pro

vide

sugges

tions

to r

elev

ant

peo

ple

that

allo

w

impro

vem

ents

to w

ork

pro

gre

ss.

8.4

ex

pla

in h

ow

im

pro

vem

ents

to p

rogre

ss c

an b

e id

entified

fro

m f

eedbac

k re

ceiv

ed.

8.5

ex

pla

in w

ays

of

reco

mm

endin

g im

pro

vem

ents

in

pro

gre

ss t

o r

elev

ant

peo

ple

.

8.6

giv

e re

aso

ns

why

reco

mm

ended

im

pro

vem

ents

in

pro

gre

ss n

eed t

o b

e m

ade

to r

elev

ant

peo

ple

.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 82: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

76

Page 83: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

77

Unit 8: Managing personal development in a construction-related workplace

Unit reference number: M/600/7359

QCF level: 6

Credit value: 8

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in managing personal development in a construction-related workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of managing personal development in a construction-related workplace to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 84: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

78

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 85: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

79

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Def

ine

your

per

sonal ai

ms

and o

bje

ctiv

es for

under

taki

ng d

evel

opm

ent.

1.1

an

alys

e, d

eter

min

e and r

ecord

per

sonal

aim

s an

d

obje

ctiv

es t

o m

eet

work

req

uirem

ents

.

1.2

ex

pla

in w

hat

are

aim

s an

d o

bje

ctiv

es for

under

taki

ng d

evel

opm

ent

and h

ow

per

sonal

aim

s ca

n b

e def

ined

.

1.3

giv

e re

aso

ns

why

aim

s an

d o

bje

ctiv

es s

hould

be

def

ined

.

Page 86: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

80

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Conta

ct s

ourc

es o

f su

pport

an

d g

uid

ance

to iden

tify

re

cognis

ed s

tandar

ds

for

you t

o m

anag

e yo

ur

per

sonal

dev

elopm

ent.

2.1

co

mm

unic

ate

with a

t le

ast

thre

e of th

e fo

llow

ing

sourc

es o

f su

pport

and g

uid

ance

and t

he

stan

dar

ds

iden

tified

:

national bodie

s

indust

ry b

odie

s

pro

fess

ional

inst

itutions

furt

her

educa

tion o

rgan

isat

ions

trai

nin

g p

rovi

der

s

in-h

ouse

res

ourc

es

line

man

ager

colle

agues

trad

e per

iodic

als

and journ

als

elec

tronic

sourc

es.

2.2

ex

pla

in h

ow

to c

onta

ct s

ourc

es o

f su

pport

and

guid

ance

to iden

tify

rec

ognis

ed s

tandar

ds.

2.3

giv

e re

aso

ns

why

reco

gnis

ed s

tandar

ds

for

under

taki

ng p

erso

nal dev

elopm

ent

should

be

iden

tified

.

Page 87: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

81

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Anal

yse

the

curr

ent

leve

l of

your

know

ledge

and

per

form

ance

and d

evel

op

a pro

file

of

your

dev

elopm

ent

nee

ds.

3.1

ex

amin

e th

e cu

rren

t le

vel of th

eir

work

per

form

ance

and c

om

par

e ag

ain

st s

elec

ted a

nd

reco

gnis

ed s

tandar

ds.

3.2

det

erm

ine

and p

rofile

thei

r pre

sent

com

pet

ence

and

per

sonal

dev

elopm

ent

nee

ds.

3.3

des

crib

e how

to a

nal

yse

curr

ent

per

sonal le

vels

of

know

ledge

and p

erfo

rman

ce a

gai

nst

sel

ecte

d a

nd

reco

gnis

ed s

tandar

ds.

3.4

ex

pla

in t

he

fact

ors

that

det

erm

ine

per

sonal

dev

elopm

ent

nee

ds

3.5

ex

pla

in w

ays

that

per

sonal

dev

elopm

ent

nee

ds

can

be

pro

file

d.

3.6

giv

e re

aso

ns

why

a p

rofile

of

per

sonal

dev

elopm

ent

nee

ds

should

be

dev

eloped

.

4

Prep

are

a d

evel

opm

ent

pla

n f

or

achie

ving

iden

tified

dev

elopm

ent

nee

ds.

4.1

dev

elop a

per

sonal

dev

elopm

ent

pla

n b

ase

d o

n

iden

tified

dev

elopm

ent

nee

ds.

4.2

des

crib

e w

ays

that

per

sonal dev

elopm

ent

pla

ns

can

be

pre

par

ed.

4.3

ex

pla

in w

hy

a per

sonal

dev

elopm

ent

pla

n s

hould

be

pre

par

ed.

Page 88: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

82

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Under

take

dev

elopm

ent

activi

ties

aim

ed a

t ac

hie

ving iden

tified

dev

elopm

ent

nee

ds,

re

view

ing a

nd r

ecord

ing

pro

gre

ss a

nd t

he

effe

ctiv

enes

s of

the

activi

ties

.

5.1

id

entify

and e

ngag

e in

dev

elopm

ent

act

ivitie

s su

itab

le f

or

mee

ting p

erso

nal

dev

elopm

ent

nee

ds.

5.2

es

tablis

h a

nd/o

r use

pro

cess

es t

hat

can

rev

iew

dev

elopm

ent

pro

gre

ss.

5.3

re

cord

the

effe

ctiv

enes

s of

dev

elopm

ent

activi

ties

.

5.4

ex

pla

in w

ays

that

dev

elopm

ent

activi

ties

to a

chie

ve

per

sonal

dev

elopm

ent

nee

ds

can b

e under

take

n.

5.5

ex

pla

in t

he

met

hods

that

can

be

use

d t

hat

rev

iew

s an

d r

ecord

s pro

gre

ss a

nd e

valu

ate

s ef

fect

iven

ess

of

activi

ties

.

6

Mea

sure

ach

ieve

men

t of

iden

tified

dev

elopm

ent

nee

ds

and r

ecord

evi

den

ce

of

know

ledge

and

com

pet

ence

gai

ned

ag

ainst

rec

ognis

ed

stan

dar

ds.

6.1

ev

aluat

e ach

ieve

men

ts o

f id

entified

dev

elopm

ent

nee

ds

from

pro

file

d p

erso

nal

dev

elopm

ents

.

6.2

co

mpare

and r

ecord

ach

ieve

men

ts o

f kn

ow

ledge

and c

om

pet

ence

gai

ned

again

st r

ecognis

ed

stan

dar

ds.

6.3

ex

pla

in h

ow

ach

ieve

men

t of

iden

tified

per

sonal

dev

elopm

ent

nee

ds

can b

e m

easu

red.

6.4

ex

pla

in w

ays

that

evi

den

ce o

f per

sonal kn

ow

ledge

and c

om

pet

ence

agai

nst

iden

tified

nat

ional

stan

dar

ds

can b

e re

cord

ed.

Page 89: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

83

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Rev

iew

the

cycl

e of

per

sonal

dev

elopm

ent

aim

s an

d o

bje

ctiv

es t

o

revi

se a

nd u

pdat

e ai

ms

and o

bje

ctiv

es t

o s

uit

chan

gin

g c

ircu

mst

ance

s.

7.1

co

nduct

reg

ula

r re

view

s on p

erso

nal

aim

s an

d

obje

ctiv

es.

7.2

m

easu

re a

nd u

pdat

e per

sonal

dev

elopm

ent

pla

ns

that

mee

t ch

angin

g w

ork

cir

cum

stan

ces.

7.3

ex

pla

in h

ow

the

revi

ewin

g o

f th

e cy

cle

of

updat

ing

per

sonal

aim

s an

d o

bje

ctiv

es c

an b

e under

take

n.

7.4

ex

pla

in m

ethods

that

allo

ws

for

the

revi

sion a

nd

updat

ing o

f per

sonal ai

ms

and o

bje

ctiv

es t

hat

suit

chan

gin

g c

ircu

mst

ance

s.

7.5

giv

e re

aso

ns

why

per

sonal

dev

elopm

ent

pla

ns

should

be

revi

ewed

, re

vise

d a

nd u

pdat

ed.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 90: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

84

Page 91: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

85

Unit 9: Identifying and enabling learning opportunities for given work teams in the workplace

Unit reference number: H/600/7553

QCF level: 3

Credit value: 7

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in identifying and enabling learning opportunities for given work teams in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of identifying and enabling learning opportunities for given work teams to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 92: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

86

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 93: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

87

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Pro

mote

the

ben

efits

of

lear

nin

g b

y giv

ing fai

r,

regula

r an

d u

sefu

l fe

edback

on t

hei

r te

am

's

work

per

form

ance

.

1.1

an

alys

e in

div

idual

and c

olle

ctiv

e w

ork

per

form

ance

s of te

am m

ember

s on v

ario

us

activi

ties

.

1.2

re

gula

rly

pro

vide

feed

bac

k on indiv

idual

and

colle

ctiv

e w

ork

per

form

ance

s th

at is

fair a

nd

enco

ura

ges

an indiv

idual

’s lea

rnin

g w

ithin

thei

r te

am.

1.3

pro

vide

thei

r te

am m

ember

s w

ith c

olle

ctiv

e an

d

indiv

idual

rea

sons

that

pro

mote

the

ben

efits

of

continual

lea

rnin

g.

1.4

des

crib

e th

e diffe

rent

tech

niq

ues

that

can

be

use

d

to p

rom

ote

ben

efits

of le

arnin

g t

o indiv

idual

s an

d

gro

ups.

1.5

ex

pla

in t

he

pro

cedure

s an

d m

ethods

that

should

be

use

d t

o g

ive

fair,

regula

r an

d u

sefu

l fe

edbac

k to

te

ams

and indiv

iduals

.

Page 94: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

88

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Work

with t

hei

r te

am t

o

iden

tify

and p

rioritise

le

arnin

g n

eeds

and

iden

tify

and o

bta

in

info

rmat

ion o

n a

ran

ge

of

poss

ible

lea

rnin

g

activi

ties

.

2.1

pla

n a

nd c

om

munic

ate

with indiv

idual te

am

m

ember

s to

det

erm

ine

thei

r im

med

iate

lea

rnin

g

requirem

ents

for

rele

vant

work

act

ivitie

s.

2.2

obta

in lea

rnin

g info

rmat

ion for

indiv

idual

tea

m

mem

ber

s bas

ed o

n a

t le

ast

tw

o o

f th

e fo

llow

ing

lear

nin

g a

ctiv

itie

s:

form

al

info

rmal

coac

hed

men

tore

d

voca

tionally

qualif

ying

continuous

pro

fess

ional

dev

elopm

ent

pro

fess

ional

mem

ber

ship

.

2.3

ex

pla

in t

he

met

hods

and t

echniq

ues

of w

ork

ing

effe

ctiv

ely

with t

eam

s an

d indiv

idual

s in

ord

er t

o

iden

tify

and p

rioritise

lea

rnin

g n

eeds.

2.4

outlin

e poss

ible

ways

of obta

inin

g info

rmation fro

m

a ra

nge

of

lear

nin

g a

ctiv

itie

s.

Page 95: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

89

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Dis

cuss

dev

elopm

ent

nee

ds

with t

eam

m

ember

s.

3.1

m

eet

with a

nd iden

tify

dev

elopm

ent

nee

ds

for

team

m

ember

s bas

ed o

n t

he

follo

win

g a

reas:

curr

ent

skill

s an

d k

now

ledge

lear

nin

g a

ctiv

itie

s under

take

n

lear

nin

g o

bje

ctiv

es t

o b

e ac

hie

ved

reso

urc

e re

quirem

ents

for

dev

elopm

ent

tim

esca

les.

3.2

ex

pla

in m

ethods

and t

echniq

ues

of dis

cuss

ing a

nd

agre

eing d

evel

opm

ent

nee

ds

with t

eam

mem

ber

s.

4

Support

tea

m m

ember

s in

under

taki

ng lea

rnin

g

activi

ties

by

maki

ng

effo

rts

to r

emove

any

obst

acl

es t

o lea

rnin

g.

4.1

pro

vide

rele

vant

assi

stan

ce a

nd s

upport

to

indiv

idual

s an

d t

he

team

when

lea

rnin

g o

r updat

ing

skill

s an

d k

now

ledge.

4.2

id

entify

any

rele

vant

obst

acl

es t

o a

n indiv

idual

's

lear

nin

g a

nd t

ake

act

ions

to r

emove

them

.

4.3

ex

pla

in p

roce

dure

s th

at c

ould

be

imple

men

ted t

o

allo

w s

upport

and a

ssis

tance

for

team

mem

ber

s w

ho a

re u

nder

taki

ng lea

rnin

g a

ctiv

itie

s.

4.4

des

crib

e th

e ty

pes

and w

ays

of

iden

tify

ing o

bst

acl

es

to lea

rnin

g for

both

indiv

idual

s an

d t

eam

s.

4.5

ex

pla

in h

ow

obst

acle

s to

lea

rnin

g for

indiv

idual

s an

d t

eam

s ca

n b

e re

move

d.

Page 96: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

90

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Eva

luat

e th

e le

arnin

g

activi

ty u

nder

take

n w

ith

team

mem

ber

s to

ensu

re

the

des

ired

outc

om

es

hav

e bee

n a

chie

ved.

5.1

ap

pra

ise

lear

nin

g a

ctiv

itie

s under

take

n b

y in

div

idual

s an

d t

he

team

on c

om

ple

tion o

f le

arnin

g

pro

gra

mm

es.

5.2

m

ap t

he

lear

nin

g o

utc

om

es f

rom

com

ple

ted

lear

nin

g p

rogra

mm

es a

gai

nst

tea

m indiv

iduals

’ pre

-id

entified

lea

rnin

g n

eeds.

5.3

ex

pla

in h

ow

to p

lan a

nd im

ple

men

t ev

aluat

ions

on

lear

nin

g a

ctiv

itie

s under

take

n b

y te

am m

ember

s.

5.4

des

crib

e m

ethods

that

can m

easu

re d

esired

outc

om

es fro

m lea

rnin

g a

ctiv

itie

s, a

nd w

ays

to

ensu

re t

hat

they

have

bee

n a

chie

ved.

6

Updat

e dev

elopm

ent

pla

ns

with t

eam

mem

ber

s.

6.1

re

view

tea

m m

ember

s’ indiv

idual

dev

elopm

ent

pla

ns

and a

men

d t

he

pla

ns

follo

win

g c

om

ple

ted

lear

nin

g a

ctiv

itie

s an

d/o

r id

entified

lea

rnin

g n

eeds.

6.2

ex

pla

in t

he

pro

cedure

s th

at

are

or

can b

e use

d t

o

updat

e dev

elopm

ent

pla

ns

with t

eam

mem

ber

s.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 97: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

91

Unit 10: Contributing to the identification of work teams in the workplace

Unit reference number: K/600/7554

QCF level: 5

Credit value: 8

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in contributing to the identification of work teams in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of contributing to the identification of work teams to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 98: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

92

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 99: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

93

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Iden

tify

any

signific

ant

fact

ors

whic

h w

ill a

ffec

t th

e num

ber

, ty

pe

and

avai

labili

ty o

f peo

ple

and

serv

ices

.

1.1

ex

amin

e and a

nal

yse

pro

ject

req

uirem

ents

and

consi

der

at

least

thre

e of th

e fo

llow

ing s

ignific

ant

fact

ors

:

loca

tion

cost

tim

e

skill

s, e

xper

ience

and k

now

ledge

required

and

avai

lable

trai

nin

g a

nd d

evel

opm

ent

requirem

ents

curr

ent

legis

lation.

1.2

ex

pla

in m

ethods

that

can

iden

tify

sig

nific

ant

fact

ors

th

at c

an a

ffec

t num

ber

s, t

ypes

and a

vaila

bili

ty o

f peo

ple

or

serv

ices

for

typic

al pro

ject

s.

Page 100: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

94

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Eva

luat

e and r

ecord

the

qual

ity

and p

ote

ntial

relia

bili

ty o

f peo

ple

or

serv

ices

, and c

ircu

late

the

resu

lts

to d

ecis

ion-

mak

ers.

2.1

under

take

a s

elec

tion,

asse

ssm

ent

and r

ecord

ing

pro

cess

on a

t le

ast

two o

f th

e fo

llow

ing p

eople

or

serv

ices

to c

hec

k th

at

thei

r w

ork

qualit

y and

relia

bili

ty m

eets

org

anis

atio

nal

req

uirem

ents

:

tech

nic

al s

taff

sub-c

ontr

act

ors

spec

ialis

t se

rvic

es

oper

ativ

es.

2.2

in

form

dec

isio

n m

ake

rs o

f th

e outc

om

es o

f qual

ity

and r

elia

bili

ty c

hec

ks m

ade

on r

elev

ant

peo

ple

or

serv

ices

.

2.3

des

crib

e m

ethods

that

can e

valu

ate

and r

ecord

the

qual

ity

and p

ote

ntial re

liabili

ty o

f peo

ple

or

serv

ices

.

2.4

ex

pla

in t

ypic

al w

ays

and t

echniq

ues

of

circ

ula

ting

resu

lts

from

eva

luat

ions

of

qual

ity

and p

ote

ntial

re

liabili

ty t

o d

ecis

ion-m

aker

s.

Page 101: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

95

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Neg

otiate

and a

gre

e pro

posa

ls w

hic

h a

re lik

ely

to p

roduce

eff

ective

te

ams.

3.1

co

nsu

lt p

eople

or

serv

ice

pro

vider

s se

lect

ed a

s m

eeting p

rogra

mm

e re

quirem

ents

, an

d a

gre

e pro

posa

ls f

or

thei

r ef

fect

ive

par

tici

pation w

ith

rele

vant

pro

ject

s.

3.2

co

nfirm

tea

m m

ember

s on r

elev

ant

pro

ject

s w

ith

sele

cted

peo

ple

or

serv

ice

pro

vider

s.

3.3

ex

pla

in f

acto

rs t

hat

allo

w p

roposa

ls t

o b

e m

ade

for

team

mem

ber

ship

fro

m s

elec

ted p

eople

or

serv

ice

pro

vider

s.

3.4

ex

pla

in n

egotiat

ion m

ethods

that

can

be

use

d t

o

get

appro

priat

e peo

ple

or

serv

ices

for

giv

en t

eam

s.

Page 102: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

96

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Follo

w r

ule

s an

d

form

alit

ies

for

obta

inin

g

peo

ple

and s

ervi

ces.

4.1

id

entify

and a

pply

at

leas

t tw

o o

f th

e fo

llow

ing r

ule

s an

d form

alitie

s w

hen

iden

tify

ing t

eam

mem

ber

s fo

r re

leva

nt

pro

gra

mm

es o

f w

ork

:

contr

act

ual

curr

ent

legis

lation

codes

of

pra

ctic

e

org

anis

atio

nal

pro

cedure

s

cert

ific

atio

n o

f co

mpet

ence

.

4.2

ex

pla

in h

ow

to w

ork

within

curr

ent

rule

s and

form

alit

ies

gove

rnin

g t

he

iden

tifica

tion o

f w

ork

te

ams.

4.3

giv

e re

aso

ns

on w

hy

they

must

work

within

curr

ent

rule

s an

d form

alitie

s w

hen

iden

tify

ing t

eam

s.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 103: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

97

Unit 11: Establishing, controlling and monitoring environmental factors and sustainability in the workplace

Unit reference number: R/600/7323

QCF level: 6

Credit value: 15

Guided learning hours: 50

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in establishing, controlling and monitoring environmental factors and sustainability in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of establishing, controlling and monitoring environmental factors and sustainability to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 104: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

98

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 105: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

99

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Iden

tify

the

envi

ronm

enta

l m

anag

emen

t co

nsi

der

ations

and

esta

blis

h m

ethods

of w

ork

th

at w

ill s

upport

su

stain

abili

ty b

y ex

amin

ing p

roje

ct d

ata.

1.1

ex

amin

e re

leva

nt

pro

ject

dat

a a

nd e

stab

lish t

he

required

consi

der

atio

ns

for

envi

ronm

enta

l m

anag

emen

t.

1.2

id

entify

met

hods

of

work

for

rele

vant

pro

ject

s th

at

will

support

sust

ainabili

ty.

1.3

ex

pla

in h

ow

, an

d w

hat

typ

es,

of pro

ject

dat

a sh

ould

be

exam

ined

to iden

tify

the

nee

ds

of

envi

ronm

enta

l m

anag

emen

t.

1.4

ex

pla

in m

ethods

and t

echniq

ues

of ex

am

inin

g

pro

ject

dat

a in

ord

er t

o iden

tify

and e

stab

lish

met

hods

of w

ork

that

will

support

sust

ain

abili

ty.

1.5

giv

e re

aso

ns

why

the

nee

ds

of en

viro

nm

enta

l m

anag

emen

t an

d s

ust

ainab

le w

ork

met

hods

nee

d

iden

tify

ing.

Page 106: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

100

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Enco

ura

ge

a cu

lture

of

envi

ronm

enta

l aw

are

nes

s an

d s

upport

for

sust

ain

abili

ty in t

he

work

forc

e.

2.1

ad

opt

and im

ple

men

t polic

ies

that

cove

r en

viro

nm

enta

l m

anagem

ent

and s

ust

ainabili

ty

pro

cedure

s.

2.2

ap

ply

met

hods

or

pro

cedure

s th

at e

nco

ura

ge

work

forc

es t

o s

upport

sust

ainab

ility

and

envi

ronm

ent

mat

ters

in t

he

work

pla

ce.

2.3

ex

pla

in h

ow

a c

ulture

of en

viro

nm

enta

l aw

aren

ess

and s

upport

for

sust

ain

abili

ty in t

he

work

forc

e ca

n

be

enco

ura

ged

.

2.4

giv

e re

aso

ns

why

a c

ulture

of

envi

ronm

enta

l aw

aren

ess

and s

upport

for

sust

ain

abili

ty in t

he

work

forc

e sh

ould

be

enco

ura

ged

.

3

Del

egate

duties

for

envi

ronm

enta

l m

anag

emen

t an

d

monitoring s

ust

ainab

le

work

met

hods.

3.1

ev

aluat

e en

viro

nm

enta

l m

anag

emen

t re

quirem

ents

of pro

ject

s an

d d

eter

min

e num

ber

s an

d t

ypes

of

peo

ple

nee

ded

.

3.2

as

sign e

nvi

ronm

enta

l m

anag

emen

t duties

to

sele

cted

peo

ple

.

3.3

in

form

the

peo

ple

sel

ecte

d o

f th

e m

onitoring

activi

ties

to b

e under

take

n in t

he

work

pla

ce o

n

sust

ain

able

work

met

hods.

3.4

ex

pla

in h

ow

and w

hy

duties

for

envi

ronm

enta

l m

anag

emen

t an

d m

onitoring s

ust

ainable

work

m

ethods

should

be

del

egat

ed.

Page 107: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

101

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Ass

ess

the

signific

ance

of

envi

ronm

enta

l fa

ctors

as

they

aff

ect

the

pro

ject

and

take

appro

priat

e ac

tion.

4.1

co

nsi

der

at

least

four

of th

e fo

llow

ing

envi

ronm

enta

l fa

ctors

when

ongoin

g w

ork

act

ivitie

s ar

e bei

ng a

sses

sed:

appea

rance

ecolo

gic

al

nat

ura

l co

nse

rvat

ion

his

torica

l co

nse

rvat

ion

nois

e

emis

sions

to a

ir,

land a

nd w

ate

r

sust

ain

able

, ec

onom

ic a

nd s

oci

al

traf

fic

man

agem

ent

was

te m

anag

emen

t and r

ecyc

ling.

4.2

ev

aluat

e th

e im

pac

t of w

ork

on t

he

envi

ronm

ent

and a

pply

corr

ective

mea

sure

s to

elim

inat

e or

reduce

eff

ects

on e

nvi

ronm

enta

l fa

ctors

.

4.3

ex

pla

in w

ays

of

asse

ssin

g s

ignific

ance

of

envi

ronm

enta

l fa

ctors

as

they

affec

t pro

ject

s an

d

des

crib

e w

hat

act

ions

ought

to b

e ta

ken.

Page 108: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

102

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Monitor

pro

ject

work

ag

ainst

sust

ainab

ility

re

quirem

ents

and t

ake

ap

pro

priat

e ac

tion t

o

ensu

re p

rogre

ss.

5.1

as

sess

ongoin

g p

roje

ct w

ork

agai

nst

at

leas

t fo

ur

of

the

follo

win

g s

ust

ainab

ility

req

uirem

ents

:

reuse

and r

ecyc

led w

aste

recy

cled

or

sust

ainab

le m

ater

ials

conta

ct w

ith n

eighbours

hea

lth a

nd s

afe

ty

pro

tect

ion o

f th

e nat

ura

l en

viro

nm

ent,

bio

div

ersi

ty a

nd h

eritag

e

new

leg

isla

tion,

tech

nolo

gie

s an

d s

kills

pollu

tion c

ontr

ol

mat

eria

l acq

uis

itio

n,

use

and s

tora

ge.

5.2

def

ine

the

term

sust

ain

abili

ty a

nd lis

t th

e fa

ctors

th

at m

ake

up s

ust

ainab

ility

req

uirem

ents

.

5.3

ev

aluat

e re

sults

of

pro

ject

work

monitori

ng a

nd

apply

corr

ective

mea

sure

s w

hic

h m

ainta

in

sust

ain

abili

ty r

equirem

ents

and p

rogre

ss o

f w

ork

.

5.4

ex

pla

in w

ays

and t

echniq

ues

of

monitoring p

roje

ct

work

agai

nst

sust

ainabili

ty r

equir

emen

ts a

nd h

ow

to

take

appro

priat

e act

ion t

o e

nsu

re p

rogre

ss.

Page 109: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

103

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Rec

ord

good p

ract

ice

in

envi

ronm

enta

l m

anag

emen

t an

d

sust

ain

able

met

hods

of

work

and m

ake

reco

mm

endat

ions

to

peo

ple

res

ponsi

ble

.

6.1

docu

men

t re

sults

from

work

pla

ce s

ust

ainab

ility

and

envi

ronm

enta

l ev

alu

ations.

6.2

id

entify

good p

ract

ice

achie

ved o

n r

elev

ant

activi

ties

and info

rm a

t le

ast

thre

e of th

e fo

llow

ing

peo

ple

res

ponsi

ble

:

the

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

contr

act

ors

consu

ltan

ts

sub-c

ontr

act

ors

supplie

rs

work

forc

e

inte

rnal

man

agem

ent.

6.3

des

crib

e w

ays

of re

cord

ing g

ood p

ract

ice

in

envi

ronm

enta

l m

anagem

ent

and s

ust

ainable

work

m

ethods.

6.4

ex

pla

in m

ethods

and t

echniq

ues

of m

aki

ng

reco

mm

endat

ions

of

good p

ract

ice

to t

he

peo

ple

re

sponsi

ble

.

Page 110: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

104

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 111: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

105

Unit 12: Planning the preparation of the site for the project or operation in the workplace

Unit reference number: M/600/7331

QCF level: 6

Credit value: 11

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in planning the preparation of the site for the project or operation in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of planning the preparation of a site for the project or operation to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 112: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

106

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 113: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

107

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Ass

emble

and r

evie

w

info

rmat

ion u

sed in t

he

pre

par

ation o

f th

e pro

ject

or

oper

atio

n p

lan,

clarify

in

form

atio

n w

hic

h is

not

clea

r an

d u

pdat

e it f

or

pro

duct

ion p

lannin

g

purp

ose

s.

1.1

m

ainta

in,

verify

and u

pdat

e th

e pro

ject

or

oper

ation

pla

n u

sing a

t le

ast

four

of th

e fo

llow

ing s

ourc

es o

f in

form

atio

n:

surv

ey r

eport

s

des

ign info

rmat

ion

contr

actu

al info

rmat

ion

stat

uto

ry c

onse

nts

contr

acts

pre

-pla

nnin

g info

rmat

ion

hea

lth,

safe

ty a

nd e

nvi

ronm

enta

l pla

ns

risk

ass

essm

ents

and m

ethod s

tate

men

ts

pro

gra

mm

es a

nd s

ched

ule

s

about

com

pet

ent

peo

ple

sub-c

ontr

act

or

arra

ngem

ents

and a

tten

dance

.

1.2

des

crib

e diffe

rent

ways

of as

sem

blin

g info

rmat

ion

nee

ded

for

the

pre

para

tion o

f th

e pro

ject

or

oper

atio

n p

lan.

1.3

ex

pla

in t

echniq

ues

that

can

be

use

d t

o c

larify

pro

ject

info

rmat

ion t

hat

is

not

clea

r.

Page 114: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

108

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1.4

ex

pla

in t

he

pro

cedure

s th

at

can b

e im

ple

men

ted

that

kee

p p

roje

ct o

r oper

atio

n info

rmation u

p t

o

dat

e.

1.5

giv

e re

aso

ns

why

info

rmat

ion s

hould

be

ass

emble

d,

clar

ifie

d a

nd k

ept

up t

o d

ate,

and e

xpla

in t

he

conse

quen

ce if

this

is

not

under

take

n.

Page 115: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

109

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Iden

tify

fact

ors

for

consi

der

atio

n,

reco

rd

them

and p

ass

them

on t

o

peo

ple

who m

ay

be

affe

cted

.

2.1

id

entify

and r

ecord

pre

para

tion info

rmation in w

hic

h

at lea

st four

of th

e fo

llow

ing f

act

ors

have

bee

n

consi

der

ed:

occ

upie

rs

nea

r nei

ghbours

public

acc

ess

site

conditio

ns

envi

ronm

ent

consi

der

atio

ns

vehic

ula

r acc

ess

secu

rity

and t

resp

ass

public

utilit

ies

her

itag

e st

atus

sust

ain

abili

ty.

2.2

dis

trib

ute

rel

evan

t pre

para

tion info

rmation t

o t

hose

nee

din

g t

hat

info

rmation.

2.3

ex

pla

in h

ow

rel

evan

t fa

ctors

for

consi

der

atio

n

should

be

iden

tified

and r

ecord

ed w

hen

pla

nnin

g

pre

par

ations

for

site

s or

oper

ations.

2.4

ex

pla

in d

iffe

rent

ways

of

pas

sing o

n r

ecord

s of

fact

ors

consi

der

ed t

o p

eople

who w

ill b

e aff

ecte

d.

2.5

giv

e re

aso

ns

why

consi

der

ed a

nd r

ecord

ed fact

ors

sh

ould

be

pas

sed o

nto

peo

ple

aff

ecte

d a

nd e

xpla

in

poss

ible

conse

quen

ces

should

this

not

be

done.

Page 116: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

110

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Iden

tify

acc

ess

and e

gre

ss

poin

ts f

or

the

site

and

work

s w

hic

h a

re s

afe,

co

nve

nie

nt

and m

inim

ise

dis

ruption.

3.1

pla

n t

raff

ic m

anag

emen

t sy

stem

s th

at

incl

ude

chose

n a

nd a

gre

ed s

ite

and w

ork

acc

ess

and e

gre

ss

poin

ts.

3.2

ex

pla

in w

ays

of

iden

tify

ing a

cces

s an

d e

gre

ss p

oin

ts

for

the

site

and w

ork

s w

hic

h a

re t

he

most

co

nve

nie

nt

for

work

s or

oper

atio

ns

traf

fic

and w

hic

h

min

imis

e dis

ruption.

3.3

ex

pla

in t

he

met

hods

of an

d f

acto

rs t

hat

should

be

iden

tified

when

pre

par

ing t

raff

ic m

anagem

ent

pla

ns.

Page 117: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

111

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Org

anis

e th

e re

sourc

es

required

for

the

pre

par

ation o

f si

te o

r w

ork

oper

atio

ns.

4.1

as

sign a

t le

ast

four

of th

e fo

llow

ing r

esourc

es in

ord

er t

o p

repar

e si

tes

or

activi

ties

:

peo

ple

pla

nt,

equip

men

t or

mac

hin

ery

mat

eria

ls a

nd c

om

ponen

ts

sub-c

ontr

act

ors

info

rmat

ion

work

are

a a

nd faci

litie

s

was

te m

anag

emen

t

utilit

y pro

vider

s.

4.2

ex

pla

in h

ow

res

ourc

es f

or

site

s or

act

ivitie

s sh

ould

be

org

anis

ed.

4.3

ex

pla

in d

iffe

rent

met

hod t

hat

allo

w f

or

the

assi

gnin

g o

f re

sourc

es f

or

site

or

oper

atio

nal

pre

par

ations.

4.4

ex

pla

in h

ow

res

ourc

es u

sed in s

ites

or

oper

atio

ns

pre

par

ation c

an b

e utilis

ed in p

roje

ct w

ork

or

activi

ties

.

Page 118: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

112

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Giv

e ac

cura

te d

etai

ls

about

the

pro

pose

d w

ork

to

the

utilit

y an

d

emer

gen

cy s

ervi

ces.

5.1

co

llate

and r

ecord

info

rmat

ion t

hat

rel

ates

to s

ite

or

oper

atio

ns

acce

ss,

layo

ut,

eva

cuation a

nd h

aza

rds.

5.2

co

mm

unic

ate

info

rmat

ion a

bout

the

pro

pose

d

work

s acc

ess,

lay

out,

eva

cuation a

nd h

aza

rds

to

rele

vant

utilit

y an

d e

mer

gen

cy s

ervi

ces.

5.3

des

crib

e th

e ty

pe

or

types

of w

ork

s th

at a

re c

arr

ied

out

by

the

org

anis

atio

n a

nd,

if r

elev

ant,

within

w

hic

h s

ecto

rs o

f in

dust

ry.

5.4

ex

pla

in h

ow

and w

hy

det

ails

about

pro

pose

d w

ork

s sh

ould

be

giv

en t

o u

tilit

y an

d e

mer

gen

cy s

ervi

ces.

5.5

ex

pla

in m

ethods

and t

echniq

ues

of giv

ing d

etai

ls o

f si

te a

cces

s, lay

out,

eva

cuat

ion a

nd h

azard

s to

utilit

y an

d e

mer

gen

cy s

ervi

ces.

Page 119: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

113

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Mak

e ar

rangem

ents

for

adeq

uat

e si

te o

r oper

atio

nal sa

fety

, w

elfa

re,

envi

ronm

enta

l pro

tect

ion a

nd s

ecurity

.

6.1

id

entify

arr

angem

ents

nee

ded

for

site

or

oper

atio

nal sa

fety

and w

elfa

re b

efore

work

sta

rts

and r

evie

w a

s w

ork

pro

gre

sses

.

6.2

id

entify

pro

cedure

s nee

ded

to p

rote

ct t

he

envi

ronm

ent

rela

tive

to t

he

site

or

oper

atio

ns.

6.3

ar

range

pro

cedure

s fo

r si

te o

r oper

atio

nal

sec

urity

.

6.4

ex

pla

in h

ow

adeq

uate

site

safe

ty for

pro

pose

d

work

s or

act

ivitie

s sh

ould

be

ensu

red w

hen

pla

nnin

g p

repar

atio

ns

for

site

s or

oper

atio

ns.

6.5

ex

pla

in h

ow

and w

hy

consi

der

atio

ns

of re

leva

nt

fact

ors

should

be

made

when

arr

angin

g s

ite

safe

ty,

wel

fare

, en

viro

nm

enta

l pro

tect

ion a

nd s

ecurity

.

6.6

des

crib

e va

rious

pro

cedure

s th

at c

an e

nsu

re

adeq

uat

e se

curity

of

site

s or

oper

atio

ns.

6.7

ex

pla

in w

ays

that

arr

angem

ents

for

hea

lth,

safe

ty

and w

elfa

re c

an b

e re

view

ed a

s w

ork

pro

gre

sses

.

Page 120: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

114

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Plan

the

site

or

area

la

yout

for

oper

atio

nal

purp

ose

s and p

ass

in

form

atio

n a

bout

the

pla

ns

to t

he

peo

ple

on t

he

site

.

7.1

id

entify

and a

rran

ge

the

layo

ut

of

site

s or

area

s fo

r w

ork

oper

atio

ns

to t

ake

pla

ce.

7.2

id

entify

and a

rran

ge

required

res

ourc

es a

nd

del

iver

y of m

ater

ials

, st

ora

ge

area

s fo

r m

ate

rial

s an

d w

aste

colle

ctio

n loca

tions

for

pro

ject

s or

oper

atio

ns.

7.3

id

entify

and a

rran

ge

recy

clin

g p

roce

dure

s fo

r si

tes

or

oper

atio

ns.

7.4

re

cord

and a

rran

ge

that

info

rmat

ion a

bout

site

or

oper

atio

n lay

outs

is

com

munic

ated

to r

elev

ant

peo

ple

.

7.5

ex

pla

in h

ow

and w

hy

the

site

or

area

lay

out

should

be

pla

nned

for

oper

atio

nal

purp

ose

s.

7.6

des

crib

e th

e fa

ctors

that

should

be

take

n into

ac

count

when

pla

nnin

g t

he

layo

ut

of

site

s or

area

s fo

r oper

ations.

7.7

ex

pla

in m

ethods

and t

echniq

ues

of co

mm

unic

atin

g

info

rmat

ion a

bout

site

or

area

lay

out

pla

ns.

7.8

ex

pla

in h

ow

the

pla

nnin

g o

f st

ora

ge

and u

se o

f m

ater

ials

and c

om

ponen

ts is

carr

ied o

ut

so t

hat

m

ater

ial han

dlin

g is

effici

ent

and w

asta

ge

is

min

imis

ed.

Page 121: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

115

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

8

Ensu

re n

otice

s to

peo

ple

, w

hic

h p

rovi

de

info

rmat

ion

that

com

plie

s w

ith c

urr

ent

legis

lation,

are

pla

ced a

nd

mai

nta

ined

.

8.1

id

entify

the

types

and n

um

ber

of notice

s re

quired

fo

r th

e si

te o

r oper

ation a

nd e

nsu

re t

hat

they

mee

t cu

rren

t le

gis

lation.

8.2

ar

range

for

the

posi

tionin

g o

f re

leva

nt

notice

s at

sp

ecifie

d loca

tions.

8.3

pro

duce

a m

ainte

nan

ce s

ched

ule

for

rele

vant

notice

s.

8.4

ex

pla

in w

ays

and m

ethods

of pla

cing a

nd

mai

nta

inin

g info

rmation n

otice

s fo

r peo

ple

, th

e public

, vi

sito

rs a

nd w

ork

forc

e.

8.5

giv

e re

aso

ns

for

mai

nta

inin

g n

otice

s fo

r peo

ple

, th

e public

, vi

sito

rs a

nd t

he

work

forc

e an

d e

xpla

in t

he

poss

ible

conse

quen

ces

should

this

not

happen

.

8.6

ex

pla

in h

ow

mai

nte

nan

ce s

ched

ule

s fo

r in

form

atio

n

notice

s ca

n b

e pre

pare

d a

nd im

ple

men

ted.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 122: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

116

Page 123: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

117

Unit 13: Ensuring that work activities and resources meet project work requirements in the workplace

Unit reference number: Y/600/7338

QCF level: 6

Credit value: 11

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in ensuring that work activities and resources meet project work requirements in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of ensuring that work activities and resources meet project work requirements to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 124: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

118

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 125: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

119

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Iden

tify

maj

or

act

ivitie

s,

det

erm

ine

the

reso

urc

es

nee

ded

fro

m t

he

info

rmat

ion a

vaila

ble

and

pre

par

e dra

ft w

ork

pro

gra

mm

es a

nd

sched

ule

s.

1.1

det

erm

ine

and inve

stig

ate

maj

or

site

act

ivitie

s on

various

pro

ject

s.

1.2

id

entify

the

required

res

ourc

es f

or

maj

or

site

ac

tivi

ties

fro

m a

vaila

ble

pro

ject

info

rmation.

1.3

pla

n initia

l w

ork

pro

gra

mm

es a

nd s

ched

ule

s fo

r va

rious

pro

ject

s en

suring t

hat

act

ivitie

s and

reso

urc

es m

eet

pro

ject

req

uirem

ents

.

1.4

ex

pla

in w

ays

that

allo

w m

ajor

work

act

ivitie

s to

be

iden

tified

.

1.5

ex

pla

in h

ow

nee

ded

res

ourc

es c

an b

e det

erm

ined

fr

om

the

info

rmation a

vaila

ble

.

1.6

ex

pla

in h

ow

dra

ft p

rogra

mm

es a

nd s

ched

ule

s ca

n

be

pre

par

ed a

nd w

hy

they

nee

d t

o b

e pre

par

ed.

2

Eva

luat

e al

tern

ativ

e m

ethods,

res

ourc

es a

nd

syst

ems

in o

rder

to s

elec

t th

e bes

t so

lution t

o m

eet

pro

ject

req

uirem

ents

.

2.1

ex

amin

e cu

rren

t pro

duct

ion m

ethods,

res

ourc

es

and s

yste

ms.

2.2

ev

aluat

e findin

gs

of

pro

duct

ion m

ethods,

res

ourc

es

and s

yste

m e

xam

inat

ions

to iden

tify

alter

nat

ive

met

hods,

res

ourc

es a

nd s

yste

ms.

2.3

ex

pla

in w

ays

that

can e

valu

ate

alte

rnat

ive

work

m

ethods,

res

ourc

es a

nd s

yste

ms.

2.4

des

crib

e how

the

bes

t so

lutions

to m

eet

pro

ject

re

quirem

ents

can

be

sele

cted

.

2.5

des

crib

e th

e fa

ctors

that

det

erm

ine

pro

ject

re

quirem

ents

.

Page 126: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

120

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Obta

in c

lari

fica

tion a

nd

advi

ce w

her

e th

e re

sourc

es n

eeded

are

not

avai

lable

.

3.1

co

nsu

lt w

ith a

t le

ast

two o

f th

e fo

llow

ing t

o g

ain

advi

ce o

n lac

k of

suitab

le r

esourc

es:

the

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

consu

ltan

ts

pro

ject

tea

m p

art

ner

s

work

forc

e

tech

nic

al a

nd t

rade

liter

ature

.

3.2

ex

pla

in h

ow

cla

rifica

tion a

nd a

dvi

ce c

an b

e obta

ined

w

hen

the

reso

urc

es n

eeded

are

not

ava

ilable

, an

d

who w

ith.

Page 127: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

121

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Anal

yse

the

activi

ties

ag

ainst

pro

ject

re

quirem

ents

and t

he

requirem

ents

of

exte

rnal

fa

ctors

.

4.1

ex

amin

e w

ork

act

ivitie

s ag

ainst

pro

ject

re

quirem

ents

for

vari

ous

pro

ject

s.

4.2

id

entify

the

effe

cts

of at

lea

st f

our

of th

e fo

llow

ing

exte

rnal fa

ctors

on p

roje

ct r

equirem

ents

:

oth

er r

elate

d p

rogra

mm

es

supply

lea

d t

imes

contingen

cies

spec

ial w

ork

ing c

onditio

ns

wea

ther

conditio

ns

stat

uto

ry lim

itat

ions

site

conditio

ns

envi

ronm

enta

l co

nsi

der

atio

ns

cust

om

ers.

4.3

ex

pla

in h

ow

work

act

ivitie

s ca

n b

e an

alys

ed a

gai

nst

pro

ject

req

uirem

ents

.

4.4

des

crib

e w

ays

that

ext

ernal

fac

tors

can

be

iden

tified

and c

onsi

der

ed.

4.5

ex

pla

in h

ow

work

act

ivitie

s ca

n b

e an

alys

ed a

gai

nst

ex

tern

al fa

ctors

.

Page 128: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

122

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Det

erm

ine

how

long e

ach

activi

ty w

ill t

ake

, id

entify

ac

tivi

ties

whic

h influen

ce

each

oth

er a

nd s

equen

ce

them

logic

ally

and

real

istica

lly s

o t

hat

they

m

ake

the

bes

t use

of

the

reso

urc

es a

vaila

ble

.

5.1

id

entify

the

dura

tion o

f pro

ject

act

ivitie

s.

5.2

in

vest

igate

and iden

tify

work

act

ivitie

s th

at

influen

ce e

ach o

ther

.

5.3

sc

hed

ule

the

sequen

ce o

f w

ork

act

ivitie

s in

ord

er t

o

use

res

ourc

es e

ffec

tive

ly.

5.4

des

crib

e how

dura

tions

of pro

gra

mm

es a

nd

sched

ule

s ca

n b

e ca

lcula

ted.

5.5

ex

pla

in h

ow

to iden

tify

work

act

ivitie

s th

at

can

influen

ce e

ach o

ther

.

5.6

ex

pla

in m

ethods

that

can

make

bes

t use

of

reso

urc

es w

hen

seq

uen

cing a

ctiv

itie

s lo

gic

ally

and

real

istica

lly.

6

Ensu

re t

he

pro

duct

ion o

f det

aile

d p

rogra

mm

es a

nd

sched

ule

s of pla

nned

ac

tivi

ties

whic

h a

re

consi

sten

t w

ith t

he

com

ple

xity

of th

e pro

ject

.

6.1

sp

ecify

work

pro

gra

mm

es a

nd s

ched

ule

s th

at

consi

st o

f at

lea

st t

wo o

f th

e fo

llow

ing:

bar

char

ts

net

work

anal

ysis

critic

al act

ivitie

s

action lis

ts

reso

urc

e sc

hed

ule

s.

6.2

ex

pla

in h

ow

the

pro

duct

ion o

f det

aile

d p

rogra

mm

es

and s

ched

ule

s ar

e en

sure

d.

6.3

ex

pla

in m

ethods

that

ensu

re p

rogra

mm

es a

nd

sched

ule

s of pla

nned

act

ivitie

s ar

e co

nsi

sten

t w

ith

the

com

ple

xity

of th

e pro

ject

.

Page 129: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

123

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Dev

elop a

sys

tem

to

monitor

the

work

s pro

gra

mm

es a

nd

sched

ule

s, im

ple

men

t it

and u

se t

he

resu

lts

to

impro

ve p

roduct

ion a

nd

pla

nnin

g.

7.1

pla

n a

nd im

ple

men

t sy

stem

s th

at c

an m

onitor

work

s pro

gra

mm

es a

nd s

ched

ule

s.

7.2

m

onitor

work

s pro

gra

mm

es a

nd s

ched

ule

s usi

ng a

dev

eloped

monitoring s

yste

m.

7.3

an

alys

e re

sults

of

monitori

ng s

yste

ms

and m

ake

re

com

men

dat

ions

to im

pro

ve p

roduct

ion a

nd

pla

nnin

g.

7.4

ex

pla

in h

ow

sys

tem

s ca

n b

e dev

eloped

that

monitor

work

s pro

gra

mm

es a

nd s

ched

ule

s.

7.5

ex

pla

in h

ow

sys

tem

s fo

r m

onitoring w

ork

s pro

gra

mm

es a

nd s

ched

ule

s ca

n b

e dev

eloped

.

7.6

ex

pla

in w

ays

that

sys

tem

s fo

r m

onitoring w

ork

s pro

gra

mm

es a

nd s

ched

ule

s ca

n b

e im

ple

men

ted.

7.7

ex

pla

in h

ow

the

usi

ng o

f m

onitoring r

esults

of w

ork

pro

gra

mm

es a

nd s

ched

ule

s ca

n im

pro

ve p

roduct

ion

and p

lannin

g.

Page 130: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

124

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

8

Iden

tify

alter

atio

ns

to t

he

work

s pro

gra

mm

es a

nd

sched

ule

s to

ensu

re t

hey

w

ill m

eet

chan

ged

ci

rcum

stan

ces.

8.1

ex

amin

e w

ork

act

ivitie

s an

d c

om

par

e to

work

s pro

gra

mm

es a

nd s

ched

ule

s.

8.2

id

entify

alter

atio

ns

to w

ork

pro

gra

mm

es c

ause

d b

y ci

rcum

stan

ces,

and c

alcu

late

cost

and t

ime

ben

efits

for

required

chan

ges

.

8.3

se

ek a

nd o

bta

in d

ecis

ion-m

ake

r’s

endors

emen

t of

chan

ges

to t

he

work

s pro

gra

mm

es a

nd s

ched

ule

s.

8.4

ex

pla

in h

ow

alter

atio

ns

to w

ork

s pro

gra

mm

es a

nd

sched

ule

s ca

n b

e id

entified

.

8.5

des

crib

e w

ays

of en

suring t

hat

alter

atio

ns

to w

ork

pro

gra

mm

es a

nd s

ched

ule

s m

eet

chan

ged

ci

rcum

stan

ces.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 131: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

125

Unit 14: Identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace

Unit reference number: Y/600/7341

QCF level: 5

Credit value: 9

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in identifying, allocating and planning the deployment and use of plant, equipment or machinery in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of identifying, allocating and planning the deployment and use of plant, equipment or machinery to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 132: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

126

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 133: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

127

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Ensu

re t

hat

the

spec

ific

atio

n o

f th

e se

lect

ed p

lant,

equip

men

t or

mach

iner

y m

eets

the

nee

ds

of th

e pro

ject

bef

ore

dep

loym

ent.

1.1

re

view

the

spec

ific

atio

ns

for

pla

nt,

equip

men

t or

mac

hin

ery

and e

valu

ate

again

st p

roje

ct o

r oper

atio

nal re

quirem

ents

.

1.2

des

crib

e w

ays

of en

suring t

hat

the

spec

ific

atio

ns

for

pla

nt,

equip

men

t or

mac

hin

ery

mee

t th

e nee

ds

of

the

pro

ject

or

oper

ation b

efore

dep

loym

ent.

1.3

ex

pla

in w

hy

it is

import

ant

that

the

pla

nt

spec

ific

atio

n m

eets

the

nee

ds

of

the

pro

ject

or

oper

atio

n.

2

Ensu

re t

hat

the

pla

nt,

eq

uip

men

t or

mac

hin

ery

to b

e dep

loye

d c

om

plie

s w

ith c

urr

ent

legis

lation

and w

ill b

e se

t up,

oper

ated

and m

ainta

ined

by

com

pet

ent

peo

ple

.

2.1

dev

ise

and im

ple

men

t a

syst

em t

o e

nsu

re p

re-u

se

chec

ks,

insp

ections,

thoro

ugh e

xam

inations

and

test

s have

bee

n c

onduct

ed o

n p

lant,

equip

men

t or

mac

hin

ery.

2.2

ex

pla

in h

ow

to e

nsu

re t

hat

pla

nt,

equip

men

t or

mac

hin

ery

com

plie

s w

ith c

urr

ent

legis

lation a

nd

why.

2.3

ca

rry

out

chec

ks o

n t

he

com

pet

ence

of peo

ple

who

will

set

up,

oper

ate

and m

ainta

in p

lant,

equip

men

t or

mach

iner

y.

2.4

ex

pla

in t

he

met

hods

of

chec

king c

om

pet

ence

of

those

set

ting u

p,

oper

atin

g a

nd m

ainta

inin

g p

lant,

eq

uip

men

t or

mac

hin

ery.

2.5

giv

e re

aso

ns

as

to w

hy

com

pet

ence

s of th

ose

se

ttin

g u

p,

oper

ating a

nd m

ain

tain

ing p

lant,

eq

uip

men

t or

mac

hin

ery

should

be

chec

ked.

Page 134: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

128

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Imple

men

t a

syst

em t

o

updat

e th

e dep

loym

ent

and a

lloca

tion o

f pla

nt,

eq

uip

men

t or

mac

hin

ery,

an

d o

per

ators

, as

the

pro

ject

pro

gre

sses

or

chan

ges

occ

ur.

3.1

dev

ise

and a

ctio

n a

sys

tem

that

tra

cks

the

dep

loym

ent,

allo

cation a

nd u

se o

f pla

nt,

equip

men

t or

mach

iner

y.

3.2

ex

pla

in t

he

various

met

hods

of im

ple

men

ting a

n

effe

ctiv

e sy

stem

that

can

updat

e th

e dep

loym

ent

and a

lloca

tion o

f pla

nt,

equip

men

t or

mach

iner

y as

pro

ject

s or

oper

ations

pro

gre

ss o

r ch

anges

occ

ur.

3.3

ex

pla

in w

hy

a sy

stem

for

updating t

he

dep

loym

ent

and a

lloca

tion o

f pla

nt,

equip

men

t or

mach

iner

y is

nee

ded

.

3.4

m

ake

reco

mm

endat

ions

on t

he

use

of

alte

rnat

ive

types

of

pla

nt,

equip

men

t or

mac

hin

ery

to d

ecis

ion

mak

ers.

3.5

des

crib

e w

ays

of

reco

mm

endin

g a

lter

nat

ives

to

dec

isio

n m

aker

s.

Page 135: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

129

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Iden

tify

haza

rds

and

asse

ss r

isks

ari

sing f

rom

th

e use

of

pla

nt,

eq

uip

men

t or

mac

hin

ery

and im

ple

men

t m

easu

res

that

pro

tect

peo

ple

and

the

envi

ronm

ent.

4.1

ev

aluat

e ri

sks

aris

ing fro

m h

aza

rds

and a

pply

m

easu

res

in o

rder

to p

rote

ct t

he

work

forc

e, g

ener

al

public

, vi

sito

rs a

nd t

he

envi

ronm

ent

rela

ting t

o

thre

e of th

e fo

llow

ing:

met

hods

of w

ork

risk

ass

essm

ent

safe

use

and s

tora

ge

of

tools

safe

use

and s

tora

ge

of

mat

eria

ls

traf

fic

man

agem

ent

emer

gen

cy p

lans.

4.2

ex

pla

in t

he

various

met

hods

of id

entify

ing h

azar

ds

and a

sses

sing r

isks

arisi

ng fro

m t

he

use

of pla

nt,

eq

uip

men

t or

mac

hin

ery.

4.3

des

crib

e w

ays

to im

ple

men

t m

easu

res

to p

rote

ct

peo

ple

and t

he

envi

ronm

ent.

Page 136: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

130

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Ensu

re t

hat

pla

nt,

eq

uip

men

t or

mac

hin

ery

oper

atio

ns

are

pla

nned

, ap

pro

priat

ely

and

super

vise

d a

nd c

onduct

ed

in a

ccord

ance

with c

urr

ent

legis

lation.

5.1

w

rite

or

appro

ve m

ethod s

tate

men

ts for

pla

nt,

eq

uip

men

t or

mac

hin

ery

oper

ations

and p

ass

the

info

rmat

ion o

n t

o t

he

peo

ple

conce

rned

.

5.2

des

crib

e va

rious

met

hods

of w

riting o

r appro

ving

met

hod s

tate

men

ts f

or

the

use

of pla

nt,

equip

men

t or

mach

iner

y.

5.3

ex

pla

in t

he

tech

niq

ues

that

can b

e use

d t

o p

ass

on

info

rmat

ion e

ffec

tive

ly.

5.4

ex

pla

in h

ow

to e

nsu

re t

hat

pla

nt,

equip

men

t or

mac

hin

ery

oper

ations

are

super

vise

d a

nd

conduct

ed in a

ccord

ance

with c

urr

ent

legis

lation.

5.5

es

tablis

h t

he

role

s and r

esponsi

bili

ties

allo

cate

d t

o

pla

nt,

equip

men

t or

mac

hin

ery

super

viso

rs,

oper

ators

and u

sers

.

5.6

ex

pla

in h

ow

to m

ainta

in e

ffec

tive

rec

ord

s fo

r th

e co

mpet

ence

of su

per

viso

rs,

oper

ators

and u

sers

.

Page 137: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

131

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Ensu

re t

he

appro

priate

st

ora

ge,

ser

vici

ng a

nd

mai

nte

nan

ce o

f pla

nt,

eq

uip

men

t or

mac

hin

ery

to m

eet

oper

atio

nal and

stat

uto

ry r

equirem

ents

.

6.1

ar

range

the

stora

ge,

ser

vici

ng a

nd m

ainte

nan

ce o

f pla

nt,

equip

men

t or

mac

hin

ery.

6.2

ca

rry

out

chec

ks t

o e

nsu

re s

ervi

ceab

ility

and

mai

nte

nan

ce o

f pla

nt,

equip

men

t or

mach

iner

y as

ap

pro

priat

e to

at

least

thre

e of

the

follo

win

g

oper

atio

nal or

stat

uto

ry r

equirem

ents

:

hea

lth,

safe

ty a

nd w

elfa

re o

f th

e w

ork

forc

e an

d

oth

ers

oper

atio

nal ef

fici

ency

secu

rity

of

reso

urc

es

oblig

ations

to t

hird p

arties

regula

tory

auth

orities

contr

act

ual co

mm

itm

ents

.

6.3

ex

pla

ins

way

s of en

suring,

and w

hy

is im

port

ant

that

, pla

nt,

equip

men

t or

mach

iner

y is

sto

red,

serv

iced

and m

ainta

ined

in a

ccord

ance

with

oper

atio

nal an

d s

tatu

tory

req

uirem

ents

.

Page 138: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

132

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Iden

tify

lea

rnin

g n

eeds

for

super

viso

rs,

oper

ators

and

use

rs o

f pla

nt,

equip

men

t or

mach

iner

y th

at w

ill o

r co

uld

support

the

pro

ject

or

futu

re p

roje

cts

or

oper

atio

ns.

7.1

es

tablis

h t

he

learn

ing n

eeds

of

pla

nt

super

viso

rs,

oper

ators

and u

sers

and r

evie

w t

he

info

rmat

ion

obta

ined

for

at lea

st t

wo o

f th

e le

arnin

g a

ctiv

itie

s:

form

al

info

rmal

coac

hed

men

tore

d

voca

tionally

qualif

ying.

7.2

ex

pla

in t

he

various

met

hods

of id

entify

ing lea

rnin

g

nee

ds

of pla

nt

super

viso

rs,

oper

ators

and u

sers

and

how

to c

om

par

e w

ith t

he

nee

ds

of

futu

re p

roje

cts

or

oper

atio

ns.

7.3

des

crib

e w

ays

of obta

inin

g info

rmat

ion o

n r

anges

of

lear

nin

g a

ctiv

itie

s.

7.4

ex

pla

in h

ow

the

lear

nin

g d

evel

opm

ent

for

pla

nt

super

viso

rs,

oper

ators

and u

sers

can

be

arra

nged

.

Page 139: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

133

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

8

Enco

ura

ge

those

invo

lved

or

affec

ted b

y pla

nt,

eq

uip

men

t or

mac

hin

ery

oper

atio

ns

to s

ugges

t im

pro

vem

ents

in s

afe

oper

atio

ns.

8.1

pro

vide

opport

unitie

s to

at

leas

t fo

ur

of th

e fo

llow

ing in o

rder

to s

ugges

t im

pro

vem

ents

in s

afe

oper

atio

ns:

super

viso

rs

oper

ators

use

rs

oth

er m

ember

s of th

e w

ork

forc

e

mem

ber

s of th

e public

occ

upie

rs

nei

ghbours

visi

tors

org

anis

atio

nal

rep

rese

nta

tive

s

hire

firm

(s),

com

pan

ies

or

agen

ts.

8.2

ex

pla

in h

ow

to e

nco

ura

ge

those

invo

lved

or

affe

cted

by

pla

nt,

equip

men

t or

mac

hin

ery

oper

atio

ns

to s

ugges

t sa

fe im

pro

vem

ents

.

8.3

ex

pla

in w

hy

enco

ura

gem

ent

is n

eeded

in

sugges

ting im

pro

vem

ents

to p

lant,

equip

men

t or

mac

hin

ery

oper

ations.

Page 140: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

134

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

9

Ensu

re t

hat

pla

nt,

eq

uip

men

t or

mac

hin

ery

whic

h is

no longer

nee

ded

is

ret

urn

ed o

r re

move

d.

9.1

m

ake

arra

ngem

ents

to a

llow

pla

nt,

equip

men

t or

mac

hin

ery

to b

e, o

r sp

ecifie

d t

o b

e, r

emove

d o

r re

turn

ed.

9.2

des

crib

e th

e va

rious

met

hods

of en

suring t

hat

pla

nt,

equip

men

t or

mac

hin

ery

not

nee

ded

is

retu

rned

or

rem

ove

d.

9.3

giv

e re

aso

ns

why

pla

nt,

equip

men

t or

mach

iner

y sh

ould

be

retu

rned

or

rem

ove

d w

hen

not

required

.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 141: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

135

Unit 15: Organising, controlling and monitoring supplies of materials in the workplace

Unit reference number: H/600/7343

QCF level: 5

Credit value: 8

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in organising, controlling and monitoring supplies of materials in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of organising, controlling and monitoring supplies of materials to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 142: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

136

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 143: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

137

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Anal

yse

oper

atio

nal pla

ns

and q

uan

tities

to a

sses

s w

hat

supplie

s of

mat

eria

ls

will

be

required

and

calc

ula

te a

nd d

evel

op a

del

iver

y sc

hed

ule

.

1.1

ex

amin

e oper

atio

nal

pla

ns

and q

uan

tities

for

various

pro

ject

s.

1.2

ca

lcula

te d

eliv

ery

and lea

d t

imes

.

1.3

sc

hed

ule

del

iver

ies

and t

raffic

man

agem

ent.

1.4

ex

pla

in h

ow

oper

atio

nal

pla

ns

and q

uan

tities

can

be

anal

ysed

to a

sses

s w

hat

mat

eria

ls w

ill b

e re

quired

.

1.5

ex

pla

in m

ethods

that

can

cal

cula

te d

eliv

ery

and

lead

tim

es f

or

supplie

s of m

ater

ials

and w

hy

they

sh

ould

be

calc

ula

ted.

1.6

giv

e re

aso

ns

why

it is

nec

essa

ry t

o a

nal

yse

oper

atio

nal pla

ns

and q

uan

tities

to a

sses

s w

hat

m

ater

ials

will

be

required

.

1.7

ex

pla

ins

way

s th

at d

eliv

ery

sched

ule

s ca

n b

e dev

eloped

.

1.8

giv

e re

aso

ns

why

del

iver

y sc

hed

ule

s an

d t

raff

ic

man

agem

ent

are

required

.

Page 144: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

138

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Iden

tify

opport

unitie

s to

st

andar

dis

e su

pplie

s of

mat

eria

ls.

2.1

se

ek w

ays

of

stan

dard

isin

g s

upplie

s th

at

can

impro

ve a

t le

ast

one

of th

e fo

llow

ing:

econom

y of usa

ge

cost

envi

ronm

enta

l im

pact

sust

ain

abili

ty.

2.2

ex

pla

in w

ays

that

opport

unitie

s fo

r st

andard

isin

g

supplie

s of

mat

eria

ls c

an b

e id

entified

.

2.3

ex

pla

in h

ow

sta

ndar

dis

atio

n o

f m

ater

ials

can

ass

ist

pro

ject

s.

2.4

giv

e re

aso

ns

why

opport

unitie

s fo

r m

ate

rial

st

andar

dis

atio

n s

hould

be

consi

der

ed.

3

Chec

k w

ith t

he

del

iver

y sc

hed

ule

and u

sers

to

confirm

what

supplie

s of

mat

eria

ls a

re n

eeded

and

ensu

re a

ppro

priat

e ord

ers

are

pre

par

ed.

3.1

id

entify

and c

onfirm

supplie

s of re

quired

mat

eria

ls

agai

nst

del

iver

y sc

hed

ule

s.

3.2

ca

rry

out

chec

ks t

hat

ensu

re a

ppro

priat

e ord

ers

are

pre

par

ed.

3.3

ex

pla

in m

ethods

of ch

ecki

ng d

eliv

ery

sched

ule

s an

d

with u

sers

so t

hat

mate

rial

nee

ds

are

iden

tified

.

3.4

des

crib

e w

ays

that

can e

nsu

re a

ppro

priat

e ord

ers

are

pre

par

ed.

3.5

giv

e re

aso

ns

why

chec

ks m

ust

be

made

to e

nsu

re

appro

priat

e ord

ers

are

pre

par

ed.

Page 145: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

139

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Conduct

neg

otiations

and

mee

tings

with s

upplie

rs

and u

sers

so t

hat

goodw

ill

and t

rust

is

main

tain

ed

and a

gre

ed s

upply

re

quirem

ents

are

ensu

red.

4.1

co

mm

unic

ate

and/o

r m

eet

with b

oth

supplie

rs a

nd

use

rs t

o iden

tify

and c

onfirm

supply

req

uirem

ents

.

4.2

ag

ree

and m

onitor

supply

req

uirem

ents

for

various

pro

ject

s w

ith v

arious

supplie

rs.

4.3

ex

pla

in m

ethods

and t

echniq

ues

of co

nduct

ing

neg

otiations

and m

eetings

with s

upplie

rs a

nd u

sers

to

ensu

re s

upply

req

uirem

ents

are

agre

ed.

4.4

lis

t an

d d

escr

ibe

the

fact

ors

and iss

ues

that

det

erm

ine

and a

ffec

t su

pply

req

uirem

ents

.

4.5

ex

pla

in h

ow

goodw

ill a

nd t

rust

can

be

main

tain

ed

with s

upplie

rs a

nd u

sers

.

4.6

ex

pla

in h

ow

form

al a

nd info

rmal m

eetings

with

supplie

rs a

nd u

sers

can

be

conduct

ed.

5

Imple

men

t sy

stem

s to

m

onitor

the

del

iver

y sc

hed

ule

and t

he

per

form

ance

of

supplie

rs,

whic

h w

ill iden

tify

supply

im

pro

vem

ents

.

5.1

es

tablis

h m

onitoring s

yste

ms

for

supply

del

iver

y sc

hed

ule

s.

5.2

es

tablis

h m

onitoring s

yste

ms

that

chec

k th

e per

form

ance

of

supplie

rs.

Page 146: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

140

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5.3

es

tablis

h a

t le

ast

thre

e of

the

follo

win

g fact

ors

use

d

in m

ater

ials

contr

ol:

qual

ity

quan

tity

pay

men

t to

supplie

rs

appro

val by

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

pro

gra

mm

ing

cost

.

5.4

id

entify

im

pro

vem

ents

that

can b

e m

ade

to

mat

eria

l su

pply

usi

ng info

rmat

ion fro

m m

onitoring

syst

ems.

5.5

ex

pla

in h

ow

sys

tem

s, t

hat

cove

r al

l nec

essa

ry

fact

ors

to m

onitor

the

del

iver

y sc

hed

ule

s, c

an b

e im

ple

men

ted.

5.6

ex

pla

in h

ow

sys

tem

s th

at c

an m

onitor

the

per

form

ance

of

supplie

rs a

gai

nst

the

agre

ed s

upply

re

quirem

ents

can

be

imple

men

ted.

5.7

des

crib

e how

iden

tified

im

pro

vem

ents

to d

eliv

ery

sched

ule

s ca

n b

e re

cord

ed.

5.8

giv

e re

aso

ns

why

the

del

iver

y sc

hed

ule

and

per

form

ance

of

supplie

rs s

hould

be

monitore

d.

Page 147: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

141

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Iden

tify

pro

ble

ms

with

supply

, re

cord

them

and

take

act

ion t

o r

esolv

e th

em.

6.1

an

alys

e su

pply

monitoring s

yste

ms

and d

eliv

ery

sched

ule

s an

d n

ote

iden

tified

supply

pro

ble

ms.

6.2

im

ple

men

t ap

pro

priate

met

hods

to r

esolv

e id

entified

supply

pro

ble

ms.

6.3

ex

pla

in m

ethods

that

can

iden

tify

pro

ble

ms

with

supply

and s

upply

req

uirem

ents

, how

they

can

be

reco

rded

and w

hat

act

ions

can b

e ta

ken t

o r

esolv

e th

em.

6.4

ex

pla

in h

ow

the

del

iver

y sc

hed

ule

can

be

modifie

d

to m

inim

ise

dis

ruption t

o t

he

pro

gra

mm

e.

7

Iden

tify

chan

ges

lik

ely

to

resu

lt in o

ver

or

under

su

pply

and m

odify

the

del

iver

y sc

hed

ule

to

min

imis

e dis

ruption t

o t

he

pro

gra

mm

e.

7.1

re

gula

rly

exam

ine

mat

eria

l su

pply

per

form

ance

ag

ainst

ongoin

g p

roje

ct r

equirem

ents

.

7.2

am

end d

eliv

ery

sched

ule

s w

hen

mat

eria

l su

pplie

s ar

e not

mee

ting p

rogra

mm

e re

quirem

ents

or

wher

e ex

cess

mate

rial

s are

bei

ng s

upplie

d.

7.3

ex

pla

in w

ays

that

can iden

tify

chan

ges

lik

ely

to

resu

lt in o

ver

or

under

supply

.

7.4

ex

pla

in h

ow

to m

odify

del

iver

y sc

hed

ule

s th

at

min

imis

es d

isru

ption t

o t

he

pro

gra

mm

e.

Page 148: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

142

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 149: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

143

Unit 16: Establishing and monitoring communication systems and organisational procedures in the workplace

Unit reference number: J/600/7349

QCF level: 6

Credit value: 11

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in establishing and monitoring communication systems and organisational procedures in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of establishing and monitoring communication systems and organisational procedures to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 150: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

144

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 151: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

145

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Iden

tify

org

anis

atio

nal

and

com

munic

atio

n n

eeds

for

the

pro

ject

.

1.1

ex

amin

e and e

stab

lish p

roje

ct c

om

munic

ation

requirem

ents

for

pro

ject

s th

at

mee

ts o

rgan

isat

ional

nee

ds.

1.2

co

nsi

der

at

least

four

of th

e fo

llow

ing o

rganis

atio

nal

an

d c

om

munic

atio

n s

yste

ms

when

iden

tify

ing

com

munic

atio

n n

eeds:

role

s an

d r

esponsi

bili

ties

site

or

hea

d o

ffic

e in

terf

ace

pro

ject

adm

inis

trat

ion

hea

lth,

safe

ty,

wel

fare

and e

nvi

ronm

enta

l nee

ds

pro

ject

tea

m inte

rfac

es

inte

gra

tion o

f dat

a

sharing o

f pro

ject

data

team

work

ing

the

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

.

1.3

ex

pla

in h

ow

suitab

le o

rgan

isat

ional

and

com

munic

atio

n s

yste

ms

can b

e id

entified

for

pro

ject

s.

Page 152: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

146

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Est

ablis

h s

yste

ms

and

pro

cedure

s w

hic

h a

re

com

patible

with t

hose

use

d b

y th

e cl

ient,

cu

stom

er o

r th

eir

repre

senta

tive

and t

he

supply

chain

.

2.1

id

entify

and im

ple

men

t co

mm

unic

atio

n s

yste

ms

and

pro

cedure

s th

at a

re c

om

pat

ible

with c

lients

, cu

stom

ers

or

thei

r re

pre

senta

tive

s, a

nd s

upply

ch

ain s

yste

ms.

2.2

m

anag

e, a

dm

inis

ter

and c

ontr

ol oper

atio

nal

co

mm

unic

atio

n s

yste

ms

and p

roce

dure

s.

2.3

ex

pla

in w

ays

that

sys

tem

s, c

om

pat

ible

with t

hose

use

d b

y cl

ients

, cu

stom

ers

or

thei

r re

pre

senta

tive

s an

d s

upply

chai

ns,

can b

e es

tablis

hed

and

intr

oduce

d.

2.4

ex

pla

ins

met

hods

of

esta

blis

hin

g c

om

munic

atio

n

and o

rgan

isat

ional

sys

tem

s th

at w

ill e

nab

le c

lear

ef

fect

ive

man

agem

ent,

adm

inis

trative

and

oper

atio

nal co

ntr

ols

.

2.5

giv

e re

aso

ns

why

com

munic

atio

n a

nd

org

anis

atio

nal

sys

tem

s, t

hat

will

be

com

patible

and

pro

vide

contr

ol, a

re n

eeded

.

Page 153: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

147

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Produce

pro

ject

in

form

atio

n a

nd c

ircu

late

it t

o p

eople

and

org

anis

atio

ns

that

have

an

inte

rest

.

3.1

id

entify

info

rmat

ion n

eeded

for

the

pro

ject

.

3.2

pro

duce

pro

ject

info

rmat

ion in r

elev

ant

form

ats

that

will

support

the

pro

ject

.

3.3

dis

trib

ute

rel

evan

t pro

ject

info

rmation o

n lea

st o

ne

of th

e fo

llow

ing t

o p

eople

that

hav

e an

inte

rest

:

info

rmat

ion o

n p

eople

’s r

ole

s

det

ails

on p

eople

’s r

esponsi

bili

ties

det

ails

of th

e org

anis

atio

nal

str

uct

ure

.

3.4

des

crib

e w

ays

that

acc

ura

te a

nd u

nam

big

uous

info

rmation a

bout

peo

ple

’s r

ole

s and

resp

onsi

bili

ties

, th

e pro

ject

and t

he

org

anis

atio

nal

stru

cture

can

be

pro

duce

d.

3.5

ex

pla

in m

ethods

that

allo

w f

or

the

circ

ula

tion o

f in

form

ation a

bout

peo

ple

’s r

ole

s and

resp

onsi

bili

ties

, an

d t

he

pro

ject

and o

rgan

isat

ional

st

ruct

ure

, to

peo

ple

and o

rgan

isat

ions

that

hav

e an

in

tere

st.

3.6

giv

e re

aso

ns

why

info

rmat

ion o

n p

eople

’s r

ole

s an

d

resp

onsi

bili

ties

is

import

ant

to p

eople

and

org

anis

atio

ns

that

have

an inte

rest

.

Page 154: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

148

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Est

ablis

h m

ethods

of

com

munic

atin

g

info

rmat

ion b

etw

een

peo

ple

and o

rgan

isat

ions

that

have

an inte

rest

.

4.1

id

entify

peo

ple

and o

rgan

isations

that

have

inte

rest

or

nee

d r

elev

ant

pro

ject

info

rmat

ion.

4.2

put

in p

lace

at

least

thre

e of

the

follo

win

g m

ethods

of

com

munic

atio

n f

or

report

ing,

reco

rdin

g a

nd

retr

ievi

ng r

elev

ant

pro

ject

info

rmat

ion for

rele

vant

peo

ple

and/o

r org

anis

atio

ns:

ora

l

writt

en

gra

phic

elec

tronic

.

4.3

lis

t an

d d

escr

ibe

who w

ould

lik

ely

to b

e in

cluded

w

hen

est

ablis

hin

g c

om

munic

atio

n m

ethods

for

pro

ject

s

4.4

ex

pla

in w

ays

that

met

hods

of

com

munic

atin

g,

report

ing,

reco

rdin

g a

nd r

etriev

ing info

rmat

ion,

bet

wee

n p

eople

and o

rgan

isat

ions

that

have

an

inte

rest

and a

ppro

priat

e to

the

nee

ds

of th

e pro

ject

, ca

n b

e es

tablis

hed

.

4.5

ex

pla

in w

hy

met

hods

of co

mm

unic

atin

g,

report

ing,

reco

rdin

g a

nd r

etriev

ing info

rmat

ion b

etw

een

inte

rest

ed p

eople

and o

rgan

isat

ions

should

be

esta

blis

hed

.

Page 155: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

149

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Monitor

the

com

munic

atio

n a

nd

org

anis

atio

nal

met

hods

for

effe

ctiv

enes

s, iden

tify

and

inve

stig

ate

bre

akd

ow

ns

and t

ake

act

ion t

o r

esto

re

effe

ctiv

e co

mm

unic

ation

and o

rgan

isat

ion.

5.1

im

ple

men

t sy

stem

s to

monitor

the

effe

ctiv

enes

s of

com

munic

atio

n a

nd o

rgan

isat

ional

met

hods.

5.2

es

tablis

h c

ause

s of any

com

munic

atio

n a

nd

org

anis

atio

nal

met

hod b

reakd

ow

ns.

5.3

re

store

eff

ective

com

munic

atio

n a

nd o

rgan

isat

ional

m

ethods

by

imple

men

ting a

ppro

priat

e co

rrec

tive

ac

tions.

5.4

ex

pla

in m

ethods

that

can

monitor

the

com

munic

atin

g,

report

ing,

reco

rdin

g a

nd r

etriev

ing

of in

form

atio

n.

5.5

ex

pla

in h

ow

bre

akdow

ns

in c

om

munic

atio

n a

nd

org

anis

atio

nal

sys

tem

s ca

n b

e id

entified

.

5.6

des

crib

e how

bre

akdow

ns

in c

om

munic

atio

n a

nd

org

anis

atio

nal

sys

tem

s ca

n b

e in

vest

igat

ed a

nd

expla

in w

hy

they

should

be

inve

stig

ate

d.

5.7

ex

pla

in a

ctio

ns

that

can

be

take

n t

o r

esto

re

effe

ctiv

e co

mm

unic

ation a

nd o

rgan

isat

ional

sy

stem

s.

Page 156: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

150

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Use

info

rmat

ion r

ecei

ved

to m

ake

im

pro

vem

ents

to

the

org

anis

atio

n o

f th

e pro

ject

and

com

munic

atio

n s

yste

ms.

6.1

gat

her

rel

evan

t in

form

atio

n a

bout

pro

ject

org

anis

atio

n a

nd c

om

munic

atio

n s

yste

ms.

6.2

es

tablis

h w

her

e co

mm

unic

atio

n s

yste

ms

and

pro

ject

org

anis

atio

n c

an b

e im

pro

ved.

6.3

im

ple

men

t pro

cess

es t

hat

can

im

pro

ve

com

munic

atio

n s

yste

ms

and p

roje

ct o

rganis

atio

n.

6.4

ex

pla

in h

ow

poss

ible

im

pro

vem

ents

to m

ethods

of

com

munic

atin

g a

nd o

rgan

isat

ional

sys

tem

s ca

n b

e id

entified

.

6.5

giv

e re

aso

ns

why

esta

blis

hed

sys

tem

s sh

ould

be

impro

ved.

7

Prep

are

for

and m

anag

e m

eetings

to m

eet

obje

ctiv

es.

7.1

pre

par

e ag

endas

, arr

ange

venues

, co

nta

ct

atte

ndee

s in

good t

ime

and a

gre

e obje

ctiv

es t

o b

e ac

hie

ved d

uring t

he

mee

ting.

7.2

m

eet

with s

take

hold

ers

and c

olle

agues

, an

d

faci

litate

const

ruct

ive

contr

ibutions

and b

alan

ced

and info

rmed

dis

cuss

ions

on a

gen

da

item

s fr

om

at

tendee

s during t

he

mee

ting.

7.3

ru

n m

eetings

with s

take

hold

ers

and c

olle

agues

on

tim

e, e

nsu

re a

nd a

gre

e th

at o

bje

ctiv

es h

ave

bee

n

achie

ved,

and a

gre

e ac

tions

and r

esponsi

bili

ties

to

be

take

n f

ollo

win

g t

he

mee

ting.

7.4

ex

pla

in h

ow

mee

tings

should

be

man

aged

that

en

sure

s obje

ctiv

es a

re m

et.

7.5

des

crib

e th

e diffe

rent

types

of

mee

tings

that

can

be

under

take

n w

ith s

take

hold

ers

and c

olle

agues

.

Page 157: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

151

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

8

Com

ple

te a

ctio

ns

follo

win

g

the

mee

ting t

o m

eet

obje

ctiv

es.

8.1

dra

ft a

nd c

ircu

late

min

ute

s of th

e m

eeting,

and

dis

trib

ute

nec

essa

ry info

rmat

ion t

o r

elev

ant

peo

ple

.

8.2

m

onitor

the

com

ple

tion o

f th

e agre

ed p

ost

-mee

ting

actions.

8.3

ex

pla

in m

ethods

that

ensu

re a

ctio

ns

are

com

ple

ted

follo

win

g m

eetings

and t

he

obje

ctiv

es a

re m

et.

8.4

des

crib

e w

ays

evalu

ating t

he

effe

ctiv

enes

s of

mee

tings.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 158: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

152

Page 159: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

153

Unit 17: Establishing project dimensional control criteria in the workplace

Unit reference number: R/600/7354

QCF level: 6

Credit value: 10

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in establishing project dimensional control criteria in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of establishing project dimensional control criteria to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 160: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

154

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 161: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

155

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Obta

in r

elev

ant

surv

ey

info

rmat

ion,

chec

k th

at it

is u

p t

o d

ate

and a

ccura

te,

and r

esolv

e an

y pro

ble

ms.

1.1

co

llect

, co

llate

and a

nal

yse

late

st s

urv

ey

info

rmation for

giv

en p

roje

cts.

1.2

id

entify

and r

esolv

e at

least

tw

o o

f th

e fo

llow

ing

pro

ble

ms

when

anal

ysin

g s

urv

ey info

rmation:

uncl

ear

info

rmat

ion

mis

sing info

rmat

ion

inco

nsi

sten

cies

bet

wee

n d

ocu

men

ts

erro

rs.

1.3

ex

pla

in w

ays

that

rel

evan

t su

rvey

info

rmation c

an

be

obta

ined

.

1.4

ex

pla

in h

ow

surv

ey info

rmation c

an b

e ch

ecke

d t

o

ensu

re it

is u

p t

o d

ate

and a

ccura

te.

1.5

ex

pla

in h

ow

pro

ble

ms

with s

urv

ey info

rmation c

an

be

reso

lved

and w

hy

pro

ble

ms

nee

d t

o b

e re

solv

ed.

Page 162: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

156

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Corr

elate

and inte

rpre

t in

form

atio

n o

n p

roje

ct

work

whic

h is

rele

vant

to

dim

ensi

onal

contr

ol.

2.1

in

terp

ret

appro

pri

ate

dim

ensi

onal

contr

ol

info

rmat

ion a

nd c

alcu

lations

for

giv

en p

roje

cts.

2.2

co

rrel

ate

dim

ensi

onal

contr

ol in

form

atio

n a

nd

calc

ula

tions

again

st r

elev

ant

pro

ject

work

.

2.3

des

crib

e fa

ctors

whic

h d

eter

min

e dim

ensi

onal

co

ntr

ol in

form

atio

n.

2.4

ex

pla

in h

ow

info

rmat

ion o

n p

roje

ct w

ork

can

be

corr

elat

ed w

ith d

imen

sional co

ntr

ol in

form

ation.

2.5

ex

pla

in m

ethods

that

can

inte

rpre

t in

form

ation o

n

pro

ject

work

whic

h is

rele

vant

to d

imen

sional

co

ntr

ol in

form

atio

n.

2.6

giv

e re

aso

ns

why

info

rmat

ion o

n p

roje

ct w

ork

, w

hic

h is

rele

vant

to d

imen

sional

contr

ol

info

rmat

ion,

nee

ds

to b

e co

rrel

ated

and inte

rpre

ted.

Page 163: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

157

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Ensu

re t

hat

variat

ions

are

iden

tified

bet

wee

n t

he

spec

ifie

d a

nd t

he

actu

al

site

dim

ensi

ons,

rec

ord

th

em a

ccura

tely

and

circ

ula

te t

hem

to d

ecis

ion-

mak

ers.

3.1

es

tablis

h v

aria

tions

bet

wee

n a

ctual

and s

pec

ifie

d

site

dim

ensi

ons

on g

iven

pro

ject

s.

3.2

docu

men

t id

entified

var

iations

of act

ual

and

spec

ifie

d s

ite

dim

ensi

ons

follo

win

g o

rgan

isat

ional

pro

cedure

s.

3.3

dis

trib

ute

iden

tified

var

iations

of act

ual

and

spec

ifie

d s

ite

dim

ensi

ons

to r

elev

ant

dec

isio

n

mak

ers.

3.4

des

crib

e poss

ible

cau

ses

of va

riat

ions

bet

wee

n

spec

ifie

d a

nd a

ctual

site

dim

ensi

ons.

3.5

ex

pla

in h

ow

var

iations

bet

wee

n t

he

spec

ifie

d a

nd

the

act

ual

site

dim

ensi

ons

can b

e id

entified

.

3.6

ex

pla

in w

ays

of re

cord

ing v

aria

tions

bet

wee

n t

he

spec

ifie

d a

nd t

he

actu

al s

ite

dim

ensi

ons.

Page 164: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

158

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Ensu

re t

hat

refe

rence

poin

ts a

re s

uitab

ly p

lace

d,

accu

rate

, cl

early

iden

tified

an

d p

rote

cted

fro

m

move

men

t or

rem

ova

l.

4.1

pla

ce r

efer

ence

poin

ts o

n g

iven

pro

ject

s ac

cord

ing

to p

roje

ct a

nd o

rgan

isat

ional

req

uirem

ents

, an

d

ensu

re d

imen

sional

acc

ura

cy a

gai

nst

set

ref

eren

ce

poin

ts.

4.2

en

sure

that

pla

ced r

efer

ence

poin

ts a

re iden

tifiable

as

to p

urp

ose

, an

d im

ple

men

t pro

tect

ion s

yste

ms

that

elim

inat

e m

ove

men

t, d

am

age

and/o

r re

mova

l.

4.3

lis

t an

d d

escr

ibe

typic

al t

ypes

of se

t re

fere

nce

poin

ts.

4.4

ex

pla

in h

ow

to a

ccura

tely

set

and c

lear

ly iden

tify

re

fere

nce

poin

ts f

rom

set

ref

eren

ce p

oin

ts.

4.5

ex

pla

in m

ethods

that

can

pro

tect

ref

eren

ce p

oin

ts

from

move

men

t an

d r

emova

l.

5

Ensu

re a

dim

ensi

onal

co

ntr

ol m

onitoring

syst

em,

whic

h w

ill m

ake

sure

the

spec

ifie

d

accu

racy

crite

ria

will

be

met

, is

est

ablis

hed

.

5.1

im

ple

men

t a

rele

vant

monitoring s

yste

m t

hat

en

sure

s dim

ensi

onal

contr

ol acc

ura

cy f

or

giv

en

pro

ject

s.

5.2

des

crib

e th

e el

emen

ts o

f m

onitoring s

yste

ms

5.3

ex

pla

in h

ow

monitoring s

yste

ms

can b

e dev

eloped

.

5.4

giv

e re

aso

ns

why

monitoring s

yste

ms

should

be

dev

eloped

.

Page 165: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

159

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Ensu

re t

hat

mea

suring

and r

ecord

ing e

quip

men

t is

mai

nta

ined

to m

eet

the

spec

ifie

d a

ccura

cy c

rite

ria.

6.1

es

tablis

h t

he

chec

ks t

hat

are

req

uired

to m

ainta

in

and u

se m

easu

ring a

nd r

ecord

ing e

quip

men

t.

6.2

en

sure

that

mai

nte

nance

and u

ser

chec

ks a

re

carr

ied o

ut

on r

elev

ant

mea

suring a

nd r

ecord

ing

equip

men

t in

acc

ord

ance

with r

elev

ant

requirem

ents

.

6.3

ex

pla

in h

ow

typ

ical m

easu

ring a

nd r

ecord

ing

equip

men

t use

d t

o e

stab

lish d

imen

sional

contr

ol is

use

d a

nd m

ainta

ined

.

6.4

giv

e re

aso

ns

why

spec

ific

mea

suring a

nd r

ecord

ing

equip

men

t sh

ould

be

sele

cted

for

giv

en p

roje

cts.

7

Rec

ord

any

dim

ensi

onal

co

ntr

ol in

form

atio

n w

hic

h

may

be

of

late

r use

, an

d

store

it

secu

rely

.

7.1

id

entify

and n

ote

the

follo

win

g w

hen

est

ablis

hin

g

and c

hec

king d

imen

sional

contr

ol in

form

atio

n:

dim

ensi

ons

loca

tions

leve

ls

dev

iations.

7.2

ap

pro

priat

ely

iden

tify

and s

ecure

ly s

tore

dim

ensi

onal

contr

ol in

form

ation follo

win

g

org

anis

atio

nal

pro

cedure

s w

her

e in

form

ation c

an b

e re

trie

ved for

futu

re u

se.

7.3

ex

pla

in t

he

met

hods

and p

roce

dure

s th

at c

an b

e use

d t

o r

ecord

and s

tore

dim

ensi

onal co

ntr

ol

info

rmat

ion w

hic

h m

ay b

e of la

ter

use

.

Page 166: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

160

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 167: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

161

Unit 18: Controlling project quantities and costs in the workplace

Unit reference number: H/600/7357

QCF level: 6

Credit value: 12

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in controlling project quantities and costs in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of controlling project quantities and costs to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 168: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

162

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 169: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

163

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Imple

men

t ap

pro

priate

quan

tities

and c

ost

contr

ol

syst

ems

whic

h a

re a

ble

to

pro

vide

early

war

nin

g o

f pro

ble

ms.

1.1

pla

n a

nd im

ple

men

t at

lea

st o

ne

of th

e fo

llow

ing

appro

priat

e quan

tities

and c

ost

contr

ol sy

stem

s on

giv

en p

roje

cts:

contr

act

ual pro

cedure

s an

d m

eetings

oper

atio

nal pro

cedure

s an

d m

eetings

elec

tronic

rec

ord

s.

1.2

lis

t an

d d

escr

ibe

the

fact

ors

that

det

erm

ine

quan

tities

and c

ost

dat

a.

1.3

ex

pla

in h

ow

appro

priat

e pro

ject

quan

tities

and c

ost

co

ntr

ol sy

stem

s, w

hic

h w

ill p

rovi

de

early

war

nin

gs

of pro

ble

ms,

can

be

imple

men

ted.

Page 170: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

164

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Ensu

re t

hat

quan

tity

and

cost

data

is

regula

rly

colle

cted

, re

cord

it

and

pas

s it o

n t

o t

he

appro

priat

e peo

ple

re

sponsi

ble

in t

ime

for

them

to b

e ab

le t

o u

se it.

2.1

gat

her

and c

olla

te info

rmat

ion r

elat

ing t

o q

uan

tities

an

d c

ost

s on a

t le

ast

four

of th

e fo

llow

ing r

esourc

es

on a

fre

quen

t basi

s:

peo

ple

pla

nt,

equip

men

t or

mac

hin

ery

mat

eria

ls a

nd c

om

ponen

ts

sub-c

ontr

act

ors

info

rmat

ion

work

are

a a

nd faci

litie

s

was

te m

anag

emen

t

utilit

y pro

vider

s

reco

rds

of

valu

atio

ns

of w

ork

com

ple

ted.

2.2

docu

men

t th

e findin

gs

of quan

tities

and c

ost

s usi

ng

appro

priat

e fo

rmat

s an

d p

ass

appro

priat

e re

sponsi

ble

peo

ple

follo

win

g o

rgan

isat

ional

tim

esca

les.

2.3

ex

pla

in m

ethods

that

allo

w f

or

quan

tities

and c

ost

dat

a to

be

colle

cted

and r

ecord

ed for

the

pro

ject

an

d t

he

reso

urc

es u

sed.

2.4

ex

pla

in h

ow

to e

nsu

re t

hat

dat

a is

pass

ed o

n t

o t

he

peo

ple

res

ponsi

ble

in t

ime

for

them

to u

se it.

Page 171: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

165

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Ensu

re t

hat

work

val

ues

, quan

tities

and c

ost

dat

a ar

e pre

par

ed.

3.1

im

ple

men

t an

d m

onitor

syst

ems

that

ensu

re t

hat

co

st c

alcu

lations

for

giv

en p

roje

cts

are

under

take

n.

3.2

im

ple

men

t an

d m

onitor

syst

ems

that

ensu

re t

hat

w

ork

val

ues

and q

uantities

for

giv

en p

roje

cts

are

under

take

n.

3.3

ex

pla

in h

ow

to e

nsu

re t

hat

corr

ect

work

val

ues

, quan

tities

and c

ost

dat

a ar

e pre

par

ed.

4

Ensu

re t

hat

accu

rate

quan

tities

and c

ost

dat

a ar

e pre

par

ed a

nd

pre

sente

d in a

form

at

whic

h w

ill h

elp t

he

peo

ple

re

sponsi

ble

to m

ake

dec

isio

ns.

4.1

det

erm

ine,

pre

pare

and d

ocu

men

t th

e re

sults

of

quan

tity

and c

ost

info

rmat

ion f

or

giv

en p

roje

cts

4.2

pre

sent

anal

ysed

res

ults

on q

uan

tities

and c

ost

dat

a to

peo

ple

res

ponsi

ble

usi

ng r

elev

ant

form

ats

.

4.3

ex

pla

in m

ethods

that

can

ensu

re t

hat

acc

ura

te

quan

tities

and c

ost

dat

a is

pre

sente

d in a

form

at

whic

h w

ill h

elp p

eople

res

ponsi

ble

to m

ake

dec

isio

ns.

Page 172: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

166

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Ensu

re t

hat

variat

ions

and

tren

ds

in q

uan

tities

and

cost

data

are

iden

tified

, quan

tified

and c

ost

ed.

5.1

pla

nt

and im

ple

men

t m

onitoring s

yste

ms

that

will

id

entify

variat

ions

and t

rends

in c

ost

s an

d

quan

tities

for

giv

en p

roje

cts.

5.2

quan

tify

and iden

tify

cost

s cr

eate

d b

y id

entified

va

riat

ions

or

tren

ds

in c

ost

dat

a an

d q

uantities

.

5.3

ex

pla

in h

ow

to e

nsu

re t

hat

variat

ions

and t

rends

in

quan

tities

and c

ost

dat

a ar

e id

entified

, quan

tified

an

d c

ost

ed.

5.4

giv

e re

aso

ns

why

tren

ds

in c

ost

and q

uan

tities

and

cost

data

nee

d t

o b

e quan

tified

.

Page 173: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

167

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Ensu

re t

hat

any

variations

are

inve

stig

ated

and a

gre

e an

d im

ple

men

t ap

pro

priat

e co

rrec

tive

ac

tion w

ith p

eople

re

sponsi

ble

.

6.1

ca

rry

out

inve

stig

atio

ns

on iden

tified

var

iations

in

pro

ject

quan

tities

and c

ost

s an

d d

iscu

ss w

ith p

eople

re

sponsi

ble

.

6.2

se

ek a

nd g

ain

appro

val in

ord

er t

o im

ple

men

t at

leas

t one

of th

e fo

llow

ing c

orr

ective

act

ions:

rest

ore

pro

gre

ss in a

ccord

ance

with a

gre

ed

pro

gra

mm

e

agre

e new

com

ple

tion d

ates

initia

te c

ontr

act

clai

m

secu

re a

dditio

nal re

sourc

es

alte

r pla

nned

work

.

6.3

ex

pla

in h

ow

to e

nsu

re t

hat

vari

atio

ns

in c

ost

dat

a

are

inve

stig

ated

and e

xpla

in w

hy

variat

ions

in c

ost

dat

a nee

d t

o b

e in

vest

igat

ed.

6.4

ex

pla

in m

ethods

and t

echniq

ues

of ag

reei

ng a

nd

imple

men

ting a

ppro

priat

e co

rrec

tive

act

ions

with

peo

ple

res

ponsi

ble

whic

h w

ill r

esto

re c

ost

s an

d

expen

diture

to b

udget

.

6.5

giv

e re

aso

ns

why

appro

priat

e co

rrec

tive

act

ion w

ith

the

peo

ple

res

ponsi

ble

, in

ord

er t

o r

esto

re c

ost

s an

d e

xpen

diture

to b

udget

, nee

ds

to b

e agre

ed a

nd

imple

men

ted.

Page 174: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

168

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Iden

tify

opport

unitie

s fo

r co

st s

avin

gs

and

reco

mm

end t

hem

to

peo

ple

res

ponsi

ble

.

7.1

im

ple

men

t sy

stem

s and p

roce

sses

that

can iden

tify

opport

unitie

s fo

r co

st s

avi

ngs

on g

iven

pro

ject

s on

at lea

st t

wo o

f th

e fo

llow

ing:

was

te r

educt

ion

reso

urc

e m

anag

emen

t an

d logis

tics

applic

atio

ns

of new

tec

hnolo

gie

s an

d m

ater

ials

ener

gy

and u

tilit

y m

anag

emen

t

recy

clable

and r

ecove

rable

mat

eria

ls

alte

rnat

ive

sourc

es a

nd t

ypes

of m

ate

rials

variat

ions

in q

ual

ity

stan

dar

dis

atio

n

reve

nue

gen

erat

ion.

7.2

su

gges

t opport

unitie

s fo

r co

st s

avin

gs

usi

ng

suitab

le f

orm

ats

to p

eople

res

ponsi

ble

.

7.3

ex

pla

in h

ow

opport

unitie

s fo

r co

st s

avi

ngs

can b

e id

entified

.

7.4

ex

pla

in h

ow

sys

tem

s an

d p

roce

sses

whic

h w

ill

assi

st in t

he

iden

tifica

tion o

f opport

unitie

s fo

r co

st

savi

ngs,

can

be

dev

eloped

and r

ecom

men

ded

to

the

peo

ple

res

ponsi

ble

.

Page 175: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

169

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7.5

giv

e re

asons

why

syst

ems

and p

roce

sses

, w

hic

h

iden

tify

opport

unitie

s fo

r co

st s

avin

gs,

nee

d t

o b

e dev

eloped

and r

ecom

men

ded

to p

eople

res

ponsi

ble

.

7.6

des

crib

e m

ethods

that

can r

ecom

men

d

opport

unitie

s fo

r co

st s

avi

ngs

to p

eople

res

ponsi

ble

.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 176: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

170

Page 177: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

171

Unit 19: Evaluating feedback information and recommending improvements in the workplace

Unit reference number: K/600/7358

QCF level: 6

Credit value: 7

Guided learning hours: 20

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in evaluating feedback information and recommending improvements in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of evaluating feedback information and recommending improvements to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 178: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

172

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 179: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

173

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Prom

ote

the

valu

e of

mak

ing im

pro

vem

ents

fr

om

fee

dbac

k an

d

enco

ura

ge

the

colle

ctio

n

of

feed

bac

k.

1.1

dev

ise

pro

cess

es t

hat

will

pro

mote

, to

oth

ers,

the

valu

e of m

akin

g a

nd c

olle

ctin

g f

eedbac

k th

at c

an

allo

w im

pro

vem

ents

to w

ork

pro

gre

ss.

1.2

en

coura

ge

the

colle

ctio

n o

f w

ork

im

pro

vem

ent

feed

back

fro

m o

ther

s fr

om

at

leas

t si

x of th

e fo

llow

ing info

rmation s

ourc

es:

appro

ved s

upplie

rs

appro

ved s

ub-c

ontr

acto

rs

contr

act

docu

men

tation

pro

ject

docu

men

tation

org

anis

atio

nal

docu

men

tation

stan

dar

d d

etai

ls

spec

ific

atio

ns

pro

duct

info

rmat

ion

gove

rnm

ent

and s

tatu

tory

public

atio

ns

rese

arc

h a

nd a

dvi

sory

data

per

iodic

als

and a

bst

ract

s.

Page 180: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

174

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1.3

ex

pla

in w

ays

of pro

moting t

he

valu

e of

maki

ng

impro

vem

ents

fro

m f

eedbac

k re

ceiv

ed f

rom

in

form

atio

n s

ourc

es.

1.4

ex

pla

in m

ethods

that

can

enco

ura

ge

the

colle

ctio

n

of

feed

bac

k fr

om

info

rmat

ion s

ourc

es.

1.5

giv

e re

aso

ns

why

the

colle

ctio

n o

f fe

edbac

k fr

om

in

form

atio

n s

ourc

es s

hould

be

enco

ura

ged

.

Page 181: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

175

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Ensu

re f

eedbac

k in

form

atio

n fro

m r

elev

ant

met

hods

or

sourc

es is

obta

ined

, in

vest

igat

ed a

nd

asse

ssed

.

2.1

co

llect

fee

dbac

k in

form

atio

n fro

m a

t le

ast

thre

e of

the

follo

win

g m

ethods

or

sourc

es:

pro

ject

rec

ord

s an

d d

ocu

men

tation

site

insp

ections

scie

ntific

rese

arch

and d

ata

studie

s of

per

form

ance

in u

se

mee

tings

ques

tionnaires

report

s.

2.2

co

llate

and e

valu

ate

feed

bac

k in

form

ation u

sing

org

anis

atio

nal

or

oth

er m

ethods

to iden

tify

im

pro

vem

ents

to w

ork

pro

gre

ss.

2.3

ex

pla

in w

ays

that

ensu

re t

hat

fee

dbac

k fr

om

in

form

atio

n s

ourc

es is

obta

ined

usi

ng v

ario

us

met

hods

and o

ther

sourc

es.

2.4

ex

pla

in m

ethods

that

allo

w f

or

the

inve

stig

atio

n a

nd

asse

ssin

g o

f fe

edbac

k fr

om

info

rmat

ion s

ourc

es

usi

ng v

ario

us

met

hods

and o

ther

sourc

es.

2.5

giv

e re

aso

ns

why

feed

bac

k fr

om

info

rmation

sourc

es n

eeds

to b

e in

vest

igat

ed a

nd a

sses

sed.

Page 182: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

176

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Rec

om

men

d

impro

vem

ents

fro

m

feed

back

rec

eive

d a

nd

just

ify

the

reco

mm

endat

ions

to

rele

vant

peo

ple

.

3.1

su

gges

t im

pro

vem

ents

that

can b

e m

ade

to w

ork

pro

gre

ss u

sing e

valu

ated

fee

dbac

k to

rel

evan

t peo

ple

.

3.2

ju

stify

to r

elev

ant

peo

ple

, fo

r ea

ch s

ugges

ted

impro

vem

ent,

by

pro

vidin

g r

easo

ns

why

impro

vem

ents

can

be

mad

e.

3.3

ex

pla

in w

ays

that

rec

om

men

dat

ions

for

impro

vem

ents

can

be

mad

e fr

om

fee

dback

re

ceiv

ed.

3.4

ex

pla

in h

ow

rec

om

men

dat

ions

for

impro

vem

ents

fr

om

fee

dbac

k ca

n b

e ju

stifie

d t

o d

ecis

ion-m

aker

s.

3.5

giv

e re

aso

ns

why

reco

mm

endations

for

impro

vem

ents

fro

m f

eedbac

k sh

ould

be

mad

e an

d

just

ifie

d t

o d

ecis

ion-m

aker

s.

Page 183: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

177

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Sum

mar

ise

chan

ges

and

impro

vem

ents

fro

m

feed

back

whic

h h

ave

bee

n

agre

ed a

nd p

rom

ote

them

fo

r ad

option a

nd u

se.

4.1

su

mm

aris

e, u

sing s

uitab

le f

orm

ats

, ch

anges

to

work

pro

gra

mm

es w

hic

h h

ave

resu

lted

fro

m s

ought

feed

back

.

4.2

pro

mote

the

adoption a

nd u

se o

f im

pro

vem

ents

id

entified

fro

m f

eedbac

k to

those

invo

lved

in

mai

nta

inin

g p

rogre

ss o

f th

e w

ork

.

4.3

ex

pla

in m

ethods

that

can

allo

w t

he

sum

mary

of

chan

ges

and im

pro

vem

ents

mad

e fr

om

fee

dbac

k re

ceiv

ed.

4.4

des

crib

e how

the

adoption o

f ch

anges

and

impro

vem

ents

fro

m f

eedbac

k ca

n b

e pro

mote

d.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 184: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

178

Page 185: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

179

Unit 20: Planning highways maintenance or repair activities in the workplace

Unit reference number: M/600/7555

QCF level: 6

Credit value: 12

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in planning highways maintenance or repair activities in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of planning highways maintenance or repair activities to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 186: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

180

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 187: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

181

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Confirm

the

work

re

quirem

ents

of

pla

nnin

g

hig

hw

ay m

ainte

nan

ce o

r re

pai

r ac

tivi

ties

.

1.1

id

entify

and e

stab

lish a

t le

ast

two o

f th

e fo

llow

ing

mai

nte

nan

ce a

ctiv

itie

s an

d a

t le

ast

five

of

the

follo

win

g r

epai

r ac

tivi

ties

on a

t le

ast

one

of th

e fo

llow

ing h

ighw

ays:

M

ainte

nan

ce:

sched

ule

d a

nd p

reve

nta

tive

unsc

hed

ule

d a

nd c

orr

ective

emer

gen

cy.

Rep

air:

stru

cture

surf

ace

mat

eria

ls

mar

kings

fitt

ings

pow

er a

nd lig

ht

dra

inag

e

tele

com

munic

atio

ns

spec

ial se

rvic

es a

nd e

quip

men

t

Page 188: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

182

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

la

ndsc

apin

g

traf

fic

contr

ols

fenci

ng.

H

ighw

ays:

dual

car

riagew

ay

single

car

riag

eway

carr

iagew

ay w

ith footw

ay

moto

rway

cycl

e w

ay

carr

iagew

ay

with h

ard s

hould

er.

1.2

ex

pla

in h

ow

work

req

uirem

ents

for

hig

hw

ays

and

its

mai

nte

nan

ce o

r re

pai

r ca

n b

e co

nfirm

ed.

1.3

ex

pla

in w

ho n

eeds

to b

e co

nsu

lted

when

confirm

ing

work

req

uirem

ents

for

hig

hw

ays

mai

nte

nance

or

repai

r.

Page 189: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

183

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Iden

tify

and r

evie

w

influen

cing fact

ors

and

guid

ance

mat

eria

l about

the

work

envi

ronm

ent.

2.1

co

nsi

der

at

least

thre

e of th

e fo

llow

ing influen

cing

fact

ors

when

pla

nnin

g h

ighw

ay

mai

nte

nan

ce o

r re

pai

r ac

tivi

ties

:

org

anis

atio

nal

req

uirem

ents

contr

act

ual re

quirem

ents

stat

uto

ry r

equirem

ents

reso

urc

e al

loca

tion

work

ing r

equirem

ents

envi

ronm

enta

l co

nsi

der

atio

ns

wea

ther

conditio

ns.

2.2

ex

amin

e at

least

tw

o o

f th

e fo

llow

ing g

uid

ance

m

ater

ials

when

pla

nnin

g h

ighw

ay m

ainte

nan

ce o

r re

pai

r ac

tivi

ties

:

ow

ner

’s m

anual

s

log b

ooks

mai

nte

nan

ce s

ched

ule

s an

d m

anual

s

pra

ctic

e guid

es a

nd s

pec

ific

atio

ns

curr

ent

legis

lation a

nd o

ffic

ial guid

ance

.

2.3

ex

pla

in h

ow

influen

cing fact

ors

and g

uid

ance

m

ater

ials

can

be

iden

tified

and w

hat

diffe

rent

met

hods

can b

e use

d t

o r

evie

w t

hem

when

pla

nnin

g h

ighw

ay m

ainte

nan

ce o

r re

pair a

ctiv

itie

s.

Page 190: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

184

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Prio

ritise

mai

nte

nan

ce

activi

ties

by

ass

essi

ng a

nd

acco

unting for

all th

e in

fluen

cing fact

ors

.

3.1

priori

tise

mai

nte

nan

ce o

r re

pai

r ac

tivi

ties

whils

t co

nsi

der

ing influen

cing fact

ors

.

3.2

des

crib

e th

e ty

pes

of

mai

nte

nan

ce a

ctiv

ity

that

are

ap

plie

d t

o h

ighw

ays.

3.3

ex

pla

in m

ethods

that

can

ass

ess

and a

ccount

for

influen

cing fact

ors

when

pla

nnin

g m

ainte

nan

ce a

nd

repai

r ac

tivi

ties

.

3.4

ex

pla

in t

he

fact

ors

that

nee

d t

o b

e ta

ken into

ac

count

when

pri

oritisi

ng m

ainte

nan

ce a

ctiv

itie

s.

Page 191: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

185

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Am

end p

riorities

to t

ake

acco

unt

of

chan

gin

g

circ

um

stan

ces

whils

t m

ainta

inin

g c

onsi

sten

cy

with t

he

influen

cing

fact

ors

.

4.1

re

view

and u

pdat

e pre

-det

erm

ined

main

tenan

ce o

r re

pai

r pri

orities

by

taki

ng into

acc

ount

of at

least

fo

ur

of

the

follo

win

g c

han

gin

g c

ircu

mst

ance

s:

susc

eptibili

ty t

o d

am

age

safe

ty r

equirem

ents

nee

d t

o inhib

it a

nd r

espond t

o d

eter

iora

tion

com

pro

mis

ed o

per

atio

nal

eff

ective

nes

s

wea

ther

conditio

ns

use

or

change

of use

curr

ent

legis

lation

reso

urc

es

secu

rity

thre

ats.

4.2

ex

pla

in m

ethods

that

allo

w p

riorities

to b

e am

ended

w

hen

influen

cing fact

ors

hav

e bee

n t

ake

n into

ac

count.

4.3

ex

pla

in h

ow

chan

gin

g c

ircu

mst

ance

s ca

n b

e ac

counte

d f

or

when

pla

nnin

g m

ainte

nan

ce a

nd

repai

r ac

tivi

ties

.

Page 192: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

186

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Prep

are

pla

ns

or

sched

ule

s of m

ainte

nan

ce a

ctiv

itie

s an

d n

egotiat

e an

d a

gre

e th

em w

ith d

ecis

ion

mak

ers.

5.1

id

entify

, anal

yse

and p

roduce

pla

ns

or

sched

ule

s fo

r at

lea

st t

hre

e of th

e fo

llow

ing m

ainte

nan

ce o

r re

pai

r ac

tivi

ties

:

regula

r pro

gra

mm

es

tender

ed w

ork

s

resp

onsi

ve w

ork

s

cost

est

imat

ed w

ork

s

win

ter

mai

nte

nan

ce

traf

fic

mai

nte

nan

ce (

signin

g,

lighting a

nd

guar

din

g).

5.2

ex

pla

in h

ow

pla

ns

and s

ched

ule

s ca

n b

e pre

par

ed

for

mai

nte

nan

ce a

ctiv

itie

s.

5.3

ex

pla

in m

ethods

and t

echniq

ues

of neg

otiating a

nd

agre

eing p

lans

and s

ched

ule

s w

ith d

ecis

ion m

aker

s.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 193: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

187

Unit 21: Providing and monitoring construction-related customer service in the workplace

Unit reference number: F/600/7558

QCF level: 5

Credit value: 8

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in providing and monitoring construction-related customer service in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of providing and monitoring construction-related customer service to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 194: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

188

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 195: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

189

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Iden

tify

and u

se c

urr

ent

legis

lation a

nd o

ffic

ial

guid

ance

to im

ple

men

t sy

stem

s or

pro

cedure

s th

at w

ill d

eliv

er a

nd

impro

ve c

ust

om

er s

ervi

ce.

1.1

ap

ply

at

leas

t fo

ur

of th

e fo

llow

ing t

o c

ust

om

er

serv

ice

syst

ems

or

pro

cedure

s:

curr

ent

legis

lation

offic

ial guid

ance

org

anis

atio

nal

pro

cedure

s

spec

ific

atio

ns

dra

win

g

inst

ruct

ions

and v

ariations

feed

back

pro

cess

es.

1.2

se

ek w

ays

of im

pro

ving c

ust

om

er s

ervi

ce w

hils

t im

ple

men

ting c

ust

om

er s

ervi

ce s

yste

ms

and

pro

cedure

s.

1.3

des

crib

e w

ays

that

curr

ent

legis

lation a

nd o

ffic

ial

guid

ance

rel

evan

t to

cust

om

er s

ervi

ce c

an b

e id

entified

.

1.4

ex

pla

in h

ow

iden

tified

info

rmation c

an b

e use

d f

or

imple

men

ting c

ust

om

er s

ervi

ce s

yste

ms

or

pro

cedure

s.

1.5

ex

pla

in m

ethods

that

can

eff

ective

ly d

eliv

er a

nd

impro

ve c

ust

om

er s

ervi

ce.

Page 196: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

190

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Prep

are

to d

eal w

ith

cust

om

ers

in o

rder

to g

ive

consi

sten

t an

d r

elia

ble

se

rvic

e.

2.1

ex

amin

e cu

rren

t cu

stom

er p

roce

dure

s an

d s

yste

ms

to iden

tify

if th

ey p

rovi

de

consi

sten

t cu

stom

er

serv

ice.

2.2

im

ple

men

t an

d u

se s

yste

ms

or

pro

cedure

s th

at w

ill

pro

vide

relia

ble

and c

onsi

sten

t se

rvic

e th

at

pro

mote

s cu

stom

ers’

confiden

ce.

2.3

ex

pla

in m

ethods

that

can

pro

vide

consi

sten

t le

vels

of

cust

om

er s

ervi

ce.

2.4

ex

pla

in h

ow

sys

tem

s or

pro

cedure

s ca

n b

e use

d

effe

ctiv

ely

to p

rovi

de

a re

liable

lev

el o

f cu

stom

er

serv

ice.

3

Work

with o

ther

s to

re

solv

e cu

stom

er

pro

ble

ms,

com

munic

ate

with c

ust

om

ers

and c

hec

k th

at t

hey

are

sat

isfied

w

ith t

he

act

ions

take

n.

3.1

id

entify

and fin

d s

olu

tions

to c

onst

ruct

ion-b

ased

cu

stom

er p

roble

ms.

3.2

co

mm

unic

ate

with c

ust

om

ers

whils

t re

solv

ing

pro

ble

ms

usi

ng a

t le

ast

two o

f th

e fo

llow

ing

med

ium

s:

elec

tronic

verb

al

writt

en

via

a s

econd p

erso

n

feed

back

docu

men

ts

gro

up m

eetings.

Page 197: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

191

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3.3

under

take

at

least

tw

o o

f th

e fo

llow

ing a

ctio

ns

that

w

ill e

nsu

re t

hat

cust

om

ers

are

satisf

ied t

hat

pro

ble

ms

are

or

will

be

solv

ed:

corr

ective

refe

rral

inve

stig

ative

reac

tive

pro

active

.

3.4

ex

pla

in h

ow

bes

t to

work

with o

ther

s w

hic

h c

an

reso

lve

cust

om

er s

ervi

ce p

roble

ms.

3.5

des

crib

e diffe

rent

met

hods

and t

echniq

ues

of

com

munic

atin

g a

nd d

ealin

g w

ith c

ust

om

ers.

3.6

ex

pla

in w

hat

chec

ks c

an b

e under

take

n t

o e

nsu

re

that

cust

om

ers

are

satisf

ied w

ith a

ctio

ns

take

n.

Page 198: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

192

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Solv

e pro

ble

ms

within

ex

isting s

yste

ms

or

pro

cedure

s th

at

may

af

fect

cust

om

ers

bef

ore

th

e cu

stom

er b

ecom

es

awar

e of

them

.

4.1

in

vest

igate

and/o

r co

llate

info

rmat

ion o

n c

urr

ent

cust

om

er p

roce

dure

s an

d s

yste

ms

to iden

tify

pote

ntial

or

repea

t cu

stom

er s

ervi

ce p

roble

ms.

4.2

ap

ply

rec

tifica

tion m

easu

res

to p

roce

dure

s an

d

syst

ems

to e

limin

ate

or

reduce

iden

tified

pote

ntial

cust

om

er p

roble

ms.

4.3

des

crib

e w

ays

that

pro

ble

ms

can b

e id

entified

w

ithin

exi

stin

g s

yste

ms

or

pro

cedure

s th

at

may

affe

ct c

ust

om

ers.

4.4

ex

pla

in h

ow

and w

hy

pro

ble

ms

in s

yste

ms

or

pro

cedure

s sh

ould

be

solv

ed b

efore

cust

om

ers

bec

om

e aw

are

of th

em.

5

Confirm

that

the

serv

ice

giv

en m

eets

the

cust

om

er’s

nee

ds

and

expec

tations.

5.1

id

entify

the

leve

l of se

rvic

e ex

pec

ted b

y co

nst

ruct

ion-r

elat

ed c

ust

om

ers.

5.2

co

mm

unic

ate

with c

ust

om

ers

to c

hec

k th

at

serv

ice

giv

en h

as m

et t

hei

r nee

ds

and e

xpec

tations.

5.3

ex

pla

in w

ays

of

chec

king t

hat

cust

om

ers

are

satisf

ied w

ith t

he

giv

en lev

el o

f se

rvic

e.

Page 199: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

193

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Info

rm t

he

peo

ple

re

sponsi

ble

about

chan

ges

to

cust

om

er s

ervi

ce

syst

ems

or

pro

cedure

s th

at w

ill r

educe

the

chan

ce o

f pro

ble

ms

bei

ng

repea

ted.

6.1

id

entify

rep

eat

pro

ble

ms

in c

ust

om

er s

ervi

ce,

and

amen

d c

ust

om

er s

ervi

ce s

yste

ms

or

pro

cedure

s to

m

inim

ise

chan

ces

of

pro

ble

ms

bei

ng r

epea

ted.

6.2

co

mm

unic

ate

with a

t le

ast

tw

o o

f th

e fo

llow

ing

peo

ple

res

ponsi

ble

to info

rm t

hem

that

syst

ems

or

pro

cedure

s hav

e bee

n a

men

ded

:

the

clie

nt,

the

cust

om

er o

r th

eir

repre

senta

tive

contr

act

ors

consu

ltan

ts

sub-c

ontr

act

ors

supplie

rs

work

forc

e

inte

rnal

man

agem

ent.

6.3

ex

pla

in t

he

mea

sure

s th

at c

ould

be

take

n t

o

iden

tify

rep

eat

pro

ble

ms

with c

ust

om

er s

ervi

ce.

6.4

ex

pla

in m

ethods

that

allo

w c

han

ges

to c

ust

om

er

serv

ice

syst

ems

or

pro

cedure

s w

hic

h c

an r

educe

th

e ch

ance

of pro

ble

ms

bei

ng r

epea

ted.

6.5

des

crib

e how

to e

ffec

tive

ly info

rm p

eople

re

sponsi

ble

about

am

endm

ents

to s

yste

ms

or

pro

cedure

s.

Page 200: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

194

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

7

Shar

e in

form

atio

n w

ith

peo

ple

res

ponsi

ble

to

mai

nta

in a

nd im

pro

ve

stan

dar

ds

of

serv

ice

del

iver

y.

7.1

in

form

and/o

r pas

s co

llate

d info

rmat

ion t

hat

will

m

ainta

in a

nd im

pro

ve s

tandar

ds

of

serv

ice

del

iver

y.

7.2

des

crib

e w

ays

that

sta

ndar

ds

of

serv

ice

del

iver

y ca

n b

e m

ain

tain

ed a

nd im

pro

ved.

7.3

ex

pla

in h

ow

info

rmat

ion w

ith p

eople

res

ponsi

ble

co

uld

be

effe

ctiv

ely

shar

ed in o

rder

to m

ain

tain

and

impro

ve s

tandar

ds

of

serv

ice

del

iver

y.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 201: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

195

Unit 22: Managing the handover of the construction project in the workplace

Unit reference number: K/600/7361

QCF level: 6

Credit value: 10

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in managing the handover of the construction project in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of managing the handover of the construction project to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 202: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

196

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 203: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

197

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Confirm

pro

ject

re

quirem

ents

and c

onsu

lt

with s

take

hold

ers

and

dev

elop a

nd a

gre

e a

han

dove

r pro

gra

mm

e.

1.1

co

nfirm

that

pro

ject

req

uirem

ents

have

met

st

akeh

old

ers’

exp

ecta

tions.

1.2

under

take

consu

ltat

ion w

ith s

take

hold

ers

to

neg

otiate

han

dove

r ar

rangem

ents

.

1.3

dev

elop a

nd a

gre

e a h

andove

r pro

gra

mm

e.

1.4

lis

t an

d d

escr

ibe

typic

al p

roje

ct r

equirem

ents

that

m

ust

be

met

for

han

dove

r purp

ose

s.

1.5

ex

pla

in h

ow

pro

ject

req

uirem

ents

for

dev

elopin

g

han

dove

r pro

gra

mm

es c

an b

e co

nfirm

ed.

1.6

ex

pla

in w

ays

of

consu

ltin

g w

ith s

take

hold

ers

when

dev

elopin

g a

nd a

gre

eing a

han

dove

r pro

gra

mm

e.

1.7

giv

e re

aso

ns

why

you n

eed a

han

dove

r pro

gra

mm

e.

2

Chec

k th

at p

roje

ct

requirem

ents

have

bee

n

met

, or

reco

rd

outs

tandin

g w

ork

in o

rder

to

agre

e and a

rran

ge

a sa

tisf

act

ory

com

ple

tion.

2.1

id

entify

work

that

may

nee

d t

o b

e co

mple

ted

agai

nst

the

requirem

ents

of th

e pro

ject

.

2.2

note

outs

tandin

g w

ork

, def

ects

or

rem

edia

l ac

tivi

ties

that

fail

to m

eet

pro

ject

req

uirem

ents

.

2.3

ag

ree

and o

rgan

ise

work

act

ivitie

s th

at c

an

com

ple

te o

uts

tandin

g w

ork

to e

nsu

re t

hat

the

pro

ject

req

uirem

ents

hav

e bee

n m

et.

2.4

ex

pla

in c

hec

ks t

hat

can

be

mad

e to

ensu

re p

roje

ct

requirem

ents

are

met

.

2.5

ex

pla

in h

ow

outs

tandin

g w

ork

, in

ord

er t

o a

gre

e an

d a

rran

ge

a sa

tisf

act

ory

com

ple

tion,

can b

e re

cord

ed.

Page 204: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

198

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Car

ry o

ut

han

dove

r in

spec

tions

and

appro

priat

e te

sts

ensu

ring

they

are

witnes

sed b

y st

akeh

old

ers

and

cert

ific

ated

in a

ccord

ance

w

ith c

urr

ent

legis

lation.

3.1

co

mple

te h

andove

r in

spec

tions

and a

ppro

priat

e te

sts,

ensu

ring t

hey

are

rec

ord

ed a

nd w

itnes

sed b

y st

akeh

old

ers.

3.2

under

take

com

mis

sionin

g a

ctiv

itie

s an

d k

eep

reco

rds

of

all ce

rtific

ate

s is

sued

.

3.3

ex

pla

in h

ow

to c

arry

out

han

dove

r in

spec

tions

and

appro

priat

e te

sts.

3.4

des

crib

e m

ethods

that

can b

e use

d t

o e

nsu

re t

hat

in

spec

tions

and a

ppro

priat

e te

sts

are

witnes

sed b

y st

akeh

old

ers.

3.5

ex

pla

in h

ow

to e

nsu

re t

hat

the

appro

priat

e ce

rtific

atio

n is

acquir

ed a

nd w

hy

han

dove

r in

spec

tions

and c

ertifica

tes

are

nee

ded

.

4

Rec

ord

sta

kehold

er

conce

rns

during insp

ection

and a

gre

e an

y re

quired

ac

tions.

4.1

se

ek,

iden

tify

and n

ote

sta

kehold

ers’

conce

rns

during h

andove

r in

spec

tions.

4.2

ag

ree

actions

with s

take

hold

ers

that

will

res

olv

e st

akeh

old

er c

once

rns

rais

ed d

uring h

andove

r in

spec

tions.

4.3

des

crib

e m

ethods

that

can r

ecord

sta

kehold

ers'

co

nce

rns

during insp

ections.

4.4

ex

pla

in h

ow

appro

priat

e act

ions

can b

e ag

reed

with

stak

ehold

ers

during insp

ections.

4.5

giv

e re

aso

ns

why

stake

hold

ers

conce

rns

nee

d t

o b

e ad

dre

ssed

prior

to h

andove

r.

Page 205: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

199

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Ensu

re t

hat

stak

ehold

ers’

re

spec

tive

res

ponsi

bili

ties

ar

e acc

epte

d a

nd a

dopte

d.

5.1

es

tablis

h a

nd c

onfirm

that

sta

kehold

ers

will

acc

ept

resp

onsi

bili

ty o

n h

andove

r fo

r at

least

thre

e of th

e fo

llow

ing:

insu

rance

secu

rity

oper

atio

ns

hea

lth a

nd s

afe

ty

utilit

y su

pply

envi

ronm

ent

sust

ain

abili

ty.

5.2

ex

pla

in h

ow

to e

nsu

re t

hat

sta

kehold

ers

acc

ept

and

adopt

resp

onsi

bili

ties

on h

andove

r.

5.3

ex

pla

in w

hy

stak

ehold

ers

nee

d t

o a

ccep

t th

eir

resp

onsi

bili

ties

on h

andove

r.

Page 206: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

200

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Ass

emble

and h

and o

ver

appro

priat

e docu

men

tation in

acco

rdan

ce w

ith t

he

pro

ject

.

6.1

co

llate

and p

repare

appro

priat

e an

d r

elev

ant

docu

men

tation f

or

at lea

st o

ne

of th

e fo

llow

ing:

syst

ems

serv

ices

equip

men

t.

6.2

ar

range

for

and/o

r han

d o

ver

ass

emble

d

docu

men

tation t

hat

mee

ts a

gre

ed p

roje

ct

requirem

ents

.

6.3

ex

pla

in h

ow

appro

priat

e docu

men

tation c

an b

e as

sem

ble

d in a

ccord

ance

with t

he

pro

ject

re

quirem

ents

.

6.4

des

crib

e m

ethods

of

han

din

g o

ver

appro

priat

e docu

men

tation.

6.5

giv

e re

aso

ns

why

appro

pri

ate

docu

men

tation

should

be

asse

mble

d a

nd h

anded

ove

r fo

r th

e pro

ject

.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 207: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

201

Unit 23: Planning and scheduling the maintenance or remedial activities of property, systems or services in the workplace

Unit reference number: H/600/7360

QCF level: 6

Credit value: 15

Guided learning hours: 40

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in planning and scheduling the maintenance or remedial activities of property, systems or services in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of planning and scheduling the maintenance or remedial activities of property, systems or services to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 208: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

202

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 209: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

203

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Imple

men

t re

gula

r in

spec

tions

to c

onfirm

the

pro

ject

req

uirem

ents

for

the

main

tenan

ce o

r re

med

ial act

ivitie

s fo

r pro

per

ty,

syst

ems

or

serv

ices

.

1.1

ar

range

regula

r in

spec

tions

that

can

confirm

and

monitor

pro

ject

req

uirem

ents

for

at lea

st t

hre

e of

the

follo

win

g m

ainte

nan

ce o

r re

med

ial act

ivitie

s on

at lea

st t

wo o

f th

e fo

llow

ing p

roper

ties

, sy

stem

s or

serv

ices

:

M

ainte

nan

ce/r

emed

ial ac

tivi

ties

:

sched

ule

d

unsc

hed

ule

d

pre

venta

tive

corr

ective

emer

gen

cy.

Pr

oper

ty,

syst

ems

or

serv

ices

:

hig

hw

ays

traf

fic

contr

ols

stru

cture

s

exte

rnal st

ruct

ure

inte

rnal

str

uct

ure

his

torica

l or

pre

serv

atio

n inte

rest

s

inte

rnal

fabric

exte

rnal fa

bric

serv

ices

utilit

ies

and s

ervi

ces

landsc

apin

g.

Page 210: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

204

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1.2

ex

pla

in h

ow

pro

ject

req

uirem

ents

for

mai

nte

nan

ce

or

rem

edia

l w

ork

of

pro

per

ty,

syst

ems

or

serv

ices

ca

n b

e co

nfirm

ed.

1.3

ex

pla

in w

ho m

ust

be

consu

lted

with w

hen

co

nfirm

ing p

roje

ct r

equirem

ents

.

2

Iden

tify

and r

evie

w

influen

cing fact

ors

and

guid

ance

mat

eria

l about

the

pro

per

ty,

syst

em o

r se

rvic

e.

2.1

ev

aluat

e at

least

four

of

the

follo

win

g influen

cing

fact

ors

when

det

erm

inin

g m

ain

tenan

ce o

r re

med

ial

activi

ties

:

org

anis

atio

nal

req

uirem

ents

pro

ject

req

uirem

ents

curr

ent

legis

lation

reso

urc

e al

loca

tion

work

ing r

equirem

ents

envi

ronm

enta

l co

nsi

der

atio

ns

nea

r nei

ghbours

wea

ther

conditio

ns

gro

und o

r si

te c

onditio

ns

sust

ain

abili

ty

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

.

Page 211: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

205

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2.2

ex

amin

e at

least

thre

e of th

e fo

llow

ing g

uid

ance

m

ater

ials

when

det

erm

inin

g m

ainte

nan

ce o

r re

med

ial act

ivitie

s:

pla

ns,

dra

win

gs

or

dia

gra

ms

ow

ner

’s m

anual

s

log b

ooks

mai

nte

nan

ce s

ched

ule

s an

d m

anual

s

pra

ctic

e guid

es a

nd s

pec

ific

atio

ns

curr

ent

legis

lation a

nd o

ffic

ial guid

ance

his

torica

l dat

a

exis

ting r

ecord

s.

2.3

ex

pla

in h

ow

influen

cing fact

ors

can

be

iden

tified

an

d r

evie

wed

.

2.4

ex

pla

in m

ethods

that

influen

cing fact

ors

and

guid

ance

mat

eria

ls c

an b

e id

entified

and r

evie

wed

.

2.5

giv

e re

aso

ns

why

influen

cing fact

ors

nee

d t

o b

e id

entified

and r

evie

wed

again

st g

uid

ance

mat

eria

ls.

Page 212: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

206

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Prio

ritise

mai

nte

nan

ce o

r re

med

ial act

ivitie

s to

tak

e ac

count

of

influen

cing

fact

ors

whils

t m

ainta

inin

g

consi

sten

cy.

3.1

pla

n a

nd p

riori

tise

main

tenance

or

rem

edia

l ac

tivi

ties

tak

ing iden

tified

influen

cing fact

ors

into

ac

count.

3.2

am

end p

riorities

for

mai

nte

nan

ce o

r re

med

ial

activi

ties

priorities

havi

ng t

aken

into

acc

ount

at

leas

t fo

ur

of th

e fo

llow

ing c

han

gin

g c

ircu

mst

ance

s:

susc

eptibili

ty t

o d

am

age

safe

ty r

equirem

ents

nee

d t

o inhib

it a

nd r

espond t

o d

eter

iora

tion

wea

ther

conditio

ns

gro

und o

r si

te c

onditio

ns

envi

ronm

enta

l co

nditio

ns

use

or

change

of use

chan

gin

g c

ircu

mst

ance

s

curr

ent

legis

lation

reso

urc

es

secu

rity

thre

ats

clie

nt,

cust

om

er o

r th

eir

repre

senta

tive

.

3.3

ex

pla

in h

ow

influen

cing fact

ors

can

be

ass

esse

d

and a

ccounte

d f

or

and w

hy

they

nee

d t

o b

e as

sess

ed a

nd a

ccounte

d for.

Page 213: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

207

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3.4

ex

pla

in h

ow

to p

rioritise

mai

nte

nan

ce o

r re

med

ial

activi

ties

.

3.5

giv

e re

aso

ns

why

main

tenan

ce o

r re

med

ial

activi

ties

nee

d t

o b

e prioritise

d.

3.6

ex

pla

in w

ays

of

acco

unting f

or

chan

gin

g

circ

um

stan

ces.

3.7

des

crib

e how

priorities

can

be

amen

ded

when

re

view

ing influen

cing f

acto

rs.

Page 214: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

208

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Ensu

re m

ain

tenan

ce o

r re

med

ial act

ivity

reco

rds

of act

ions

carr

ied o

ut

and

dat

a co

llect

ed a

re c

urr

ent.

4.1

co

mple

te a

nd/o

r ar

range

main

tenan

ce o

r re

med

ial

activi

ty r

ecord

s fo

r fo

ur

of

the

follo

win

g a

ctiv

itie

s an

d d

ata:

insp

ections

faults

or

pro

ble

ms

corr

ective

act

ions

cost

s

reso

urc

es

com

pla

ints

del

ays.

4.2

m

onitor

mai

nte

nan

ce o

r re

med

ial ac

tivi

ty r

ecord

s to

en

sure

they

are

up t

o d

ate.

4.3

giv

e re

aso

ns

why

reco

rds

of

activi

ties

and d

ata,

ca

rrie

d o

ut

and c

olle

cted

, fo

r m

ainte

nan

ce o

r re

med

ial act

ivitie

s/w

ork

nee

d t

o b

e cu

rren

t.

4.4

ex

pla

in w

ays

of

ensu

ring t

hat

rec

ord

s of

act

ivitie

s an

d d

ata a

re c

urr

ent.

Page 215: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

209

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Iden

tify

, ass

ess

and

mai

nta

in t

he

nec

essa

ry

reso

urc

es f

or

main

tenan

ce

or

rem

edia

l ac

tivi

ties

.

5.1

ac

quis

itio

n a

nd m

ainta

in a

t le

ast

tw

o o

f th

e fo

llow

ing r

esourc

es w

hen

pla

nnin

g a

nd s

ched

ulin

g

mai

nte

nan

ce o

r re

med

ial act

ivitie

s:

peo

ple

pla

nt,

equip

men

t or

mac

hin

ery

mat

eria

ls a

nd c

om

ponen

ts

sub-c

ontr

act

ors

info

rmat

ion

work

are

a a

nd faci

litie

s

was

te m

anag

emen

t

utilit

y pro

vider

s.

5.2

des

crib

e how

the

nec

essa

ry r

esourc

es f

or

mai

nte

nan

ce o

r re

med

ial act

ivitie

s ca

n b

e id

entified

.

5.3

ex

pla

in h

ow

to a

sses

s th

e quan

tity

and q

ual

ity

of

reso

urc

es f

or

main

tenan

ce o

r re

med

ial act

ivitie

s.

5.4

ex

pla

in w

ays

and m

ethods

that

mai

nta

in n

eces

sary

re

sourc

es f

or

the

main

tenan

ce o

r re

med

ial w

ork

of

pro

per

ty,

syst

ems

or

serv

ices

.

Page 216: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

210

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

6

Prep

are

pla

ns

and

sched

ule

s of m

ainte

nan

ce

or

rem

edia

l ac

tivi

ties

and

neg

otiate

and a

gre

e th

em

with d

ecis

ion-m

aker

s.

6.1

pla

n a

nd s

ched

ule

at

leas

t th

ree

of th

e fo

llow

ing

mai

nte

nan

ce o

r re

med

ial act

ivitie

s:

pla

nned

mai

nte

nan

ce o

r re

med

ial ac

tivi

ties

tender

ed w

ork

s

resp

onsi

ve w

ork

s

pre

venta

tive

mai

nte

nan

ce o

r re

med

ial w

ork

cost

est

imat

ed w

ork

s

seas

onal

mai

nte

nan

ce

traf

fic

mai

nte

nan

ce (

signs,

lig

hts

and g

uar

ds)

emer

gen

cy w

ork

s

contingen

cy p

lans.

6.2

dis

cuss

and g

ain a

gre

emen

t of

pre

par

ed p

lans

and

sched

ule

s w

ith d

ecis

ion m

ake

rs.

6.3

ex

pla

in h

ow

pla

ns

and s

ched

ule

s ca

n b

e pre

par

ed

for

mai

nte

nan

ce o

r re

med

ial act

ivitie

s.

6.4

ex

pla

in m

ethods

of neg

otiating a

nd a

gre

eing p

lans

and s

ched

ule

s w

ith d

ecis

ion-m

ake

rs.

6.5

giv

e re

aso

ns

why

pla

ns

and s

ched

ule

s fo

r m

ainte

nan

ce o

r re

med

ial act

ivitie

s are

nee

ded

.

Page 217: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

211

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 218: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

212

Page 219: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

213

Unit 24: Planning historical conservation/restoration activities in the workplace

Unit reference number: J/600/7559

QCF level: 6

Credit value: 12

Guided learning hours: 30

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in planning historical conservation/restoration activities in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of planning historical conservation/restoration activities to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 220: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

214

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 221: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

215

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Confirm

the

work

re

quirem

ents

agai

nst

the

info

rmat

ion s

upplie

d w

hen

pla

nnin

g h

isto

rica

l co

nse

rvation/r

esto

ration

activi

ties

.

1.1

id

entify

and e

stab

lish a

t le

ast

two o

f th

e fo

llow

ing

his

torica

l co

nse

rvat

ion/r

esto

ration a

ctiv

itie

s ag

ain

st

at lea

st fiv

e of th

e fo

llow

ing info

rmat

ion s

ourc

es:

Act

ivity:

roofing

lead

work

brick

layi

ng a

nd c

raft

mas

onry

eart

h w

allin

g

stonem

asonry

dec

ora

tion

pla

ster

ing

wal

l an

d flo

or

tilin

g

carp

entr

y an

d join

ery

spec

ialis

t her

itag

e act

ivitie

s.

In

form

atio

n s

ourc

es:

surv

ey r

eport

dra

win

gs,

sch

edule

s an

d s

pec

ific

atio

ns

contr

act

ual

stat

uto

ry c

onse

nts

risk

ass

essm

ents

and m

ethod s

tate

men

ts

Page 222: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

216

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

pro

gra

mm

es

reco

rds

about

the

com

pet

ence

of peo

ple

sub-c

ontr

act

or

arra

ngem

ents

hea

lth,

safe

ty a

nd e

nvi

ronm

enta

l pla

n

arch

aeolo

gic

al w

atch

ing b

rief

mat

eria

l su

pplie

rs

his

torica

l co

nse

rvat

ion p

lans.

1.2

ex

pla

in h

ow

work

req

uirem

ents

for

his

torica

l co

nse

rvation/r

esto

ration w

ork

can

be

confirm

ed.

1.3

ex

pla

in w

ho n

eeds

to b

e co

nsu

lted

when

confirm

ing

work

req

uirem

ents

for

his

torica

l co

nse

rvation/r

esto

rations.

2

Iden

tify

and r

evie

w

influen

cing fact

ors

and

guid

ance

mat

eria

l about

the

work

envi

ronm

ent.

2.1

co

nsi

der

at

least

thre

e of th

e fo

llow

ing influen

cing

fact

ors

when

pla

nnin

g h

isto

rica

l co

nse

rvation/r

esto

ration a

ctiv

itie

s:

org

anis

atio

nal

req

uirem

ents

contr

act

ual re

quirem

ents

stat

uto

ry r

equirem

ents

reso

urc

e al

loca

tion

work

ing r

equirem

ents

envi

ronm

enta

l co

nsi

der

atio

ns

wea

ther

conditio

ns.

Page 223: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

217

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2.2

ex

amin

e at

least

tw

o o

f th

e fo

llow

ing g

uid

ance

m

ater

ials

when

pla

nnin

g h

isto

rica

l co

nse

rvat

ion/

rest

ora

tion a

ctiv

itie

s:

ow

ner

’s m

anual

s

log b

ooks

mai

nte

nan

ce s

ched

ule

s an

d m

anual

s

pra

ctic

e guid

es a

nd s

pec

ific

atio

ns

curr

ent

legis

lation a

nd o

ffic

ial guid

ance

.

2.3

ex

pla

in h

ow

influen

cing fact

ors

and g

uid

ance

m

ater

ials

can

be

iden

tified

and w

hat

diffe

rent

met

hods

can b

e use

d t

o r

evie

w t

hem

.

2.4

giv

e re

aso

ns

why

influen

cing fact

ors

should

be

revi

ewed

agai

nst

guid

ance

mat

eria

ls.

3

Prio

ritise

act

ivitie

s by

asse

ssin

g a

nd a

ccounting

for

all th

e in

fluen

cing

fact

ors

.

3.1

priori

tise

his

torica

l co

nse

rvat

ion/r

esto

ration

activi

ties

whils

t co

nsi

der

ing influen

cing fact

ors

.

3.2

ex

pla

in m

ethods

that

can

ass

ess

and a

ccount

for

influen

cing fact

ors

when

pla

nnin

g h

isto

rica

l co

nse

rvation/r

esto

ration a

ctiv

itie

s.

3.3

ex

pla

in t

he

fact

ors

that

nee

d t

o b

e ta

ken into

ac

count

when

prioritisi

ng h

isto

rica

l co

nse

rvation/r

esto

ration a

ctiv

itie

s.

3.4

giv

e re

aso

ns

why

his

tori

cal co

nse

rvat

ion/r

esto

ration

activi

ties

should

be

prioritise

d.

Page 224: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

218

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Am

end p

riorities

to t

ake

acco

unt

of

chan

gin

g

circ

um

stan

ces

whils

t m

ainta

inin

g c

onsi

sten

cy

with t

he

influen

cing

fact

ors

.

4.1

re

view

and u

pdat

e pre

-det

erm

ined

his

torica

l co

nse

rvation/r

esto

ration p

riorities

by

taki

ng into

ac

count

at lea

st f

our

of th

e fo

llow

ing c

han

gin

g

circ

um

stan

ces:

susc

eptibili

ty t

o d

am

age

safe

ty r

equirem

ents

nee

d t

o inhib

it a

nd r

espond t

o d

eter

iora

tion

com

pro

mis

ed o

per

atio

nal

eff

ective

nes

s

wea

ther

conditio

ns

use

or

change

of use

mee

ting c

urr

ent

legis

lation

reso

urc

es

secu

rity

thre

ats.

4.2

ex

pla

in m

ethods

that

allo

w p

riorities

to b

e am

ended

w

hen

influen

cing fact

ors

hav

e bee

n t

ake

n into

ac

count.

4.3

ex

pla

in h

ow

chan

gin

g c

ircu

mst

ance

s ca

n b

e ac

counte

d f

or

when

pla

nnin

g h

isto

rica

l co

nse

rvation/r

esto

ration a

ctiv

itie

s.

Page 225: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

219

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Prep

are

pla

ns

or

sched

ule

s an

d n

egotiat

e an

d a

gre

e th

em w

ith d

ecis

ion-

mak

ers.

5.1

id

entify

, anal

yse

and p

roduce

pla

ns

or

sched

ule

s fo

r at

lea

st t

hre

e of th

e fo

llow

ing h

isto

rica

l co

nse

rvation/

rest

ora

tion a

ctiv

itie

s:

roofing

lead

work

brick

layi

ng a

nd c

raft

mas

onry

eart

h w

allin

g

stonem

asonry

dec

ora

tion

pla

ster

ing

wal

l an

d flo

or

tilin

g

carp

entr

y an

d join

ery

spec

ialis

t her

itag

e act

ivitie

s.

5.2

ex

pla

in h

ow

pla

ns

and s

ched

ule

s ca

n b

e pre

par

ed

for

his

torica

l co

nse

rvat

ion/r

esto

ration a

ctiv

itie

s.

5.3

ex

pla

in m

ethods

and t

echniq

ues

of neg

otiating a

nd

agre

eing p

lans

and s

ched

ule

s w

ith d

ecis

ion m

aker

s.

Page 226: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

220

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 227: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

221

Unit 25: Planning demolition activities in the workplace

Unit reference number: F/600/7561

QCF level: 6

Credit value: 12

Guided learning hours: 50

Unit summary

The aim of this unit is to illustrate the skills, knowledge and understanding required to confirm competence in planning demolition activities in the workplace within the relevant sector of industry.

Assessment requirements/evidence requirements

This unit must be assessed in a work environment and in accordance with:

• the Additional Requirements for Qualifications using the title NVQ in QCF

• the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment – Craft, Supervisory, Technical, Managerial and Professional Units and Qualifications with NVQ in the Qualification and Credit Framework (QCF) title and SVQs.

Assessors for this unit must use a combination of the following assessment methods:

• observation of normal work activities within the workplace that clearly confirms the required skills

• questioning the learner on knowledge criteria that clearly confirms the required understanding

• review other forms of evidence that can clearly confirm industry required skills, knowledge and understanding.

Assessors for this unit must have verifiable, current industry experience and a sufficient depth of occupational expertise and knowledge of planning demolition activities to be effective and reliable when confirming a learner’s competence.

Workplace evidence of skills cannot be simulated.

Page 228: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

222

Assessment methodology

Learners can enter the types of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centre documentation should be used to record this information.

Page 229: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

223

Lear

nin

g ou

tcom

es a

nd a

sses

smen

t cr

iter

ia

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

1

Confirm

the

work

re

quirem

ents

when

pla

nnin

g d

emolit

ion

activi

ties

agai

nst

the

info

rmat

ion s

upplie

d.

1.1

id

entify

and e

stab

lish a

t le

ast

two o

f th

e fo

llow

ing

dem

olit

ion a

ctiv

itie

s ag

ainst

at

leas

t five

of

the

follo

win

g info

rmation s

ourc

es:

D

emolit

ion a

ctiv

ity:

soft

str

ip

mec

han

ical dem

olit

ion

rem

ote

mec

han

ical

dem

olit

ion

explo

sive

dem

olit

ion

sele

ctiv

e dem

olit

ion.

In

form

atio

n s

ourc

es:

surv

ey r

eport

s

des

ign

contr

act

ual

stat

uto

ry c

onse

nts

risk

ass

essm

ents

and m

ethod s

tate

men

ts

pro

gra

mm

es

reco

rds

about

the

com

pet

ence

of peo

ple

sub-c

ontr

act

or

arra

ngem

ents

hea

lth,

safe

ty a

nd e

nvi

ronm

enta

l pla

n

Typ

e 3 a

sbes

tos

surv

ey

Page 230: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

224

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

se

rvic

e dis

connec

tion c

ertifica

tes

utilit

ies

surv

ey r

eport

.

1.2

ex

pla

in h

ow

work

req

uirem

ents

for

dem

olit

ion

activi

ties

can

be

confirm

ed a

gai

nst

info

rmat

ion

sourc

es.

1.3

ex

pla

in w

ho n

eeds

to b

e co

nsu

lted

when

confirm

ing

work

req

uirem

ents

for

dem

olit

ion a

ctiv

itie

s.

Page 231: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

225

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

2

Iden

tify

and r

evie

w

influen

cing fact

ors

and

guid

ance

mat

eria

l about

the

work

envi

ronm

ent.

2.1

co

nsi

der

at

least

thre

e of th

e fo

llow

ing influen

cing

fact

ors

when

pla

nnin

g d

emolit

ion a

ctiv

itie

s:

org

anis

atio

nal

req

uirem

ents

contr

act

ual re

quirem

ents

stat

uto

ry r

equirem

ents

reso

urc

e al

loca

tion

work

ing r

equirem

ents

envi

ronm

enta

l co

nsi

der

atio

ns

wea

ther

conditio

ns.

2.2

ex

amin

e at

least

tw

o o

f th

e fo

llow

ing g

uid

ance

m

ater

ials

when

pla

nnin

g d

emolit

ion a

ctiv

itie

s:

ow

ner

’s m

anual

s

log b

ooks

mai

nte

nan

ce s

ched

ule

s an

d m

anual

s

pra

ctic

e guid

es a

nd s

pec

ific

atio

ns

curr

ent

legis

lation a

nd o

ffic

ial guid

ance

.

2.3

ex

pla

in h

ow

influen

cing fact

ors

and g

uid

ance

m

ater

ials

can

be

iden

tified

and w

hat

diffe

rent

met

hods

can b

e use

d t

o r

evie

w t

hem

when

pla

nnin

g d

emolit

ion a

ctiv

itie

s.

2.4

giv

e re

aso

ns

why

influen

cing fact

ors

should

be

revi

ewed

agai

nst

guid

ance

mat

eria

l.

Page 232: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

226

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

3

Prio

ritise

act

ivitie

s by

asse

ssin

g a

nd a

ccounting

for

all th

e in

fluen

cing

fact

ors

.

3.1

prioritisi

ng d

emolit

ion a

ctiv

itie

s w

hils

t co

nsi

der

ing

influen

cing fact

ors

.

3.2

ex

pla

in m

ethods

that

can

ass

ess

and a

ccount

for

influen

cing fact

ors

when

pri

oritisi

ng d

emolit

ion

activi

ties

.

3.3

ex

pla

in t

he

fact

ors

that

nee

d t

o b

e ta

ken into

ac

count

when

prioritisi

ng d

emolit

ion a

ctiv

itie

s.

3.4

giv

e re

aso

ns

why

dem

olit

ion a

ctiv

itie

s sh

ould

be

prioritise

d.

Page 233: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

227

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

4

Am

end p

riorities

to t

ake

acco

unt

of

chan

gin

g

circ

um

stan

ces

whils

t m

ainta

inin

g c

onsi

sten

cy

with t

he

influen

cing

fact

ors

.

4.1

re

view

and u

pdat

e pre

-det

erm

ined

dem

olit

ion

activi

ty p

riorities

by

taki

ng a

ccount

of

at lea

st f

our

of th

e fo

llow

ing c

han

gin

g c

ircu

mst

ance

s:

susc

eptibili

ty t

o d

am

age

safe

ty r

equirem

ents

nee

d t

o inhib

it a

nd r

espond t

o d

eter

iora

tion

com

pro

mis

ed o

per

atio

nal

eff

ective

nes

s

wea

ther

conditio

ns

use

or

change

of use

mee

ting c

urr

ent

legis

lation

reso

urc

es

secu

rity

thre

ats.

4.2

ex

pla

in m

ethods

that

allo

w p

riorities

to b

e am

ended

w

hen

influen

cing fact

ors

hav

e bee

n t

ake

n into

ac

count.

4.3

ex

pla

in h

ow

chan

gin

g c

ircu

mst

ance

s ca

n b

e ac

counte

d f

or

when

pla

nnin

g d

emolit

ion a

ctiv

itie

s.

Page 234: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

228

Learn

ing

ou

tco

mes

Ass

ess

men

t cr

iteri

a

Evid

en

ce

typ

e

Po

rtfo

lio

re

fere

nce

Date

5

Prep

are

pla

ns

or

sched

ule

s an

d n

egotiat

e an

d a

gre

e th

em w

ith d

ecis

ion

mak

ers.

5.1

id

entify

, anal

yse

and p

roduce

pla

ns

or

sched

ule

s fo

r at

lea

st t

hre

e of th

e fo

llow

ing d

emolit

ion a

ctiv

itie

s:

soft

str

ip

mec

han

ical dem

olit

ion

rem

ote

mec

han

ical

dem

olit

ion

explo

sive

dem

olit

ion

sele

ctiv

e dem

olit

ion.

5.2

ex

pla

in h

ow

pla

ns

and s

ched

ule

s ca

n b

e pre

par

ed

for

dem

olit

ion a

ctiv

itie

s.

5.3

ex

pla

in m

ethods

and t

echniq

ues

of neg

otiating a

nd

agre

eing p

lans

and s

ched

ule

s w

ith d

ecis

ion m

aker

s.

Lear

ner

nam

e:__________________________________________

D

ate:

___________________________

Lear

ner

sig

nat

ure

:_______________________________________

D

ate:

___________________________

Ass

esso

r si

gnat

ure

:______________________________________

D

ate:

___________________________

Inte

rnal

ver

ifie

r si

gnatu

re:

________________________________

(i

f sa

mple

d)

Dat

e:___________________________

Page 235: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

229

Further information

Our customer service numbers are:

BTEC and NVQ 0844 576 0026

GCSE 0844 576 0027

GCE 0844 576 0025

The Diploma 0844 576 0028

DiDA and other qualifications 0844 576 0031

Calls may be recorded for training purposes.

Useful publications

Related information and publications include:

• Centre Handbook for Edexcel QCF NVQs and Competence-based Qualifications published annually

• functional skills publications – specifications, tutor support materials and question papers

• Regulatory Arrangements for the Qualification and Credit Framework (published by Ofqual, August 2008)

• the current Edexcel publications catalogue and update catalogue.

Edexcel publications concerning the Quality Assurance System and the internal and standards verification of vocationally related programmes can be found on the Edexcel website.

NB: Some of our publications are priced. There is also a charge for postage and packing. Please check the cost when you order.

How to obtain National Occupational Standards

CITB-ConstructionSkills Bircham Newton King’s Lynn Norfolk PE31 6RH

Telephone: 01485 577577 Fax: 01485 577793 Email: [email protected]

Page 236: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

230

Professional development and training

Edexcel supports UK and international customers with training related to NVQ and BTEC qualifications. This support is available through a choice of training options offered in our published training directory or through customised training at your centre.

The support we offer focuses on a range of issues including:

• planning for the delivery of a new programme

• planning for assessment and grading

• developing effective assignments

• building your team and teamwork skills

• developing learner-centred learning and teaching approaches

• building functional skills into your programme

• building effective and efficient quality assurance systems.

The national programme of training we offer can be viewed on our website (www.edexcel.com/training). You can request customised training through the website or by contacting one of our advisers in the Training from Edexcel team via Customer Services to discuss your training needs.

The training we provide:

• is active

• is designed to be supportive and thought provoking

• builds on best practice

• may be suitable for those seeking evidence for their continuing professional development.

Page 237: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

231

Annex

e A

: Pro

gres

sion

pat

hw

ays

The

Edex

cel qual

ific

atio

n f

ram

ewor

k fo

r th

e C

onst

ruct

ion a

nd t

he

Built

Envi

ronm

ent

sect

or

Level

Gen

era

l q

uali

fica

tio

ns

Dip

lom

as

BTE

C v

oca

tio

nall

y-

rela

ted

q

uali

fica

tio

ns

BTEC

sp

eci

ali

st

qu

alifi

cati

on

/

pro

fess

ion

al

NV

Q/

com

pete

nce

8

7

Edex

cel Le

vel 7 N

VQ

D

iplo

ma

in B

uilt

Envi

ronm

ent

Des

ign

and C

onsu

ltan

cy

Prac

tice

Edex

cel Le

vel 7 N

VQ

D

iplo

ma

in

Const

ruct

ion S

enio

r M

anag

emen

t (Q

CF)

`

Page 238: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

232

Level

Gen

era

l q

uali

fica

tio

ns

Dip

lom

as

BTE

C v

oca

tio

nall

y-

rela

ted

q

uali

fica

tio

ns

BTEC

sp

eci

ali

st

qu

alifi

cati

on

/

pro

fess

ion

al

NV

Q/

com

pete

nce

6

Edex

cel Le

vel 6 N

VQ

D

iplo

ma

in B

uilt

Envi

ronm

ent

Des

ign

Man

agem

ent

Edex

cel Le

vel 6 N

VQ

D

iplo

ma

in

Const

ruct

ion

Contr

acting

Oper

atio

ns

Man

agem

ent

ED

EXCEL

Leve

l 6 N

VQ

D

iplo

ma

in

Const

ruct

ion S

ite

Man

agem

ent

Edex

cel Le

vel 6 N

VQ

D

iplo

ma

in S

enio

r Site

Insp

ection

5

Edex

cel BTEC L

evel

5

HN

Dip

lom

a in

Const

ruct

ion

4

Edex

cel BTEC L

evel

4

HN

Cer

tifica

te in

Const

ruct

ion

Page 239: Specification - NVQ Level 6 Diploma in Construction Site

N025079 –

Spec

ific

atio

n –

Edex

cel Le

vel 6 N

VQ

Dip

lom

a in

Const

ruct

ion S

ite

Man

agem

ent

(Const

ruct

ion)

(QCF)

– I

ssue

1 –

April 2011 ©

Edex

cel Li

mited

2011

233

Level

Gen

era

l q

uali

fica

tio

ns

Dip

lom

as

BTE

C v

oca

tio

nall

y-

rela

ted

q

uali

fica

tio

ns

BTEC

sp

eci

ali

st

qu

alifi

cati

on

/

pro

fess

ion

al

NV

Q/

com

pete

nce

3

Edex

cel Le

vel 3

Dip

lom

a in

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

Edex

cel BTEC L

evel

3

Cer

tifica

te,

Subsi

dia

ry

Dip

lom

a, D

iplo

ma

Ext

ended

Dip

lom

a in

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

Edex

cel BTEC L

evel

3

Aw

ard,

Ext

ended

Cer

tifica

te a

nd

Dip

lom

a in

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

We

have

too m

any

qual

ific

ations

to lis

t in

th

is s

pace

.

Plea

se r

efer

to

ww

w.e

dex

cel.co

m f

or

furt

her

info

rmat

ion

2

Edex

cel Le

vel 2

Dip

lom

a in

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

Edex

cel BTEC L

evel

2

Cer

tifica

te,

Ext

ended

Cer

tifica

te a

nd

Dip

lom

a in

Const

ruct

ion

Edex

cel BTEC L

evel

2

Aw

ard,

Cer

tifica

te a

nd

Ext

ended

Cer

tifica

te in

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

(Cra

ft)

and

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

(Tec

hnic

ian)

We

have

too m

any

qual

ific

ations

to lis

t in

th

is s

pace

.

Plea

se r

efer

to

ww

w.e

dex

cel.co

m f

or

furt

her

info

rmat

ion

1

Edex

cel Le

vel 1

Dip

lom

a in

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

Edex

cel Le

vel 1

Aw

ard,

Cer

tifica

te,

Dip

lom

a in

Const

ruct

ion (

QC

F)

Edex

cel BTEC L

evel

1

Aw

ard,

Cer

tifica

te,

Ext

ended

Cer

tifica

te in

Const

ruct

ion a

nd t

he

Built

Envi

ronm

ent

We

have

too m

any

qual

ific

ations

to lis

t in

th

is s

pace

.

Plea

se r

efer

to

ww

w.e

dex

cel.co

m f

or

furt

her

info

rmat

ion

En

try

Edex

cel Entr

y Le

vel

BTEC A

ward

in

Const

ruct

ion (

Entr

y 3)

(QCF)

Page 240: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

234

Page 241: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

235

Annexe B: Quality assurance

Key principles of quality assurance

• A centre delivering Edexcel qualifications must be an Edexcel recognised centre and must have approval for qualifications that it is offering.

• The centre agrees as part of gaining recognition to abide by specific terms and conditions around the effective delivery and quality assurance of assessment; the centre must abide by these conditions throughout the period of delivery.

• Edexcel makes available to approved centres a range of materials and opportunities to exemplify the processes required for effective assessment and provide examples of effective standards. Approved centres must use the guidance on assessment to ensure that staff who are delivering Edexcel qualifications are applying consistent standards.

• An approved centre must follow agreed protocols for: standardisation of assessors; planning, monitoring and recording of assessment processes; internal verification and recording of internal verification processes; and for dealing with special circumstances, appeals and malpractice.

Quality assurance processes

The approach to quality assured assessment is made through a partnership between a recognised centre and Edexcel. Edexcel is committed to ensuring that it follows best practice and employs appropriate technology to support quality assurance process where practicable. Therefore, the specific arrangements for working with centres will vary. Edexcel seeks to ensure that the quality assurance processes that it uses do not place undue bureaucratic processes on centres and works to support centres in providing robust quality assurance processes.

The learning outcomes and assessment criteria in each unit within this specification set out the standard to be achieved by each learner in order to gain each qualification. Edexcel operates a quality assurance process, which is designed to ensure that these standards are maintained by all assessors and verifiers.

For the purposes of quality assurance all individual qualifications and units are considered as a whole. Centres offering these qualifications must be committed to ensuring the quality of the units and qualifications they offer, through effective standardisation of assessors and internal verification of assessor decisions. Centre quality assurance and assessment processes are monitored by Edexcel.

Page 242: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

236

The Edexcel quality assurance processes will involve:

• gaining centre recognition and qualification approval if a centre is not currently approved to offer Edexcel qualifications

• annual visits to centres by Edexcel for quality review and development of overarching processes and quality standards. Quality review and development visits will be conducted by an Edexcel quality development reviewer

• annual visits by occupationally competent and qualified Edexcel Standards Verifiers for sampling of internal verification and assessor decisions for the occupational sector

• the provision of support, advice and guidance towards the achievement of National Occupational Standards.

Centres are required to declare their commitment to ensuring quality and appropriate opportunities for learners that lead to valid and accurate assessment outcomes. In addition, centres will commit to undertaking defined training and online standardisation activities.

Page 243: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

237

Annexe C: Centre certification and registration

Edexcel Standards Verifiers will provide support, advice and guidance to centres to achieve Direct Claims Status (DCS). Edexcel will maintain the integrity of Edexcel QCF NVQs through ensuring that the awarding of these qualifications is secure. Where there are quality issues identified in the delivery of programmes, Edexcel will exercise the right to:

• direct centres to take actions

• limit or suspend certification

• suspend registration.

The approach of Edexcel in such circumstances is to work with the centre to overcome the problems identified. If additional training is required, Edexcel will aim to secure the appropriate expertise to provide this.

What are the access arrangements and special considerations for the qualification in this specification?

Centres are required to recruit learners to Edexcel qualifications with integrity.

Appropriate steps should be taken to assess each applicant’s potential and a professional judgement made about their ability to successfully complete the programme of study and achieve the qualification. This assessment will need to take account of the support available to the learner within the centre during their programme of study and any specific support that might be necessary to allow the learner to access the assessment for the qualification. Centres should consult Edexcel’s policy on learners with particular requirements.

Edexcel’s policy on access arrangements and special considerations for Edexcel qualifications aims to enhance access to the qualifications for learners with disabilities and other difficulties (as defined by the 1995 Disability Discrimination Act and the amendments to the Act) without compromising the assessment of skills, knowledge, understanding or competence. Please refer to Access Arrangements and Special Considerations for BTEC and Edexcel NVQ Qualifications for further details. www.edexcel.com.

Page 244: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

238

Page 245: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

239

Annexe D: Additional requirements for qualifications that use the title NVQ within the QCF

Contents

Purpose of document 240

Background 241

Additional requirements for qualifications that use the title NVQ within the QCF 242

Introduction 242

Assessment requirements 242

Quality assurance requirements 244

Page 246: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

240

Purpose of document

1 The purpose of this document is to make clear what additional requirements are needed to assess and quality assure qualifications that use the title NVQ within the QCF.

2 When an SSC/SSB and awarding organisation wants to use the title NVQ in the naming of a qualification within the QCF, the awarding organisation is required to make sure this qualification is assessed and quality assured in accordance with these additional requirements and other requirements described in the SSC/SSB Assessment Strategy.

3 The aims of these additional requirements are to:

• ensure that all competence based qualifications that use the title NVQ within the QCF are

o assessed consistently

o quality assured consistently

• maintain the integrity of qualifications that use the title NVQ within the QCF

• establish the NVQ brand within the QCF

• keep bureaucracy associated with assessment and quality assurance of qualifications that use the title NVQ within the QCF to a minimum.

Page 247: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

241

Background

4 1“At the heart of an NVQ is the concept of occupational competence; the ability to perform to the standards required in employment across a range of circumstances and to meet changing demands. NVQs are first and foremost about what people can do. They go beyond technical skills to include planning, problem solving, dealing with unexpected occurrences, working with other people and applying the knowledge and understanding that underpins overall competence”.

5 NVQs are based entirely on National Occupational Standards (NOS) developed by an SSC/SSB, which describe the competence needed in an occupational role.

6 Qualifications that use the title NVQ within the QCF must comply with the rules of combination determined by the SSC/SSB. Awarding organisations are not allowed to develop another qualification that does not use the title NVQ within the QCF, if it uses the same rules of combination as a qualification that does use the title NVQ within the QCF.

7 The QCF offers increased flexibility in the way occupational competence can be assessed and demonstrated. Qualifications that use the title NVQ in the title within the QCF are just one way of assessing and demonstrating occupational competence. SSCs/SSBs are free to work with their awarding organisations to agree what qualifications will be used to assess occupational competence. Qualifications that use the title NVQ within the QCF, are not a preferred method for assessing occupational competence and all qualifications accredited through the QCF have equal status.

8 When developing a qualification for the QCF, including qualifications that use the title NVQ within the QCF, an awarding organisation must be a recognised awarding organisation and must meet the Qualification Requirements in the Regulatory Arrangements for the Qualifications and Credit Framework, published by The Office of the Qualifications and Examinations Regulator (Ofqual) in August 2008.

9 The qualification regulators confirmed that a group of SSCs and SSBs would be free to develop specific, additional requirements about the way in which qualifications that use the title NVQ within the QCF will be assessed and quality assured. For those recognised awarding organisations that want to assess occupational competence through the use of qualifications that use the title NVQ within the QCF, it has been agreed by SSCs and SSBs that the following additional requirements must be met.

1 NCVQ’s NVQ Criteria and Guidance 1995.

Page 248: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

242

Additional requirements for qualifications that use the title NVQ within the QCF

Introduction

10 Qualifications that use the title NVQ within the QCF must be assessed and quality assured in accordance with the following additional requirements.

Assessment requirements

11 When a qualification uses the title NVQ within the QCF, awarding organisations are required to make sure their recognised assessment centres understand how learners are to be assessed.

12 Assessment methodologies must meet the Assessment Strategy developed in partnership between the relevant SSC or SSB and awarding organisations for the qualification. The Assessment Strategy must be published and made available separately and will include the requirements for assessment of qualifications that use the title NVQ within the QCF. The assessment criteria for each unit will be part of the units that make up the qualification.

13 Learners must complete real work activities in order to produce evidence to demonstrate they have met the NOS and are occupationally competent.

14 When a learner cannot complete a real work activity, simulation is allowed.

15 Simulation is allowed when:

• a learner is required to complete a work activity that does not occur on a regular basis and therefore opportunities to complete a particular work activity do not easily arise

• a learner is required to respond to a situation that rarely occurs, such as responding to an emergency situation

• the safety of a learner, other individuals and/or resources will be put at risk.

16 When simulation is used, assessors must be confident that the simulation replicates the workplace to such an extent that learners will be able to fully transfer their occupational competence to the workplace and real situations.

17 Units that must not be assessed by simulation must be identified by the SSC/SSB in the Assessment Strategy for the qualification or family of qualifications.

Page 249: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

243

18 Learners must be assessed by assessors:

• who are occupationally competent in the occupational areas they are assessing where they have sufficient and relevant technical/occupational competence in the unit, at or above the level of the unit being assessed and as defined by the Assessment Strategy for that qualification

• 2who must hold or be working towards a suitable assessor qualification to confirm they understand assessment and how to assess learners

• must be fully conversant with the unit(s) against which the assessments and verification are to be undertaken.

19 All assessors must carry out assessment to the standards specified in the A units.

20 All assessment decisions made by a trainee assessor must be checked by a qualified assessor or an assessor recognised by an awarding organisation.

21 Trainee assessors must have a plan, which is overseen by the recognised assessment centre, to achieve the relevant assessor qualification(s) within an agreed timescale.

2 Currently an assessor could hold unit A1 and/or unit A2. Or from the past unit D32 and/or unit D33. SSCs also identify other suitable equivalent qualifications.

Page 250: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

244

Quality assurance requirements

22 When a qualification uses the title NVQ within the QCF, awarding organisations are required to make sure their recognised assessment centres understand how the qualification will be quality assured.

23 Qualifications that use the title NVQ within the QCF, must be verified:

• internally by an internal verifier, who is accountable to the assessment centre

• externally by an external verifier, who is accountable to the awarding organisation or an agent of the awarding organisation.

24 With reference to internal verification, internal verifiers must:

• 3hold or be working towards a suitable internal verifier qualification to confirm they understand how to internally verify assessments

• have sufficient and relevant technical/occupational familiarity in the unit(s) being verified

• be fully conversant with the standards and assessment criteria in the units to be assessed

• understand the awarding organisation’s quality assurance systems and requirements for this qualification.

25 Trainee internal verifiers must have a plan, which is overseen by the recognised assessment centre, to achieve the internal verifier qualification within an agreed timescale.

26 With reference to external verification, external verifiers must:

• 4hold or be working towards a suitable external verification qualification to confirm they understand and are able to carry out external verification

• have no connections with the assessment centre, in order to maintain objectivity

• have sufficient and relevant technical/occupational understanding in the unit(s) being verified

• be fully conversant with the standards and performance criteria in the units to be assessed

• understand the awarding organisation’s quality assurance systems for this qualification.

27 Trainee external verifiers must have a plan, which is overseen by the awarding organisation, to achieve the external verifier qualification within an agreed timescale.

3 Currently an internal verifier needs to hold unit V1. Or from the past unit D34. SSCs also identify other suitable equivalent qualifications. 4 Currently an external verifier needs to hold unit V2. Or from the past unit D35.

Page 251: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

245

28 Awarding organisations must decide the frequency of external monitoring activities. Any decision must be based on:

• the risks associated with a qualification that is designed to help a learner demonstrate occupational competence

• an evaluation of the centre’s performance and past record.

29 Awarding organisations will have in place suitably constituted audit processes, which are supported by naturally occurring quality assurance and monitoring systems that already exist in workplace assessment environments.

Page 252: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

246

Page 253: Specification - NVQ Level 6 Diploma in Construction Site

N025079 – Specification – Edexcel Level 6 NVQ Diploma in Construction Site Management (Construction) (QCF) – Issue 1 – April 2011 © Edexcel Limited 2011

247

Annexe E: Assessment Strategy

The ConstructionSkills Assessment Strategy will be available on the Edexcel website, alongside the full specification on the Construction NVQ/Competence page.

4556seb060411 S:\LT\PD\NVQ COMPETENCE\N025079 EDEXCEL LEVEL 6 NVQ DIPLOMA IN CONSTRUCTION SITE MANAGEMENT.DOC.1-254/4

Page 254: Specification - NVQ Level 6 Diploma in Construction Site

Publications Code N025079 April 2011 For more information on Edexcel and BTEC qualifications please visit our website: www.edexcel.com Edexcel Limited. Registered in England and Wales No. 4496750 Registered Office: One90 High Holborn, London WC1V 7BH. VAT Reg No 780 0898 07