Contents Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Special Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Getting to Know the FCR2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8 SPECIFICATION AND INSTALLATION GUIDE FCR2 Field Cut Riser System For use with grease interceptors models GB-250, GB-500, GB-1000, GGI-500, GGI-750, GGI-1000, GGI-1500 and GGI-2000; sampling port model SV24; and solids interceptors models SI-250 and SI-500 Notes TOP VIEW SIDE VIEW SECTION A-A ø 27-1/2" ø 24-3/16" ø 23" 32-1/2" 1" 6" TYP 1" TYP Cut Lines A A Riser Height Needed Risers Required (per accessway) 0" - 4" None (use adapter) >4" - 34" FCR2 >34" - 64" FCR2 (x2) >64" - 94" FCR2 (x3) 1. Unit weight: 32 lbs. 2. Riser not designed to hold water Engineer Specification Guide: Field-cut adjustable riser system to consist of injection molded polypropylene body, 100% Silicone Sealant for assembly of riser components, butyl mastic sealant for tank-riser or riser-riser joints, stainless steel fastening hardware and heavy duty nylon cable ties and mounts. Riser shall allow field adjustability of cover to grade. Installation Note Minimum install height: 4". Maximum install height: 34". Riser system may be stacked no more than three units high to a maximum of 94" extension. Access to internal components will not be compromised. 9500 Woodend Road | Edwardsville, KS 66111 | 913-951-3300 | schierproducts.com © Copyright 2020 Schier, All Rights Reserved MODEL NUMBER: FCR2 DESCRIPTION: 34" Field Cut Riser System PART #: 8010-006-01 DWG BY: B. Karrer DATE: 3/31/2020 REV: ECO:

Upload: others

Post on 19-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

Contents

Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1Special Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2Getting to Know the FCR2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8

SPECIFICATION AND INSTALLATION GUIDE

FCR2 Field Cut Riser SystemFor use with grease interceptors models GB-250, GB-500, GB-1000, GGI-500, GGI-750, GGI-1000, GGI-1500 and GGI-2000; sampling port model SV24; and solids interceptors models SI-250 and SI-500

Notes

TOP VIEW

SIDE VIEW

SECTION A-Aø 27-1/2"

ø 24-3/16"

ø 23"

32-1/2"

1"

6" TYP1" TYPCut

Lines

A

A

Riser Height Needed Risers Required (per accessway)

0" - 4" None (use adapter)

>4" - 34" FCR2

>34" - 64" FCR2 (x2)

>64" - 94" FCR2 (x3)

1. Unit weight: 32 lbs.2. Riser not designed to hold water

Engineer Specification Guide:Field-cut adjustable riser system to consist of injection molded polypropylene body, 100% Silicone Sealant for assembly of riser components, butyl mastic sealant for tank-riser or riser-riser joints, stainless steel fastening hardware and heavy duty nylon cable ties and mounts. Riser shall allow field adjustability of cover to grade.

Installation NoteMinimum install height: 4". Maximum install height: 34". Riser system may be stacked no more than three units high to a maximum of 94" extension. Access to internal components will not be compromised.

9500 Woodend Road | Edwardsville, KS 66111 | 913-951-3300 | schierproducts.com © Copyright 2020 Schier, All Rights Reserved

MODEL NUMBER:

FCR2DESCRIPTION: 34" Field Cut Riser System

PART #: 8010-006-01 DWG BY: B. Karrer DATE: 3/31/2020 REV: ECO:

Page 2: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

FCR2 Installation Guide page 2 of 9

When Installing Interceptor Inside

Fernco or similar rubber flow restriction end cap

SPECIAL PRECAUTIONS

Installation Instructions

Hydrostatic/Pressure Slabs

High Temperature Kitchen Water

concrete slab subject to hydrostatic pressure

watertight concrete vault

Do not install this unit in any manner

except as described in these instructions.Doing so may result in property damage, personal injury or death.

DO NOT AIR TEST UNIT OR RISER SYSTEM!

For Schier Grease Interceptor Installations - Failure to follow this guidance voids your warranty

cold water supply line

high temperature effluent ( > 150º F)

approved backflow prevention assembly

DTV (drain water tempering valve)

directly connected indirectly connected

If water is entering the interceptor at excessive temperature (over 150º F), a drain water tempering valve (DTV) and approved backflow prevention assembly must be installed. Most state and local plumbing codes prohibit water above 150º F being discharged into the sanitary sewer. Water above 150º F will weaken or deform PVC Schedule 40 pipe, poly drainage fixtures like interceptors and erode the coating of cast iron (leading to eventual failure).

Installation instructions and additional components are included with the interceptor. Read all instructions prior to installation. This interceptor is intended to be installed by a licensed plumber in conformance with all local codes.

If your dishwashing sink(s) discharges into a floor drain/sink (drain), you must regulate the flow into the drain to avoid an overflow of water onto the kitchen floor. This can be done by installing a valve or flow restriction cap on the sink piping that discharges into the drain. See drawing for guidance. For detailed guidance on indirect connections, go to: webtools.schierproducts.com/Technical_Data/Indirect_Connections.pdf

When installed under a hydrostatic slab (slab designed to withstand upward lift, usually caused by hydrostatic pressure) interceptor must be enclosed in a watertight concrete vault.

InterceptorInterceptorInterceptor

InterceptorInterceptorInterceptor

InterceptorInterceptorInterceptor

InterceptorInterceptorInterceptor

Page 3: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

FCR2 Installation Guide page 3 of 9

SPECIAL PRECAUTIONS

Install unit on solid, level surface in contact with the entire footprint of unit base

Fully Support Base of Unit

For above grade installations ensure heavy inlet and outlet piping (such as cast iron or long runs) is properly supported or suspended during the entire installation process to prevent connection failure or damage to bulkhead fittings.

Support Inlet and Outlet Piping

pipe supports

DO NOT COMPACT BACKFILL

For Schier Grease Interceptor Installations - Failure to follow this guidance voids your warranty

Interceptors and risers are not designed to withstand water table height in excess of the top of the unit when buried (see figure). If it is possible for this to occur, install the interceptor and risers in a water-tight concrete vault or backfill with concrete or flowable fill (wet concrete and flowable backfill should be poured in stages to avoid crushing the interceptor). At risk areas include but are not limited to tidal surge areas, floodplains and areas that receive storm water. Great Basin™models that are direct buried in high water table scenarios must be installed with an anchor kit.

max water table height for direct burial

model AK1 anchor kit

High Water Table Installations

InterceptorInterceptorInterceptor

InterceptorInterceptorInterceptor

Page 4: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

GETTING TO KNOW THE FCR2

1. #8 x 5/8" Riser Body Assembly Screw (x12)

2. Riser Body Half (x2)

3. 100% Silicone Sealant

4. #10 x 3/4" Phillips Head Stainless Steel Screws (x4)

5. Cable Tie Mounts(x4)

6. Heavy Duty 18" - 120 lb. Cable Tie (x4)

7. Stainless Steel Eyebolt and Nut (x4)

8. 1" square x 80" block butyl mastic sealant

FCR2 Installation Guide page 4 of 9

2

2

4

5

6

7

4

5

6

7

1

8

3

6

4

5

7

6

7

4

5

1

Page 5: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

Read all instructions before installationInstall in conformancewith all local codes

2

Special Precautions

DO NOT AIR TEST UNIT OR RISER SYSTEM! Doing so may result in property damage,

personal injury or death.

1

Do not add any form of lubricant to riser tube during installation.

3

INSTALLATION

3 Risers (94") Max4

InterceptorInterceptorInterceptor

Max Water LevelRisers are not designed to retain water

5

Make Sure Parts Are Clean When Applying Silicone or Mastic Sealant

6

Tools You Will Need

#2 Phillips Head Screwdriver

Tape Measure

Reciprocating Saw, Circular Saw or Jigsaw

Drill with 1/2" Chuck

1/4" Drill Bit

Level

7/16" Nut Driver Bit

INCLUDED WITH GB-500

Grease Pencil

Determine Trim Length (round up all fractions to next inch). Only one FCR2 riser per cover will need to be cut.

NOTE: If trim length is 0 or less, no cutting is required. Trimming risers using these guidelines will result in risers that are 0-2" shorter than the exact riser height needed. Cover Adapter adjustability will allow for final adjustments to grade.

1b

1 Determine riser height needed and trim risers. Measure dimension X to determine riser height needed. 1a

Riser Height Risers RequiredNeeded (X) (per accessway)

0" - 4" None (use adapter)

>4" - 34" FCR2 (x1)

>34" - 64" FCR2 (x2)

>64" - 94" FCR2 (x3)

Trim Length(27" Max)

Measuring from bottom of riser, mark trim length and cut Riser Halves.

1c

Riser Height Needed Trim Length =

>4" - 34"

0" - 4"

>34" - 64"

31" - Riser Height (X)

62" - Riser Height (X)

93" - Riser Height (X)>64" - 94"

FCR2 Installation Guide page 5 of 9

Page 6: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

INSTALLATION

FCR2 Installation Guide page 6 of 9

2 Assemble riser body halves.2a

Apply Silicone Sealant (included) to the edge of each Riser Body Half. Lay one bead into the entire length of the Groove and another bead into the Sealant Trough next to the screw holes.

2b

Immediately assemble riser halves after applying sealant and fasten using supplied screws.

Groove

Sealant Trough

Tongue Edge

Groove Edge

Page 7: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

INSTALLATION

3 Install risers onto grease interceptor.

Place Riser Into position aligning vertical ribs with Eyebolts.

Remove Cover Adapters

3b

Loosen the Cover Adapter LowerBand Clamps using 7/16" Nut Driver Bit.

3a

3e

Remove insert plugs, then hand tighten Eyebolts into threaded holes surrounding the accessway.

3c

x4

Lay Butyl Mastic sealant into the channel surrounding the accessway.

3d

Make final adjustments to cable ties to ensure riser is level.

3h

FCR2 Installation Guide

Loop Cable Ties through Mounting Holes and Eyebolts, do not tighten.

3f

Tighten Cable Ties, a little bit at a time in a star pattern going around the riser to evenly force the riser into the Mastic Sealant. Riser should go 1/2" - 3/4" into the sealant.

Tightening Pattern3g

1 2

4

3

4e

Install 4 Cable Tie Mounts onto lowest horizontal structural rib using #10 x 3/4" screws. Make sure Mounts are located directly above Eyebolts and are positioned for horizontal Cable Tie placement.

page 7 of 9

Page 8: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

INSTALLATION

4 Install risers onto risers (34"+).

On bottom riser: lay Butyl Mastic sealant onto the flange surrounding the accessway.

4c

Make final adjustments to cable ties to ensure riser system is level.

Tighten Cable Ties, a little bit at a time in a star pattern going around the riser to evenly force the riser into the Mastic Sealant. Riser should go 1/2" - 3/4" into the sealant.

4g 4h

Loop Cable Ties through Cable Mounts and Eyebolts, do not tighten.

4f

On bottom riser: install Eyebolts into holes in riser flange using supplied stainless steel nuts. Hand tighten only.

4b

x4

Place Top Riser onto Bottom Riser.

4d

FCR2 Installation Guide

Tightening Pattern

1 2

4

3

4a

On bottom riser: drill (4) 1/4" Mounting Holes through flange.

4e

On the top riser: Install 4 Cable Tie Mounts onto lowest horizontal structural rib using #10 x 3/4" screws. Make sure Mounts are located directly above Eyebolts and are positioned for horizontal Cable Tie placement.

page 8 of 9

Page 9: SPECIFICATION AND INSTALLATION GUIDE FCR2 · Install unit on solid, level surface in contact with the entire footprint of unit base Fully Support Base of Unit For above grade installations

INSTALLATION

5 Install cover adapters onto risers.

Place Cover Adapter onto tops of riser systems.

5a

Tighten LowerBand Clamp to 5 -8 ft. lbs. of torque using 7/16" Nut Driver Bit.

5b Resume Installation instructions for interceptor: "Bring Covers Flush-to-Grade"