specific order

Upload: hrish-bhimber

Post on 01-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 Specific Order

    1/12

    M-II-2002

    ADVANCE COST ACCOUNTING

  • 8/9/2019 Specific Order

    2/12

    METHOD OF COSTINGAre classifed into….

  • 8/9/2019 Specific Order

    3/12

    Specifc order Costing

    METHOD OF COSTING

    Operation Costing Process CostingSingle Costing

    Operting Costing

     !o" Costing#tc$ Costing

    Contrct Costing

  • 8/9/2019 Specific Order

    4/12

    Specifc order Costing !o" Costing

    #tc$ CostingContrct Costing

  • 8/9/2019 Specific Order

    5/12

     !o" Costing

    costs re collecte% n% cc&'&lte%

    ccor%ing to (o"s) contrcts) pro%&cts or*or+ or%ers. order o customers & Not continuous no uniormity in the ow o production Costs are collected and accumulated ater the completion

    separate work in progress maintained 

    ach !o" is treated as a separate entity identiying profta"le and

    unprofta"le !o"s. #ro$ides inormation or

    preparation o estimates acilitates e%ecti$e cost

    control t helps management to f'

    selling price Spoilage and deecti$e works

    can "e easily identifed cost(plus ormula o pricing "udgetary control o

    ) more la"our intensi$e) *ith increase in clerical work+

    there are chances orcommitting more errors and

    mistakes.) t does not pro$ide or thecontrol o cost

    ) di,cult to make costcomparison

  • 8/9/2019 Specific Order

    6/12

    Specifc order Costing !o" Costing

    #tc$ CostingContrct Costing

  • 8/9/2019 Specific Order

    7/12

    #tc$Costing lot o, si'ilr &nits *$ic$ co'prise t$e "tc$ ' "e

    &se% s cost &nit ,or scertin'ent o, cost.

    Separate cost sheet is maintained or each "atch "y assigning a"atch num"er.

    Cost per unit o product is determined "y di$iding the total cost oa "atch "y the num"er o units o that "atch.

    -atch costing is used in drug industries+ readymade garments+

     ./. sets+ 0adio1s and lectronic Components 2anuacture.

    -3 (4etermination o economic "atch lot is the important work in "atchcosting. he two types o costs in$ol$ed in "atch costing are 567 Set up costand 587 Carrying cost.(conomic -atch 3uantity will "alance these two opposing costs.

    conomic -atch 3uantity 5-37 9

    4 9 Annual #roduction or 4emand in :nits

    S 9 Setup Cost per "atchC 9 Annual ;olding or Carrying Cost per unit

  • 8/9/2019 Specific Order

    8/12

    Specifc order Costing !o" Costing

    #tc$ CostingContrct Costing

  • 8/9/2019 Specific Order

    9/12

    Contrct Costing

    Ter'inl costing *$ic$ &n%ert+es %e/nite contrct ,orlong perio%

    ach contract 9 separate unit o cost Separate ledger A

  • 8/9/2019 Specific Order

    10/12

    Specifc order Costing !o" Costing

    #tc$ CostingContrct Costing

  • 8/9/2019 Specific Order

    11/12

    • >o" or order

    • ach !o" is separate

    • O$erheads are determined

    • Cost at completion

     !o"Costing

    #tc$ Costing ContrctCosting

  • 8/9/2019 Specific Order

    12/12

    THAN  

     1OU