uttarakhandssa.uk.gov.in/files/costing.pdf · special focus districts budget allocation -2014-15...

96
SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25% and above) PMO's 121 Minority Districts Muslim Concentratio n (20% and above) LWE Affected Districts New PS New UPS ACR Resi. schools PS UPS Resi. schools Residential hostel Integration of Class VIII with UPS New teachers for new schools Additional teacher against excess enrolment Part Time Instructors SSA KGBV Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 Bageshwar 1 17 2594.68 21.59 2616.27 2 Haridwar (Roorkee) 1 1 156 121 5291.71 152.97 5444.68 3 US Nagar 1 1 25 34 6441.65 43.55 6485.20 Sub Total 1 2 2 181 172 14328.05 218.10 14546.15 14 183 14 481 51056.70 609.63 51666.33 98.91% 35.79% 28.06% 35.78% 28.15% 17 2594.6814 21.585 2616.2664 9.87% 18.11% 9.90% 17.99% 14 183.9891 14 481.608 51056.983 609.9878 51666.614 #DIV/0! 101.65% ###### 279.60% 356.34% 279.68% 355.19% 181 155.25 11733.367 196.515 11929.882 100.00% 90.13% 81.89% 90.10% 82.01% Outlay approved Civil Works (Fresh) New Schools Teachers S. No Districts SOCIAL CATEGORY GROUP Physical items recommended for 2014-15 No. of KGBVs % Muslim Concentration (20% and above) Naxalite Affected Districts % Naxalite Affected State total % w.r.t Approvals for the whole state SOCIAL CATEGORY GROUP Scheduled Tribes (25% % Scheduled Tribes (25% Scheduled Castes (25% % Scheduled Castes (25% PMO's 121 Minority % PMO's 121 Minority Muslim Concentration (20% and above)

Upload: others

Post on 04-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15

(UTTARAKHAND)

(Rs. in lakh)

Scheduled Tribes (25% and above)

Scheduled Castes

(25% and above)

PMO's 121

Minority Districts

Muslim Concentration (20% and

above)

LWE Affected Districts

New PS New UPS ACR Resi. schools PS UPS Resi.

schoolsResidential

hostel

Integration of Class

VIII with UPS

New teachers for new schools

Additional teacher against excess

enrolment

Part Time Instructors SSA KGBV Total

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 231 Bageshwar 1 17 2594.68 21.59 2616.272 Haridwar (Roorkee) 1 1 156 121 5291.71 152.97 5444.683 US Nagar 1 1 25 34 6441.65 43.55 6485.20

Sub Total 1 2 2 181 172 14328.05 218.10 14546.1514 183 14 481 51056.70 609.63 51666.33

98.91% 35.79% 28.06% 35.78% 28.15%

17 2594.6814 21.585 2616.2664

9.87% 18.11% 9.90% 17.99%14 183.9891 14 481.608 51056.983 609.9878 51666.614

#DIV/0! 101.65% ###### 279.60% 356.34% 279.68% 355.19%

181 155.25 11733.367 196.515 11929.882

100.00% 90.13% 81.89% 90.10% 82.01%

Outlay approvedCivil Works (Fresh) New Schools Teachers

S. No Districts

SOCIAL CATEGORY GROUP

Physical items recommended for 2014-15

No. of KGBVs

% Muslim Concentration (20% and above)

Naxalite Affected Districts % Naxalite Affected

State total% w.r.t Approvals for the whole state

SOCIAL CATEGORY

GROUP

Scheduled Tribes (25% % Scheduled Tribes (25%

Scheduled Castes (25% % Scheduled Castes (25%

PMO's 121 Minority % PMO's 121 Minority

Muslim Concentration (20% and above)

Page 2: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School 14 14 Approved 1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS 4 Not Approved1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 1 9.00 1 9.00 9.0000 1 9.00 1 9.0002.05 Stipend per child per month @ Rs.100/- 0.6000 1 0.60 1 0.60 0.6000 1 0.60 1 0.600

2.06 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50 0.5000

Not Approved2.07 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.000 Approved

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400 1.4400

iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.800iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.200v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.200

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 1 1.26 1 1.26 1.2600 1 1.26 1 1.260

2.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5002.1 Medical care/contingencies @ Rs.750/- per child 0.6250 1 0.63 1 0.63 0.6250 1 0.63 1 0.6252.11 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3752.12 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3752.13 P.T.A / school functions 0.1000 1 0.10 1 0.10 0.1000 Not Approved2.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.250 Approved

Sub Total 14 20.79 14 20.79 12 20.19 12 20.19Total 14 20.79 14 20.79 12 20.19 12 20.19

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 1 18.00 1 18.00 18.0000 1 18.00 1 18.003.05 Stipend per child per month @ Rs.100/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

3.06 Supplementary TLM, Stationery and other educational material 1.0000 1 1.00 1 1.00 1.0000 Not approved

3.07 Salariesi Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00 Approved

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400 1.4400

iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80

3.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1 1.00 1 1.00 1.0000 1 1.00 1 1.003.10 Medical care/contingencies @ Rs.750/- per child 1.2500 1 1.25 1 1.25 1.2500 1 1.25 1 1.253.11 Maintenance 0.7500 1 0.75 1 0.75 0.7500 1 0.75 1 0.753.12 Miscellaneous 0.7500 1 0.75 1 0.75 0.7500 1 0.75 1 0.75

Recommended as proposed

Approved

Approved

Approved

Approved

Approved

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

Page 3: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

3.13 P.T.A / school functions 0.2000 1 0.20 1 0.20 0.2000 Not recommended as appraised

3.14 Provision of Rent

3.15 Capacity Building 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.50 Recommended as proposed

Sub Total 14 33.65 14 33.65 12 32.45 12 32.45Total 14 33.65 14 33.65 12 32.45 12 32.45

4 Transport/Escort Facility

4.01 Children in remote habitations 0.0300 322 9.66 322 9.66 0.0300 Not recommended as appraised

4.02 Urban deprived children/children without adult protection 0.0300 0.0300Sub Total 322 9.66 322 9.66

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000

(b) 9 months 0.1500 40 6.00 40 6.00 0.09050 40 3.62 40 3.62Unit cost reduced(Page no. 51)

(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 40 6.00 40 6.00 40 3.62 40 3.625.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600

(b) 9 months 0.0450 1958 88.11 1958 88.11 0.02675 1958 52.38 1958 52.38Unit cost reduced(Page no. 51)

(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 1958 88.11 1958 88.11 1958 52.38 1958 52.385.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450

(c) 6 months 0.0300 86 2.58 86 2.58 0.02675 86 2.30 86 2.30Unit cost reduced(Page no. 51)

(d) 3 months 0.0150 0.0150Sub Total 86 2.58 86 2.58 86 2.30 86 2.30

5.05 Madarasa/Maktab(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal 2084 96.69 2084 96.69 2084 58.30 2084 58.30

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 368185 552.28 368185 552.28 0.00125 368185 460.23 368185 460.23Recommended at the average

cost rate(Page no.58 to 62)

6.02 Braille Books (P) 0.0015 68 0.10 68 0.10 0.00150 68 0.102 68 0.102

6.03 Large print books (P) 0.0015 417 0.63 417 0.63 0.00150 417 0.6255 417 0.62556.04 Free Text Book (UP) 0.0025 251599 629.00 251599 629.00 0.00250 251599 629.00 251599 629.00

6.05 Braille Books (UP) 0.0025 44 0.11 44 0.11 0.00250 44 0.11 44 0.116.06 Large print books (UP) 0.0025 300 0.75 300 0.75 0.00250 300 0.75 300 0.75

Sub Total 620613 1182.86 620613 1182.86 620613 1090.82 620613 1090.827 Provision of 2 sets of Uniform

Recommended as proposed

Page 4: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

7.01 All Girls 0.0040 419705 1678.82 419705 1678.82 0.0040 419705 1678.82 419705 1678.827.02 SC Boys 0.0040 127065 508.26 127065 508.26 0.0040 127065 508.26 127065 508.267.03 ST Boys 0.0040 10692 42.77 10692 42.77 0.0040 10692 42.77 10692 42.777.04 BPL Boys 0.0040 179928 719.71 179928 719.71 0.0040 179928 719.71 179928 719.71

Sub Total 0.0160 737390 2949.56 737390 2949.56 737390 2949.56 737390 2949.568 Teaching Learning Equipment (TLE)

8.01 New Primary 0.40 0.2000 14 2.80 14 3.20 0.2000 Spill over and fresh not recommended

8.02 New Upper Primary 0.5000 4 2.00 4 2.00 0.5000Sub Total 0.40 18 4.80 18 5.20

III ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 28 70.56 28 70.56 0.4200 Not recommended as appraised

9.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 4 11.52 4 11.52 0.4800(b) Social Studies 0.4800 4 11.52 4 11.52 0.4800(c) Languages 0.4800 4 11.52 4 11.52 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total 40 105.12 40 105.12

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total 40 105.12 40 105.12

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 2070 10432.80 2070 10432.80 0.4200 2070 10432.80 2070 10432.809.14 Primary Teachers (Contract)-Existing 0.1300 785 1224.60 785 1224.60 0.1300 785 1224.60 785 1224.609.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers

9.16 Additional Teachers - PS (Regular) 0.4200 170 856.80 170 856.80 0.4200 170 856.80 170 856.80 Recommended as proposed

9.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers

9.19 UP Teachers (Regular)-Existing 0.4800 3306 19042.56 3306 19042.56 0.4800 3306 19042.56 3306 19042.56 Recommended as proposed

9.2 UP Teachers (Contract)-Existing9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

Recommended as proposed

Not recommended as appraised

Recommended as proposed

Page 5: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 275 1584.00 275 1584.00 0.4800 275 1584.00 275 1584.00 Recommended as proposed

9.25 Additional Teachers - UPS (Contract)9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 292 233.60 292 233.60 0.0800 17 5.44 17 5.44(b) Health and Physical Education 0.0800 285 228.00 285 228.00 0.0800 17 5.44 17 5.44(c) Work Education 0.0800 550 440.00 550 440.00 0.0800 78 24.96 78 24.96

9.29 Others Sub Total 7733 34042.36 7733 34042.36 6718 33176.60 6718 33176.60

Total 7733 34042.36 7733 34042.36 6718 33176.60 6718 33176.60Total (New+Recurring) 7773 34147.48 7773 34147.48 6718 33176.60 6718 33176.60

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 5 days residential 0.0200 18320 366.40 18320 366.40 0.0100 31203 314.23 31203 314.23

Rs.2.20 lakhs for School leadership Programme (training of 30 RPs, 10 days residential @ Rs.200 per head and 100 Head teachers, 16 days non- residential @ Rs.100 per day)

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 5 days non residential 0.0050 18320 91.60 18320 91.60 0.0050 31203 156.02 31203 156.02 Recommended as appraised

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600 0.0600

(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200 0.0200

(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 5 days residential

0.0200 1399 27.98 1399 27.98 0.0100 560 5.60 560 5.60 Recommended as appraised

Sub Total 38039 485.98 38039 485.98 62966 475.85 62966 475.85

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200 117 730.08 117 730.08 0.5200 117 730.08 117 730.08

(b) 2 RPs for CWSN 0.1200 156 224.64 156 224.64 0.1200 156 224.64 156 224.64(c) 1 MIS Coordinator 0.1500 95 171.00 95 171.00 0.1500 95 171.00 95 171.00(d) 1 Datra Entry Operator 0.1200 61 87.84 61 87.84 0.1200 61 87.84 61 87.84(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 211 303.84 211 303.84 0.1200 211 303.84 211 303.84

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 95 47.50 95 47.50 0.5000 95 47.50 95 47.5011.05 Meeting, TA 0.3000 95 28.50 95 28.50 0.3000 95 28.50 95 28.5011.06 TLM Grant 0.1000 0.1000

11.07 Maintenance Grant 0.1000 95 9.50 95 9.50 0.1000 Not recommended as appraised

Sub Total 925 1602.90 925 1602.90 830 1593.40 830 1593.4012 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 509 3176.16 509 3176.16 0.5200 509 3176.16 509 3176.16 Recommended only in

position

Recommended only in position

Salary for 4 Months

Recommended as proposed

Page 6: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 994 99.40 994 99.40 0.1000 994 99.40 994 99.4012.06 Meeting, TA 0.1200 994 119.28 994 119.28 0.1200 994 119.28 994 119.2812.07 TLM Grant 0.0300 0.0300

12.08 Maintenance Grant 0.0200 994 19.88 994 19.88 0.0200 Not recommended as appraised

Sub Total 3491 3414.72 3491 3414.72 2497 3394.84 2497 3394.8413 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 13 650.00 13 650.00 50.0000 Not recommended as appraised

Sub Total 13 650.00 13 650.0014 Libraries in Schools

(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 25832 129.16 25832 129.16 0.005015.02 Upper Primary 0.0050 17118 85.59 17118 85.59 0.0050

Sub Total 42950 214.75 42950 214.75

Not recommended as appraised

Recommended as proposed

Page 7: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

16 School Grant16.01 Primary 0.0500 12600 630.00 12600 630.00 0.0500 12600 630.00 12600 630.0016.02 Upper Primary 0.0700 5344 374.08 5344 374.08 0.0700 5344 374.08 5344 374.08

Sub Total 17944 1004.08 17944 1004.08 17944 1004.08 17944 1004.0817 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 17934 170.37 17934 170.37 0.00393 17934 70.50 17934 70.50 recommended as appraisedSub Total 17934 170.37 17934 170.37 17934 70.50 17934 70.50

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 16863 1064.18 16863 1064.18 16863 1064.18 16863 1064.18 Recommended as proposed

Sub Total 16863 1064.18 16863 1064.18 16863 1064.18 16863 1064.18

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN

19.01 Provision for Inclusive Education0.0300

16558 496.74 16558 496.74 0.0190 13662 259.578 13662 259.578CWSN taken as per DISE, unit cost reduced to eligible activities

Sub Total 16558 496.74 16558 496.74 13662 259.58 13662 259.5820 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 13 186.47 13 186.4720.02 ECCE 13 168.55 13 168.5520.03 Intervention for SC / ST children 12 146.52 12 146.52

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children 6 29.49 6 29.49 Not recommended as appraised

20.06 Intervention for Urban Deprived children1208 36.24 1208 36.24 1208

36.241208

36.24Recommended as proposed

Sub Total 1252 567.27 1252 567.27 1208 36.24 1208 36.2421 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.0060

21.02 Non-residential (3 days) 0.0030102756 308.27 102756 308.27

0.0030102756

308.268102756

308.268Recommended as proposed

21.03 Local Authority Members (3 days residential) 0.0060 0.0060Sub Total 102756 308.27 102756 308.27 102756 308.27 102756 308.27

V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 12 245.40 12 245.40 20.4500 12 245.40 12 245.4022.04 New Primary School (Plain) 19.2500 2 38.50 2 38.50 19.2500 2 38.50 2 38.50

22.05 New Upper Primary (Hill) 26.6900 4 106.76 4 106.76 26.6900 Not recommended as appraised

22.06 New Upper Primary (Plain) 24.5700 24.5700

22.06.1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary) 4 54.06 4 54.06 4 54.06 134.14 188.20

Rs. 134.14 lakhs approved as

per decsion of cabinat

committee Uttrakhand for

reconstruction activity

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary)

22.09 Building Less (Pry) Hill 20.4500 4 81.80 4 81.80 20.4500Building Less (Pry) Plain 19.2500 1 19.25 1 19.25 19.2500

22.1 Building Less (UP) Hill 26.6900 1 26.69 1 26.69 26.6900Building Less (UP) Plain 24.5700 24.5700

22.11 Dilapidated Building (Pry) Hill 1 4.76 197 1013.88 12.8600 234 3009.24 432 4027.88 1 4.76 111 404.60 12.8600 409.36

Spil over recommended as proposed and deferred liability recommended as appraised and fresh not recommended

Dilapidated Building (Pry) Plain 11 25.50 11.4100 28 319.48 39 344.98 11 25.50 11.4100 25.50Deferred liability recommended as proposed and fresh not recommended

Fresh not recommended as appraised

Not recommended as appraise

Approved by PAB

Recommended as proposed

Page 8: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

22.12 Dilapidated Building (UP) Hill 25 206.81 17.4200 15 261.30 40 468.11 17 77.21 17.4200 77.21Deferred liability recommended as appraised and fresh not recommended

Dilapidated Building (UP) Plain 14.8200 4 59.28 4 59.28 14.8200 Fresh not recommended as appraised

22.13 Additional Class Room (Rural)

22.14 Additional Class Room (Hill) 11 20.30 141 483.39 5.7900 21 121.59 173 625.28 11 20.30 24 44.28 5.7900 2 11.58 2 76.16

Spill over recommended as proposed and deferred liability and fresh recommended as appraised

22.15 Additional Class Room (Plain) 582 928.96 4.8300 369 1782.27 951 2711.23 375 535.36 4.8300 181 874.23 181 1409.59 Deferred liability and fresh recommended as appraised

22.16 Toilet/Urinals (for urban areas only) 5 2.75 5 2.75 5 2.75 2.75 Spill over recommended as proposed

22.17 Separate Girls Toilet Hill 2.1400 121 258.94 121 258.94 2.1400 121 258.94 121 258.94Separate Girls Toilet Plain 1.7600 71 124.96 71 124.96 1.7600 71 124.96 71 124.96

22.18 CWSN friendly toilets Hill 15 8.25 2.1400 32 68.48 47 76.73 15 8.25 2.1400 8.25Spill over recommended as proposed and fresh not recommended as appraised

CWSN friendly toilets Plain 1.7600 15 26.40 15 26.40 1.760022.19 Drinking Water Facility 1171 1528.21 1171 1528.21

22.2 Boundary Wall 5 6.49 1098 2344.40 1103 2350.89Spill over and deferred liability not recommended as appraised

22.21 Electrification 1709 699.30 0.3000 167 50.10 1876 749.40 1709 699.30 0.3000 699.30 Deferred liability recommended by PAB

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 4 5.40 1 1.35 7.3000 5 6.75 1 1.35 7.3000 1.35

Spill over not recommended as appraised and Deferred liability recommended as proposed

Office-cum-store-cum-Head Teacher's room (Primary) Plain 94 157.03 6.3200 102 644.64 196 801.67 44 60.07 6.3200 60.07

Deferred liability recommended as appraised and fresh not recommended asappraised

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 5 13.50 7.3000 5 13.50 1 2.70 7.3000 2.70

Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 35 57.60 6.3200 35 57.60 13 10.56 6.3200 10.56

22.24 Augumentation of training facility in BRC (one time)

22.25 Child friendly Elements 935 237.00 0.3000 110 33.00 1045 270.00 0.3000 Deferred and fresh not recommended as appraised

22.26 Ramps with Handrails 0.1500 165 24.75 165 24.75 0.1500 165 24.75 165 24.75 Approved by PAB22.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children

(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings 2 10.50 2 10.50 2 10.50 10.50

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 1 2.50 121 682.11 340 1229.98 462 1914.59 117 187.93 187.9323.34 Major Repairs for Upper Primary School 34 123.70 60 273.34 94 397.04 25 42.08 42.0823.35 Others

Sub Total 46 104.51 4990 6985.02 3049 10334.36 8085 17423.88 36 90.12 2450 2101.44 554 1712.50 554 3904.06VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%

(a) Project Management and MIS 13 2060.86 13 2060.86 890.74 890.74 Recommended as appraised

(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 13 2060.86 13 2060.86 890.74 890.74

Fresh not recommended as appraised

Deferred liability recommended as appraised

Deferred liability recommended as proposed

Recommended as proposed

Deferred liability approved by PAB

22.3

Page 9: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

23.02 Learning Enhancement Prog. (LEP) (up to 2%) 13 986.59 13 986.59 206189 10.309 206189 10.309 206189 @ Rs5 per head for CCE card

23.03 Community Mobilization activities (up to 0.5%) 13 198.14 13 198.14 142.42 142.42 Recommended as appraised

Sub Total 26 1184.73 26 1184.73 206189 152.73 206189 152.73Total of SSA (District) 46 104.91 4990 6985.02 1630041 62004.70 1635077 69094.62 36 90.12 2450 2101.44 1810232 48290.81 1810232 50482.36

24 STATE COMPONENT

24.01 Management & MIS 772.76 772.76 524.51 524.51 Recommended as appraised

24.02 REMS 0.0055 17934 98.64 17934 98.64 0.00278 17934 49.83 17934 49.83PAB approved Rs. 3 lakhs for SLAS to be conducted for class V

24.03 SIEMATSub Total 17934 871.40 17934 871.40 17934 574.34 17934 574.34

STATE SSA TOTAL 46 104.91 4990 6985.02 1647975 62876.09 1653011 69966.02 36 90.12 2450 2101.44 1828166 48865.15 1828166 51056.70

25 KGBV Financial Provisions (provide separate costing sheets for different Models) IIINon-recurring (one time grant)

25.01 Construction of Building (New) HillConstruction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) PlainVariation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New) 1 2.31 1 2.31 Not recommended as appraised

Boudary Wall25.04 Boring/Hanpump (Spill over only)

Boring/Hanpump 25.05 Electricity/water charges (Spill over only)

Electricity/water charges (Spill over only)Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

25.08 (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 28 280.00 28 280.00 10.0000 Not recommended as

appraised

25.09 Replacement of bedding (once in 3 years) 0.3750 14 5.25 14 5.25 0.3750 14 5.25 5 5.25 Recommended as proposed

Sub Total Non-recurring 43 287.56 43 287.56 14 5.25 5 5.25Recurring

25.1 Maintenance per girl Per month @ Rs.1500/- 9.0000 28 252.00 28 252.00 9.0000 28 252.00 28 252.0025.11 Stipend per girl per month @ Rs.100/- 0.6000 28 16.80 28 16.80 0.6000 28 16.80 28 16.80

25.12 Supplementary TLM, Stationery and other educational material 0.5000 28 14.00 28 14.00 0.5000 28 14.00 28 14.00

25.13 Examination Fee25.14 Salaries

i Warden @ 25000/- 3.0000 28 84.00 28 84.00 3.0000 28 84.00 28 84.00 Recommended as proposed

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400 1.4400

iii Part time teachers @5000/- 1.8000 28 50.40 28 50.40 1.8000 28 50.40 28 50.40iv Accountant @10000/- 1.2000 28 33.60 28 33.60 1.2000 28 33.60 28 33.60v Support Staff @5000/- 1.2000 28 33.60 28 33.60 1.2000 28 33.60 28 33.60

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 28 35.28 28 35.28 1.2600 28 35.28 28 35.28

25.15 Vocational training / specific skill training 0.5000 28 14.00 28 14.00 0.5000 28 14.00 28 14.0025.16 Electricity / water charges 0.5000 28 14.00 28 14.00 0.5000 28 14.00 28 14.0025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 28 17.50 28 17.50 0.6250 28 17.50 28 17.5025.18 Maintenance 0.3750 28 10.50 28 10.50 0.3750 28 10.50 28 10.5025.19 Miscellaneous 0.3750 28 10.50 28 10.50 0.3750 28 10.50 28 10.5025.2 Preparatory camps 0.1500 28 4.20 28 4.20 0.1500 28 4.20 28 4.20

25.21 P.T.A / school functions 0.1500 28 4.20 28 4.20 0.1500 28 4.20 28 4.2025.22 Provision of Rent (8 months) 8 7.06 8 7.0625.23 Capacity Building 0.2500 28 7.00 28 7.00 0.2500 28 7.00 28 7.0025.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 28 2.80 28 2.80 0.1000 28 2.80 28 2.80

Sub Total 484 611.44 484 611.44 476 604.38 476 604.38Total 527 899.00 527 899.00 490 609.63 481 609.63

Recommended as proposed

Recommended as proposed

Page 10: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the State: UttarakhandState Summary for AWP&B 2014-15 - SSA

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

Spill Over Fresh Total Spill Over Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Total

RemarksS.

No. Activity

Grand Total - (SSA & KGBV) 46 104.91 4990 6985.02 1648502 63775.10 1653538 70865.02 36 90.12 2450 2101.44 1828656 49474.78 1828647 51666.33

Page 11: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of theDistrict AlmoraCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1.00 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools 2.00 Residential Hostel for 50 children

Non-recurring (one time grant)2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3.00 Residential Hostel for specific category of children

Non-recurring (one time grant)3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.10 Medical care/contingencies @ Rs.750/- per child 1.2500 1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4.00 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 42 1.26 42 1.26 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total 42 1.26 42 1.26

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of

2014-15 Total Deferred liability of 2014-15Total Fresh

Page 12: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of theDistrict AlmoraCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of

2014-15 Total Deferred liability of 2014-15Total Fresh

5.00 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 15 0.68 15 0.68 0.02675 15 0.40 15 0.40(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 15 0.68 15 0.68 15 0.40 15 0.405.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTOTAL 15 0.68 15 0.68 15 0.40 15 0.40

II RETENTION6.00 Free Text Book6.01 Free Text Book (P) 0.0015 26413 39.62 26413 39.62 0.00125 26413 33.02 26413 33.026.02 Braille Books (P) 0.0015 0.001506.03 Large print books (P) 0.0015 13 0.02 13 0.02 0.00150 13 0.02 13 0.026.04 Free Text Book (UP) 0.0025 21636 54.09 21636 54.09 0.00250 21636 54.09 21636 54.096.05 Braille Books (UP) 0.0025 0.002506.06 Large print books (UP) 0.0025 12 0.03 12 0.03 0.00250 12 0.03 12 0.03

Sub Total 48074 93.76 48074 93.76 48074 87.16 48074 87.167.00 Provision of 2 sets of Uniform 7.01 All Girls 0.0040 34212 136.85 34212 136.85 0.0040 34212 136.85 34212 136.857.02 SC Boys 0.0040 11064 44.26 11064 44.26 0.0040 11064 44.26 11064 44.267.03 ST Boys 0.0040 50 0.20 50 0.20 0.0040 50 0.20 50 0.207.04 BPL Boys 0.0040 13470 53.88 13470 53.88 0.0040 13470 53.88 13470 53.88

Sub Total 58796 235.18 58796 235.18 58796 235.18 58796 235.188.00 Teaching Learning Equipment (TLE)8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Sub TotalIII ENHANCING QUALITY

9.00 New Teachers Salary 9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

Page 13: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of theDistrict AlmoraCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of

2014-15 Total Deferred liability of 2014-15Total Fresh

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)in positionPrimary teachers

9.13 Primary Teachers ( Regular)-Existing, in position 0.4200 353 1779.12 353 1779.12 0.4200 353 1779.12 353 1779.129.14 Primary Teachers (Contract)-Existing, in position 0.1300 113 176.28 113 176.28 0.1300 113 176.28 113 176.289.15 Head Teacher for Primary in position 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular)in position 0.4200 0.42009.17 Additional Teachers - PS (Contract)in position 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing, in position 0.4800 261 1503.36 261 1503.36 0.4800 261 1503.36 261 1503.369.20 UP Teachers (Contract)-Existing, in position

9.21 Head Teacher for Upper Primary in position (if the numberof children exceeds 100 in a school) 0.0500

0.0500

9.22 Subject specific Upper Primary Teachers (Regular)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)in position

(a) Science and Mathematics 0.08000.0800

(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) in position 0.4800 0.48009.25 Additional Teachers - UPS (Contract) in position

9.26Subject specific Additional Teachers-UPS (Regular)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors in position(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

9.29 Others in positionSub Total 727 3458.76 727 3458.76 727 3458.76 727 3458.76

Total 727 3458.76 727 3458.76 727 3458.76 727 3458.76Total (New+Recurring) 727 3458.76 727 3458.76 727 3458.76 727 3458.76

10.00 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 1909 38.18 1909 38.18 0.0100 3141 31.58 3141 31.58

10.02One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days

0.0050 1909 9.55 1909 9.55 0.0050 3141 15.71 3141 15.71

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

Page 14: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of theDistrict AlmoraCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of

2014-15 Total Deferred liability of 2014-15Total Fresh

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 140 2.80 140 2.800.0100

50 0.50 50 0.50

Sub Total 3958 50.53 3958 50.53 6332 47.78 6332 47.78

11.00 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular)

0.5200 33 205.92 33 205.920.5200

33 205.92 33 205.92

(b) 2 RPs for CWSN 0.1200 9 12.96 9 12.96 0.1200 16 23.04 16 23.04(c) 1 MIS Coordinator 0.1500 11 19.80 11 19.80 0.1500 11 19.80 11 19.80(d) 1 Datra Entry Operator 0.1200 0.1200(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 0.1200

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 11 5.50 11 5.50 0.5000 11 5.50 11 5.5011.05 Meeting,TA 0.3000 11 3.30 11 3.30 0.3000 11 3.30 11 3.3011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 11 1.10 11 1.10 0.1000

Sub Total 86 248.58 86 248.58 82 257.56 82 257.56

12.00 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regu 0.5200 107 667.68 107 667.68 0.5200 107 667.68 107 667.6812.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.1000

12.05 Contingency Grant 0.1000 107 10.70 107 10.70 0.1000 107 10.70 107 10.70

12.06 Meeting,TA 0.1200 107 12.84 107 12.84 0.1200 107 12.84 107 12.84

12.07 TLM Grant 0.0300 0.0300

12.08 Maintenance Grant 0.0200 107 2.14 107 2.14 0.0200Sub Total 428 693.36 428 693.36 321 691.22 321 691.22

13.00 Computer Aided Education in UPS under Innovation13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000

Sub Total 1 50.00 1 50.0014 Libraries in Schools

(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS

15.00 Teachers' Grant15.01 Primary 0.0050 2647 13.24 2647 13.24 0.005015.02 Upper Primary 0.0050 1438 7.19 1438 7.19 0.0050

Sub Total 4085 20.43 4085 20.4316.00 School Grant16.01 Primary 0.0500 1415 70.75 1415 70.75 0.0500 1415 70.75 1415 70.75

16.02 Upper Primary 0.0700 494 34.58 494 34.58 0.0700 494 34.58 494 34.58Sub Total 1909 105.33 1909 105.33 1909 105.33 1909 105.33

17.00 Research, Evaluation, Monitoring & Supervision17.01 REMS activities 0.0095 1910 18.15 1910 18.15 0.0039 1910 7.51 1910 7.51

Sub Total 1910 18.15 1910 18.15 1910 7.51 1910 7.51

18 Maintenance Grant

18.04 Maintenance Grant ( PS & UPS) 1847 111.85 1847 111.85 1847 111.85 1847 111.85

Sub Total 1847 111.85 1847 111.85 1847 111.85 1847 111.85

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19.00 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 885 26.55 885 26.55 0.0190 740 14.06 740 14.06

Sub Total 885 26.55 885 26.55 740 14.06 740 14.0620.00 Innovation Head up to Rs. 50 lakh per district20.01 Girls Education 1 17.97 1 17.9720.02 ECCE 1 14.75 1 14.7520.03 Intervention for SC / ST children 1 15.41 1 15.41

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children20.06 Intervention for Urban Deprived children

Sub Total 3 48.13 3 48.1321.00 SMC/PRI Training21.01 Residential (3 days) 0.0060 0.0060

Page 15: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of theDistrict AlmoraCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of

2014-15 Total Deferred liability of 2014-15Total Fresh

21.02 Non-residential (3 days) 0.0030 11118 33.35 11118 33.35 0.0030 11118 33.35 11118 33.3521.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 11118 33.35 11118 33.35 11118 33.35 11118 33.35V SCHOOL INFRASTRUCTURE

21.00 Civil Works Construction 22.01 BRC /URC22.02 CRC22.03 New Primary School (Rural) 20.4500 20.450022.04 New Primary School (Urban) 19.2500 19.250022.05 New Upper Primary (Rural) 26.6900 26.690022.06 New Upper Primary (Urban) 24.5700 24.5700

22.06.1 New Upper Primary (Hill) Spill Over

22.07 Reconstruction of completely damaged schools in natural calamity (Primary) 14.0000 11.16 11.16

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary)

22.09 Building Less (Pry) Hill 20.4500 20.4500Building Less (Pry) Plain 19.2500 19.2500

22.10 Building Less (UP) Hill 26.6900 26.6900Building Less (UP) Plain 24.5700 24.5700

22.11 Dilapidated Building (Pry) Hill 48 114.24 12.8600 61 784.46 109 898.70 13 114.24 12.8600 114.24Dilapidated Building (Pry) Plain 11.4100 11.4100

22.12 Dilapidated Building (UP) Hill 1 3.60 17.4200 4 69.68 5 73.28 1 3.60 17.4200 3.60Dilapidated Building (UP) Plain 14.8200 14.8200

22.13 Additional Class Room (Rural)22.14 Additional Class Room (Urban) 5.7900 5.790022;15 Additional Class Room (Hill Area) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility 27 61.84 27 61.8422.20 Boundary Wall22.21 Electrification 0.3000 0.3000

22.22Office-cum-store-cum-Head Teacher's room (Primary) HIll

7.30007.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain6.3200

6.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill

7.30007.3000

Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain

6.32006.3200

22.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 0.3000 0.3000

22.26 Ramps with Handrails 0.15000.1500

22.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)22.33 Major Repairs to partially damaged to schools 136.56 21 109.00 21 245.56 45 82.40 82.4023.10 Major Repairs for Upper Primary School 8.15 1 11.05 1 19.20 4 6.80 6.8023.02 Others (Difference of Civil Works sanctioned in pre.yr

Sub Total 49 262.55 114 1036.03 163 1298.58 63 207.04 11.16 218.20VI PROJECT MANAGEMENT COST

23.00 Management23.01 Management up to 3.5%

(a) Project Management and MIS 1 139.00 1 139.00 68.62 68.62(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 139.00 1 139.00 68.62 68.62

23.02 Learning Enhancement Prog. (LEP) (up to 2%)only for large scale integrated programmes for quality development 1 97.29 1 97.29 0.00005 12434 0.62 12434 0.62

23.03 Community Mobilization activities (up to 0.5%) 1 17.42 1 17.42 11.90 11.90Sub Total 2 114.71 2 114.71 12434 12.52 12434 12.52

Total of SSA (District) 49 262.55 134001 6485.63 134050 6748.18 63 207.04 144305 5142.47 144305 5349.5124.00 STATE COMPONENT

22.3

Page 16: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of theDistrict AlmoraCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of

2014-15 Total Deferred liability of 2014-15Total Fresh

24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 49 262.55 134001 6485.63 134050 6748.18 63 207.04 144305 5666.98 144305 5874.02

25 KGBV Financial Provision (give separate costing sheetsfor different Models)

Non recurring one time grant (only committedliabilities)

25.01 Construction of building (new)HILL 80.1500 80.1500Construction of building KGBV sanctioned earlier

25.02 Construction of building (new)Plain 69.1600 69.1600Construction of building KGBV sanctioned earlierConstruction of building KGBV sanctioned

25.03 Boundary Wall (Spillover only)Boundary Wall 1.5000 1.5000

25.04 Boring/ Handpump (Spill over only)Boring/ Handpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07

25.06 Furniture/ Equipment (including kitchen)25.07 TLM and equipment including library books

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 2 20.00 2 20.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 0.3750

Subtotal non recurring 2 20.00 2 20.00Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 2 18.00 2 18.00 9.0000 2 18.00 2 18.0025.11 Stipend per child per month @ Rs.50/- 0.6000 2 1.20 2 1.20 0.6000 2 1.20 2 1.20

25.12 Supplementary TLM, Stationery and other educational material 0.5000 2 1.00 2 1.00

0.50002 1.00 2 1.00

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 2 6.00 2 6.00 3.0000 2 6.00 2 6.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 2 3.60 2 3.60 1.8000 2 3.60 2 3.60iv Accountant @10000/- 1.2000 2 2.40 2 2.40 1.2000 2 2.40 2 2.40v Support Staff @5000/- 1.2000 2 2.40 2 2.40 1.2000 2 2.40 2 2.40

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 2 2.52 2 2.52

1.26002 2.52 2 2.52

25.15 Specific Skill training 0.5000 2 1.00 2 1.00 0.5000 2 1.00 2 1.0025.16 Electricity/ water charges 0.5000 2 1.00 2 1.00 0.5000 2 1.00 2 1.0025.17 Medical care/contingencies @ Rs.750/- per child 0.6250 2 1.25 2 1.25 0.6250 2 1.25 2 1.2525.18 Maintenance 0.3750 2 0.75 2 0.75 0.3750 2 0.75 2 0.7525.19 Miscellaneous 0.3750 2 0.75 2 0.75 0.3750 2 0.75 2 0.7525.20 Preparatory camps 0.1500 2 0.30 2 0.30 0.1500 2 0.30 2 0.3025.21 P.T.A / school functions 0.1500 2 0.30 2 0.30 0.1500 2 0.30 2 0.3025.22 Provision of Rent25.23 Capacity Building 0.2500 2 0.50 2 0.50 0.2500 2 0.50 2 0.5025.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 2 0.20 2 0.20 0.1000 2 0.20 2 0.20

Sub Total 34 43.17 34 43.17 34 43.17 34 43.17STATE KGBV TOTAL 36 63.17 36 63.17 34 43.17 34 43.17

Grand Total (SSA and KGBV) 49 262.55 134037 6548.80 134086 6811.35 63 207.04 144339 5710.15 144339 5917.19

Page 17: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: BageshwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.1 Medical care/contingencies @ Rs.750/- per child 1.2500 1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 18: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: BageshwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Total 4 Transport/Escort Facility

4.01 Children in remote habitations / CWSN Escort 0.0300 13 0.39 13 0.39 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total 13 0.39 13 0.39

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.02675(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 5.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 12671 19.01 12671 19.01 0.00125 12671 15.84 12671 15.846.02 Braille Books (P) 0.0015 0.001506.03 Large print books (P) 0.0015 40 0.06 40 0.06 0.00150 40 0.06 40 0.066.04 Free Text Book (UP) 0.0025 9309 23.27 9309 23.27 0.00250 9309 23.27 9309 23.276.05 Braille Books (UP) 0.0025 0.002506.06 Large print books (UP) 0.0025 45 0.11 45 0.11 0.00250 45 0.11 45 0.11

Sub Total 22065 42.45 22065 42.45 22065 39.28 22065 39.287 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 15042 60.17 15042 60.17 0.0040 15042 60.17 15042 60.177.02 SC Boys 0.0040 5655 22.62 5655 22.62 0.0040 5655 22.62 5655 22.627.03 ST Boys 0.0040 55 0.22 55 0.22 0.0040 55 0.22 55 0.227.04 BPL Boys 0.0040 6077 24.31 6077 24.31 0.0040 6077 24.31 6077 24.31

Sub Total 26829 107.32 26829 107.32 26829 107.32 26829 107.328 Teaching Learning Equipment (TLE)

8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Sub TotalIII ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800

Page 19: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: BageshwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(c) Languages 0.4800 0.48009.04 Subject specific Upper Primary Teachers (Contract)

(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 30 151.20 30 151.20 0.4200 30 151.20 30 151.209.14 Primary Teachers (Contract)-Existing 0.1300 13 20.28 13 20.28 0.1300 13 20.28 13 20.289.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular) 0.4200 0.42009.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 229 1319.04 229 1319.04 0.4800 229 1319.04 229 1319.049.2 UP Teachers (Contract)-Existing9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 0.48009.25 Additional Teachers - UPS (Contract)9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 2 1.60 2 1.60 0.0800(b) Health and Physical Education 0.0800 2 1.60 2 1.60 0.0800(c) Work Education 0.0800 23 18.40 23 18.40 0.0800

9.29 Others Sub Total 299 1512.12 299 1512.12 272 1490.52 272 1490.52

Total 299 1512.12 299 1512.12 272 1490.52 272 1490.52Total (New+Recurring) 299 1512.12 299 1512.12 272 1490.52 272 1490.52

10 Training

Page 20: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: BageshwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 826 16.52 826 16.52

0.01001239 12.56 1239 12.56

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 826 4.13 826 4.13 0.0050 1239 6.20 1239 6.20

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 60 1.20 60 1.200.0100

51 0.51 51 0.51

Sub Total 1712 21.85 1712 21.85 2529 19.26 2529 19.26

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200

0.5200(b) 2 RPs for CWSN 0.1200 6 8.64 6 8.64 0.1200 5 7.20 5 7.20(c) 1 MIS Coordinator 0.1500 3 5.40 3 5.40 0.1500 3 5.40 3 5.40(d) 1 Datra Entry Operator 0.1200 3 4.32 3 4.32 0.1200 3 4.32 3 4.32(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 17 24.48 17 24.48 0.1200 17 24.48 17 24.48

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 3 1.50 3 1.50 0.5000 3 1.50 3 1.5011.05 Meeting, TA 0.3000 3 0.90 3 0.90 0.3000 3 0.90 3 0.9011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 3 0.30 3 0.30 0.1000

Sub Total 38 45.54 38 45.54 34 43.80 34 43.8012 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 9 56.16 9 56.16

0.52009 56.16 9 56.16

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 46 4.60 46 4.60 0.1000 46 4.60 46 4.6012.06 Meeting, TA 0.1200 46 5.52 46 5.52 0.1200 46 5.52 46 5.5212.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 46 0.92 46 0.92 0.0200

Sub Total 147 67.20 147 67.20 101 66.28 101 66.2813 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 1013 5.07 1013 5.07 0.005015.02 Upper Primary 0.0050 695 3.48 695 3.48 0.0050

Sub Total 1708 8.54 1708 8.5416 School Grant

16.01 Primary 0.0500 600 30.00 600 30.00 0.0500 600 30.00 600 30.0016.02 Upper Primary 0.0700 226 15.82 226 15.82 0.0700 226 15.82 226 15.82

Sub Total 826 45.82 826 45.82 826 45.82 826 45.8217 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 830 7.89 830 7.89 0.0039 830 3.26 830 3.26Sub Total 830 7.89 830 7.89 830 3.26 830 3.26

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 804 52.90 804 52.90 804 52.90 804 52.90

Sub Total 804 52.90 804 52.90 804 52.90 804 52.90

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 759 22.77 759 22.77 0.0190 578 10.98 578 10.98

Sub Total 759 22.77 759 22.77 578 10.98 578 10.98

Page 21: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: BageshwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

20 Innovation Head up to Rs. 50 lakh per district20.01 Girls Education 15.0000 1 14.50 1 14.5020.02 ECCE 11.0000 1 10.63 1 10.6320.03 Intervention for SC / ST children 11.2800 1 11.40 1 11.40

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children20.06 Intervention for Urban Deprived children

Sub Total 3 36.53 3 36.5321 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 4800 14.40 4800 14.40 0.0030 4800 14.40 4800 14.4021.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 4800 14.40 4800 14.40 4800 14.40 4800 14.40V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 20.450022.04 New Primary School (Plain) 19.2500 19.250022.05 New Upper Primary (Hill) 26.6900 26.690022.06 New Upper Primary (Plain) 24.5700 24.570022.06.

1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary)

10.4800 11.18 11.18

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary)

22.09 Building Less (Pry) Hill 20.4500 20.4500Building Less (Pry) Plain 19.2500 19.2500

22.10 Building Less (UP) Hill 26.6900 26.6900Building Less (UP) Plain 24.5700 24.5700

22.11 Dilapidated Building (Pry) Hill 3 7.14 12.8600 9 115.74 12 122.88 3 7.14 12.8600 7.14Dilapidated Building (Pry) Plain 11.4100 11.4100

22.12 Dilapidated Building (UP) Hill 2 7.20 17.4200 2 7.20 2 7.20 17.4200 7.20Dilapidated Building (UP) Plain 14.8200 14.8200

22.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 5.7900 5.790022.15 Additional Class Room (Plain) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 19 40.66 19 40.66 2.1400 19 40.66 19 40.66

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility22.20 Boundary Wall 96.09 3.2800 96.09 3.280022.21 Electrification 30.00 0.3000 30.00 30.00 0.3000 30.00

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.30007.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.3200

6.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 1.35 7.3000 1.35 1.35

7.30001.35

Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.3200

6.320022.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 0.3000 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Wateand sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 101.38 31 144.27 31 245.65

22.3

Page 22: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: BageshwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

23.34 Major Repairs for Upper Primary School 3.44 2 8.50 2 11.9423.35 Others

Sub Total 5 246.60 61 309.17 66 555.77 5 45.69 19 51.84 19 97.53VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 103.87 1 103.87 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 103.87 1 103.87 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 38.82 1 38.82 0.00005 6052 0.30 6052 0.3023.03 Community Mobilization activities (up to 0.5%) 1 11.00 1 11.00 10.00 10.00

Sub Total 2 49.82 2 49.82 6052 10.30 6052 10.30Total of SSA (District) 5 246.60 60898 2498.57 60903 2745.17 5 45.69 65739 2024.48 65739 2070.17

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 5 246.60 60898 2498.57 60903 2745.17 5 45.69 65739 2548.99 65739 2594.68

25 KGBV Financial Provisions (provide separate costing sheets for different Models)Non-recurring (one time grant)

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 1 10.00 1 10.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 0.3750

Sub Total Non-recurring 1 10.00 1 10.00Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 1 9.00 1 9.00 9.0000 1 9.00 1 9.0025.11 Stipend per girl per month @ Rs.50/- 0.6000 1 0.60 1 0.60 0.6000 1 0.60 1 0.60

25.12 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50

0.50001 0.50 1 0.50

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 1 1.26 1 1.26

1.26001 1.26 1 1.26

25.15 Vocational training / specific skill training 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.16 Electricity / water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 1 0.63 1 0.63 0.6250 1 0.63 1 0.6325.18 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.19 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.20 Preparatory camps 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.21 P.T.A / school functions 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.22 Provision of Rent (8 months)25.23 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.2525.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 1 0.10 1 0.10 0.1000 1 0.10 1 0.10

Sub Total 17 21.59 17 21.59 17 21.59 17 21.59Total 18 31.59 18 31.59 17 21.59 17 21.59

Grand Total - (SSA, NPGEL & KGBV) 5 246.60 60916 2530.16 60921 2776.76 5 45.69 65756 2570.58 65756 2616.27

Page 23: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChamoliCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1.00 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2.00 Residential Hostel for 50 children

Non-recurring (one time grant)2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3.00 Residential Hostel for specific category of childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.10 Medical care/contingencies @ Rs.750/- per child 1.2500 1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent

Spill OverDeferred liability

of 2014-15

Total Deferred liability of 2014-15

Total Fresh

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill Over

Page 24: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChamoliCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Spill OverDeferred liability

of 2014-15

Total Deferred liability of 2014-15

Total Fresh

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill Over

3.15 Capacity Building 0.5000 0.5000Sub Total

Total 4.00 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 18 0.54 18 0.54 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total 18 0.54 18 0.54

5.00 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.02675(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 5.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal

II RETENTION6.00 Free Text Book6.01 Free Text Book (P) 0.0015 17234 25.85 17234 25.85 0.00125 17234 21.54 17234 21.546.02 Braille Books (P) 0.0015 5 0.01 5 0.01 0.00150 5 0.01 5 0.016.03 Large print books (P) 0.0015 30 0.05 30 0.05 0.00150 30 0.05 30 0.056.04 Free Text Book (UP) 0.0025 12764 31.91 12764 31.91 0.00250 12764 31.91 12764 31.916.05 Braille Books (UP) 0.0025 0.002506.06 Large print books (UP) 0.0025 27 0.07 27 0.07 0.00250 27 0.07 27 0.07

Sub Total 30060 57.88 30060 57.88 30060 53.57 30060 53.577.00 Provision of 2 sets of Uniform 7.01 All Girls 0.0040 22701 90.80 22701 90.80 0.0040 22701 90.80 22701 90.807.02 SC Boys 0.0040 6497 25.99 6497 25.99 0.0040 6497 25.99 6497 25.997.03 ST Boys 0.0040 209 0.84 209 0.84 0.0040 209 0.84 209 0.847.04 BPL Boys 0.0040 10443 41.77 10443 41.77 0.0040 10443 41.77 10443 41.77

Sub Total 39850 159.40 39850 159.40 39850 159.40 39850 159.408.00 Teaching Learning Equipment (TLE)8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Sub TotalIII ENHANCING QUALITY

9.00 New Teachers Salary 9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.1300

Page 25: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChamoliCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Spill OverDeferred liability

of 2014-15

Total Deferred liability of 2014-15

Total Fresh

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill Over

9.03 Subject specific Upper Primary Teachers (Regular) (a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceed150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular(a) Science and Mathematics(b) Social Studies(c) Languages

9.10Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)in positionPrimary teachers

9.13 Primary Teachers ( Regular)-Existing, in position 0.4200 132 665.28 132 665.28 0.4200 132 665.28 132 665.289.14 Primary Teachers (Contract)-Existing, in position 0.1300 93 145.08 93 145.08 0.1300 93 145.08 93 145.08

9.15 Head Teacher for Primary in position 0.0500 0.0500Additional teachers

9.16 Additional Teachers - PS (Regular)in position 0.4200 0.42009.17 Additional Teachers - PS (Contract)in position 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing, in position 0.4800 339 1952.64 339 1952.64 0.4800 339 1952.64 339 1952.649.20 UP Teachers (Contract)-Existing, in position9.21 Head Teacher for Upper Primary 0.0500 0.0500

9.22 Subject specific Upper Primary Teachers (Regular)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)in position

(a) Science and Mathematics 0.08000.0800

(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) in position 0.4800 0.48009.25 Additional Teachers - UPS (Contract) in position

9.26Subject specific Additional Teachers-UPS (Regular)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)in position(a) Science and Mathematics

Page 26: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChamoliCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Spill OverDeferred liability

of 2014-15

Total Deferred liability of 2014-15

Total Fresh

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill Over

(b) Social Studies(c) Languages

9.28 Part Time Instructors in position(a) Art Education 0.0800 4 3.20 4 3.20 0.0800 6 1.92 6 1.92(b) Health and Physical Education 0.0800 5 4.00 5 4.00 0.0800 6 1.92 6 1.92(c) Work Education 0.0800 17 13.60 17 13.60 0.0800 19 6.08 19 6.08

9.29 Others in positionSub Total 590 2783.80 590 2783.80 595 2772.92 595 2772.92

Total 590 2783.80 590 2783.80 595 2772.92 595 2772.92Total (New+Recurring) 590 2783.80 590 2783.80 595 2772.92 595 2772.92

10.00 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 1400 28.00 1400 28.00 0.0100 2267 22.84 2267 22.84

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 1400 7.00 1400 7.00 0.0050 2267 11.34 2267 11.34

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 72 1.44 72 1.440.0100

51 0.51 51 0.51

Sub Total 2872 36.44 2872 36.44 4585 34.68 4585 34.68

11.00 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200 27 168.48 27 168.48

0.520027 168.48 27 168.48

(b) 2 RPs for CWSN 0.1200 7 10.08 7 10.08 0.1200 12 17.28 12 17.28(c) 1 MIS Coordinator 0.1500 9 16.20 9 16.20 0.1500 9 16.20 9 16.20(d) 1 Datra Entry Operator 0.1200 9 12.96 9 12.96 0.1200 9 12.96 9 12.96(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 0.1200

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 9 4.50 9 4.50 0.5000 9 4.50 9 4.5011.05 Meeting, TA 0.3000 9 2.70 9 2.70 0.3000 9 2.70 9 2.7011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 9 0.90 9 0.90 0.1000

Sub Total 79 215.82 79 215.82 75 222.12 75 222.12

12.00 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 78 486.72 78 486.72

0.520078 486.72 78 486.72

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 78 7.80 78 7.80 0.1000 78 7.80 78 7.8012.06 Meeting, TA 0.1200 78 9.36 78 9.36 0.1200 78 9.36 78 9.3612.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 78 1.56 78 1.56 0.0200

Sub Total 312 505.44 312 505.44 234 503.88 234 503.8813 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools14.01 (a) Primary 0.0300 0.030014.02 (b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 1842 9.21 1842 9.21 0.005015.02 Upper Primary 0.0050 1638 8.19 1638 8.19 0.0050

Sub Total 3480 17.40 3480 17.4016 School Grant

16.01 Primary 0.0500 975 48.75 975 48.75 0.0500 975 48.75 975 48.75

Page 27: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChamoliCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Spill OverDeferred liability

of 2014-15

Total Deferred liability of 2014-15

Total Fresh

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill Over

16.02 Upper Primary 0.0700 425 29.75 425 29.75 0.0700 425 29.75 425 29.75Sub Total 1400 78.50 1400 78.50 1400 78.50 1400 78.50

17 Research, Evaluation, Monitoring & Supervision17.01 REMS activities 0.0095 1400 13.30 1400 13.30 0.0039 1400 5.50 1400 5.50

Sub Total 1400 13.30 1400 13.30 1400 5.50 1400 5.5018 Maintenance Grant

18.01 Maintenance Grant ( PS & UPS) 1330 79.70 1330 79.70 1330 79.70 1330 79.70Sub Total 1330 79.70 1330 79.70 1330 79.70 1330 79.70

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 623 18.69 623 18.69 0.0190 579 11.00 579 11.00

Sub Total 623 18.69 623 18.69 579 11.00 579 11.0020 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 12.90 1 12.9020.02 ECCE 1 12.50 1 12.5020.03 Intervention for SC / ST children 1 15.85 1 15.85

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children20.06 Intervention for Urban Deprived children

Sub Total 3 41.25 3 41.2521 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 8280 24.84 8280 24.84 0.0030 8280 24.84 8280 24.8421.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 8280 24.84 8280 24.84 8280 24.84 8280 24.84V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Rural) 20.4500 20.450022.04 New Primary School (Urban) 19.2500 19.250022.05 New Upper Primary (Rural) 26.6900 26.690022.06 New Upper Primary (Urban) 24.5700 24.5700

22.06.1 New Upper Primary (Hill) Spill Over

22.07 Reconstruction of completely damaged schools in natural calamity (Primary)

16.5500 11.18 11.18

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary)

23.030023.0300

22.09 Building Less (Pry) Hill 20.4500 20.4500Building Less (Pry) Plain 19.2500 19.2500

22.10 Building Less (UP) Hill 26.6900 26.6900Building Less (UP) Plain 24.5700 24.5700

22.11 Deli plated Building (Pry) 15 80.92 12.8600 15 80.92 14 61.88 12.8600 61.88Deli plated Building (UP) 11.4100 11.4100

22.12 Deli plated Building (UP) Hill 3 21.60 17.4200 3 21.60 3 21.60 17.4200 21.60Deli plated Building (UP) Plain 14.8200 14.8200

22.13 Additional Class Room (Rural)22.15 Additional Class Room (Hill Area) 3 7.38 5.7900 3 7.38 2 3.69 5.7900 3.6922.14 Additional Class Room (plain) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility 179 202.74 179 202.7422.20 Boundary Wall 65 66.18 65 66.1822.21 Electrification 958 287.40 0.3000 958 287.40 958 287.40 0.3000 287.40

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.30007.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.32006.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 7.3000

7.3000

Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.3200

6.3200

Page 28: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChamoliCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Spill OverDeferred liability

of 2014-15

Total Deferred liability of 2014-15

Total Fresh

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill Over

22.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 200 60.00 0.3000 200 60.00 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 31 61.38 25 47.60 25 47.60 47.6023.34 Major Repairs for Upper Primary School 2 5.51 2 5.51 2 5.51 5.5123.35 Others

Sub total 1277 590.36 179 202.74 1450 779.33 1004 427.68 11.18 438.86VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 150.37 1 150.37 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 150.37 1 150.37 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 73.05 1 73.05 0.00005 9347 0.47 9347 0.4723.03 Community Mobilization activities (up to 0.5%) 1 17.05 1 17.05 10.96 10.96

Sub Total 2 90.10 2 90.10 9347 11.42 9347 11.42Total of SSA (District) 1277 590.36 90480 4526.21 91751 5102.80 1004 427.68 97735 4037.23 97735 4464.91

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 1277 590.36 90480 4526.21 91751 5102.80 1004 427.68 97735 4561.74 97735 4989.42

25 KGBV Financial Provision (give separate costing sheets for different Models)Non recurring one time grant (only committed liabilities)/ CCTV & Others

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 1 10.00 1 10.00

10.000025.09 Replacement of bedding (once in 3 years)

Sub Total Non-recurring 1 10.00 1 10.00Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 1 9.00 1 9.00 9.0000 1 9.00 1 9.0025.11 Stipend per child per month @ Rs.50/- 0.6000 1 0.60 1 0.60 0.6000 1 0.60 1 0.60

25.12 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50

0.50001 0.50 1 0.50

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80

22.3

Page 29: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChamoliCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Spill OverDeferred liability

of 2014-15

Total Deferred liability of 2014-15

Total Fresh

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill Over

iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 1 1.26 1 1.26

1.26001 1.26 1 1.26

25.15 Specific Skill training 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.16 Electricity/ water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.17 Medical care/contingencies @ Rs.750/- per child 0.6250 1 0.63 1 0.63 0.6250 1 0.63 1 0.6325.18 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.19 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.20 Preparatory camps 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.21 P.T.A / school functions 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.22 Provision of Rent25.23 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.2525.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 1 0.10 1 0.10 0.1000 1 0.10 1 0.10

Sub Total 17 21.59 17 21.59 17 21.59 17 21.59Total 18 31.59 18 31.59 17 21.59 17 21.59

Grand Total (SSA and KGBV) 1277 590.36 90498 4557.80 91769 5134.38 1004 427.68 97752 4583.33 97752 5011.01

Page 30: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChampawatCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1.00 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools 2.00 Residential Hostel for 50 children

Non-recurring (one time grant)2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3.00 Residential Hostel for specific category of childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.10 Medical care/contingencies @ Rs.750/- per child 1.2500 1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.7500

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivitySpill Over Total

Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Fresh Spill OverTotal

Page 31: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChampawatCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivitySpill Over Total

Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Fresh Spill OverTotal

3.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4.00 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 48 1.44 48 1.44 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total 48 1.44 48 1.44

5.00 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 122 5.49 122 5.49 0.02675 122 3.26 122 3.26(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 122 5.49 122 5.49 122 3.26 122 3.265.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal 122 5.49 122 5.49 122 3.26 122 3.26

II RETENTION6.00 Free Text Book6.01 Free Text Book (P) 0.0015 12266 18.40 12266 18.40 0.00125 12266 15.33 12266 15.336.02 Braille Books (P) 0.0015 3 0.00 3 0.00 0.00150 3 0.00 3 0.006.03 Large print books (P) 0.0015 30 0.05 30 0.05 0.00150 30 0.05 30 0.056.04 Free Text Book (UP) 0.0025 8919 22.30 8919 22.30 0.00250 8919 22.30 8919 22.306.05 Braille Books (UP) 0.0025 4 0.01 4 0.01 0.00250 4 0.01 4 0.016.06 Large print books (UP) 0.0025 31 0.08 31 0.08 0.00250 31 0.08 31 0.08

Sub Total 21253 40.83 21253 40.83 21253 37.77 21253 37.777.00 Provision of 2 sets of Uniform 7.01 All Girls 0.0040 16286 65.14 16286 65.14 0.0040 16286 65.14 16286 65.147.02 SC Boys 0.0040 3949 15.80 3949 15.80 0.0040 3949 15.80 3949 15.807.03 ST Boys 0.0040 85 0.34 85 0.34 0.0040 85 0.34 85 0.347.04 BPL Boys 0.0040 7856 31.42 7856 31.42 0.0040 7856 31.42 7856 31.42

Sub Total 28176 112.70 28176 112.70 28176 112.70 28176 112.708.00 Teaching Learning Equipment (TLE)8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Page 32: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChampawatCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivitySpill Over Total

Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Fresh Spill OverTotal

Sub TotalIII ENHANCING QUALITY

9.00 New Teachers Salary 9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)in position

Primary teachers9.13 Primary Teachers ( Regular)-Existing, in position 0.4200 212 1068.48 212 1068.48 0.4200 212 1068.48 212 1068.489.14 Primary Teachers (Contract)-Existing, in position 0.1300 15 23.40 15 23.40 0.1300 15 23.40 15 23.40

9.15 Head Teacher for Primary in position 0.0500 0.0500Additional teachers

9.16 Additional Teachers - PS (Regular)in position 0.4200 0.42009.17 Additional Teachers - PS (Contract)in position 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing, in position 0.4800 243 1399.68 243 1399.68 0.4800 243 1399.68 243 1399.689.20 UP Teachers (Contract)-Existing, in position9.21 Head Teacher for Upper Primary 0.0500 0.0500

9.22 Subject specific Upper Primary Teachers (Regular)in position

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)in position

(a) Science and Mathematics 0.08000.0800

(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) in position 0.4800 27 155.52 27 155.52 0.4800 27 155.52 27 155.529.25 Additional Teachers - UPS (Contract) in position

Page 33: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChampawatCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivitySpill Over Total

Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Fresh Spill OverTotal

9.26 Subject specific Additional Teachers-UPS (Regular)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors in position(a) Art Education 0.0800 2 1.60 2 1.60 0.0800(b) Health and Physical Education 0.0800 2 1.60 2 1.60 0.0800(c) Work Education 0.0800 2 1.60 2 1.60 0.0800

9.29 Others in positionSub Total 503 2651.88 503 2651.88 497 2647.08 497 2647.08

Total 503 2651.88 503 2651.88 497 2647.08 497 2647.08Total (New+Recurring) 503 2651.88 503 2651.88 497 2647.08 497 2647.08

10.00 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 712 14.24 712 14.24

0.01001190 12.07 1190 12.07

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 712 3.56 712 3.56 0.0050 1190 5.95 1190 5.95

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 60 1.20 60 1.200.0100

51 0.51 51 0.51

Sub Total 1484 19.00 1484 19.00 2431 18.53 2431 18.53

11.00 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200

0.5200(b) 2 RPs for CWSN 0.1200 6 8.64 6 8.64 0.1200 6 8.64 6 8.64(c) 1 MIS Coordinator 0.1500 4 7.20 4 7.20 0.1500 4 7.20 4 7.20(d) 1 Datra Entry Operator 0.1200 4 5.76 4 5.76 0.1200 4 5.76 4 5.76(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 14 20.16 14 20.16 0.1200 14 20.16 14 20.16

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 4 2.00 4 2.00 0.5000 4 2.00 4 2.0011.05 Meeting, TA 0.3000 4 1.20 4 1.20 0.3000 4 1.20 4 1.2011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 4 0.40 4 0.40 0.1000

Sub Total 40 45.36 40 45.36 36 44.96 36 44.96

12.00 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 16 99.84 16 99.84

0.520016 99.84 16 99.84

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 40 4.00 40 4.00 0.1000 40 4.00 40 4.0012.06 Meeting, TA 0.1200 40 4.80 40 4.80 0.1200 40 4.80 40 4.8012.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 40 0.80 40 0.80 0.0200

Sub Total 136 109.44 136 109.44 96 108.64 96 108.6413 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

Page 34: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChampawatCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivitySpill Over Total

Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Fresh Spill OverTotal

14 Libraries in Schools14.01 (a) Primary 0.0300 0.030014.02 (b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 988 4.94 988 4.94 0.005015.02 Upper Primary 0.0050 452 2.26 452 2.26 0.0050

Sub Total 1440 7.20 1440 7.2016 School Grant

16.01 Primary 0.0500 510 25.50 510 25.50 0.0500 510 25.50 510 25.50

16.02 Upper Primary 0.0700 202 14.14 202 14.14 0.0700 202 14.14 202 14.14Sub Total 712 39.64 712 39.64 712 39.64 712 39.64

17 Research, Evaluation, Monitoring & Supervision17.01 REMS activities 0.0095 712 6.76 712 6.76 0.0039 712 2.80 712 2.80

Sub Total 712 6.76 712 6.76 712 2.80 712 2.8018 Maintenance Grant

18.01 Maintenance Grant ( PS & UPS) 696 49.70 696 49.70 696 49.70 696 49.70Sub Total 696 49.70 696 49.70 696 49.70 696 49.70

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 565 16.95 565 16.95 0.0190 509 9.67 509 9.67

Sub Total 565 16.95 565 16.95 509 9.67 509 9.6720 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 10.05 1 10.0520.02 ECCE 1 9.72 1 9.7220.03 Intervention for SC / ST children 1 9.99 1 9.99

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children20.06 Intervention for Urban Deprived children

Sub Total 3 29.76 3 29.7621 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 4218 12.65 4218 12.65 0.0030 4218 12.65 4218 12.6521.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 4218 12.65 4218 12.65 4218 12.65 4218 12.65V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Rural) 20.4500 20.450022.04 New Primary School (Urban) 19.2500 19.250022.05 New Upper Primary (Rural) 26.6900 26.690022.06 New Upper Primary (Urban) 24.5700 24.5700

22.06.1 New Upper Primary (Hill) Spill Over

22.07 Reconstruction of completely damaged schools in natural calamity (Primary)

10.4800 11.18 11.18

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary)

22.09 Building Less (Pry) Hill 20.4500 20.4500Building Less (Pry) Plain 19.2500 19.2500

22.10 Building Less (UP) Hill 26.6900 26.6900Building Less (UP) Plain 24.5700 24.5700

22.11 Dilapidated Building (Pry) Hill 6 14.28 12.8600 15 192.90 21 207.18 6 14.28 12.8600 14.28Dilapidated Building (Pry) Plain 11.4100 2 22.82 2 22.82 11.4100

22.12 Dilapidated Building (UP) Hill 2 8.81 17.4200 1 17.42 3 26.23 2 8.81 17.4200 8.81Dilapidated Building (UP) Plain 14.8200 14.8200

22.13 Additional Class Room (Rural)22.15 Additional Class Room (Hill Area) 5.7900 5.790022.14 Additional Class Room (plain) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 1.7600

Page 35: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChampawatCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivitySpill Over Total

Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Fresh Spill OverTotal

22.18 CWSN friendly toilets Hill 2.1400 32 68.48 32 68.48 2.1400CWSN friendly toilets Plain 1.7600 3 5.28 3 5.28 1.7600

22.19 Drinking Water Facility 15 43.47 15 43.4722.20 Boundary Wall 50 74.36 50 74.3622.21 Electrification 100 24.45 0.3000 167 50.10 267 74.55 100 24.45 0.3000 24.45

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.30007.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.32006.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.3200

6.320022.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 0.3000 90 27.00 90 27.00 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 15 50.28 24 77.47 25 127.7523.34 Major Repairs for Upper Primary School23.35 Others

Sub total 173 172.18 349 504.94 508 677.12 108 47.54 11.18 58.72VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 110.40 1 110.40 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 110.40 1 110.40 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 58.02 1 58.02 0.00005 6611 0.33 6611 0.3323.03 Community Mobilization activities (up to 0.5%) 1 13.92 1 13.92 10.96 10.96

Sub Total 2 71.94 2 71.94 6611 11.29 6611 11.29Total of SSA (District) 173 172.18 60461 3886.10 60620 4058.27 108 47.54 66069 3178.38 66069 3225.92

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 173 172.18 60461 3886.10 60620 4058.27 108 47.54 66069 3702.89 66069 3750.43

25 KGBV Financial Provision (give separate costing sheets for different Models)

Non recurring one time grant (only committed liabilities)

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

22.3

Page 36: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : ChampawatCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivitySpill Over Total

Deferred liability of 2014-15

Deferred liability of 2014-15 Fresh Fresh Spill OverTotal

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 1 10.00 1 10.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 0.3750

Sub Total Non-recurring 1 10.00 1 10.00Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 1 9.00 1 9.00 9.0000 1 9.00 1 9.0025.11 Stipend per child per month @ Rs.50/- 0.6000 1 0.60 1 0.60 0.6000 1 0.60 1 0.60

25.12 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50

0.50001 0.50 1 0.50

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 1 1.26 1 1.26

1.26001 1.26 1 1.26

25.15 Specific Skill training 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.16 Electricity/ water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.17 Medical care/contingencies @ Rs.750/- per child 0.6250 1 0.63 1 0.63 0.6250 1 0.63 1 0.6325.18 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.19 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.20 Preparatory camps 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.21 P.T.A / school functions 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.22 Provision of Rent25.23 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.2525.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 1 0.10 1 0.10 0.1000 1 0.10 1 0.10

Sub Total 17 21.59 17 21.59 17 21.59 17 21.59Total 18 31.59 18 31.59 17 21.59 17 21.59

Grand Total (SSA and KGBV) 173 172.18 60479 3917.68 60638 4089.86 108 47.54 66086 3724.48 66086 3772.02

Page 37: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

ACCESSSSA

1 Opening of New Schools

1.01 Upgradation of EGS to Primary School

1.02 New Primary School 5 51.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS 1

1.05 Residential schools for specific category of children

1.06 Residential Hostel

1.07 Integration of Class V with primary schools

1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 children

Non-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)

2.02 TLM and equipment including library books

2.03 BeddingSub Total

Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 1 9.00 1 9.00

9.00001 9.00 1 9.00

2.05 Stipend per child per month @ Rs.100/- 0.6000 1 0.60 1 0.60

0.60001 0.60 1 0.60

2.06 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

iiUrdu Teacher (only for muslim population blocks above 20%) @ 12000/-

1.44001.4400

iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi.Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook

1.2600 1 1.26 1 1.261.2600

1 1.26 1 1.26

2.08 Vocational training / specific skill training 0.5000

0.50002.09 Electricity / water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.50

2.10 Medical care/contingencies @ Rs.750/- per child 0.6250 1 0.63 1 0.63

0.62501 0.63 1 0.63

2.11 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.382.12 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.382.13 P.T.A / school functions 0.1000 1 0.10 1 0.10 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.25

Sub Total 14 20.79 14 20.79 12 20.19 12 20.19Total 14 20.79 14 20.79 12 20.19 12 20.19

3 Residential Hostel for 100 children

Non-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)

3.02 TLM and equipment including library books

3.03 BeddingSub Total

Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000

18.0000

3.05 Stipend per child per month @ Rs.100/- 1.2000

1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

iiUrdu Teacher (only for muslim population blocks above 20%) @ 12000/-

1.44001.4400

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 38: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi.Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook

1.80001.8000

3.08 Vocational training / specific skill training 1.0000

1.00003.09 Electricity / water charges 1.0000 1.0000

3.1 Medical care/contingencies @ Rs.750/- per child 1.2500

1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 13 0.39 13 0.39 0.0300

4.02 Urban deprived children/children without adult protection 0.0300

0.0300Sub Total 0.0600 13 0.39 13 0.39

5Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 40 6.00 40 6.00 0.09050 40 3.62 40 3.62(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 40 6.00 40 6.00 40 3.62 40 3.62

5.02 Residential (Continuing from previous year)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 895 40.28 895 40.28 0.02675 895 23.94 895 23.94(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 895 40.275 895 40.275 895 23.94125 895 23.94125

5.04 Non-Residential (Continuing from previous year)(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal 935 46.28 935 46.28 935 27.56 935 27.56

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 39096 58.64 39096 58.64 0.00125 39096 48.87 39096 48.876.02 Braille Books (P) 0.0015 0.001506.03 Large print books (P) 0.0015 33 0.05 33 0.05 0.00150 33 0.05 33 0.056.04 Free Text Book (UP) 0.0025 27260 68.15 27260 68.15 0.00250 27260 68.15 27260 68.156.05 Braille Books (UP) 0.0025 0.002506.06 Large print books (UP) 0.0025 18 0.05 18 0.05 0.00250 18 0.05 18 0.05

Sub Total 66407 126.89 66407 126.89 66407 117.11 66407 117.117 Provision of 2 sets of Uniform

Page 39: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

7.01 All Girls 0.0040 38733 154.93 38733 154.93 0.0040 38733 154.93 38733 154.937.02 SC Boys 0.0040 12811 51.24 12811 51.24 0.0040 12811 51.24 12811 51.247.03 ST Boys 0.0040 4827 19.31 4827 19.31 0.0040 4827 19.31 4827 19.317.04 BPL Boys 0.0040 12618 50.47 12618 50.47 0.0040 12618 50.47 12618 50.47

Sub Total 68989 275.96 68989 275.96 68989 275.96 68989 275.96

8 Teaching Learning Equipment (TLE)

8.01 New Primary 0.2000 5 1.00 5 1.00 0.20008.02 New Upper Primary 0.5000 1 0.50 1 0.50 0.5000

Sub Total 6 1.50 6 1.50III ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 10 25.20 10 25.20 0.42009.02 Primary Teachers (Contract) 0.1300 0.1300

9.03 Subject specific Upper Primary Teachers (Regular) (a) Science and Mathematics 0.4800 1 2.88 1 2.88 0.4800(b) Social Studies 0.4800 1 2.88 1 2.88 0.4800(c) Languages 0.4800 1 2.88 1 2.88 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000

0.3000Sub Total 13 33.84 13 33.84

Additional Teachers against PTR

9.06 New Additional Teachers - PS (Regular)

9.07 New Additional Teachers - PS (Contract)

9.08Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)

(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total 13 33.84 13 33.84

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 215 1083.60 215 1083.60

0.4200215 1083.60 215 1083.60

9.14 Primary Teachers (Contract)-Existing 0.1300 96 149.76 96 149.76

0.130096 149.76 96 149.76

9.15 Head Teacher for Primary 0.0500 0.0500Additional teachers

9.16 Additional Teachers - PS (Regular) 0.4200 13 65.52 13 65.52 0.4200 13 65.52 13 65.52

9.17 Additional Teachers - PS (Contract) 0.13000.1300

9.18 Others in positionUpper Primary teachers

9.19 UP Teachers (Regular)-Existing 0.4800 351 2021.76 351 2021.76 0.4800 351 2021.76 351 2021.769.2 UP Teachers (Contract)-Existing

9.21 Head Teacher for Upper Primary 0.0500 0.0500

Page 40: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

9.22 Subject specific Upper Primary Teachers (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 52 299.52 52 299.52

0.480052 299.52 52 299.52

9.25 Additional Teachers - UPS (Contract)

9.26 Subject specific Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 44 35.20 44 35.20 0.0800(b) Health and Physical Education 0.0800 43 34.40 43 34.40 0.0800(c) Work Education 0.0800 86 68.80 86 68.80 0.0800

9.29 Others Sub Total 900 3758.56 900 3758.56 727 3620.16 727 3620.16

Total 900 3758.56 900 3758.56 727 3620.16 727 3620.16Total (New+Recurring) 913 3792.40 913 3792.40 727 3620.16 727 3620.16

10 Training(a) Teachers

10.01Refresher In-service Teachers' Training at BRC level and above- 10 days

0.0200 1576 31.52 1576 31.520.0100

2653 26.70 2653 26.70

10.02One day monthly cluster level meetings for 10 months for all

h l l d

0.0050 1576 7.88 1576 7.88 0.0050 2653 13.27 2653 13.27

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600

0.0600

10.04Training of untrained Teachers to acquire professional qualifications over a two year period.

0.06000.0600

(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06

Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 100 2.00 100 2.00

0.0100

51 0.51 51 0.51

Sub Total 3252 41.40 3252 41.40 5357 40.47 5357 40.47

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200 18 112.32 18 112.32

0.520018 112.32 18 112.32

(b) 2 RPs for CWSN 0.1200 21 30.24 21 30.24 0.1200 12 17.28 12 17.28(c) 1 MIS Coordinator 0.1500 6 10.80 6 10.80 0.1500 6 10.80 6 10.80(d) 1 Datra Entry Operator 0.1200 6 8.64 6 8.64 0.1200 6 8.64 6 8.64(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 34 48.96 34 48.96

0.120034 48.96 34 48.96

11.02 Furniture Grant 1.0000 1.0000

11.03 Replacement of furniture (Once in 5 years) 1.0000

1.000011.04 Contingency Grant 0.5000 6 3.00 6 3.00 0.5000 6 3.00 6 3.0011.05 Meeting, TA 0.3000 6 1.80 6 1.80 0.3000 6 1.80 6 1.8011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 6 0.60 6 0.60 0.1000

Sub Total 103 216.36 103 216.36 88 202.80 88 202.80

12 Academic Support through Cluster Resource Centres

Page 41: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

12.01

Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular)

0.5200 82 511.68 82 511.68

0.5200

82 511.68 82 511.68

12.03 Furniture Grant 0.1000 0.1000

12.04 Replacement of furniture (once in 5 years) 0.1000

0.100012.05 Contingency Grant 0.1000 82 8.20 82 8.20 0.1000 82 8.20 82 8.2012.06 Meeting, TA 0.1200 82 9.84 82 9.84 0.1200 82 9.84 82 9.8412.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 82 1.64 82 1.64 0.0200

Sub Total 328 531.36 328 531.36 246 529.72 246 529.72

13 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00

50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 2133 10.67 2133 10.67 0.005015.02 Upper Primary 0.0050 1597 7.99 1597 7.99 0.0050

Sub Total 3730 18.65 3730 18.6516 School Grant

16.01 Primary 0.0500 987 49.35 987 49.35 0.0500 987 49.35 987 49.3516.02 Upper Primary 0.0700 497 34.79 497 34.79 0.0700 497 34.79 497 34.79

Sub Total 1484 84.14 1484 84.14 1484 84.14 1484 84.14

17 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 1477 14.03 1477 14.03 0.0039 1477 5.81 1477 5.81Sub Total 1477 14.03 1477 14.03 1477 5.81 1477 5.81

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 1331 99.83 1331 99.83 1331 99.83 1331 99.83

Sub Total 1331 99.83 1331 99.83 1331 99.83 1331 99.83

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 1660 49.80 1660 49.80 0.0190 1512 28.73 1512 28.73

Sub Total 1660 49.8 1660 49.8 1512 28.728 1512 28.728

20 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 9.99 1 9.9920.02 ECCE 1 14.75 1 14.7520.03 Intervention for SC / ST children 1 10.00 1 10.00

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children

20.06 Intervention for Urban Deprived children 453 13.59 453 13.59 453 13.59 453 13.59

Sub Total 456 48.33 456 48.33 453 13.59 453 13.5921 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 7986 23.96 7986 23.96 0.0030 7986 23.96 7986 23.96

21.03 Local Authority Members (3 days residential) 0.0060

0.0060Sub Total 7986 23.958 7986 23.958 7986 23.958 7986 23.958

V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 3 61.35 3 61.35 20.4500 3 61.35 3 61.3522.04 New Primary School (Plain) 19.2500 2 38.50 2 38.50 19.2500 2 38.50 2 38.5022.05 New Upper Primary (Hill) 26.6900 1 26.69 1 26.69 26.690022.06 New Upper Primary (Plain) 24.5700 24.570022.06.

1New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity 9.1514 11.18 11.18

22.08Reconstruction of completely damaged schools in natural calamity (Upper Primary)

16.480016.4800

Page 42: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

22.09 Building Less (Pry) Hill 20.4500 20.4500Building Less (Pry) Plain 19.2500 19.2500

22.10 Building Less (UP) Hill 26.6900 26.6900Building Less (UP) Plain 24.5700 24.5700

22.11 Dilapidated Building (Pry) Hill 24 111.86 12.8600 17 218.62 41 330.48 33 92.82 12.8600 92.82Dilapidated Building (Pry) Plain 3 8.50 11.4100 3 8.50 3 8.50 11.4100 8.50

22.12 Dilapidated Building (UP) Hill 3 10.80 17.4200 2 34.84 5 45.64 3 10.80 17.4200 10.80Dilapidated Building (UP) Plain 14.8200 14.8200

22.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 22 40.59 5.7900 2 11.58 24 52.17 22 40.59 5.7900 40.5922.15 Additional Class Room (Plain) 134 214.40 4.8300 8 38.64 142 253.04 129 198.40 4.8300 198.4022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 1 2.14 1 2.14 2.1400 1 2.14 1 2.14

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility 36 125.17 36 125.1722.20 Boundary Wall 235 281.30 235 281.3022.21 Electrification 117 26.55 0.3000 117 26.55 117 26.55 0.3000 26.55

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Primary) Plain 41 49.20 6.3200 41 49.20 34 42.00

6.320042.00

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain

12 9.60 6.3200 12 9.60 12 9.606.3200

9.60

22.24 Augumentation of training facility in BRC (one time)

22.25 Child friendly Elements 300 45.00 0.3000 20 6.00 320 51.00 0.300022.26 Ramps with Handrails 0.1500 0.1500

Page 43: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

22.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation

(b) Construction of residential hostel

(c) Refurbishing unused old buildings 1 8.00 1 8.00 1 8.00 8.00

22.31 Construction of Hostel in existing Govt UPS

22.32 Furniture for Govt. UPS (per child)

23.33 Major Repairs to partially damaged to schools 37 44.92 37 128.28 74 173.20 24 30.19 30.19

23.34 Major Repairs for Upper Primary School 11 20.22 10 44.95 21 65.17 10 18.60 18.60

23.35 Others Sub Total 940 870.94 139 736.76 1079 1607.70 388 486.05 6 113.17 6 599.22

VI PROJECT MANAGEMENT COST

23 Management23.01 Management up to 3.5%

(a) Project Management and MIS 1 216.56 1 216.56 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 216.56 1 216.56 68.51 68.51

23.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 105.39 1 105.39 0.00005 20991 1.05 20991 1.05

23.03 Community Mobilization activities (up to 0.5%) 1 15.00 1 15.00 10.96 10.96

Sub Total 2 120.39 2 120.39 20991 12.00 20991 12.00Total of SSA (District) 940 870.94 159227 6515.76 160167 7386.70 388 486.05 178001 5283.71 178001 5769.76

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 940 870.94 159227 6515.76 160167 7386.70 388 486.05 178001 5808.22 178001 6294.27

25KGBV Financial Provisions (provide separate costing sheets for different Models)Non-recurring (one time grant)

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600

69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000

0.2000Electricity/water charges (Spill over only) 0.2000

0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment)

25.07 TLM and equipment including library books (New)

25.08Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet)

10.0000 2 20.00 2 20.0010.0000

22.3

Page 44: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the Distt : DehradunCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

25.09 Replacement of bedding (once in 3 years) 0.3750 1 0.38 1 0.38

0.37501 0.38 0 0.38

Sub Total Non-recurring 3 20.38 3 20.38 1 0.38 0 0.38Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 2 18.00 2 18.00

9.00002 18.00 2 18.00

25.11 Stipend per girl per month @ Rs.50/- 0.6000 2 1.20 2 1.200.6000

2 1.20 2 1.20

25.12 Supplementary TLM, Stationery and other educational material 0.5000 2 1.00 2 1.00

0.50002 1.00 2 1.00

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 2 6.00 2 6.00 3.0000 2 6.00 2 6.00

iiUrdu Teacher (only for muslim population blocks above 20%) @ 12000/-

1.44001.4400

iii Part time teachers @5000/- 1.8000 2 3.60 2 3.60 1.8000 2 3.60 2 3.60iv Accountant @10000/- 1.2000 2 2.40 2 2.40 1.2000 2 2.40 2 2.40v Support Staff @5000/- 1.2000 2 2.40 2 2.40 1.2000 2 2.40 2 2.40

vi.Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook

1.2600 2 2.52 2 2.521.2600

2 2.52 2 2.52

25.15 Vocational training / specific skill training 0.5000 2 1.00 2 1.00

0.50002 1.00 2 1.00

25.16 Electricity / water charges 0.5000 2 1.00 2 1.00 0.5000 2 1.00 2 1.00

25.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 2 1.25 2 1.25

0.62502 1.25 2 1.25

25.18 Maintenance 0.3750 2 0.75 2 0.75 0.3750 2 0.75 2 0.7525.19 Miscellaneous 0.3750 2 0.75 2 0.75 0.3750 2 0.75 2 0.7525.20 Preparatory camps 0.1500 2 0.30 2 0.30 0.1500 2 0.30 2 0.3025.21 P.T.A / school functions 0.1500 2 0.30 2 0.30 0.1500 2 0.30 2 0.3025.22 Provision of Rent (8 months) 2 0.96 2 0.9625.23 Capacity Building 0.2500 2 0.50 2 0.50 0.2500 2 0.50 2 0.50

25.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 2 0.20 2 0.20

0.10002 0.20 2 0.20

Sub Total 36 44.13 36 44.13 34 43.17 34 43.17Total 39 64.51 39 64.51 35 43.55 34 43.55

Grand Total - (SSA, NPGEL & KGBV) 940 870.94 159266 6580.27 160206 7451.21 388 486.05 178036 5851.76 178035 6337.81

Page 45: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: HaridwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000 0.5000

2.07 Salariesi Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for specific category of childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 1 18.00 1 18.00 18.0000 1 18.00 1 18.003.05 Stipend per child per month @ Rs.100/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

3.06 Supplementary TLM, Stationery and other educational material 1.0000 1 1.00 1 1.00 1.0000

3.07 Salariesi Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000 1 1.80 1 1.80

1.80001 1.80 1 1.80

3.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1 1.00 1 1.00 1.0000 1 1.00 1 1.003.1 Medical care/contingencies @ Rs.750/- per child 1.2500 1 1.25 1 1.25 1.2500 1 1.25 1 1.253.11 Maintenance 0.7500 1 0.75 1 0.75 0.7500 1 0.75 1 0.753.12 Miscellaneous 0.7500 1 0.75 1 0.75 0.7500 1 0.75 1 0.753.13 P.T.A / school functions 0.2000 1 0.20 1 0.20 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.50

Sub Total 14 33.65 14 33.65 12 32.45 12 32.45Total 14 33.65 14 33.65 12 32.45 12 32.45

4 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 46: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: HaridwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 142 6.39 142 6.39 0.02675 142 3.80 142 3.80(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 142 6.39 142 6.39 142 3.80 142 3.805.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 86 2.58 86 2.58 0.02675 86 2.30 86 2.30(d) 3 months 0.0150 0.0150

Sub Total 86 2.58 86 2.58 86 2.30 86 2.305.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal 228 8.97 228 8.97 228 6.10 228 6.10

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 66752 100.13 66752 100.13 0.00125 66752 83.44 66752 83.446.02 Braille Books (P) 0.0015 5 0.01 5 0.01 0.00150 5 0.01 5 0.016.03 Large print books (P) 0.0015 44 0.07 44 0.07 0.00150 44 0.07 44 0.076.04 Free Text Book (UP) 0.0025 34633 86.58 34633 86.58 0.00250 34633 86.58 34633 86.586.05 Braille Books (UP) 0.0025 0.002506.06 Large print books (UP) 0.0025 0.00250

Sub Total 101434 186.78 101434 186.78 101434 170.10 101434 170.107 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 61493 245.97 61493 245.97 0.0040 61493 245.97 61493 245.977.02 SC Boys 0.0040 18325 73.30 18325 73.30 0.0040 18325 73.30 18325 73.307.03 ST Boys 0.0040 711 2.84 711 2.84 0.0040 711 2.84 711 2.847.04 BPL Boys 0.0040 30979 123.92 30979 123.92 0.0040 30979 123.92 30979 123.92

Sub Total 111508 446.03 111508 446.03 111508 446.03 111508 446.038 Teaching Learning Equipment (TLE)

8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Sub TotalIII ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

Page 47: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: HaridwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

9.10 Subject specific New Additional Teachers - UPS (Contract)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 88 443.52 88 443.52 0.4200 88 443.52 88 443.529.14 Primary Teachers (Contract)-Existing 0.1300 18 28.08 18 28.08 0.1300 18 28.08 18 28.089.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular)-Existing 0.4200 0.42009.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 345 1987.20 345 1987.20 0.4800 345 1987.20 345 1987.209.2 UP Teachers (Contract)-Existing9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 33 190.08 33 190.08 0.4800 33 190.08 33 190.089.25 Additional Teachers - UPS (Contract)9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 100 80.00 100 80.00 0.0800(b) Health and Physical Education 0.0800 96 76.80 96 76.80 0.0800(c) Work Education 0.0800 110 88.00 110 88.00 0.0800

9.29 Others Sub Total 790 2893.68 790 2893.68 484 2648.88 484 2648.88

Total 790 2893.68 790 2893.68 484 2648.88 484 2648.88Total (New+Recurring) 790 2893.68 790 2893.68 484 2648.88 484 2648.88

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 1170 23.40 1170 23.40

0.01002538 25.55 2538 25.55

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 1170 5.85 1170 5.85 0.0050 2538 12.69 2538 12.69

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 0.0100

Sub Total 2340 29.25 2340 29.25 5076 38.24 5076 38.24

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200

0.5200(b) 2 RPs for CWSN 0.1200 22 31.68 22 31.68 0.1200 12 17.28 12 17.28(c) 1 MIS Coordinator 0.1500 6 10.80 6 10.80 0.1500 6 10.80 6 10.80(d) 1 Datra Entry Operator 0.1200 6 8.64 6 8.64 0.1200 6 8.64 6 8.64

Page 48: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: HaridwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 18 25.92 18 25.92 0.1200 18 25.92 18 25.9211.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 6 3.00 6 3.00 0.5000 6 3.00 6 3.0011.05 Meeting, TA 0.3000 6 1.80 6 1.80 0.3000 6 1.80 6 1.8011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 6 0.60 6 0.60 0.1000

Sub Total 70 82.44 70 82.44 54 67.44 54 67.4412 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 8 49.92 8 49.92 0.5200 8 49.92 8 49.92

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 54 5.40 54 5.40 0.1000 54 5.40 54 5.4012.06 Meeting, TA 0.1200 54 6.48 54 6.48 0.1200 54 6.48 54 6.4812.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 54 1.08 54 1.08 0.0200

Sub Total 170 62.88 170 62.88 116 61.80 116 61.8013 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 2226 11.13 2226 11.13 0.005015.02 Upper Primary 0.0050 881 4.41 881 4.41 0.0050

Sub Total 3107 15.54 3107 15.5416 School Grant

16.01 Primary 0.0500 706 35.30 706 35.30 0.0500 706 35.30 706 35.3016.02 Upper Primary 0.0700 313 21.91 313 21.91 0.0700 313 21.91 313 21.91

Sub Total 1019 57.21 1019 57.21 1019 57.21 1019 57.2117 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 998 9.48 998 9.48 0.0039 998 3.92 998 3.92Sub Total 998 9.48 998 9.48 998 3.92 998 3.92

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 898 67.35 898 67.35 898 67.35 898 67.35

Sub Total 898 67.35 898 67.35 898 67.35 898 67.35

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 2473 74.19 2473 74.19 0.0190 2360 44.84 2360 44.84

Sub Total 2473 74.19 2473 74.19 2360 44.84 2360 44.8420 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 15.00 1 15.0020.02 ECCE 1 13.42 1 13.4220.03 Intervention for SC / ST children 1 5.36 1 5.36

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children 1 8.05 1 8.0520.06 Intervention for Urban Deprived children 190 5.70 190 5.70 190 5.70 190 5.70

Sub Total 194 47.53 194 47.53 190 5.70 190 5.7021 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 5466 16.40 5466 16.40 0.0030 5466 16.40 5466 16.4021.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 5466 16.40 5466 16.40 5466 16.40 5466 16.40V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 20.450022.04 New Primary School (Plain) 19.2500 19.250022.05 New Upper Primary (Hill) 26.6900 26.690022.06 New Upper Primary (Plain) 24.5700 24.5700

22.06.1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary) 11.18 11.18

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary) 16.4800

16.480022.09 Building Less (Pry) Hill 20.4500 20.4500

Building Less (Pry) Plain 19.2500 19.250022.10 Building Less (UP) Hill 26.6900 26.6900

Page 49: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: HaridwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Building Less (UP) Plain 24.5700 24.570022.11 Dilapidated Building (Pry) 12.8600 12.8600

Dilapidated Building (Pry) 11.4100 1 11.41 1 11.41 11.410022.12 Dilapidated Building (UP) 17.4200 17.4200

Dilapidated Building (UP) 14.8200 14.820022.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 5.7900 5.790022.15 Additional Class Room (Plain) 159 254.40 4.8300 305 1473.15 464 1727.55 159 254.40 4.8300 156 753.48 156 1007.8822.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 12 21.12 12 21.12 1.760022.19 Drinking Water Facility22.20 Boundary Wall 21.26 21.2622.21 Electrification 0.3000 0.3000

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.30007.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.3200 102 644.64 102 644.646.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary)Hill 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary)Plain 6.3200

6.320022.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 0.3000 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools23.34 Major Repairs for Upper Primary School23.35 Others

Sub Total 159 275.66 420 2150.32 579 2425.98 159 254.40 156 764.66 156 1019.06VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 216.32 1 216.32 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 216.32 1 216.32 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 97.62 1 97.62 0.00005 44394 2.22 44394 2.2223.03 Community Mobilization activities (up to 0.5%) 1 15.35 1 15.35 10.96 10.96

Sub Total 2 112.97 2 112.97 44394 13.18 44394 13.18Total of SSA (District) 159 275.66 231133 6560.99 231292 6836.65 159 254.40 274393 4512.80 274393 4767.20

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 159 275.66 231133 6560.99 231292 6836.65 159 254.40 274393 5037.31 274393 5291.71

25 KGBV Financial Provisions (provide separate costing sheets for different Models)Non-recurring (one time grant)

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) PlainVariation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New) 1 2.31 1 2.31Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

22.3

Page 50: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: HaridwarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 7 70.00 7 70.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 5 1.88 5 1.88 0.3750 5 1.88 2 1.88

Sub Total Non-recurring 13 74.19 13 74.19 5 1.88 2 1.88Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 7 63.00 7 63.00 9.0000 7 63.00 7 63.0025.11 Stipend per girl per month @ Rs.50/- 0.6000 7 4.20 7 4.20 0.6000 7 4.20 7 4.20

25.12 Supplementary TLM, Stationery and other educational material 0.5000 7 3.50 7 3.50

0.50007 3.50 7 3.50

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 7 21.00 7 21.00 3.0000 7 21.00 7 21.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 7 12.60 7 12.60 1.8000 7 12.60 7 12.60iv Accountant @10000/- 1.2000 7 8.40 7 8.40 1.2000 7 8.40 7 8.40v Support Staff @5000/- 1.2000 7 8.40 7 8.40 1.2000 7 8.40 7 8.40

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 7 8.82 7 8.82

1.26007 8.82 7 8.82

25.15 Vocational training / specific skill training 0.5000 7 3.50 7 3.50 0.5000 7 3.50 7 3.5025.16 Electricity / water charges 0.5000 7 3.50 7 3.50 0.5000 7 3.50 7 3.5025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 7 4.38 7 4.38 0.6250 7 4.38 7 4.3825.18 Maintenance 0.3750 7 2.63 7 2.63 0.3750 7 2.63 7 2.6325.19 Miscellaneous 0.3750 7 2.63 7 2.63 0.3750 7 2.63 7 2.6325.20 Preparatory camps 0.1500 7 1.05 7 1.05 0.1500 7 1.05 7 1.0525.21 P.T.A / school functions 0.1500 7 1.05 7 1.05 0.1500 7 1.05 7 1.0525.22 Provision of Rent (8 months)25.23 Capacity Building 0.2500 7 1.75 7 1.75 0.2500 7 1.75 7 1.7525.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 7 0.70 7 0.70 0.1000 7 0.70 7 0.70

Sub Total 119 151.10 119 151.10 119 151.10 119 151.10Total 132 225.28 132 225.28 124 152.97 121 152.97

Grand Total - (SSA, NPGEL & KGBV) 159 275.66 231265 6786.27 231424 7061.93 159 254.40 274517 5190.28 274514 5444.68

Page 51: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Nainital Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.1 Medical care/contingencies @ Rs.750/- per child 1.2500 1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4 Transport/Escort Facility

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 52: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Nainital Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

4.01 Children in remote habitations 0.0300 0.0300

4.02 Urban deprived children/children without adult protection 0.0300

0.0300Sub Total

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 84 3.78 84 3.78 0.02675 84 2.25 84 2.25(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 84 3.78 84 3.78 84 2.25 84 2.255.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal 84 3.78 84 3.78 84 2.25 84 2.25

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 30884 46.33 30884 46.33 0.00125 30884 38.61 30884 38.616.02 Braille Books (P) 0.0015 31 0.05 31 0.05 0.00150 31 0.05 31 0.056.03 Large print books (P) 0.0015 73 0.11 73 0.11 0.00150 73 0.11 73 0.116.04 Free Text Book (UP) 0.0025 22230 55.58 22230 55.58 0.00250 22230 55.58 22230 55.586.05 Braille Books (UP) 0.0025 21 0.05 21 0.05 0.00250 21 0.05 21 0.056.06 Large print books (UP) 0.0025 45 0.11 45 0.11 0.00250 45 0.11 45 0.11

Sub Total 53284 102.22 53284 102.22 53284 94.50 53284 94.507 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 36796 147.18 36796 147.18 0.0040 36796 147.18 36796 147.187.02 SC Boys 0.0040 12193 48.77 12193 48.77 0.0040 12193 48.77 12193 48.777.03 ST Boys 0.0040 444 1.78 444 1.78 0.0040 444 1.78 444 1.787.04 BPL Boys 0.0040 12194 48.78 12194 48.78 0.0040 12194 48.78 12194 48.78

Sub Total 61627 246.51 61627 246.51 61627 246.51 61627 246.518 Teaching Learning Equipment (TLE)

8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Sub TotalIII ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500

Page 53: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Nainital Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 134 675.36 134 675.36 0.4200 134 675.36 134 675.369.14 Primary Teachers (Contract)-Existing 0.1300 24 37.44 24 37.44 0.1300 24 37.44 24 37.449.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular) 0.4200 0.42009.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 190 1094.40 190 1094.40 0.4800 190 1094.40 190 1094.409.2 UP Teachers (Contract)-Existing9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 0.48009.25 Additional Teachers - UPS (Contract)9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

9.29 Others Sub Total 348 1807.20 348 1807.20 348 1807.20 348 1807.20

Total 348 1807.20 348 1807.20 348 1807.20 348 1807.20Total (New+Recurring) 348 1807.20 348 1807.20 348 1807.20 348 1807.20

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 1446 28.92 1446 28.92 0.0100 2559 25.76 2559 25.76

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 1446 7.23 1446 7.23 0.0050 2559 12.80 2559 12.80

Page 54: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Nainital Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

10.03 Induction Training for Newly Recruited Teachers- 30 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 126 2.52 126 2.520.0100

51 0.51 51 0.51

Sub Total 3018 38.67 3018 38.67 5169 39.06 5169 39.06

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200 8 49.92 8 49.92

0.52008 49.92 8 49.92

(b) 2 RPs for CWSN 0.1200 8 11.52 8 11.52 0.1200 13 18.72 13 18.72(c) 1 MIS Coordinator 0.1500 8 14.40 8 14.40 0.1500 8 14.40 8 14.40(d) 1 Datra Entry Operator 0.1200 0.1200

(e) 1 Accountant-cum-support staff for every 50 schools 0.12000.1200

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 8 4.00 8 4.00 0.5000 8 4.00 8 4.0011.05 Meeting, TA 0.3000 8 2.40 8 2.40 0.3000 8 2.40 8 2.4011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 8 0.80 8 0.80 0.1000

Sub Total 48 83.04 48 83.04 45 89.44 45 89.4412 Academic Support through Cluster Resource

12.01Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular)

0.5200 34 212.16 34 212.160.5200

34 212.16 34 212.16

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 78 7.80 78 7.80 0.1000 78 7.80 78 7.8012.06 Meeting, TA 0.1200 78 9.36 78 9.36 0.1200 78 9.36 78 9.3612.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 78 1.56 78 1.56 0.0200

Sub Total 268 230.88 268 230.88 190 229.32 190 229.32

13 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 2099 10.50 2099 10.50 0.005015.02 Upper Primary 0.0050 1568 7.84 1568 7.84 0.0050

Sub Total 3667 18.34 3667 18.3416 School Grant

16.01 Primary 0.0500 987 49.35 987 49.35 0.0500 987 49.35 987 49.3516.02 Upper Primary 0.0700 461 32.27 461 32.27 0.0700 461 32.27 461 32.27

Sub Total 1448 81.62 1448 81.62 1448 81.62 1448 81.6217 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 1444 13.72 1444 13.72 0.0039 1444 5.68 1444 5.68Sub Total 1444 13.72 1444 13.72 1444 5.68 1444 5.68

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 1307 83.65 1307 83.65 1307 83.65 1307 83.65

Sub Total 1307 83.65 1307 83.65 1307 83.65 1307 83.65

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 911 27.33 911 27.33 0.0190 832 15.81 832 15.81

Sub Total 911 27.33 911 27.33 832 15.81 832 15.8120 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 14.86 1 14.8620.02 ECCE 1 14.03 1 14.0320.03 Intervention for SC / ST children 1 12.10 1 12.10

Page 55: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Nainital Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children 1 1.88 1 1.8820.06 Intervention for Urban Deprived children 100 3.00 100 3.00 100 3.00 100 3.00

Sub Total 104 45.87 104 45.87 100 3.00 100 3.0021 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 8298 24.89 8298 24.89 0.0030 8298 24.89 8298 24.8921.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 8298 24.89 8298 24.89 8298 24.89 8298 24.89V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 20.450022.04 New Primary School (Plain) 19.2500 19.250022.05 New Upper Primary (Hill) 26.6900 26.690022.06 New Upper Primary (Plain) 24.5700 24.570022.06.

1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary)

10.4800 11.18 11.18

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary) 16.4800

16.480022.09 Building Less (Pry) Hill 20.4500 3 61.35 3 61.35 20.4500

Building Less (Pry) Plain 19.2500 1 19.25 1 19.25 19.250022.10 Building Less (UP) Hill 26.6900 26.6900

Building Less (UP) Plain 24.5700 24.570022.11 Dilapidated Building (Pry) Hill 9.52 12.8600 12 154.32 12 163.84 12.8600

Dilapidated Building (Pry) Plain 8 17.00 11.4100 20 228.20 28 245.20 8 17.00 11.4100 17.0022.12 Dilapidated Building (UP) Hill 14.40 17.4200 1 17.42 1 31.82 17.4200

Dilapidated Building (UP) Plain 14.8200 3 44.46 3 44.46 14.820022.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 7.38 5.7900 7.38 5.790022.15 Additional Class Room (Plain) 122 246.40 4.8300 122 246.40 60 48.00 4.8300 48.0022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility 135 117.53 135 117.5322.20 Boundary Wall 203.77 203.7722.21 Electrification 15.00 0.3000 15.00 15.00 0.3000 15.0022.22 Office-cum-store-cum-Head Teacher's room (Primary) 7.3000 7.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 19 60.79 6.3200 19 60.79 3 7.99

6.32007.99

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 3 8.10 7.3000 3 8.10

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 18 43.20 6.3200 18 43.20

6.320022.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 15.00 0.3000 15.00 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings 1 2.50 1 2.50 1 2.50 2.50

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 36.36 36.36 7 5.64 5.6423.34 Major Repairs for Upper Primary School 13.13 13.13 1 1.05 1.0523.35 Others

Sub Total 171 692.55 311.8000 175 642.53 346 1335.08 80 97.18 11.18 108.36VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 147.05 1 147.05 68.51 68.51

22.3

Page 56: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Nainital Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 147.05 1 147.05 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 62.72 1 62.72 0.00005 17145 0.86 17145 0.8623.03 Community Mobilization activities (up to 0.5%) 1 15.40 1 15.40 10.96 10.96

Sub Total 2 78.12 2 78.12 17145 11.81 17145 11.81Total of SSA (District) 171 692.55 136035 3725.42 136206 4417.97 80 97.18 151321 2814.43 151321 2911.61

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 171 692.55 136035 3725.42 136206 4417.97 80 97.18 151321 3338.94 151321 3436.12

25 KGBV Financial Provisions (provide separate costing sheets for different Models)Non-recurring (one time grant)

25.01 Construction of Building (New) Hill 80.1500 80.1500

Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 1 10.00 1 10.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 0.3750

Sub Total Non-recurring 1 10.00 1 10.00Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 1 9.00 1 9.00 9.0000 1 9.00 1 9.0025.11 Stipend per girl per month @ Rs.50/- 0.6000 1 0.60 1 0.60 0.6000 1 0.60 1 0.60

25.12 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50

0.50001 0.50 1 0.50

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 1 1.26 1 1.26

1.26001 1.26 1 1.26

25.15 Vocational training / specific skill training 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.16 Electricity / water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 1 0.63 1 0.63 0.6250 1 0.63 1 0.6325.18 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.19 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.20 Preparatory camps 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.21 P.T.A / school functions 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.22 Provision of Rent (8 months)25.23 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.2525.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 1 0.10 1 0.10 0.1000 1 0.10 1 0.10

Sub Total 17 21.59 17 21.59 17 21.59 17 21.59Total 18 31.59 18 31.59 17 21.59 17 21.59Grand Total - (SSA, NPGEL & KGBV) 171 692.55 136053 3757.00 136224 4449.55 80 97.18 151338 3360.53 151338 3457.71

Page 57: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District/State: PAURI GARHWAL (UTTARAKHAND)Costing Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School 5 51.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools

1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen 2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen 3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.1 Medical care/contingencies @ Rs.750/- per child 1.2500 1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 59 1.77 59 1.77 0.0300

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 58: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District/State: PAURI GARHWAL (UTTARAKHAND)Costing Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

4.02 Urban deprived children/children without adult protection 0.0300

0.0300Sub Total 59 1.77 59 1.77

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.02675(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total

5.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 25298 37.95 25298 37.95 0.00125 25298 31.62 25298 31.626.02 Braille Books (P) 0.0015 7 0.01 7 0.01 0.00150 7 0.01 7 0.016.03 Large print books (P) 0.0015 14 0.02 14 0.02 0.00150 14 0.02 14 0.026.04 Free Text Book (UP) 0.0025 19553 48.88 19553 48.88 0.00250 19553 48.88 19553 48.886.05 Braille Books (UP) 0.0025 9 0.02 9 0.02 0.00250 9 0.02 9 0.026.06 Large print books (UP) 0.0025 10 0.03 10 0.03 0.00250 10 0.03 10 0.03

Sub Total 44891 86.91 44891 86.91 44891 80.58 44891 80.587 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 32081 128.32 32081 128.32 0.0040 32081 128.32 32081 128.327.02 SC Boys 0.0040 9077 36.31 9077 36.31 0.0040 9077 36.31 9077 36.317.03 ST Boys 0.0040 139 0.56 139 0.56 0.0040 139 0.56 139 0.567.04 BPL Boys 0.0040 13946 55.78 13946 55.78 0.0040 13946 55.78 13946 55.78

Sub Total 55243 220.97 55243 220.97 55243 220.97 55243 220.978 Teaching Learning Equipment (TLE)

8.01 New Primary 0.2000 5 1.00 5 1.00 0.20008.02 New Upper Primary 0.5000 0.5000

Sub Total 5 1.00 5 1.00III ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 10 25.20 10 25.20 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)

(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

Page 59: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District/State: PAURI GARHWAL (UTTARAKHAND)Costing Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total 10 25.20 10 25.20

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total 10 25.20 10 25.20

Teachers Salary (Recurring-sanctioned earlier)

Primary teachers9.13 Primary Teachers ( Regular)-Existing 0.4200 131 660.24 131 660.24 0.4200 131 660.24 131 660.249.14 Primary Teachers (Contract)-Existing 0.1300 93 145.08 93 145.08 0.1300 93 145.08 93 145.089.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular) 0.4200 0.42009.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 178 1025.28 178 1025.28 0.4800 178 1025.28 178 1025.289.2 UP Teachers (Contract)-Existing9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)

(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 0.48009.25 Additional Teachers - UPS (Contract)

9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 5 4.00 5 4.00 0.0800 4 1.28 4 1.28(b) Health and Physical Education 0.0800 5 4.00 5 4.00 0.0800 4 1.28 4 1.28(c) Work Education 0.0800 27 21.60 27 21.60 0.0800 26 8.32 26 8.32

9.29 Others Sub Total 439 1860.20 439 1860.20 436 1841.48 436 1841.48

Total 439 1860.20 439 1860.20 436 1841.48 436 1841.48Total (New+Recurring) 449 1885.40 449 1885.40 436 1841.48 436 1841.48

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 2311 46.22 2311 46.22

0.01003993 40.10 3993 40.10

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 2311 11.56 2311 11.56 0.0050 3993 19.97 3993 19.97

Page 60: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District/State: PAURI GARHWAL (UTTARAKHAND)Costing Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600

0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 250 5.00 250 5.000.0100

51 0.51 51 0.51

Sub Total 4872 62.78 4872 62.78 8037 60.57 8037 60.57

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200 15 93.60 15 93.60

0.520015 93.60 15 93.60

(b) 2 RPs for CWSN 0.1200 12 17.28 12 17.28 0.1200 22 31.68 22 31.68(c) 1 MIS Coordinator 0.1500 15 27.00 15 27.00 0.1500 15 27.00 15 27.00(d) 1 Datra Entry Operator 0.1200 0.1200(e) 1 Accountant-cum-support staff for every 50 schools 0.1200

0.120011.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 15 7.50 15 7.50 0.5000 15 7.50 15 7.5011.05 Meeting, TA 0.3000 15 4.50 15 4.50 0.3000 15 4.50 15 4.5011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 15 1.50 15 1.50 0.1000

Sub Total 87 151.38 87 151.38 82 164.28 82 164.28

12 Academic Support through Cluster Resource Centres

12.01Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular)

0.5200 12 74.88 12 74.880.5200

12 74.88 12 74.88

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 130 13.00 130 13.00 0.1000 130 13.00 130 13.0012.06 Meeting, TA 0.1200 130 15.60 130 15.60 0.1200 130 15.60 130 15.6012.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 130 2.60 130 2.60 0.0200

Sub Total 402 106.08 402 106.08 272 103.48 272 103.48

13 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00

50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 3317 16.59 3317 16.59 0.005015.02 Upper Primary 0.0050 2297 11.49 2297 11.49 0.0050

Sub Total 5614 28.07 5614 28.0716 School Grant

16.01 Primary 0.0500 1635 81.75 1635 81.75 0.0500 1635 81.75 1635 81.7516.02 Upper Primary 0.0700 676 47.32 676 47.32 0.0700 676 47.32 676 47.32

Sub Total 2311 129.07 2311 129.07 2311 129.07 2311 129.07

17 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 2311 21.95 2311 21.95 0.0039 2311 9.08 2311 9.08Sub Total 2311 21.95 2311 21.95 2311 9.08 2311 9.08

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 2209 125.90 2209 125.90 2209 125.90 2209 125.90

Sub Total 2209 125.90 2209 125.90 2209 125.90 2209 125.90

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 949 28.47 949 28.47 0.0190 846 16.07 846 16.07

Sub Total 949 28.47 949 28.47 846 16.07 846 16.0720 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 15.76 1 15.7620.02 ECCE 1 15.86 1 15.8620.03 Intervention for SC / ST children 1 15.00 1 15.00

Page 61: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District/State: PAURI GARHWAL (UTTARAKHAND)Costing Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children 1 3.25 1 3.2520.06 Intervention for Urban Deprived children

Sub Total 4 49.87 4 49.8721 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 13272 39.82 13272 39.82 0.0030 13272 39.82 13272 39.8221.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 13272 39.82 13272 39.82 13272 39.82 13272 39.82V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 5 102.25 5 102.25 20.4500 5 102.25 5 102.2522.04 New Primary School (Plain) 19.2500 19.250022.05 New Upper Primary (Hill) 26.6900 26.690022.06 New Upper Primary (Plain) 24.5700 24.570022.06.

1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary)

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary)

22.09 Building Less (Pry) Hill 20.4500 20.4500Building Less (Pry) Plain 19.2500 19.2500

22.10 Building Less (UP) Hill 26.6900 26.6900Building Less (UP) Plain 24.5700 24.5700

22.11 Dilapidated Building (Pry) Hill 1 4.76 4 16.66 12.8600 13 167.18 18 188.60 1 4.76 4 16.66 12.8600 21.42Dilapidated Building (Pry) Plain 11.4100 11.4100

22.12 Dilapidated Building (UP) Hill 1 7.20 17.4200 2 34.84 3 42.04 1 7.20 17.4200 7.20Dilapidated Building (UP) Plain 14.8200 14.8200

22.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 11 20.30 5.7900 6 34.74 17 55.04 11 20.30 5.7900 20.3022.15 Additional Class Room (Plain) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only) 5 2.75 5 2.75 5 2.75 2.7522.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 15 8.25 2.1400 15 8.25 15 8.25 2.1400 8.25

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility 111 251.01 111 251.0122.20 Boundary Wall 5 6.49 158 148.52 163 155.0122.21 Electrification 0.3000 0.3000

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 4 5.40 7.3000 4 5.40

7.3000Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.3200

6.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.3200

6.320022.24 Augumentation of training facility in BRC (one 22.25 Child friendly Elements 375 112.50 0.3000 375 112.50 0.300022.26 Ramps with Handrails 0.1500 165 24.75 165 24.75 0.1500 165 24.75 165 24.7522.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 37 44.54 60 193.20 97 237.74 9 11.35 11.3523.34 Major Repairs for Upper Primary School 21 28.35 19 84.14 40 112.49 7 8.52 8.5223.35 Others

Sub Total 41 47.95 596 357.76 381 892.11 1018 1297.82 32 36.06 21 43.73 170 127.00 170 206.79VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 113.34 1 113.34 68.51 68.51(b) Training of Educational Administrators

22.3

Page 62: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District/State: PAURI GARHWAL (UTTARAKHAND)Costing Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(c) School Mapping and Social MappingSub Total 1 113.34 1 113.34 68.51 68.51

23.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 64.18 1 64.18 0.00005 13094 0.65 13094 0.6523.03 Community Mobilization activities (up to 0.5%) 1 21.80 1 21.80 10.96 10.96

Sub Total 2 85.98 2 85.98 13094 11.61 13094 11.61Total of SSA (District) 41 47.95 596 357.76 133063 4080.87 133700 4486.57 32 36.06 21 43.73 143174 2998.44 143174 3078.22

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS24.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 41 47.95 596 357.76 133063 4080.87 133700 4486.57 32 36.06 21 43.73 143174 3522.95 143174 3602.73

25 KGBV Financial Provisions (provide separate costing sheets for different Models)Non-recurring (one time grant)

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen 25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 1 10.00 1 10.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 0.3750

Sub Total Non-recurring 1 10.00 1 10.00Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 1 9.00 1 9.00 9.0000 1 9.00 1 9.0025.11 Stipend per girl per month @ Rs.50/- 0.6000 1 0.60 1 0.60 0.6000 1 0.60 1 0.60

25.12 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50

0.50001 0.50 1 0.50

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 1 1.26 1 1.26

1.26001 1.26 1 1.26

25.15 Vocational training / specific skill training 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.16 Electricity / water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 1 0.63 1 0.63 0.6250 1 0.63 1 0.6325.18 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.19 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.20 Preparatory camps 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.21 P.T.A / school functions 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.22 Provision of Rent (8 months)25.23 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.2525.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 1 0.10 1 0.10 0.1000 1 0.10 1 0.10

Sub Total (Recurring) 17 21.59 17 21.59 17 21.59 17 21.59Total (KGBV) 18 31.59 18 31.59 17 21.59 17 21.59

Grand Total - (SSA, NPGEL & KGBV) 41 47.95 596 357.76 133081 4112.45 133718 4518.16 32 36.06 21 43.73 143191 3544.53 143191 3624.32

Page 63: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : PithoragarhTill Month- Jan.2014

Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1.00 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of PS to UPS1.04 Composite Schools1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools 2.00 Residential Hostel for 50 children

Non-recurring (one time grant)2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.5000

2.10 Medical care/contingencies @ Rs.750/- per child 0.62500.6250

2.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3.00 Residential Hostel for specific category of childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.0000

3.10 Medical care/contingencies @ Rs.750/- per child 1.25001.2500

3.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4.00 Transport/Escort Facility

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 64: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : PithoragarhTill Month- Jan.2014

Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

4.01 Children in remote habitations 0.0300 11 0.33 11 0.33 0.0300

4.02 Urban deprived children/children without adult protection 0.0300

0.0300Sub Total 11 0.33 11 0.33

5.00 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total

5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.02675(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total

5.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub TotalSeasonal Hostel(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal

II RETENTION6.00 Free Text Book6.01 Free Text Book (P) 0.0015 19044 28.57 19044 28.57 0.00125 19044 23.81 19044 23.816.02 Braille Books (P) 0.0015 6 0.01 6 0.01 0.00150 6 0.01 6 0.016.03 Large print books (P) 0.0015 90 0.14 90 0.14 0.00150 90 0.14 90 0.146.04 Free Text Book (UP) 0.0025 14773 36.93 14773 36.93 0.00250 14773 36.93 14773 36.936.05 Braille Books (UP) 0.0025 6 0.02 6 0.02 0.00250 6 0.02 6 0.026.06 Large print books (UP) 0.0025 84 0.21 84 0.21 0.00250 84 0.21 84 0.21

Sub Total 34003 65.87 34003 65.87 34003 61.11 34003 61.117.00 Provision of 2 sets of Uniform 7.01 All Girls 0.0040 23910 95.64 23910 95.64 0.0040 23910 95.64 23910 95.647.02 SC Boys 0.0040 8846 35.38 8846 35.38 0.0040 8846 35.38 8846 35.387.03 ST Boys 0.0040 426 1.70 426 1.70 0.0040 426 1.70 426 1.707.04 BPL Boys 0.0040 10643 42.57 10643 42.57 0.0040 10643 42.57 10643 42.57

Sub Total 43825 175.30 43825 175.30 43825 175.30 43825 175.308.00 Teaching Learning Equipment (TLE)8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Sub TotalIII ENHANCING QUALITY

9.00 New Teachers Salary 9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500

Page 65: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : PithoragarhTill Month- Jan.2014

Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(c) Languages 0.0500 0.05009.05 UP teachers for integration of Class VIII 0.3000 0.3000

Sub Total Additional Teachers against PTR

9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)in positionPrimary teachers

9.13 Primary Teachers ( Regular)-Existing, in position 0.4200 77 388.08 77 388.080.4200

77 388.08 77 388.08

9.14 Primary Teachers (Contract)-Existing, in position 0.1300 23 35.88 23 35.88 0.1300 23 35.88 23 35.889.15 Head Teacher for Primary in position 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular)in position 0.4200 0.4200

9.17 Additional Teachers - PS (Contract)in position 0.13000.1300

9.18 Others in positionUpper Primary teachers

9.19 UP Teachers (Regular)-Existing, in position 0.4800 340 1958.40 340 1958.40 0.4800 340 1958.40 340 1958.409.20 UP Teachers (Contract)-Existing, in position

9.21 Head Teacher for Upper Primary in position (if the number of children exceeds 100 in a school) 0.0500

0.0500

9.22 Subject specific Upper Primary Teachers (Regular)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)in position(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) in position 0.48000.4800

9.25 Additional Teachers - UPS (Contract) in position

9.26 Subject specific Additional Teachers-UPS (Regular)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)in position(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors in position(a) Art Education 0.0800 3 2.40 3 2.40 0.0800(b) Health and Physical Education 0.0800 3 2.40 3 2.40 0.0800(c) Work Education 0.0800 39 31.20 39 31.20 0.0800

9.29 Others in positionSub Total 485 2418.36 485 2418.36 440 2382.36 440 2382.36

Page 66: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : PithoragarhTill Month- Jan.2014

Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Total 485 2418.36 485 2418.36 440 2382.36 440 2382.36Total (New+Recurring) 485 2418.36 485 2418.36 440 2382.36 440 2382.36

10.00 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 1653 33.06 1653 33.06

0.01002500 25.17 2500 25.17

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 1653 8.27 1653 8.27 0.0050 2500 12.50 2500 12.50

10.03 Induction Training for Newly Recruited Teachers- 30days 0.0600

0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 180 3.60 180 3.600.0100

51 0.51 51 0.51

Sub Total 3486 44.93 3486 44.93 5051 38.18 5051 38.18

11.00 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200

0.5200(b) 2 RPs for CWSN 0.1200 9 12.96 9 12.96 0.1200 14 20.16 14 20.16(c) 1 MIS Coordinator 0.1500 8 14.40 8 14.40 0.1500 8 14.40 8 14.40(d) 1 Datra Entry Operator 0.1200 8 11.52 8 11.52 0.1200 8 11.52 8 11.52(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 27 38.88 27 38.88

0.120027 38.88 27 38.88

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 8 4.00 8 4.00 0.5000 8 4.00 8 4.0011.05 Meeting,TA 0.3000 8 2.40 8 2.40 0.3000 8 2.40 8 2.4011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 8 0.80 8 0.80 0.1000

Sub Total 76 84.96 76 84.96 73 91.36 73 91.36

12.00 Academic Support through Cluster Resource Centres

12.01Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular)

0.5200 28 174.72 28 174.720.5200

28 174.72 28 174.72

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.1000

12.05 Contingency Grant 0.1000 92 9.20 92 9.20 0.1000 92 9.20 92 9.20

12.06 Meeting,TA 0.1200 92 11.04 92 11.04 0.1200 92 11.04 92 11.04

12.07 TLM Grant 0.0300 0.0300

12.08 Maintenance Grant 0.0200 92 1.84 92 1.84 0.0200Sub Total 304 196.80 304 196.80 212 194.96 212 194.96

13.00 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.0050.0000

Sub Total 1 50.00 1 50.0014.00 Libraries in Schools

(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS

14.00 Teachers' Grant14.01 Primary 0.0050 2037 10.19 2037 10.19 0.005014.02 Upper Primary 0.0050 1414 7.07 1414 7.07 0.0050

Sub Total 3451 17.26 3451 17.2615.00 School Grant15.01 Primary 0.0500 1190 59.50 1190 59.50 0.0500 1190 59.50 1190 59.50

15.02 Upper Primary 0.0700 463 32.41 463 32.41 0.0700 463 32.41 463 32.41Sub Total 1653 91.91 1653 91.91 1653 91.91 1653 91.91

16.00 Research, Evaluation, Monitoring & Supervision

16.01 REMS activities 0.0095 1653 15.70 1653 15.70 0.0039 1653 6.50 1653 6.50

Page 67: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : PithoragarhTill Month- Jan.2014

Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Sub Total 1653 15.70 1653 15.70 1653 6.50 1653 6.5017.00 Maintenance Grant

17.01 Maintenance Grant ( PS & UPS) 1579 89.45 1579 89.45 1579 89.45 1579 89.45

Sub Total 1579 89.45 1579 89.45 1579 89.45 1579 89.45

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

18.00 Interventions for CWSN 18.01 Provision for Inclusive Education 0.0300 1630 48.90 1630 48.90 0.0190 937 17.80 937 17.80

Sub Total 1630 48.90 1630 48.90 937 17.80 937 17.8019.00 Innovation Head up to Rs. 50 lakh per district19.01 Girls Education 1 15.03 1 15.0319.02 ECCE 1 15.00 1 15.0019.03 Intervention for SC / ST children 1 9.96 1 9.96

19.04 Community based activities dealing with Post traumatic stress disorder

19.05 Intervention for Minority Community children19.06 Intervention for Urban Deprived children

Sub Total 3 39.99 3 39.9920.00 SMC/PRI Training20.01 Residential (3 days) 0.0060 0.0060

Non-residential (3 days) 0.0030 9468 28.40 9468 28.40 0.0030 9468 28.40 9468 28.40Local Authority Members (3 days residential) 0.0060 0.0060Sub Total 9468 28.40 9468 28.40 9468 28.40 9468 28.40

V SCHOOL INFRASTRUCTURE 21.00 Civil Works Construction

BRC/URCCRC

21.01 New Primary School (Rural) 20.4500 20.450021.02 New Primary School (Urban) 19.2500 19.250021.03 New Upper Primary (Rural) 26.6900 26.690021.04 New Upper Primary (Urban) 24.5700 24.5700

New Upper Primay (Hill) Spill Over (2006-07)

21.05 Reconstruction of completely damaged schools in natural calamity (Primary)

1 10.48 10.4800 1 10.48 1 10.48 11.18 21.66

21.06 Reconstruction of completely damaged schools in natural calamity (Upper Primary)

21.07 Building Less (Pry) Hill 20.4500 20.4500Building Less (Pry) Plain 19.2500 19.2500

21.08 Building Less (UP) Hill 26.6900 26.6900Building Less (UP) Plain 24.5700 24.5700

21.09 Dilapidated Building (Pry) Hill 5 26.18 12.8600 41 527.26 46 553.44 4 16.66 12.8600 16.66Dilapidated Building (Pry) Plain 11.4100 11.4100

21.10 Dilapidated Building (UP) Hill 17.4200 17.4200Dilapidated Building (UP) Plain 14.8200 14.8200

21.11 Additional Class Room (Rural)21.12 Additional Class Room (Hill) 5.7900 5.790021.13 Additional Class Room (Plain) 4.8300 4.830021.14 Toilet/Urinals (for urban areas only)21.15 Separate Girls Toilet Hill 2.1400 1 2.14 1 2.14 2.1400 1 2.14 1 2.14

Separate Girls Toilet Plain 1.7600 1.760021.16 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760021.17 Drinking Water Facility 264 282.72 264 282.7221.18 Boundary Wall 134 596.38 134 596.3821.19 Electrification 0.3000 0.3000

21.20 Office-cum-store-cum-Head Teacher's room (Primary) 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Primary Plain) 6.3200

6.3200

21.21 Office-cum-store-cum-Head Teacher's room (Upper Primary) 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.3200

6.320021.22 Augumentation of training facility in BRC (one 21.23 Child friendly Elements 0.3000 0.3000

21.24 Ramps with Handrails 0.15000.1500

21.25 Handrails in existing ramps21.26 Whole School Development 21.27 Retro-fitting and repairs

Residential Schools/hostels for specific category of children

Page 68: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : PithoragarhTill Month- Jan.2014

Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

(a) Construction of Building including boundary wall, Water and sanitation facilities, electric (b) Construction of residential hostel(c) Refurbishing unused old buildings

21.29 Construction of Hostel in existing Govt UPS21.30 Furniture for Govt. UPS (per child)21.31 Major Repairs to partially damaged to schools 1 0.45 29 136.25 30 136.7021.32 Major Repairs for Upper Primary School

21.33 Others (Difference of Civil Works sanctioned in pre.yr

Sub Total 1 10.48 140 623.01 295.3200 335 948.37 476 1581.86 1 10.48 4 16.66 1 13.32 1 40.46VI PROJECT MANAGEMENT COST

23.00 Management23.01 Management up to 3.5%

(a) Project Management and MIS 1 199.85 1 199.85 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 199.85 1 199.85 68.51 68.51

23.02Learning Enhancement Prog. (LEP) (up to 2%)only for large scale integrated programmes for quality development

1 74.20 1 74.20 0.00005 9378 0.47 9378 0.47

23.03 Community Mobilization activities (up to 0.5%) 1 13.73 1 13.73 11.92 11.92Sub Total 2 87.93 2 87.93 9378 12.39 9378 12.39

Total of SSA (District) 1 10.48 140 623.01 101966 4604.30 102107 5237.79 1 10.48 4 16.66 108273 3271.55 108273 3298.6924.00 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 1 10.48 140 623.01 101966 4604.30 102107 5237.79 1 10.48 4 16.66 108273 3796.06 108273 3823.20

25.00 KGBV Financial Provision (give separate costingsheets for different Models)

Non recurring one time grant (only committedliabilities)

25.01 Construction of building (new) Hill 80.1500 80.1500

24.02 Construction of building KGBV sanctioned in 2004-05

25.02 Construction of building (new) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spillover only) (New)Boundary Wall 1.5000 1.5000

25.04 Boring/ Handpump (Spill over only)Boring/ Handpump 1.0000 1.0000

25.05 Electricity / water charges (Spill over only) 0.2000 0.2000Electricity / water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture/ Equipment (including kitchen)25.07 TLM and equipment including library books

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 1 10.00 1 10.00

10.000025.09 Replacement of bedding (once in 3 years)

Subtotal non recurring 1 10.00 1 10.00Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 1 9.00 1 9.00 9.0000 1 9.00 1 9.0025.11 Stipend per child per month @ Rs.50/- 0.6000 1 0.60 1 0.60 0.6000 1 0.60 1 0.60

25.12 Supplementary TLM, Stationery and other educational material 0.5000 1 0.50 1 0.50

0.50001 0.50 1 0.50

25.13 Examination Fees 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 1 3.00 1 3.00 3.0000 1 3.00 1 3.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1 1.80 1 1.80 1.8000 1 1.80 1 1.80iv Accountant @10000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20v Support Staff @5000/- 1.2000 1 1.20 1 1.20 1.2000 1 1.20 1 1.20

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 1 1.26 1 1.26

1.26001 1.26 1 1.26

25.15 Vocational Training/Specific Skill training 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.16 Electricity/ water charges 0.5000 1 0.50 1 0.50 0.5000 1 0.50 1 0.5025.17 Medical care/contingencies @ Rs.750/- per child 0.6250 1 0.63 1 0.63 0.6250 1 0.63 1 0.6325.18 Maintenance 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.3825.19 Miscellaneous 0.3750 1 0.38 1 0.38 0.3750 1 0.38 1 0.38

21.28

Page 69: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District : PithoragarhTill Month- Jan.2014

Costing Sheets for AWP&B 2014-15 - SSA-RTE(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

25.20 Preparatory camps 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.21 P.T.A / school functions 0.1500 1 0.15 1 0.15 0.1500 1 0.15 1 0.1525.22 Provision of Rent 1 0.50 1 0.5025.23 Capacity Building 0.2500 1 0.25 1 0.25 0.2500 1 0.25 1 0.2525.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 1 0.10 1 0.10 0.1000 1 0.10 1 0.10

Sub Total 18 22.09 18 22.09 17 21.59 17 21.59STATE KGBV TOTAL 19 32.09 19 32.09 17 21.59 17 21.59

Grand Total (SSA and KGBV) 1 10.48 140 623.01 101985 4636.39 102126 5269.88 1 10.48 4 16.66 108290 3817.64 108290 3844.78

Page 70: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Rudarpryag.Costing Sheets for AWP&B 2014-15 - SSA RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.1 Medical care/contingencies @ Rs.750/- per child 1.2500 1.2500

3.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 78 2.34 78 2.34 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total 78 2.34 78 2.34

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 71: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Rudarpryag.Costing Sheets for AWP&B 2014-15 - SSA RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.02675(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 5.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 11440 17.16 11440 17.16 0.00125 11440 14.30 11440 14.306.02 Braille Books (P) 0.0015 3 0.00 3 0.00 0.00150 3 0.00 3 0.006.03 Large print books (P) 0.0015 33 0.05 33 0.05 0.00150 33 0.05 33 0.056.04 Free Text Book (UP) 0.0025 8377 20.94 8377 20.94 0.00250 8377 20.94 8377 20.946.05 Braille Books (UP) 0.0025 1 0.00 1 0.00 0.00250 1 0.00 1 0.006.06 Large print books (UP) 0.0025 18 0.05 18 0.05 0.00250 18 0.05 18 0.05

Sub Total 19872 38.20 19872 38.20 19872 35.34 19872 35.347 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 14397 57.59 14397 57.59 0.0040 14397 57.59 14397 57.597.02 SC Boys 0.0040 4292 17.17 4292 17.17 0.0040 4292 17.17 4292 17.177.03 ST Boys 0.0040 7 0.03 7 0.03 0.0040 7 0.03 7 0.037.04 BPL Boys 0.0040 6483 25.93 6483 25.93 0.0040 6483 25.93 6483 25.93

Sub Total 25179 100.72 25179 100.72 25179 100.72 25179 100.728 Teaching Learning Equipment (TLE)

8.01 New Primary 0.2000 0.20008.02 New Upper Primary 0.5000 0.5000

Sub TotalIII ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

Page 72: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Rudarpryag.Costing Sheets for AWP&B 2014-15 - SSA RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 52 262.08 52 262.08 0.4200 52 262.08 52 262.089.14 Primary Teachers (Contract)-Existing 0.1300 92 143.52 92 143.52 0.1300 92 143.52 92 143.529.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular) 0.4200 0.42009.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 159 915.84 159 915.84 0.4800 159 915.84 159 915.849.2 UP Teachers (Contract)-Existing

9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 0.48009.25 Additional Teachers - UPS (Contract)9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 3 2.40 3 2.40 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 25 20.00 25 20.00 0.0800

9.29 Others Sub Total 331 1343.84 331 1343.84 303 1321.44 303 1321.44

Total 331 1343.84 331 1343.84 303 1321.44 303 1321.44Total (New+Recurring) 331 1343.84 331 1343.84 303 1321.44 303 1321.44

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 823 16.46 823 16.46

0.01001239 12.56 1239 12.56

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 823 4.12 823 4.12 0.0050 1239 6.20 1239 6.20

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 50 1.00 50 1.000.0100

51 0.51 51 0.51

Page 73: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Rudarpryag.Costing Sheets for AWP&B 2014-15 - SSA RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Sub Total 1696 21.58 1696 21.58 2529 19.26 2529 19.26

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200 9 56.16 9 56.16

0.52009 56.16 9 56.16

(b) 2 RPs for CWSN 0.1200 4 5.76 4 5.76 0.1200 5 7.20 5 7.20(c) 1 MIS Coordinator 0.1500 3 5.40 3 5.40 0.1500 3 5.40 3 5.40(d) 1 Datra Entry Operator 0.1200 3 4.32 3 4.32 0.1200 3 4.32 3 4.32(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 16 23.04 16 23.04 0.1200 16 23.04 16 23.04

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 3 1.50 3 1.50 0.5000 3 1.50 3 1.5011.05 Meeting, TA 0.3000 3 0.90 3 0.90 0.3000 3 0.90 3 0.9011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 3 0.30 3 0.30 0.1000

Sub Total 44 97.38 44 97.38 42 98.52 42 98.5212 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 46 287.04 46 287.04

0.520046 287.04 46 287.04

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 46 4.60 46 4.60 0.1000 46 4.60 46 4.6012.06 Meeting, TA 0.1200 46 5.52 46 5.52 0.1200 46 5.52 46 5.5212.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 46 0.92 46 0.92 0.0200

Sub Total 184 298.08 184 298.08 138 297.16 138 297.1613 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 984 4.92 984 4.92 0.005015.02 Upper Primary 0.0050 844 4.22 844 4.22 0.0050

Sub Total 1828 9.14 1828 9.1416 School Grant

16.01 Primary 0.0500 568 28.40 568 28.40 0.0500 568 28.40 568 28.4016.02 Upper Primary 0.0700 255 17.85 255 17.85 0.0700 255 17.85 255 17.85

Sub Total 823 46.25 823 46.25 823 46.25 823 46.2517 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 823 7.82 823 7.82 0.0039 823 3.24 823 3.24Sub Total 823 7.82 823 7.82 823 3.24 823 3.24

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 710 39.50 710 39.50 710 39.50 710 39.50

Sub Total 710 39.50 710 39.50 710 39.50 710 39.50

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 678 20.34 678 20.34 0.0190 558 10.60 558 10.60

Sub Total 678 20.34 678 20.34 558 10.60 558 10.6020 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 16.51 1 16.5120.02 ECCE 1 7.85 1 7.8520.03 Intervention for SC / ST children 1 11.95 1 11.95

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children20.06 Intervention for Urban Deprived children

Sub Total 3 36.31 3 36.3121 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 4728 14.18 4728 14.18 0.0030 4728 14.18 4728 14.1821.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 4728 14.18 4728 14.18 4728 14.18 4728 14.18V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 20.450022.04 New Primary School (Plain) 19.2500 19.2500

Page 74: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Rudarpryag.Costing Sheets for AWP&B 2014-15 - SSA RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

22.05 New Upper Primary (Hill) 26.6900 26.690022.06 New Upper Primary (Plain) 24.5700 24.570022.06.

1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary) 2 33.10 16.5500 2 33.10 2 33.10 11.18 44.28

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary) 23.0300

23.030022.09 Building Less (Pry) Hill 20.4500 20.4500

Building Less (Pry) Plain 19.2500 19.250022.10 Building Less (UP) Hill 26.6900 26.6900

Building Less (UP) Plain 24.5700 24.570022.11 Dilapidated Building (Pry) Hill 27 257.04 12.8600 38 488.68 65 745.72 12.8600

Dilapidated Building (Pry) Plain 11.4100 11.410022.12 Dilapidated Building (UP) Hill 4 57.60 17.4200 2 34.84 6 92.44 17.4200

Dilapidated Building (UP) Plain 14.8200 14.820022.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 15 55.35 5.7900 15 55.35 5.790022.15 Additional Class Room (Plain) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility 68 18.02 68 18.0222.20 Boundary Wall 50 135.10 50 135.1022.21 Electrification 489 56.70 0.3000 489 56.70 489 56.70 0.3000 56.70

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.30007.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.32006.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.3200

6.320022.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 60 4.50 0.3000 60 4.50 0.300022.26 Ramps with Handrails 0.1500 0.1500

Page 75: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Rudarpryag.Costing Sheets for AWP&B 2014-15 - SSA RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

22.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 1 2.50 26.43 9 41.57 10 70.5023.34 Major Repairs for Upper Primary School23.35 Others

Sub Total 3 35.60 645 592.72 117 583.11 765 1211.43 2 33.10 489 56.70 11.18 100.98VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 108.00 1 108.00 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 108.00 1 108.00 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 50.08 1 50.08 0.00005 6128 0.31 6128 0.3123.03 Community Mobilization activities (up to 0.5%) 1 12.00 1 12.00 10.00 10.00

Sub Total 2 62.08 2 62.08 6128 10.31 6128 10.31Total of SSA (District) 3 35.60 645 592.72 57098 2878.87 57746 3507.19 2 33.10 489 56.70 61833 2076.21 61833 2166.01

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 3 35.60 645 592.72 57098 2878.87 57746 3507.19 2 33.10 489 56.70 61833 2600.72 61833 2690.52

25 KGBV Financial Provisions (provide separate costing sheets for different Models)Non-recurring (one time grant)

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet)

25.09 Replacement of bedding (once in 3 years) 0.3750 0.3750Sub Total Non-recurringRecurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 9.000025.11 Stipend per girl per month @ Rs.50/- 0.6000 0.6000

25.12 Supplementary TLM, Stationery and other educational material 0.5000

0.500025.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.260025.15 Vocational training / specific skill training 0.5000 0.500025.16 Electricity / water charges 0.5000 0.500025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 0.625025.18 Maintenance 0.3750 0.375025.19 Miscellaneous 0.3750 0.375025.20 Preparatory camps 0.1500 0.1500

22.3

Page 76: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Rudarpryag.Costing Sheets for AWP&B 2014-15 - SSA RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

25.21 P.T.A / school functions 0.1500 0.150025.22 Provision of Rent (8 months)25.23 Capacity Building 0.2500 0.250025.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 0.1000

Sub Total Total Grand Total - (SSA, NPGEL & KGBV) 3 35.60 645 592.72 57098 2878.87 57746 3507.19 2 33.10 489 56.70 61833 2600.72 61833 2690.52

Page 77: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Tehri GarhwalCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School 3 31.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS 2

1.05 Residential schools for specific category of children

1.06 Residential Hostel1.07 Integration of Class V with primary schools

1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)

2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.5000

2.10 Medical care/contingencies @ Rs.750/- per child 0.62500.6250

2.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)

3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.0000

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability Total Deferred liability of Total Fresh

1

Page 78: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Tehri GarhwalCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability Total Deferred liability of Total Fresh

3.09 Electricity / water charges 1.0000 1.0000

3.10 Medical care/contingencies @ Rs.750/- per child 1.25001.2500

3.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 17 0.51 17 0.51 0.0300

4.02 Urban deprived children/children without adult protection 0.0300

0.0300Sub Total 17 0.51 17 0.51

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500Sub Total

5.02 Residential (Continuing from previous year)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500Sub Total

5.03 Non-Residential (Fresh)(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.02675(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150Sub Total

5.04 Non-Residential (Continuing from previous year)(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150Sub Total

5.05 Madarasa/Maktab(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150Sub Total

5.06 Seasonal Hostel(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500Sub TotalTotal

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 27917 41.88 27917 41.88 0.00125 27917 34.90 27917 34.906.02 Braille Books (P) 0.0015 8 0.01 8 0.01 0.00150 8 0.01 8 0.016.03 Large print books (P) 0.0015 17 0.03 17 0.03 0.00150 17 0.03 17 0.036.04 Free Text Book (UP) 0.0025 20321 50.80 20321 50.80 0.00250 20321 50.80 20321 50.806.05 Braille Books (UP) 0.0025 3 0.01 3 0.01 0.00250 3 0.01 3 0.016.06 Large print books (UP) 0.0025 10 0.03 10 0.03 0.00250 10 0.03 10 0.03

Sub Total 48276 92.75 48276 92.75 48276 85.77 48276 85.777 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 37260 149.04 37260 149.04 0.0040 37260 149.04 37260 149.047.02 SC Boys 0.0040 9138 36.55 9138 36.55 0.0040 9138 36.55 9138 36.55

2

Page 79: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Tehri GarhwalCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability Total Deferred liability of Total Fresh

7.03 ST Boys 0.0040 60 0.24 60 0.24 0.0040 60 0.24 60 0.247.04 BPL Boys 0.0040 24793 99.17 24793 99.17 0.0040 24793 99.17 24793 99.17

Sub Total 71251 285.00 71251 285.00 71251 285.00 71251 285.008 Teaching Learning Equipment (TLE)

8.01 New Primary 0.2000 3 0.60 3 0.60 0.20008.02 New Upper Primary 0.5000 2 1.00 2 1.00 0.5000

Sub Total 5 1.60 5 1.60III ENHANCING QUALITY 9 New Teachers Salary 9.01 Primary Teachers (Regular) 0.4200 6 15.12 6 15.12 0.42009.02 Primary Teachers (Contract) 0.1300 0.1300

9.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 2 5.76 2 5.76 0.4800(b) Social Studies 0.4800 2 5.76 2 5.76 0.4800(c) Languages 0.4800 2 5.76 2 5.76 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)

(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total 12 32.40 12 32.40Additional Teachers against PTR

9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS(a) Science and Mathematics(b) Social Studies(c) Languages

9.1 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800Sub Total Total 12 32.40 12 32.40

Teachers Salary (Recurring-sanctioned earlier)

Primary teachers9.13 Primary Teachers ( Regular)-Existing 0.4200 203 1023.12 203 1023.12 0.4200 203 1023.12 203 1023.129.14 Primary Teachers (Contract)-Existing 0.1300 50 78.00 50 78.00 0.1300 50 78.00 50 78.009.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular) 0.4200 0.42009.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 250 1440.00 250 1440.00 0.4800 250 1440.00 250 1440.00

9.2 UP Teachers (Contract)-Existing9.21 Head Teacher for Upper Primary 0.0500 0.0500

9.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)

3

Page 80: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Tehri GarhwalCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability Total Deferred liability of Total Fresh

(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 48 276.48 48 276.48 0.4800 48 276.48 48 276.489.25 Additional Teachers - UPS (Contract)

9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 5 4.00 5 4.00 0.0800(b) Health and Physical Education 0.0800 5 4.00 5 4.00 0.0800(c) Work Education 0.0800 73 58.40 73 58.40 0.0800

9.29 Others Sub Total 634 2884.00 634 2884.00 551 2817.60 551 2817.60Total 634 2884.00 634 2884.00 551 2817.60 551 2817.60Total (New+Recurring) 646 2916.40 646 2916.40 551 2817.60 551 2817.60

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 2024 40.48 2024 40.48

0.01003305 33.22 3305 33.22

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 2024 10.12 2024 10.12 0.0050 3305 16.53 3305 16.53

10.03 Induction Training for Newly Recruited Teachers- 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 241 4.82 241 4.820.0100

51 0.51 51 0.51

Sub Total 4289 55.42 4289 55.42 6661 50.25 6661 50.25

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200

0.5200(b) 2 RPs for CWSN 0.1200 14 20.16 14 20.16 0.1200 15 21.60 15 21.60(c) 1 MIS Coordinator 0.1500 9 16.20 9 16.20 0.1500 9 16.20 9 16.20(d) 1 Datra Entry Operator 0.1200 9 12.96 9 12.96 0.1200 9 12.96 9 12.96(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 41 59.04 41 59.04

0.120041 59.04 41 59.04

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 9 4.50 9 4.50 0.5000 9 4.50 9 4.5011.05 Meeting, TA 0.3000 9 2.70 9 2.70 0.3000 9 2.70 9 2.7011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 9 0.90 9 0.90 0.1000

Sub Total 100 116.46 100 116.46 92 117.00 92 117.0012 Academic Support through Cluster Resource

12.01Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular)

0.5200 37 230.88 37 230.880.5200

37 230.88 37 230.88

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 115 11.50 115 11.50 0.1000 115 11.50 115 11.5012.06 Meeting, TA 0.1200 115 13.80 115 13.80 0.1200 115 13.80 115 13.80

4

Page 81: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Tehri GarhwalCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability Total Deferred liability of Total Fresh

12.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 115 2.30 115 2.30 0.0200

Sub Total 382 258.48 382 258.48 267 256.18 267 256.18

13 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.0050.0000

Sub Total 1 50.00 1 50.0014 Libraries in Schools

(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000Sub Total

IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 2703 13.52 2703 13.52 0.005015.02 Upper Primary 0.0050 1898 9.49 1898 9.49 0.0050

Sub Total 4601 23.01 4601 23.0116 School Grant

16.01 Primary 0.0500 1433 71.65 1433 71.65 0.0500 1433 71.65 1433 71.6516.02 Upper Primary 0.0700 591 41.37 591 41.37 0.0700 591 41.37 591 41.37

Sub Total 2024 113.02 2024 113.02 2024 113.02 2024 113.02

17 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 2076 19.72 2076 19.72 0.0039 2076 8.16 2076 8.16Sub Total 2076 19.72 2076 19.72 2076 8.16 2076 8.16

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 1952 106.90 1952 106.90 1952 106.90 1952 106.90

Sub Total 1952 106.90 1952 106.90 1952 106.90 1952 106.90

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 1160 34.80 1160 34.80 0.0190 1160 22.04 1160 22.04

Sub Total 1160 34.8 1160 34.8 1160 22.04 1160 22.04

20 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 14.98 1 14.9820.02 ECCE 1 14.14 1 14.1420.03 Intervention for SC / ST children 1 14.92 1 14.92

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children 1 4.98 1 4.9820.06 Intervention for Urban Deprived children

Sub Total 4 49.02 4 49.0221 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 11934 35.80 11934 35.80 0.0030 11934 35.80 11934 35.8021.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 11934 35.802 11934 35.802 11934 35.802 11934 35.802V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 3 61.35 3 61.35 20.4500 3 61.35 3 61.3522.04 New Primary School (Plain) 19.2500 19.250022.05 New Upper Primary (Hill) 26.6900 2 53.38 2 53.38 26.690022.06 New Upper Primary (Plain) 24.5700 24.5700

22.06.1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary)

1 10.48 10.4800 1 10.48 1 10.48 11.18 21.66

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary) 16.4800

16.480022.09 Building Less (Pry) Hill 20.4500 1 20.45 1 20.45 20.4500

Building Less (Pry) Plain 19.2500 19.250022.10 Building Less (UP) Hill 26.6900 1 26.69 1 26.69 26.6900

Building Less (UP) Plain 24.5700 24.5700

5

Page 82: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Tehri GarhwalCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability Total Deferred liability of Total Fresh

22.11 Dilapidated Building (Pry) Hill 34 80.92 12.8600 28 360.08 62 441.00 34 80.92 12.8600 80.92Dilapidated Building (Pry) Plain 11.4100 11.4100

22.12 Dilapidated Building (UP) Hill 5 18.00 17.4200 3 52.26 8 70.26 5 18.00 17.4200 18.00Dilapidated Building (UP) Plain 14.8200 14.8200

22.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 89 328.41 5.7900 89 328.41 5.790022.15 Additional Class Room (Plain) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 38 81.32 38 81.32 2.1400 38 81.32 38 81.32

Separate Girls Toilet Plain 1.7600 1.760022.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility 165 312.85 165 312.8522.20 Boundary Wall 43.61 43.6122.21 Electrification 245.70 0.3000 245.70 245.70 0.3000 245.70

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 1 1.35 7.3000 1 1.35 1 1.35

7.30001.35

Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.3200

6.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 2 4.05 7.3000 2 4.05 1 1.35

7.30001.35

Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.3200

6.3200

22.24 Augumentation of training facility in BRC (one time)

22.25 Child friendly Elements 0.3000 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 18.53 18 81.73 18 100.26 7 10.75 10.7523.34 Major Repairs for Upper Primary School 3.32 1 2.80 1 6.12 1 1.60 1.6023.35 Others

Sub Total 1 10.48 131 743.89 260 1052.91 392 1807.28 1 10.48 49 359.67 41 153.85 41 524.00VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 231.00 1 231.00 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social MappingSub Total 1 231.00 1 231.00 68.51 68.51

23.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 89.45 1 89.45 0.00005 16380 0.82 16380 0.8223.03 Community Mobilization activities (up to 0.5%) 1 17.37 1 17.37 10.96 10.96

Sub Total 2 106.82 2 106.82 16380 11.77 16380 11.77Total of SSA (District) 1 10.48 131 743.89 148981 5549.62 149113 6303.99 1 10.48 49 359.67 162665 4131.86 162665 4502.01

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS24.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 1 10.48 131 743.89 148981 5549.62 149113 6303.99 1 10.48 49 359.67 162665 4656.37 162665 5026.52

25 KGBV Financial Provisions (provide separate costing sheets for different Models)

Non-recurring (one time grant)25.01 Construction of Building (New) Hill 80.1500 80.1500

22.3

6

Page 83: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: Tehri GarhwalCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability Total Deferred liability of Total Fresh

Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment

25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 5 50.00 5 50.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 4 1.50 4 1.50 0.3750 4 1.50 2 1.50

Sub Total Non-recurring 9 51.50 9 51.50 4 1.50 2 1.50Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 5 45.00 5 45.00 9.0000 5 45.00 5 45.0025.11 Stipend per girl per month @ Rs.50/- 0.6000 5 3.00 5 3.00 0.6000 5 3.00 5 3.00

25.12 Supplementary TLM, Stationery and other educational material 0.5000 5 2.50 5 2.50

0.50005 2.50 5 2.50

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 5 15.00 5 15.00 3.0000 5 15.00 5 15.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 5 9.00 5 9.00 1.8000 5 9.00 5 9.00iv Accountant @10000/- 1.2000 5 6.00 5 6.00 1.2000 5 6.00 5 6.00v Support Staff @5000/- 1.2000 5 6.00 5 6.00 1.2000 5 6.00 5 6.00

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 5 6.30 5 6.30

1.26005 6.30 5 6.30

25.15 Vocational training / specific skill training 0.5000 5 2.50 5 2.50 0.5000 5 2.50 5 2.5025.16 Electricity / water charges 0.5000 5 2.50 5 2.50 0.5000 5 2.50 5 2.5025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 5 3.13 5 3.13 0.6250 5 3.13 5 3.1325.18 Maintenance 0.3750 5 1.88 5 1.88 0.3750 5 1.88 5 1.8825.19 Miscellaneous 0.3750 5 1.88 5 1.88 0.3750 5 1.88 5 1.8825.2 Preparatory camps 0.1500 5 0.75 5 0.75 0.1500 5 0.75 5 0.75

25.21 P.T.A / school functions 0.1500 5 0.75 5 0.75 0.1500 5 0.75 5 0.7525.22 Provision of Rent (8 months) 1.2000 3 3.60 3 3.6025.23 Capacity Building 0.2500 5 1.25 5 1.25 0.2500 5 1.25 5 1.25

25.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 5 0.50 5 0.500.1000

5 0.50 5 0.50

Sub Total 88 111.53 88 111.53 85 107.93 85 107.93Total 97 163.03 97 163.03 89 109.43 87 109.43Grand Total - (SSA, NPGEL & KGBV) 1 10.48 131 743.89 149078 5712.65 149210 6467.02 1 10.48 49 359.67 162754 4765.80 162752 5135.95

7

Page 84: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: UttarkashiCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School 1 11.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS 11.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.60002.06 Supplementary TLM, Stationery and other educational material 0.5000 0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000ii Urdu Teacher (only for muslim population blocks above 20%) @ 1.4400 1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per 1.2600 1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.20003.06 Supplementary TLM, Stationery and other educational material 1.0000 1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000ii Urdu Teacher (only for muslim population blocks above 20%) @ 1.4400 1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per 1.8000 1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.1 Medical care/contingencies @ Rs.750/- per child 1.2500 1.25003.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent

Deferred liability of 2014-15

Fresh Total Spill Over Total

Outlay Recommended for 2014-15

Fresh Spill OverDeferred liability of 2014-15

S.No. Activity

Outlay Proposed for 2014-15

Page 85: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: UttarkashiCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Deferred liability of 2014-15

Fresh Total Spill Over Total

Outlay Recommended for 2014-15

Fresh Spill OverDeferred liability of 2014-15

S.No. Activity

Outlay Proposed for 2014-15

3.15 Capacity Building 0.5000 0.5000Sub Total

Total 4 Transport/Escort Facility

4.01 Children in remote habitations 0.0300 23 0.69 23 0.69 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total 23 0.69 23 0.69

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.02675(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 5.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 16442 24.66 16442 24.66 0.00125 16442 20.55 16442 20.556.02 Braille Books (P) 0.0015 0.001506.03 Large print books (P) 0.0015 0.001506.04 Free Text Book (UP) 0.0025 10454 26.14 10454 26.14 0.00250 10454 26.14 10454 26.146.05 Braille Books (UP) 0.0025 0.002506.06 Large print books (UP) 0.0025 0.00250

Sub Total 26896 50.80 26896 50.80 26896 46.69 26896 46.697 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 20769 83.08 20769 83.08 0.0040 20769 83.08 20769 83.087.02 SC Boys 0.0040 5826 23.30 5826 23.30 0.0040 5826 23.30 5826 23.307.03 ST Boys 0.0040 235 0.94 235 0.94 0.0040 235 0.94 235 0.947.04 BPL Boys 0.0040 8927 35.71 8927 35.71 0.0040 8927 35.71 8927 35.71

Sub Total 35757 143.03 35757 143.03 35757 143.03 35757 143.038 Teaching Learning Equipment (TLE)

Page 86: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: UttarkashiCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Deferred liability of 2014-15

Fresh Total Spill Over Total

Outlay Recommended for 2014-15

Fresh Spill OverDeferred liability of 2014-15

S.No. Activity

Outlay Proposed for 2014-15

8.01 New Primary 0.2000 1 0.20 1 0.20 0.20008.02 New Upper Primary 0.5000 1 0.50 1 0.50 0.5000

Sub Total 2 0.70 2 0.70III ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 2 5.04 2 5.04 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 1 2.88 1 2.88 0.4800(b) Social Studies 0.4800 1 2.88 1 2.88 0.4800(c) Languages 0.4800 1 2.88 1 2.88 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VII 0.3000 0.3000Sub Total 5 13.68 5 13.68

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

9.08 Head Teacher for Primary (if the number of children exceeds 150 ina school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total 5 13.68 5 13.68

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 82 413.28 82 413.28 0.4200 82 413.28 82 413.289.14 Primary Teachers (Contract)-Existing 0.1300 25 39.00 25 39.00 0.1300 25 39.00 25 39.009.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular) 0.4200 0.4200

9.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 189 1088.64 189 1088.64 0.4800 189 1088.64 189 1088.649.2 UP Teachers (Contract)-Existing9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 94 541.44 94 541.44 0.4800 94 541.44 94 541.449.25 Additional Teachers - UPS (Contract)9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics

Page 87: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: UttarkashiCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Deferred liability of 2014-15

Fresh Total Spill Over Total

Outlay Recommended for 2014-15

Fresh Spill OverDeferred liability of 2014-15

S.No. Activity

Outlay Proposed for 2014-15

(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 5 4.00 5 4.00 0.0800 7 2.24 7 2.24(b) Health and Physical Education 0.0800 5 4.00 5 4.00 0.0800 7 2.24 7 2.24(c) Work Education 0.0800 29 23.20 29 23.20 0.0800 33 10.56 33 10.56

9.29 Others

Sub Total 429 2113.56 429 2113.56 437 2097.40 437 2097.40

Total 429 2113.56 429 2113.56 437 2097.40 437 2097.40

Total (New+Recurring) 434 2127.24 434 2127.24 437 2097.40 437 2097.40

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 1108 22.16 1108 22.16

0.01001710 17.27 1710 17.27

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 1108 5.54 1108 5.54 0.0050 1710 8.55 1710 8.55

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06 Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days 0.0200

0.0100Sub Total 2216 27.70 2216 27.70 3420 25.82 3420 25.82

11 Academic Support through Block Resource Centre/ URC11.01 Salary of Faculty and Staff

(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200

0.5200(b) 2 RPs for CWSN 0.1200 11 15.84 11 15.84 0.1200 10 14.40 10 14.40(c) 1 MIS Coordinator 0.1500 6 10.80 6 10.80 0.1500 6 10.80 6 10.80(d) 1 Datra Entry Operator 0.1200 6 8.64 6 8.64 0.1200 6 8.64 6 8.64(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 22 31.68 22 31.68 0.1200 22 31.68 22 31.68

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 6 3.00 6 3.00 0.5000 6 3.00 6 3.0011.05 Meeting, TA 0.3000 6 1.80 6 1.80 0.3000 6 1.80 6 1.8011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 6 0.60 6 0.60 0.1000

Sub Total 63 72.36 63 72.36 56 70.32 56 70.3212 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 19 118.56 19 118.56

0.520019 118.56 19 118.56

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 61 6.10 61 6.10 0.1000 61 6.10 61 6.1012.06 Meeting, TA 0.1200 61 7.32 61 7.32 0.1200 61 7.32 61 7.3212.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 61 1.22 61 1.22 0.0200

Sub Total 202 133.20 202 133.20 141 131.98 141 131.98

Page 88: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: UttarkashiCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Deferred liability of 2014-15

Fresh Total Spill Over Total

Outlay Recommended for 2014-15

Fresh Spill OverDeferred liability of 2014-15

S.No. Activity

Outlay Proposed for 2014-15

13 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 1368 6.84 1368 6.84 0.005015.02 Upper Primary 0.0050 980 4.90 980 4.90 0.0050

Sub Total 2348 11.74 2348 11.7416 School Grant

16.01 Primary 0.0500 769 38.45 769 38.45 0.0500 769 38.45 769 38.45

16.02 Upper Primary 0.0700 339 23.73 339 23.73 0.0700 339 23.73 339 23.73

Sub Total 1108 62.18 1108 62.18 1108 62.18 1108 62.18

17 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 1111 10.55 1111 10.55 0.0039 1111 4.37 1111 4.37Sub Total 1111 10.55 1111 10.55 1111 4.37 1111 4.37

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 1110 75.70 1110 75.70 1110 75.70 1110 75.70

Sub Total 1110 75.70 1110 75.70 1110 75.70 1110 75.70

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 1462 43.86 1462 43.86 0.0190 775 14.73 775 14.73

Sub Total 1462 43.86 1462 43.86 775 14.73 775 14.7320 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 15.00 1 15.0020.02 ECCE 1 14.27 1 14.2720.03 Intervention for SC / ST children 1 14.58 1 14.58

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children 1 1.19 1 1.1920.06 Intervention for Urban Deprived children

Sub Total 4 45.04 4 45.0421 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 6546 19.64 6546 19.64 0.0030 6546 19.64 6546 19.6421.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 6546 19.64 6546 19.64 6546 19.64 6546 19.64V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC

22.02 CRC

22.03 New Primary School (Hill) 20.4500 1 20.45 1 20.45 20.4500 1 20.45 1 20.4522.04 New Primary School (Plain) 19.2500 19.250022.05 New Upper Primary (Hill) 26.6900 1 26.69 1 26.69 26.690022.06 New Upper Primary (Plain) 24.5700 24.5700

22.06.1 New Upper Primary (Hill Spill over 2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary)

10.4800 11.18 11.18

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary) 16.0000

16.000022.09 Building Less (Pry) Hill 20.4500 20.4500

Building Less (Pry) Plain 19.2500 19.250022.10 Building Less (UP) Hill 26.6900 26.6900

Page 89: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: UttarkashiCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Deferred liability of 2014-15

Fresh Total Spill Over Total

Outlay Recommended for 2014-15

Fresh Spill OverDeferred liability of 2014-15

S.No. Activity

Outlay Proposed for 2014-15

Building Less (UP) Plain 24.5700 24.570022.11 Dilapidated Building (Pry) Hill 31 295.12 12.8600 31 295.12 12.8600

Dilapidated Building (Pry) Plain 11.4100 11.410022.12 Dilapidated Building (UP) Hill 4 57.60 17.4200 4 57.60 17.4200

Dilapidated Building (UP) Plain 14.8200 14.820022.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 12 44.28 5.7900 13 75.27 25 119.55 5.7900 2 11.58 2 11.5822.15 Additional Class Room (Plain) 4.8300 4.830022.16 Toilet/Urinals (for urban areas only)

22.17 Separate Girls Toilet Hill 2.1400 62 132.68 62 132.68 2.1400 62 132.68 62 132.68Separate Girls Toilet Plain 1.7600 1.7600

22.18 CWSN friendly toilets Hill 2.1400 2.1400CWSN friendly toilets Plain 1.7600 1.7600

22.19 Drinking Water Facility 171 112.86 171 112.8622.20 Boundary Wall 106 229.26 106 229.2622.21 Electrification 45 13.50 0.3000 45 13.50 45 13.50 0.3000 13.5022.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.3000 7.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 6.3200 6.3200

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 7.30007.3000

Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 6.32006.3200

22.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 0.3000 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children

(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 161.29 81 245.77 81 407.0623.34 Major Repairs for Upper Primary School 41.58 22 103.65 22 145.2323.35 Others

Sub Total 198 842.63 351 717.37 549 1560.00 45 13.50 65 175.89 65 189.39VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 150.00 1 150.00 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 150.00 1 150.00 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 66.40 1 66.40 0.00005 9814 0.49 9814 0.4923.03 Community Mobilization activities (up to 0.5%) 1 13.20 1 13.20 10.96 10.96

Sub Total 2 79.60 2 79.60 9814 11.45 9814 11.45

Total of SSA (District) 198 842.63 79637 3821.40 79835 4664.03 45 13.50 87236 2947.69 87236 2961.19

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51

22.3

Page 90: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: UttarkashiCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Deferred liability of 2014-15

Fresh Total Spill Over Total

Outlay Recommended for 2014-15

Fresh Spill OverDeferred liability of 2014-15

S.No. Activity

Outlay Proposed for 2014-15

STATE SSA TOTAL 198 842.63 79637 3821.40 79835 4664.03 45 13.50 87236 3472.20 87236 3485.7025 KGBV Financial Provisions (provide separate costing sheets

f diff M d l )Non-recurring (one time grant)25.01 Construction of Building (New) Hil 80.1500 80.1500

Construction of Building KGBV sanctioned in 2004-0525.02 Construction of Building (New) Plain 69.1600 69.1600

Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over onlyBoring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008

25.06 Furniture / Equipment (including kitchen equipment25.07 TLM and equipment including library books (New

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 4 40.00 4 40.00

10.000025.09 Replacement of bedding (once in 3 years 0.3750 3 1.13 3 1.13 0.3750 3 1.13 1 1.13

Sub Total Non-recurring 7 41.13 7 41.13 3 1.13 1 1.13Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 4 36.00 4 36.00 9.0000 4 36.00 4 36.0025.11 Stipend per girl per month @ Rs.50/- 0.6000 4 2.40 4 2.40 0.6000 4 2.40 4 2.4025.12 Supplementary TLM, Stationery and other educational material 0.5000 4 2.00 4 2.00 0.5000 4 2.00 4 2.0025.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 4 12.00 4 12.00 3.0000 4 12.00 4 12.00ii Urdu Teacher (only for muslim population blocks above 20%) @ 1.4400 1.4400iii Part time teachers @5000/- 1.8000 4 7.20 4 7.20 1.8000 4 7.20 4 7.20iv Accountant @10000/- 1.2000 4 4.80 4 4.80 1.2000 4 4.80 4 4.80v Support Staff @5000/- 1.2000 4 4.80 4 4.80 1.2000 4 4.80 4 4.80

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per 1.2600 4 5.04 4 5.04 1.2600 4 5.04 4 5.0425.15 Vocational training / specific skill training 0.5000 4 2.00 4 2.00 0.5000 4 2.00 4 2.0025.16 Electricity / water charges 0.5000 4 2.00 4 2.00 0.5000 4 2.00 4 2.0025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 4 2.50 4 2.50 0.6250 4 2.50 4 2.5025.18 Maintenance 0.3750 4 1.50 4 1.50 0.3750 4 1.50 4 1.5025.19 Miscellaneous 0.3750 4 1.50 4 1.50 0.3750 4 1.50 4 1.5025.20 Preparatory camps 0.1500 4 0.60 4 0.60 0.1500 4 0.60 4 0.6025.21 P.T.A / school functions 0.1500 4 0.60 4 0.60 0.1500 4 0.60 4 0.6025.22 Provision of Rent (8 months) 2 2.00 2 2.0025.23 Capacity Building 0.2500 4 1.00 4 1.00 0.2500 4 1.00 4 1.0025.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 4 0.40 4 0.40 0.1000 4 0.40 4 0.40

Sub Total 70 88.34 70 88.34 22.9350 68 86.34 68 86.34Total 77 129.47 77 129.47 22.9350 71 87.47 69 87.47

Grand Total - (SSA, NPGEL & KGBV) 198 842.63 79714 3950.86 79912 4793.49 45 13.50 87307 3559.67 87305 3573.17

Page 91: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: USNagarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

I ACCESSSSA

1 Opening of New Schools 1.01 Upgradation of EGS to Primary School1.02 New Primary School1.03 Upgradation of EGS to UPS1.04 Upgradation of PS to UPS1.05 Residential schools for specific category of children1.06 Residential Hostel1.07 Integration of Class V with primary schools 1.08 Integration of Class VIII with upper primary schools

2 Residential Hostel for 50 childrenNon-recurring (one time grant)

2.01 Furniture / Equipment (including kitchen equipment)2.02 TLM and equipment including library books 2.03 Bedding

Sub Total Recurring

2.04 Maintenance per child per month @ Rs. 1500/- 9.0000 9.00002.05 Stipend per child per month @ Rs.100/- 0.6000 0.6000

2.06 Supplementary TLM, Stationery and other educational material 0.5000

0.50002.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600

1.26002.08 Vocational training / specific skill training 0.5000 0.50002.09 Electricity / water charges 0.5000 0.50002.10 Medical care/contingencies @ Rs.750/- per child 0.6250 0.62502.11 Maintenance 0.3750 0.37502.12 Miscellaneous 0.3750 0.37502.13 P.T.A / school functions 0.1000 0.10002.14 Provision of Rent (8 months)2.15 Capacity Building 0.2500 0.2500

Sub Total Total

3 Residential Hostel for 100 childrenNon-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment)3.02 TLM and equipment including library books 3.03 Bedding

Sub Total Recurring

3.04 Maintenance per child per month @ Rs. 1500/- 18.0000 18.00003.05 Stipend per child per month @ Rs.100/- 1.2000 1.2000

3.06 Supplementary TLM, Stationery and other educational material 1.0000

1.00003.07 Salaries

i Warden @ 25000/- 3.0000 3.0000

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 1.8000iv Accountant @10000/- 1.2000 1.2000v Support Staff @5000/- 1.2000 1.2000

vi. Head Cook @6000/- and 2 Asst Cook @ Rs. 4500/- per month per cook 1.8000

1.80003.08 Vocational training / specific skill training 1.0000 1.00003.09 Electricity / water charges 1.0000 1.00003.1 Medical care/contingencies @ Rs.750/- per child 1.2500 1.2500

3.11 Maintenance 0.7500 0.75003.12 Miscellaneous 0.7500 0.75003.13 P.T.A / school functions 0.2000 0.20003.14 Provision of Rent3.15 Capacity Building 0.5000 0.5000

Sub Total Total

4 Transport/Escort Facility 4.01 Children in remote habitations 0.0300 0.03004.02 Urban deprived children/children without adult protection 0.0300 0.0300

Sub Total

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Page 92: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: USNagarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

5 Special Training for mainstreaming of Out-of-School Children

5.01 Residential (Fresh)(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.09050(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.02 Residential (Continuing from previous year)

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub Total 5.03 Non-Residential (Fresh)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 700 31.50 700 31.50 0.02675 700 18.73 700 18.73(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total 700 31.50 700 31.50 700 18.73 700 18.735.04 Non-Residential (Continuing from previous year)

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.02675(d) 3 months 0.0150 0.0150

Sub Total 5.05 Madarasa/Maktab

(a) 12 months 0.0600 0.0600(b) 9 months 0.0450 0.0450(c) 6 months 0.0300 0.0300(d) 3 months 0.0150 0.0150

Sub Total5.06 Seasonal Hostel

(a) 12 months 0.2000 0.2000(b) 9 months 0.1500 0.1500(c) 6 months 0.1000 0.1000(d) 3 months 0.0500 0.0500

Sub TotalTotal 700 31.50 700 31.50 700 18.73 700 18.73

II RETENTION6 Free Text Book

6.01 Free Text Book (P) 0.0015 62728 94.09 62728 94.09 0.00125 62728 78.41 62728 78.416.02 Braille Books (P) 0.0015 0.001506.03 Large print books (P) 0.0015 0.001506.04 Free Text Book (UP) 0.0025 41370 103.43 41370 103.43 0.00250 41370 103.43 41370 103.436.05 Braille Books (UP) 0.0025 0.002506.06 Large print books (UP) 0.0025 0.00250

Sub Total 104098 197.52 104098 197.52 104098 181.84 104098 181.847 Provision of 2 sets of Uniform

7.01 All Girls 0.0040 66025 264.10 66025 264.10 0.0040 66025 264.10 66025 264.107.02 SC Boys 0.0040 19392 77.57 19392 77.57 0.0040 19392 77.57 19392 77.577.03 ST Boys 0.0040 3444 13.78 3444 13.78 0.0040 3444 13.78 3444 13.787.04 BPL Boys 0.0040 21499 86.00 21499 86.00 0.0040 21499 86.00 21499 86.00

Sub Total 110360 441.44 110360 441.44 110360 441.44 110360 441.448 Teaching Learning Equipment (TLE)

8.01 New Primary 0.40 0.2000 0.40 0.20008.02 New Upper Primary 0.5000 0.5000

Sub Total 0.40 0.40III ENHANCING QUALITY 9 New Teachers Salary

9.01 Primary Teachers (Regular) 0.4200 0.42009.02 Primary Teachers (Contract) 0.1300 0.13009.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics 0.4800 0.4800(b) Social Studies 0.4800 0.4800(c) Languages 0.4800 0.4800

9.04 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0500 0.0500(b) Social Studies 0.0500 0.0500(c) Languages 0.0500 0.0500

9.05 UP teachers for integration of Class VIII 0.3000 0.3000Sub Total

Additional Teachers against PTR9.06 New Additional Teachers - PS (Regular)9.07 New Additional Teachers - PS (Contract)

Page 93: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: USNagarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

9.08 Head Teacher for Primary (if the number of children exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.10 Subject specific New Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.11 Head Teacher for Upper Primary (if the number of children exceeds 100 in a school)

9.12 Part Time Instructors (if the number of children exceeds 100 in a school)(a) Art Education 0.0800 0.0800(b) Health and Physical Education 0.0800 0.0800(c) Work Education 0.0800 0.0800

Sub Total Total

Teachers Salary (Recurring-sanctioned earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing 0.4200 361 1819.44 361 1819.44 0.4200 361 1819.44 361 1819.449.14 Primary Teachers (Contract)-Existing 0.1300 130 202.80 130 202.80 0.1300 130 202.80 130 202.809.15 Head Teacher for Primary 0.0500 0.0500

Additional teachers 9.16 Additional Teachers - PS (Regular) 0.4200 157 791.28 157 791.28 0.4200 157 791.28 157 791.289.17 Additional Teachers - PS (Contract) 0.1300 0.13009.18 Others in position

Upper Primary teachers 9.19 UP Teachers (Regular)-Existing 0.4800 232 1336.32 232 1336.32 0.4800 232 1336.32 232 1336.329.2 UP Teachers (Contract)-Existing

9.21 Head Teacher for Upper Primary 0.0500 0.05009.22 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.23 Subject specific Upper Primary Teachers (Contract)(a) Science and Mathematics 0.0800 0.0800(b) Social Studies 0.0800 0.0800(c) Languages 0.0800 0.0800

9.24 Additional Teachers - UPS (Regular) 0.4800 21 120.96 21 120.96 0.4800 21 120.96 21 120.969.25 Additional Teachers - UPS (Contract)9.26 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics(b) Social Studies(c) Languages

9.27 Subject specific Additional Teachers - UPS (Contract)(a) Science and Mathematics(b) Social Studies(c) Languages

9.28 Part Time Instructors (a) Art Education 0.0800 119 95.20 119 95.20 0.0800(b) Health and Physical Education 0.0800 119 95.20 119 95.20 0.0800(c) Work Education 0.0800 119 95.20 119 95.20 0.0800

9.29 Others Sub Total 1258 4556.40 1258 4556.40 901 4270.80 901 4270.80

Total 1258 4556.40 1258 4556.40 901 4270.80 901 4270.80Total (New+Recurring) 1258 4556.40 1258 4556.40 901 4270.80 901 4270.80

10 Training(a) Teachers

10.01 Refresher In-service Teachers' Training at BRC level and above- 10 days 0.0200 1362 27.24 1362 27.24

0.01002869 28.86 2869 28.86

10.02 One day monthly cluster level meetings for 10 months for all teachers at CRC level - 10 days 0.0050 1362 6.81 1362 6.81 0.0050 2869 14.35 2869 14.35

10.03 Induction Training for Newly Recruited Teachers- 30 days 0.0600 0.0600

10.04 Training of untrained Teachers to acquire professional qualifications over a two year period. 0.0600

0.0600(b) Head Teachers

10.05 Referesher residential in-service for 10 days at BRC level and above 0.0200

0.0200(c) Resource Persons

10.06Refresher Residential Training for all Resource Persons,Master Trainers, BRC & CRC faculty and Coordinators for 10 days

0.0200 120 2.40 120 2.400.0100

51 0.51 51 0.51

Page 94: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: USNagarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Sub Total 2844 36.45 2844 36.45 5789 43.71 5789 43.71

11 Academic Support through Block Resource Centre/ URC

11.01 Salary of Faculty and Staff(a) 6 Resource Persons at BRC for subject specific training (Regular) 0.5200 7 43.68 7 43.68

0.52007 43.68 7 43.68

(b) 2 RPs for CWSN 0.1200 27 38.88 27 38.88 0.1200 14 20.16 14 20.16(c) 1 MIS Coordinator 0.1500 7 12.60 7 12.60 0.1500 7 12.60 7 12.60(d) 1 Datra Entry Operator 0.1200 7 10.08 7 10.08 0.1200 7 10.08 7 10.08(e) 1 Accountant-cum-support staff for every 50 schools 0.1200 22 31.68 22 31.68 0.1200 22 31.68 22 31.68

11.02 Furniture Grant 1.0000 1.000011.03 Replacement of furniture (Once in 5 years) 1.0000 1.000011.04 Contingency Grant 0.5000 7 3.50 7 3.50 0.5000 7 3.50 7 3.5011.05 Meeting, TA 0.3000 7 2.10 7 2.10 0.3000 7 2.10 7 2.1011.06 TLM Grant 0.1000 0.100011.07 Maintenance Grant 0.1000 7 0.70 7 0.70 0.1000

Sub Total 91 143.22 91 143.22 71 123.80 71 123.8012 Academic Support through Cluster Resource Centres

12.01 Salary of Cluster Resource Persons (on an average of one Resource Person per 18 schools in a block) (Regular) 0.5200 33 205.92 33 205.92

0.520033 205.92 33 205.92

12.03 Furniture Grant 0.1000 0.100012.04 Replacement of furniture (once in 5 years) 0.1000 0.100012.05 Contingency Grant 0.1000 65 6.50 65 6.50 0.1000 65 6.50 65 6.5012.06 Meeting, TA 0.1200 65 7.80 65 7.80 0.1200 65 7.80 65 7.8012.07 TLM Grant 0.0300 0.030012.08 Maintenance Grant 0.0200 65 1.30 65 1.30 0.0200

Sub Total 228 221.52 228 221.52 163 220.22 163 220.2213 Computer Aided Education in UPS under Innovation

13.01 Computer Aided Education in upper primary schools 50.0000 1 50.00 1 50.00 50.0000Sub Total 1 50.00 1 50.00

14 Libraries in Schools(a) Primary 0.0300 0.0300(b) Upper Primary 0.1000 0.1000

Sub Total IV ANNUAL GRANTS15 Teachers' Grant

15.01 Primary 0.0050 2475 12.38 2475 12.38 0.005015.02 Upper Primary 0.0050 1416 7.08 1416 7.08 0.0050

Sub Total 3891 19.46 3891 19.4616 School Grant

16.01 Primary 0.0500 825 41.25 825 41.25 0.0500 825 41.25 825 41.2516.02 Upper Primary 0.0700 402 28.14 402 28.14 0.0700 402 28.14 402 28.14

Sub Total 1227 69.39 1227 69.39 1227 69.39 1227 69.3917 Research, Evaluation, Monitoring & Supervision

17.01 REMS activities 0.0095 1189 11.30 1189 11.30 0.0039 1189 4.67 1189 4.67Sub Total 1189 11.30 1189 11.30 1189 4.67 1189 4.67

18 Maintenance Grant18.01 Maintenance Grant ( PS & UPS) 1090 81.75 1090 81.75 1090 81.75 1090 81.75

Sub Total 1090 81.75 1090 81.75 1090 81.75 1090 81.75

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN 19.01 Provision for Inclusive Education 0.0300 2803 84.09 2803 84.09 0.0190 2276 43.24 2276 43.24

Sub Total 2803 84.09 2803 84.09 2276 43.24 2276 43.2420 Innovation Head up to Rs. 50 lakh per district

20.01 Girls Education 1 13.92 1 13.9220.02 ECCE 1 11.63 1 11.6320.03 Intervention for SC / ST children

20.04 Community based activities dealing with Post traumatic stress disorder

20.05 Intervention for Minority Community children 1 10.14 1 10.1420.06 Intervention for Urban Deprived children 465 13.95 465 13.95 465 13.95 465 13.95

Sub Total 468 49.64 468 49.64 465 13.95 465 13.9521 SMC/PRI Training

21.01 Residential (3 days) 0.0060 0.006021.02 Non-residential (3 days) 0.0030 6642 19.93 6642 19.93 0.0030 6642 19.93 6642 19.9321.03 Local Authority Members (3 days residential) 0.0060 0.0060

Sub Total 6642 19.93 6642 19.93 6642 19.93 6642 19.93V SCHOOL INFRASTRUCTURE 22 Civil Works Construction

22.01 BRC /URC22.02 CRC22.03 New Primary School (Hill) 20.4500 20.450022.04 New Primary School (Plain) 19.2500 19.250022.05 New Upper Primary (Hill) 26.6900 26.6900

Page 95: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: USNagarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

22.06 New Upper Primary (Plain) 24.5700 24.570022.06.1 New Upper Primary (Hill) Spill Over (2006-07)

22.07 Reconstruction of completely damaged schools in natural calamity (Primary) 10.5000 11.18 11.18

22.08 Reconstruction of completely damaged schools in natural calamity (Upper Primary) 16.5000

16.500022.09 Building Less (Pry) Hill 20.4500 20.4500

Building Less (Pry) Plain 19.2500 19.250022.10 Building Less (UP) Hill 26.6900 26.6900

Building Less (UP) Plain 24.5700 24.570022.11 Dilapidated Building (Pry) Hill 12.8600 12.8600

Dilapidated Building (Pry) Plain 11.4100 5 57.05 5 57.05 11.410022.12 Dilapidated Building (UP) Hill 17.4200 17.4200

Dilapidated Building (UP) Plain 14.8200 1 14.82 1 14.82 14.820022.13 Additional Class Room (Rural)22.14 Additional Class Room (Hill) 5.7900 5.790022.15 Additional Class Room (Plain) 167 213.76 4.8300 56 270.48 223 484.24 27 34.56 4.8300 25 120.75 25 155.3122.16 Toilet/Urinals (for urban areas only)22.17 Separate Girls Toilet Hill 2.1400 2.1400

Separate Girls Toilet Plain 1.7600 71 124.96 71 124.96 1.7600 71 124.96 71 124.9622.18 CWSN friendly toilets Hill 2.1400 2.1400

CWSN friendly toilets Plain 1.7600 1.760022.19 Drinking Water Facility22.20 Boundary Wall 300 448.57 300 448.5722.21 Electrification 0.3000 0.3000

22.22 Office-cum-store-cum-Head Teacher's room (Primary) Hill 7.30007.3000

Office-cum-store-cum-Head Teacher's room (Primary) Plain 34 47.04 6.3200 34 47.04 7 10.086.3200

10.08

22.23 Office-cum-store-cum-Head Teacher's room (Upper Primary) Hill 7.3000

7.3000Office-cum-store-cum-Head Teacher's room (Upper Primary) Plain 5 4.80 6.3200 5 4.80 1 0.96

6.32000.96

22.24 Augumentation of training facility in BRC (one time)22.25 Child friendly Elements 0.3000 0.300022.26 Ramps with Handrails 0.1500 0.150022.27 Handrails in existing ramps22.28 Whole School Development 22.29 Retro-fitting and repairs

Residential Schools/hostels for specific category of children(a) Construction of Building including boundary wall, Water and sanitation facilities, electric installation(b) Construction of residential hostel(c) Refurbishing unused old buildings

22.31 Construction of Hostel in existing Govt UPS22.32 Furniture for Govt. UPS (per child)23.33 Major Repairs to partially damaged to schools 30 72.44 30 72.4423.34 Major Repairs for Upper Primary School 5 18.25 5 18.2523.35 Others

Sub Total 506 714.17 168 558.00 674 1272.17 35 45.60 96 256.89 96 302.49VI PROJECT MANAGEMENT COST23 Management

23.01 Management up to 3.5%(a) Project Management and MIS 1 175.10 1 175.10 68.51 68.51(b) Training of Educational Administrators(c) School Mapping and Social Mapping

Sub Total 1 175.10 1 175.10 68.51 68.5123.02 Learning Enhancement Prog. (LEP) (up to 2%) 1 109.37 1 109.37 0.00005 34421 1.72 34421 1.7223.03 Community Mobilization activities (up to 0.5%) 1 14.90 1 14.90 10.96 10.96

Sub Total 2 124.27 2 124.27 34421 12.68 34421 12.68Total of SSA (District) 0.40 506 714.17 237061 6870.96 237567 7585.53 35 45.60 269488 5871.54 269488 5917.14

24 STATE COMPONENT24.01 Management & MIS 524.51 524.5124.02 REMS 0.0055 0.005524.03 SIEMAT

Sub Total 524.51 524.51STATE SSA TOTAL 0.40 506 714.17 237061 6870.96 237567 7585.53 35 45.60 269488 6396.05 269488 6441.65

25 KGBV Financial Provisions (provide separate costing sheets for different Models)

Non-recurring (one time grant)/ cctv & other

25.01 Construction of Building (New) Hill 80.1500 80.1500Construction of Building KGBV sanctioned in 2004-05

25.02 Construction of Building (New) Plain 69.1600 69.1600

22.3

Page 96: Uttarakhandssa.uk.gov.in/files/COSTING.pdf · SPECIAL FOCUS DISTRICTS BUDGET ALLOCATION -2014-15 (UTTARAKHAND) (Rs. in lakh) Scheduled Tribes (25% and above) Scheduled Castes (25%

Name of the District: USNagarCosting Sheets for AWP&B 2014-15 - SSA-RTE

(Rs. in lakh)

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Unit

Cost Phy. Fin. Phy. Fin.

Outlay Proposed for 2014-15 Outlay Recommended for 2014-15

S.No. ActivityFresh Spill OverSpill Over Deferred liability of Total Deferred liability of Total Fresh

Variation of construction cost (2006-07)Construction of building

25.03 Boundary Wall (Spill over only) (New)Boudary Wall 1.5000 1.5000

25.04 Boring/Hanpump (Spill over only)Boring/Hanpump 1.0000 1.0000

25.05 Electricity/water charges (Spill over only) 0.2000 0.2000Electricity/water charges (Spill over only) 0.2000 0.2000Boundary wall/Boring/Electricity (Sanctioned in 2006-07 and 2008-09)

25.06 Furniture / Equipment (including kitchen equipment) 25.07 TLM and equipment including library books (New)

25.08 Bedding (New) (Infrastructure, CCTv, Guard cum Visitor Room with Attached Toilet) 10.0000 2 20.00 2 20.00

10.000025.09 Replacement of bedding (once in 3 years) 0.3750 1 0.38 1 0.38 0.3750 1 0.38 0 0.38

Sub Total Non-recurring 3 20.38 3 20.38 1 0.38 0 0.38Recurring

25.10 Maintenance per girl Per month @ Rs.1500/- 9.0000 2 18.00 2 18.00 9.0000 2 18.00 2 18.0025.11 Stipend per girl per month @ Rs.50/- 0.6000 2 1.20 2 1.20 0.6000 2 1.20 2 1.20

25.12 Supplementary TLM, Stationery and other educational material 0.5000 2 1.00 2 1.00

0.50002 1.00 2 1.00

25.13 Examination Fee 0.0100 0.010025.14 Salaries

i Warden @ 25000/- 3.0000 2 6.00 2 6.00 3.0000 2 6.00 2 6.00

ii Urdu Teacher (only for muslim population blocks above 20%) @ 12000/- 1.4400

1.4400iii Part time teachers @5000/- 1.8000 2 3.60 2 3.60 1.8000 2 3.60 2 3.60iv Accountant @10000/- 1.2000 2 2.40 2 2.40 1.2000 2 2.40 2 2.40v Support Staff @5000/- 1.2000 2 2.40 2 2.40 1.2000 2 2.40 2 2.40

vi. Head Cook @6000/- and 1 Asst Cook @ Rs. 4500/- per month per cook 1.2600 2 2.52 2 2.52

1.26002 2.52 2 2.52

25.15 Vocational training / specific skill training 0.5000 2 1.00 2 1.00 0.5000 2 1.00 2 1.0025.16 Electricity / water charges 0.5000 2 1.00 2 1.00 0.5000 2 1.00 2 1.0025.17 Medical care/contingencies @ Rs.750/- per girl. 0.6250 2 1.25 2 1.25 0.6250 2 1.25 2 1.2525.18 Maintenance 0.3750 2 0.75 2 0.75 0.3750 2 0.75 2 0.7525.19 Miscellaneous 0.3750 2 0.75 2 0.75 0.3750 2 0.75 2 0.7525.20 Preparatory camps 0.1500 2 0.30 2 0.30 0.1500 2 0.30 2 0.3025.21 P.T.A / school functions 0.1500 2 0.30 2 0.30 0.1500 2 0.30 2 0.3025.22 Provision of Rent (8 months)25.23 Capacity Building 0.2500 2 0.50 2 0.50 0.2500 2 0.50 2 0.5025.24 Physical/Self Defence training @ Rs. 200/- per girl 0.1000 2 0.20 2 0.20 0.1000 2 0.20 2 0.20

Sub Total 34 43.17 34 43.17 34 43.17 34 43.17Total 37 63.55 37 63.55 35 43.55 34 43.55Grand Total - (SSA, NPGEL & KGBV) 0.40 506 714.17 237098 6934.51 237604 7649.08 35 45.60 269523 6439.60 269522 6485.20