spec pro ghambat sma brouchere april 2016
TRANSCRIPT
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
1/146
N ISO 9001-2000 CERTIFIED COMP NY
OR
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
2/146
PROUDLY AN ISO 9001:2000
CERTI IED COMPANY
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
3/146
or The K ind Attention Of:
Mr. Zafar Sheikh
Mr. Abdaal Rafique
SPEC Energy DMCC Pakistan
H.No. 56, Main Nazim Ud-Din Road,Sector -7/4, Islamabad, Pakistan.
Tel : +92 (51) 2611545ax : +92 (51) 2611545
Email: [email protected]
Web: www.spec.com.pk
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
4/146
COMPANIES PRO ILEIRMS NAME : M/s S.M.Asghar (Pvt) Limited
n ISO 9001:2000 Certified Comp
COMPLETE ADDRESS : 908-910, 9 th loor, ChapalPlaza, Hasrat Mohani RoadOff I.I.Chundrigar RoadKarachi.
CORPORATE STATUS O IRM : PRIVATE LIMITED.
TELEPHONE NO : 00+ 92+21+32468091 -5
AX NO : 00+92+21+32468090.
IRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).
DATE O REGISTRATION WITH : 30-03-1980.CUSTOMS
E- MAIL ADDRESS : [email protected]
E- MAIL ADDRESS : [email protected]
Web- Page : http://www.smasghar.com.pk
DATE O ISSUE O LICENCE : 30-03-1980.
NUMBER O STA EMPLOYED : 20.
YEAR O ESTABLISHMENT : 1980.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
5/146
SYED KHALID JAMAL CHIEF EXECUTIVE
SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION
SYED MOHAMMAD ALI KHALID GENNERAL MANAGER
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
6/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
7/146
PEOPLE BEHIND THE COMPANY SYED KHALID JAMAL : CHIEF EXECUTIVE.SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIVSYED MOHAMMAD ALI KHALID : GENERAL MANAGER
MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.
MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION
MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.
S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.MOHD SALEEM : ASST PORT OPERATIONS.
MOHAMMAD TARIQ : ASST. PORT OPERATIONS
MOHD JAVED : ASST PORT OPERATIONS.
QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.
SALEEM NOOR : ASST. AIRPORT OPERATIONS
AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANYSAEED KHAN : HEAD OF COMPUTER DIVISION
DILSHAD A. SIDDIQUI. : MANAGER FINANCE
ASIF KHAN : ASST. MANAGER FINANCE
ATIA FASIAL : ASST. OFFICE CO-ORDINATOR
MOHAMMAD SAMI : INCHARGE GD PREPARATION (BY AIR)
ASAD ABBAS : ASST.BILLINGS & ACCOUNTS
MOHSIN KHAN : FIELD OFFICER.
SADDAM HUSSAIN : FIELD OFFICER.
SULEMAN : OFFICE PEON.USMAN GHANI : OFFICE PEON.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
8/146
SECTION 1 : INTRODUCTION
SECTION 2 : SCOPE OF WORK
SECTION 3 : DOCUMENTATIONREQUIREMENTS
SECTION 4 : PROJECT REFERENCES
SECTION 5 : PICUTRE GALLARY
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
9/146
We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more orless US $ 1.2 Billion Dollars.
You will appreciates that in all of the Projects mentionedbelow we have taken various Exemptions & benefits ofvarious SRO’s from Customer to Customer& on Project to Project Basis.
With our background experience, M/s. S.M.Asghar (Pvt) Limited has successfully completed all the major & PrestigiousProjects of National Importance as well asInternational Importance.
We on merit got the benefit of various ConcessionarySRO’s & Exemptions to our valued Customer to theirEntire satisfaction & without any problems and difficulty.
Our team of professionals sits with the Customer priorto the start of the Project/Projects & developed systemsand a general flexibility of approach tailored to ourClients most Complex of requirements.
We believe that our Professional approach to ourClient is unparalleled by any competitors.
Few of the recent Projects & Customer Referencesare given below, for whom we have claimed the various SRO’s& Exemptions to our valued Customer to their entiresatisfaction.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
10/146
MOL MAKORI GAS FIELD SRO: 678(I)/2004, DT: 07-08-2004
GHAMBAT SOUTH GAS PROCESSING FACILITY (GPF II)PROJECT OF PAKISTAN PETROLEUM LIMITED (PPL)
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Ravi SRO: 678(I)/2004, DT: 07-08-2004
SHELL GASSRO: 678(I)/2004, DT: 07-08-2004
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
11/146
SHV ENERGY PAKISTAN Various Equipments & Material Including Break Bulk LPG Mixture
SRO: 678(I)/2004, DT: 07-08-2004
Expansion of Plant: RAVI GAS SRO: 678(I)/2004, DT: 07-08-2004
WEATHERFORD DRILLINGSRO: 678(I)/2004, DT: 07-08-2004
Petrosin Engineering
(One of the Largest Private Sector Project for OGDCL US $ 135 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
12/146
TRANSASIA REFINERY LTD (Re-Location) (One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
INDUS REFINERY LTD (Re-Location) (Another Largest Private Sector Project US $ 650 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESALINATION & POWER PROJECT” at DHA Karachi (Total Cost of the Project US $ 160 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi EXPANSION PROJECT & NEW GANTRY CRANE
(Total Cost of the Project US $ 400 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
13/146
MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006
SATPARA HYDRO POWER DAM PROJECT (The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
14/146
GOMAL ZAM HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I (The Project Cost US $ 45 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
15/146
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PROGAS LPG STORAGE & HANDLING TERMIANAL (Private Sector Project US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (The Second Expansion Phase Project US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PETROSIN ENGINEERING (Pvt) LTDQADIRPUR 600 MMSOFD EXPANSION PROJECT
(The Project Cost US $ 6 Million Dollars)SRO: 678(I)/2004, DT: 07-08-2004
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
16/146
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR
BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD(The Project Cost US $ 14 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT
PROGRAM FOR ERRA(The Project Cost US $ 300 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAKISTAN LIMITEDFUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
(The Project Cost US $ 20 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
17/146
ALSTOM PAKISTAN LIMITEDZHORLU WIND POWER ( Heavy Transformers)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.( The Project Cost US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
18/146
DESCON ENGINEERINGSETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERINGSETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
19/146
VARIOUS PORTS AT KARACHI
Qasim International Container Limited (QICT) Karachi Port Trust Head office (KPT)
Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
20/146
S.M.ASGHAR (PVT) LIMITED
908-910, 9 th loor, Chapal Plaza, Hasrat MohaniRoad, Off I.I Chundrigar Road, KARACH I
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
21/146
We have a pleasure to give a brief introduction of our CompanyM/s. S.M.Asghar (Pvt) Limited , a name famous for its credibility,reliability & commitment in this part of world.
We are proudly an ISO 9001-2000 Certified Company.
We are among the few & pioneer company who got theISO Certification in Custom Clearance in Pakistan.
With our background experience, M/s. S.M.Asghar (Pvt) Limited has been able to developed systems and a general flexibility ofapproach tailored & personalized solutions to our Clients most ComplexRequirements that we believe is unparalleled by any competitors.
Most important our customers are able to deal with an InternationalNetwork who can arrange the movement and supervisionof cargo from Europe, and beyond, whilst they onlyinstruct one control office. This International Strengthand wealth of experience combined with a genuinely personalapproach we feel makes us a formidable contender.
Our Credentials our Enthusiasm and our Track Record speak forthemselves.
For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited have developed & specializes and simultaneously Transformitself into a PROJECT CLEARANCE SPECIALIST .
If one can give a brief look at the Pakistan’s Most Advanced& the Important Industrial Estate PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor forM/s. S.M.Asghar (Pvt) Limited to perform the Complete CustomClearance & the Logistics Support in the form of Local Transportation tothese Prestigious Projects.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
22/146
Among The Prestigious Projects At
Port Bin Qasim ew Are Listed below
PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM(The Contractor for PARCO Project Cost US $ 300 Million Dollars)
ICI PTA T-11(The Largest Private Sector Project US $ 480 Million Dollars)
Engro Vopak Terminal Ltd (VCM Tank Farm)
Engro Vopak Terminal Ltd (MEG Tank Farm)
Engro Vopak Terminal Ltd (LPG Tank Farm)
Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm) (Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)
PROGAS LPG STORAGE & HANDLING TERMINAL(Private Sector Project US $ 50 Million Dollars)
INDUS REFINERY LIMITED(Another Largest Private Sector Project US $ 750 Million Dollars)
TRANASIA REFINERY LIMITED(Another Largest Private Sector Project US $ 800 Million Dollars)
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES(The Second Expansion Phase Project US $ 30 Million Dollars)
CHINA HARBOR ENGINEERING(The Contractor for EVTL for the EVTL JETTY Private Sector Project US$ 4 Million Dollars)
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
23/146
ENGRO ASAHI POLYEMR & CHEMICALS(Another One of the Largest Private Sector Project US $ 80 Million Dollars)
FAUJI FERTILIZER BIN QASIM LTD(Handling of Break Bulk Phosphoric Acid)
LPG BREAK BULK SHIPMENT(Handling of 90% of Pakistan Break Bulk LPG Shipments at EVTL& SSGC Terminal )
VCM BREAK BULK SHIPMENT(Handling of 100% of Break Bulk VCM Shipments at EVTL)
ETHYLENE BREAK BULK SHIPMENT(Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)
K ARACHI I NTERNATIONAL C ONTAINER T ERMINAL P HASE II E XPANSION PROJECT Total Cost of the Project US $ 400 Million Dollars
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
24/146
Hydro Power Sector
The Government of Pakistan since last 8 Years initiated fewHydropower Power & Dam Projects to overcome the Power Break downCrisis.
Among these Projects of National Importance includes:-
MIRANI HYDRO POWER DAM PROJECT(The Project Cost US $ 80 Million Dollars)
SATPARA HYDRO POWER DAM PROJECT(The Project Cost US $ 30 Million Dollars)
MANGLA RAISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
GOMAL ZAM HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars )
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
ALAI KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
We have privilege to be associated in all the above Hydro PowerProjects.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
25/146
Beside the Hydropower Projects, the Government also encourages theother areas such as the Sea to generate Electricity, beside the supplyof quality water to the people. Among them the DHA Desalination &Power Project was the only to be setup by the Private Sector.
DHA DESALINATION & POWER PROJECT(Total Cost of the Project US $ 160 Million Dollars)
This is the first ever desalination plant in history of Pakistan. Ithas a capacity to Desal, 3 MGD (Million Gallons Per Day)of Water, beside to Produce & Generate Electricity of aCapacity 95 MW
Beside the Hydro Power Project initiated by the Governmentalso focused on the another very important Sector which wasOIL & GAS and LPG (Liquid Petroleum Gas Project)
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I(The Project Cost US $ 80 Million Dollars)
M/s. S.M.Asghar (Pvt) Limited was awarded by thePresident of Pakistan for successfully and timely performance inClearance and Logistics of JJVL Phase I Project
JJVL is Pakistan’s single largest producer of LiquefiedPetroleum Gas. Situated in Dei Shah Bukhari, DistrictHyderabad, JJVL’s Extraction Plant has a daily output of about500 metric tonnes of LPG and 150 metric tonnes of NGL/Naphtha.
JJVL accounts for about one-third of the total local LPG production of thecountry.JJVL processes about 200-220 million cubic feet of natural gas condensateper day piped from British Petroleum's Badin Gas Field through the LiquidHandling Facility of Sui Southern Gas Co Ltd at Jamshoro
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
26/146
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)
M/s S.M.Asghar (Pvt Limited also have a privilege of Handling02 chartered flights carrying main booster pumps weighing over 100 Tons by
Air for PARCO White Oil Pipeline Project.
We also have a privilege of handling one of the Heaviest and Length WisePiece in History of Pakistan which Weights 265 M/tons and Length
Approx.76 Meters.
R EQUIRED F OR C USTOM C LEARANCE
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
27/146
SCOPE OF WORK
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
28/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
29/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
30/146
OBTAINING THE DELIVERY ORDER:
We shall complete all the formalities required by the relative Shipping Agent / MainCarrier Agent/ relevant Port Authority and will obtain the Delivery Order from theShipping Company/ OR their Agent against the presentation/ submission of Original Bill ofLading.The delivery Order's are generally issued after filing of IGM in order to ascertain thegoods have not been Transshipped .
NECESSARY ASSISTANCE:
We shall provide all necessary Assistance andConsultancy Services Concerning Custom Clearance tothe Importer / Representatives of the Importer.
AIR CARGOES:
We shall also perform the Works Related to the Air Cargo As per request ofImporter / Representatives of the Importer…
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
31/146
DELIVERY AT / TO THE PLANT SITE
We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, LowBed OR as per the requirement & Nature of Cargo to the Warehouse or theopen storage area as per the instruction of Importer / Representatives ofthe Importer.
CUSTOM DUTIES TAXESSRO’s AND NECESSARY PERMITS
All the Plant, Machinery, Equipment and Parts/Spares which are importedinto Pakistan shall be subject to Custom Duties and Taxes Prevailing at thetime of Import.
The Duties and Taxes concerns with the Custom Authorities as perPakistan Custom Tariff includes:-
Custom Duty/Duties From 5% Minimum To 20% Maximum
Sales Tax/Taxes 17 %
Income Tax/Taxes 5.5%
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
32/146
The Taxes Concerns with the Port Authorities:-
Port Wharfage
Port Demurrage
Weighment Charges (If any) (for Products like Pipes of Iron/Steel/Coil-Bar)
There Are Two Major Ports in Karachi Namely as below:
Karachi Port
Port Bin Qasim
Karachi Port is Further Divided into 02 Parts, namely;
1) EAST WHARF:
a) Pakistan Container Terminal (PICT) Private Terminal
b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.
c) Ghass Bunder, For Launches, Steamer and Boats
2) WEST WHARF:
a) Karachi International Container Terminal Ltd (KICT)
b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24 And 25
c) Berth Number 25 is for Heavy Lift Cargo that has On Shore HeavyCrane for capacity 50 M/Tons.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
33/146
For Containerized Cargo the various Yards/Ports are charging differentHandling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking
Charges/Yard Storage Charges.
Please note that for all the above mentioned charges the relevantPort /Yard will issue Receipts for the relevant charges.
Excise Taxes @ 1.0-1.05% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing atthe time of Import shall be Paid by the I m p o r t e r immediatelybefore the Clearance of the Consignments from the Port.
Further the completion of GD’s (Bill of Entry) and other Custom formalitiesare subject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.
Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /Bill of Lading OR any other relevant documents submitted by the Importer ,will may render in delay to clear the consignment.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
34/146
SUBMITTAL O SHIPPING GUARANTEE
BOND IN ABSENCE O ORIGINAL BILL O LADING
If there is a delay in the arrival of the Original Bill of Lading, can cause a
delay in getting the Goods/ Cargo release of the from the Port
premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading
would be therefore required by the shipping company in order to issue the
Delivery Order. It shall be discussed and settle before arrival of the vessel.
We will provide all necessary assistance and advice for the Shipping
Guarantee to the Importer / Representatives of the Importer.
During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer or
Arrange a joint survey as soon as possible. Marine/Transit insurance
Shall be arranged by Importer / Representatives of the Importer ,from Place of Origin up to the Plant Site
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
35/146
METHOD STATEMENT Newly Implemented Web-BasedOne Customs WeBoc) SYSTEM
At the present there are 02 procedures for Custom Clearance:-
Under this newly implemented procedure if the Vessel is berthed
at any of the below Ports i.e.
Karachi Port Trust (KPT)Karachi International Container Terminal (KICTL)Pakistan International Container Terminal (PICTL)Qasim International Container Terminal (QICTL Port Qasim)Air Freight Unit (AFU)FCL/LCL/Loose/Break Bulk
Goods Declaration (GD) is prepared on Line Under the New WeBOC System (Via Electronic Mail Data Transfer System).
The G.D (Goods Declaration) is prepared in accordance with thedeclaration of the Importer and the documents provided by the Importeri.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter theG.D is submitted to the Custom for Assessment on Line.
WEB BASED ONE CUSTOM WeBOC
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
36/146
* The amount of Custom Duties & Taxes and the Sindh Infra StructureFee (CESS) has to be paid in advance as per the Importer declaration.
* If the assessment by the WeBOC is done as per the declaration ofImporter, than the G.D is processed and the Importer can take thedelivery of the goods, after the payment of all the necessary Port Dues& Excise Tax.
In case the goods have been processed under WeBOC SYSTEM does notaccept the Importer Declaration, than the Importer may asked for additionalDuties & Taxes or If the Importer wants to Contest with the views of theCustoms than they can go for appeal & meet the Senior Custom Officialsalong with the relevant Documents & Proof to justify their claims.
The Custom Authorities may differ in three basic ways:
1) Disagreement in the PCT OR HS Code Classification.
2) Not Extending the Benefit of the Claimed Benefit/SRO.
3) Disagreement with the Valuation.
The GD is Prepared and filed Online (Via Electronic Filling),as per declaration of the Importer.
If Customs satisfy with all the 03 criteria’s mentioned above i.e.
PCTSROValuation
The GD is than completed by the Concerned Group. The Importer hasto than pay the Applicable Duties & Taxes after that the GD isforwarded to the Port side for Examination after which the Importer can
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
37/146
take the Delivery of the goods after the payment necessary PortDues.
* If Customs do not satisfy with all the 03 Criteria’s mentioned abovei.e.
PCTSROValuation
Than the GD is forwarded to the Port Side for Physical Examination to
check the goods are in conformity to the declaration of the Importer &under the light of Examination Report GD will be completed by theconcerned Group in the Custom House.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
38/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
39/146
The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Sea Port.
I Original Invoice showing complete description of the goods with valueof the each individual item
II Detail Packing List showing complete Description, Quantity GrossWt, Net Wt, Ullage Certificate.
III Original Bill of Lading duly endorsed at the backside in our Favor.
IV Certificate of Origin
V All Govt. Sanctions, Authorization from Government Agencies if any
VII Original Letter of Credit
VIII Sales Tax Registration Certificate
IX Import Registration
X National Tax No Certificate Copy
XI WeBOC Registration (User ID & Pass Word)
Any other document that may be requested by the Custom to verify thedeclaration of Importer
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
40/146
The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Air Port.
I Original Invoice showing complete description of the goods withvalue of the each individual item
II Detail Packing List showing complete Description, Quantity, Numbersof Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter
III Original Airway Bill
IV Certificate of Origin
V Complete Catalogue/Drawing for Machinery & Equipment.
VI All Govt. Sanctions, Authorization from Government Agenciesif any
VII Original Letter of Credit
VII WeBOC Registration (User ID & Pass Word)
Any other document that may be requested by the Custom to verify thedeclaration of Importer
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
41/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
42/146
PREVIOUSPROJECTSHANDLED
.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
43/146
CLIENTS PROJECTS
* M/S ICI PAKISTAN LTD.C/o TRANSCAR PROJECTS LTD
ICI PTA PROJECT PORT QASIM
* M/S ENGRO PAKTANK TERMINAL.CHEMICAL STORAGE TERMINAL
* M/S NOEL LGA (GERMANY)LPG EXPANSION & MARKETING
* M/S ENGRO ASAHI POLYMER & CHEMICALS.
ENGRO PVC PLANT PROJECT
* M/s TEKSER INSAAT SAANAYI
CHASMA RIGHT BANK C-65
* M/S MC. (MARINE LOADING ARM)
OTCO OIL TERMINAL BIN QASIM
* M/S SECA PAKISTAN.
KHI - HYDERABAD BY PASS
* M/S TRANSCAR PROJECTS LTD.
DHABEJI PUMPING STATION W-19
* M/S TRANSCAR PROJECTS LTD.
NORTH EAST KARACHI STATION W-18
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
44/146
CLIENTS PROJECTS
* M/S CHINA GUANGXI CORPORATION
PAT EEDER CANAL PROJECT
* M/S CHINA DONG ANG CORPORATION
SEWERAGE TREATMENT PROJECT
* M/S CHINA PETROLEUMKORANGI SEWERAGE TREATMENT
* M/S CHINA YUNNAN CORPORATIONKPT JINNAH BRIDGE PHASE II
* M/S CHINA NATIONAL ELECTRIC WIRE & CABLES
QUEENS ROAD POWER STATION
* M/S CHINA HARBOR ENGINEERING
JETTY OR ENGRO PAKTANK
* M/S IJM / IGI JOINT VENTURE.
LBOD SANGHAR PROJECTS
* M/S LI E LINE (Pvt) LTD.
DHURNAL LPG GAS EXPANSIONPROJECT
* M/S ENGRO PAKTANK TERMINAL.
LPG TERMINAL AT BIN QASIM
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
45/146
CLIENTS PROJECTS
* M/S ENGRO PAKTANK TERMINAL
VCM TERMINAL HANDLING PROJECT
* M/S HYUNDAI CORP KHI O ICE.
K.E.S.C HIGH TENSION CABLE PROJ.
* M/S HYDERABAD DEVELOPMENT AUTHORITY.
MACHINERY UNDER SPANISH GRANT
* M/S CHINA YUNNAN CORPORATION.
MALDIVE SPARLIAMENT BUILDING
* M/S CHINA NATIONAL CHEM ENGG CORP.
SUB CONTRACTOR OR DONG ANGS2 PROJECT
* ENGRO ASAHI TRADING (PVT) LTD
EXPORT O PVC WORLD WIDE
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
46/146
CLIENTS PROJECTS
* M/S DESCON ENGINEERING WORKED OR NUMBER O PROJECTS
1) EPTL OR LPG TERMINAL
2) EPTL OR VCM PROJECT
3) EVTL OR MEG PROJECT
4) OR PARCO MID COUNTRY RE INERY
5) LASMO OIL BHIT GAS IELD PROJECTUS $ 6.5 Million Dollars
* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD
HUB & PIPRI PROJECT UNDED BY ADB£ 15.8 Million Sterling
* M/S HYUNDAI HIDCO HAKAS JV
EXPORT O HEAVY DREDGING MACHINERYUS $ 2.5 Million Dollars
* M/S AL - NOOR SUGAR MILLS LTD
MD BOARD IBRE BUILDING BOARD PLANT(LASSANI)
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
47/146
CLIENTS PROJECTS
* PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.
US $ 4.5 Million Dollars* M/S ENGRO PAKTANK TERMINAL.
CHEMICAL STORAGE TERMINALUS $ 5.5 Million Dollars
* M/S SHV ENERGY PAKISTAN
GAS EXPANSION PROJECTUS & 1.5 Million Dollars
* M/S TEKSER INSAAT SANAYI VE TICCARRET
CHASMA RIGHT BANK CANNAL PROJECT C-65 US $ 260 Million Dollars
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
48/146
BREAK BULKLIQUID CHEMICALS &
PETROCHEMICALS HANDLINGPROJECTS IN HAND
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
49/146
* SHV ENERGY LIMITEDLIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* JAMSHORO JOINT VENTURE LIMITEDLIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* AFTAB TRADERS
LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* CRESS LPG LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* RELIANCE CONSULTANCYLIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* ENGRO POLYMER & CHEMICAL LIMITED
VINYL CHLORIDE (VCM)IN BULK OF VARIOUS PARCELS
EDC IN BULK OF VARIOUS PARCELS
CAUSTIC SODA IN BULK
ETHELYNEIN BULK OF VARIOUS PARCELS
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
50/146
UNDER GOINGPROJECTS
IN HAND
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
51/146
* M/S ENGRO OODS LIMITED
1) LAUNCHING & SETTING UP A COMPLETE STATE O AN ARTO O'MORE ICE CREAM PLANT
2) BRAND NEW STATE O AN ART ENGRO RICE &PAR BOILING PLANT
3) EXPANSION O EXISTING DAIRY MILK PLANT.(OLPER'S MILK)
* M/s. OUNDATION ENERGY LIMITED-1
SETTING UP A STATE O AN ART WIND POWER PROJECT OA CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE
* M/s. OUNDATION ENERGY LIMITED-II
SETTING UP A STATE O AN ART WIND POWER PROJECT OA CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
52/146
* M/S. PAK ARAB RE INERY LIMITED
SETTING UP A COMPLETE BRAND NEW ASPHALT BUILTUNIT (ABU UNIT)
* ENGRO POLYMER TRADING LIMITED
EXPORT O PVC RESIN (SABZ BRAND) WORLD WIDEAPPROXIMATE EXPORT IN M/TONS 2500 PER MONTH
* M/s. CIVIL AVIATION AUTHORITYSETTING UP A BRAND NEW BENAZIR BHUTTOINTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06RE UEL HYDRANT SYSTEM.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
53/146
KARKEY PAKISTANPOWER SHIP & OIL SUPPLY TANKER
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
54/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
55/146
VARIOUS OTHER PROJECTSO NATIONAL IMPORTANCE
INCLUDING HYDRO, SEWERAGEWATER TREATMENT, DAMS CHEMICAL
INDUSTRY OIL & GAS SECTOR
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
56/146
* M/S CHINA SINOHYDRO CORPORATION
1) GOMAL ZAM DAM HYDRO POWER
2) DUBAR KHAWAR DAM HYDRO POWER
3) KHAN KHAWAR DAM
4) KWSB K-III
* M/S. INDUS RE INERY LIMITED.
HI-TECH 100,000 BPSD OIL RE INERYON RELOCATION BASIS
* M/S. JAMSHORO JOINT VENTURE
LPG EXTRACTION PLANT
* M/S. PETROSIN RAVI ENGINEERING
OIL & GAS PROJECTS LTD.
* M/S. SHELL GAS LPG PAKISTAN LTD
LPG PROJECTS / LPG GAS
* M/S. BI-WATER INTERNATIONAL
KARACHI WATER & SEWERAGEBOARD HUB & PIPRI PUMPINGSTATION PROJECT
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
57/146
* M/S. DESCON ENGINEERING LTD (HYDRO POWER PROJECTS)
1) SATPARA DAM PROJECT
2) MIRANI DAM PROJECT
3) MANGLA RAISING PROJECT
4) TUNSA BARRAGE PROJECT
5) HYDERABAD WATERTREATMENT PROJECT.
* M/S. AUJI ERTILIZER BIN QASIM LTD
BREAK BULK HANDLING OPHOSPHORIC ACID
* M/S. ENGRO ASAHI POLYMER AND CHEMICAL LTD.
V.C.M / MACHINERY &EQUIPMENT / EXPORT
* M/S. DHA COGEN LTD.
DESALINATION / POWERPROJECT
* M/S. BAHRIA TOWN HOUSING & IN RASTRUCTURE P ROJECT
RE-LOCATION O PLANT &MACHINERY OR PRE-
ABRICATING HOUSING
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
58/146
* AREVA T&D PAKISTAN (PVT) LTD.
132 KV GRID STATION ATCREEK CITY, DHA
* KHALID RAU & CO., (PVT) LTD.
IN RASTRUCTURE PROJECTSLAHORE RING ROAD
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
59/146
HYDROPOWER PROJECTS
From our background experience, strength & experiences from
industrial development projects, S.M.Asghar (Pvt) Limited
has rapidly established itself as a key player in infrastructure
projects.
We successfully did the Custom Clearance & In-land
Transportation jobs of large-scale projects like dams, barrages,
highways and housing complexes.
We hold the distinction of being the first ever local company to
do the 07 Major Hydropower Projects Simultaneously of National
Importance in Pakistan
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
60/146
HYDROPOWER
PROJECT Taunsa Barrage RehabilitationAnd Modernization Location: Taunsa Pakistan
Year Of Project March 2006-2007
Cost Of Project US $ 140 Million Dollars
Completion : May 2008
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
61/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
62/146
HYDROPOWERPROJECT MANGLA DAM RAISING
PROJECT LOCATION Mangla
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION
COST OF PROJECT US $ 140 Million Dollars
ExpectedCompletion Date:
September 20 2007
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
63/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
64/146
HYDROPOWERPROJECT. SATPARA DAM
HYDROPOWER PROJECT LOCATION PAKISTAN
NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.
COST OFPROJECT US $ 140 Million Dollars
Completion : March 2007
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
65/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
66/146
Project Name Kachhi Canal ProjectContract # KC-03
Location: Taunsa Barrage – Kot Addu
NATURE O JOB CUSTOM CLEARANCE & INLANDTRANSPORTATION.
COST OPROJECT
US $ 65 MILLION DOLLARS
Completion: January 2009
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
67/146
Project Name GOMAL ZAMHYDROPOWER PROJECT
CLIENT CHINA SIOHYDRO CORPORATION
NATURE OFJOB
CUSTOM CLEARANCE & INLANDTRANSPORTATION.
COST O
PROJECT
US $ 220 MILLION DOLLARS
Completion: 4 YEARS
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
68/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
69/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
70/146
Project Name Duber Khwar
Location:The project located on river Duber Khwar, rightbank tributary of Indus river near Patan in NW Pat a distance 265 Km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLANDTRANSPORTATION.
COST OF PROJECT US$ 109 million
Completion: 4 YEARS
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
71/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
72/146
Location: Allai KhwarHydropower Plant
The Project is located on AllaiKhwar River, Left Tributary ofRiver Indus near Besham inNW P, 245 km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLANDTRANSPORTATION.
COST OF PROJECT US$ 110 million
Completion: 4 YEARS
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
73/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
74/146
Project Name
MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)West of Turbat Town in Makran Div ofBaluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLANDTRANSPORTATION.
COST OFPROJECT
US$ 120 million
Completion: 4 YEARS
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
75/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
76/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
77/146
LPG Storage & Handling acilities
Project Name ENGRO PAKTANKLPG TERMINAL
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLANDTRANSPORTATION.
COST OF PROJECT US$ 10 million
CAPACITY 4,500 METRIC TONES OF LPG
LPG BULLETS 10 LPG bullets
Completion: 1997 -98
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
78/146
Integrated Bulk Liquid ChemicalTerminal Storage & Handling acilities
Project Name
ENGRO PAKTANKVCM TERMINAL Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLANDTRANSPORTATION.
CAPACITY 41,000 CUBIC METER STORAGE FACILITY
SPHERICAL TANK 2 SPHERICAL TANK
Completion: 1997 -98
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
79/146
In the first phase EPTL constructed facilities for the integratedbulk liquid Chemical and Storage Terminal the first phase comprised constructionof 41,000 cubic meter of storage facility the cost of first phase of the Project wasUS $ 60 million the tank farm is situated on reclaimed land in the PQA.
PARAXYLENE ACETIC ACID PHOSPHORIC ACID (HANDLING ONLY)VINYLCHLORIDE MONOMER ACRYLONITRILE LIQUE IED PETROLEUM GAS MONO ETHYLENE GLYCOL
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
80/146
Project Name ENGRO ASAHI POLYMER& CHEMICALS LIMITED
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 100,000 (TPA) PVC MANU ACTURING PLANT
CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD
Completion: 1999-2000
Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint
Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi
Corporation (Japan), each with an 80% and 20% shareholding, respectivelyEAPCL is the only PVC manufacturer in Pakistan with a Capacity
Of 100,000tons per annum (TPA) and its operations are located at Port Qasim
Engro Asahi Polymer & Chemicals Limited
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
81/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
82/146
ICI T11 PTA PlantProject Name ICI PTA T11 PLANTLocation: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 480 million
CLIENT TRANSCAR PROJECTS UK/ OOSTER WHEELER UK
Completion: 1998
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
83/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
84/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
85/146
PARCO Mid Country Refinery (100, 000 BPD)
Project Name PAK ARAB RE INERY COMPANY
Location: MULTAN, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT DESCON ENGINEERING
Completion: 1998
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
86/146
JAMSHORO JOINT VENTURE LIMITEDSINGLE LARGEST LPG EXTRACTION PLANT
Project Name JAMSHORO JOINT VENTURE LIMITED
Location: JAMSHORO, SINDH
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT ASSOCIATED GROUP
Completion: 2005
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
87/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
88/146
-------
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
89/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
90/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
91/146
INDUS RE INERY LIMITEDPAKISTAN SECOND LARGEST RE INERY
Project Name IRL is a 100,000 bpd or 4.95 million metric tons perannum complex fuels refinery. It will be the sixthpetroleum refinery in Pakistan and the country’slargest refinery.
Location: PORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 700 million
CLIENT INDUS RE INERY LIMITED
Completion: UNDER CONSTRUCTION
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
92/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
93/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
94/146
RELOCATION O 100,000 BARRELS CAPACITY RE INERY
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
95/146
PETRO CANADA RE INERY TO PAKISTAN PORT QASIM
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
96/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
97/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
98/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
99/146
Gambat South Gas Processing Facility(GPF-||) Project
ProjectGambat South Gas Processing Facility
PROJECT NATURE50 MMSCFD Gas ProcessingLPG 11 MTPD, Condensate 1050 BPD
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
100/146
TRANSASIA RE INERY LIMITEDPAKISTAN SECOND LARGEST RE INERY
Project Name TRL is a 100,000 bpd or 4.00 million metric tons perannum complex fuels refinery. It will be the state of anArt petroleum refinery in Pakistan and will be one of
the country’s largest refinery.
Location: PORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 700 million
CLIENT TRANSASIA RE INERY LIMITED
Completion: UNDER CONSTRUCTION
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
101/146
TRANASIA REFINERY LIMITED
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
102/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
103/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
104/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
105/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
106/146
WIND POWERPROJECTS
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
107/146
AUJI ERTILIZER ENERGY COMPNAYLIMITED ( CEL) 49.5 MW WINDENERGY PROJECT AT JHAMPIR,
KARACHI
Project Name CEL WIND ENERGY PROJECT O CAPACITY 49.5 MW
Location: JHAMPIR, NEAR THATTA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 110 million
CLIENT DESCON ENGINEERING LIMITED
Completion: ALREADY COMPLETED
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
108/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
109/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
110/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
111/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
112/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
113/146
Project Name ASPHALT BUILT UNIT PROJECT (ABU)OR PARCO
Location: PARCO MID COUNTRY RE INERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 30 Million
Completion: DECEMBER 2012
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
114/146
Project Name 49.5 MW OUNDATION WIND ENERGY-1 PROJECT
Location: JHAMPIR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 Million
Completion: SEPTEMBER 2014
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
115/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
116/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
117/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
118/146
Project Name 49.5 MW OUNDATION WIND ENERGY-II (Pvt) Ltd.PROJECT
Location: JHAMPIR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 Million
Completion: SEPTEMBER 2014
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
119/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
120/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
121/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
122/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
123/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
124/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
125/146
Project Name NEW KHANKI BARRAGE HYDROPOWER PROJECT
Location: RIVER CHENAB, DISTT GUJRANWALA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 70 Million
Completion: SEPTEMBER 2016
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
126/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
127/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
128/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
129/146
Project Name ASPHALT BUILT UNIT PROJECT (ABU)
OR PARCO
Location: PARCO MID COUNTRY RE INERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 30 Million
Completion: DECEMBER 2012
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
130/146
Project Name METRO HABIB CASH & CARRY PAKISTAN (PVT) LTD
Location: HEAD O ICE THOKAR NIAZ BAIG, MULTAN RD, LHR.
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 3.4
Completion: STILL UNDERGOING
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
131/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
132/146
DHA DESALINATION PLANT 3 MIGD& 94 MW POWER PLANT KARACHI
Project Name DHA DESALINATION & POWER PLANTPAKISTAN IRST EVER SEA DESALINATION& POWER PLANT
Location: DHA, PHASE VIII. KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 million
CLIENT DHA COGEN LIMITED (DCL)
Completion: UNDER CONSTRUCTION
TOTAL VALUE O L/C ESTABLISHED:
Siemens AG Germany $ 41,400,000 $ 33,120,000
Siemens AG Germany € 6,550,000 € 5,240,000
Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241
Lincas Electro Vertibas € 295,500 € 236,390
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
133/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
134/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
135/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
136/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
137/146
KARACHI INTERNATIONAL CONTAINERTERMINAL (KICTL) KARACHI
Project Name KARACHI INTERNATIONAL CONTAINERTERMINAL (KICTL)PHASE III EXPANSION PROJECT
Location: WEST WHAR ROAD, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 400 million
CLIENT KICTL PAKISTAN
Completion: UNDER CONSTRUCTION
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
138/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
139/146
BAHRIA TOWN (PVT) LIMITEDRAWALPINDI
Project Name BAHRIA TOWN (Pvt) LIMITEDAWAMI VILLAS PROJECT.TOTAL # O VILLAS 8000
Location: RAWALPINDI, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 120 million
CLIENT BAHRIA TOWN (Pvt) LIMITED
Completion: UNDER CONSTRUCTION/ PROGRESS
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
140/146
HEALTH, SA ETY AND ENVIRONMENT
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
141/146
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
142/146
S.M.Asghar (Pvt) Limited believes that
ACCIDENTS DON ’T JUST happen, they’re caused, and it is the dutyof the Company to remove and minimize all possible causes ofAccidents.
We at S.M.Asghar (Pvt) Limited takes preliminary guide to therecognition of potential hazards to the following.
M O S T - S A E - P L A C E S
M MACHINERY : Sources of Mechanical Power
O OPENINGS : Pits, Sumps, Ducts & Drains
S STACKS : Stores Materials, Raw & Process.
T TOOLS : All type of Tools.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
143/146
S A E - P L A C E SS STRUCTURE : loors, Walls, Ceilings, Road
A ATMOSPHERE : Dust, gases, fumes & Spray.
IRE : ire Points & ire Exits.
E ELECTRICITY : Wires, Cables, Switches.
P PRESSURE VESSEL : Boilers & Compressors
L LADDERS : Steps, trestles & Scaffolds
A ATTIRE : Protective Clothing, Helmets
C CRANES : Hoist, Derricks & Ropes / Hooks
E EXPLOSIVES : lammable Liquids, LPG, Radioactive.
S or SIGNALS : Warning Light, Telephone Buzzers.
As a Company Policy we take care of our Employee to the best Standardsbecause Employees are Our Assets.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
144/146
We provide following safety Equipments to our Port staff such as :
Safety Belts : They are provided to the Staff whoWorks On the Ship /Vessel (VCM/LPG)
Emergency Lights : In case of Night Delivery at the PortPremise/ Highways
Safety Helmets : At time of delivery at the Port AreaDuring Loading/ UnloadingHeavy Machineries/ Hazardous Cargo
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
145/146
Safety Boots : At the Ship Derricks & the Port Premises
Safety Glasses : They are provided to the Staff whoWork on the Ship /Vessel.
-
8/17/2019 Spec Pro Ghambat Sma Brouchere April 2016
146/146