SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION The Society gratefully acknowledges those companies that support the program by allowing their professionals to participate as Lecturers. And special thanks to The American Institute of Mining, Metallurgical, and Petroleum Engineers (AIME) for their contribution to the program.

Upload: buixuyen

Post on 04-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

SPE DISTINGUISHED LECTURER SERIESis funded principally

through a grant of the

SPE FOUNDATIONThe Society gratefully acknowledges

those companies that support the programby allowing their professionals

to participate as Lecturers.

And special thanks to The American Institute of Mining, Metallurgical,and Petroleum Engineers (AIME) for their contribution to the program.

Page 2: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNG – Roaring Ahead

John MorganJohn M. Campbell & Company

Exclusive Provider of PetroSkills Facilities TrainingHeadquarters Office

1215 Crossroads Blvd., Norman, OK 73072 USA

(405) 321-1383 Office / (405) 321-4533 Fax / (303) 523-6797 Cell

[email protected] / www.jmcampbell.com

©2008 John M. Campbell & Co. and Other Copyright Holders

All Rights Reserved

Where Will it End?

Page 3: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2005 Air Products & Chemicals, Inc. All Rights Reserved

Page 4: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

$7 Billion Entry Fee

Page 5: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

©2008 ConocoPhillipsUsed With Permission

All Rights Reserved

Page 6: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Liquefied Natural Gas (LNG)

1. Allows gas to be sold from remote suppliers Indonesia, Middle East, Australia, Algeria, etc.

to industrialized countries, Japan, Korea, Spain, UK and USA

2. The largest producer of LNG is Qatar.3. Was Indonesia but gas reserves depleted4. The largest market for LNG is Japan5. International trade in 2007 was ~165mtpy

(Equivalent to 217BCMa)

Page 7: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNGNGL

Methane

Ethane

Propane

Butane

Pentane +

LPG

96%

3%

1%

0.1%

LPG – Liquid Petroleum GasNGL – Natural Gas LiquidsLNG – Liquid Natural Gas

WHAT IS LNG

Page 8: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 9: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Example LNG Properties-162oC [-235oF] at atmospheric pressure

Rich Leannitrogen 0.3 0.5methane 88.7 97.5ethane 8.0 1.5propane 2.0 0.5butanes 1.0 -

approx. kg/m3 465 435

CV (higher) MJ/m3 42 38.5

Page 10: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

An LNG Export Terminal with Multiple Expansions - Bontang, Indonesia

© 2004 LNG Journal & Reproduced with Permission

Page 11: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

The Basic LNG Chain

LNG Production

Shipping

LNG Reception

Gas Utilization

Gas Production

Page 12: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Common Engineering Units

• scf is the volume of gas at 14.7psi and 60oF• scm is the volume of gas at 101.3kPa and 15oC• 1MMscfd is 1,000,000scf/day• 1m3 = 35.3ft3

• Density of water = 1000kg/m3

• Molecular weight of air is 29 (28.97)• Power 0.746kW = 1HP• 1Btu is the energy required to raise the temperature of

1 lb water 1oF• 1Btu = 1.055kJ

Page 13: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Natural GasTransportation Options

5000

1000

500

100

50

MM

scfd

0 1000 2000 3000 4000 5000

Distance to market, km

Pipeline

Uneconomic

Electricity

Gas-to-liquids

LNG

Page 14: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Nominal GasTransportation Efficiency

Page 15: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Historical Developmentof LNG Trade – Last 25 Years

• Projects grow from less than 1 mtpa to 4-6 mtpa• New supplies to Japan,

first imports to Korea, 1987, and Taiwan, 1990

• Late 1990s – present– Slower growth in Asian LNG demand – economic upsets– Growth in LNG demand in Europe, USA and Caribbean– New supply projects in Atlantic Basin and Middle East– Today’s LNG trade

Page 16: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNG Industry Growth

Source: CERA, CEDIGAZ

5.5%/yr

Historical

Projected

Page 17: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Demand is Met from DiverseSources of Supply

© 2005 Source NPC

Page 18: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNG Imports Are Needed,but Face Obstacles

© 2005 Source NPC

Page 19: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

The Basic LNG Chain

LNG Production

Shipping

LNG Reception

Gas Utilization

Gas Production

Page 20: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

The Contract Chain

1. Exploration licenses, production-sharing contracts

2. Gas sales to LNG Producer3. LNG production joint venture agreement4. Condensate/LPG production and sale5. Government and local authority agreements6. LNG sale and purchase agreement

between LNG producer and LNG buyers

Page 21: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2005 LNG Journal & Reproduced with Permission

Gas Production PlatformNorth Rankin A

North-West Shelf Project, Australia

Page 22: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

The Basic LNG Chain

LNG Production

Shipping

LNG Reception

Gas Utilization

Gas Production

Page 23: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

General SchematicGas Liquefaction Terminal

© 2005 LNG Journal & Reproduced with Permission

Pre-cooling and

LPG Separation

Page 24: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 25: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Contaminants

What’s in gas (besides light hydrocarbons)?

H2O CO2 H2S

S He N2 Cl Hg As

Waxes Asphaltenes etc.

Sand Dinosaur Dust

Lubricants Corrosion Inhibitors

Mystery Stuff, etc.

Page 26: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Some Mercury Levels Worldwide

South America 69 119 373 643Far East 1 3 20 16 108Far East 2 58 193 313 1,042Far East 3 0.02 0.16 0.11 0.86Groningen 180 972Mid West P/L 0.001 0.1 0.01 0.54

microgm/m3 Mercury kg/a

Based on 4mtpy LNG production (600MMscfd)

Page 27: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Mixed Refrigerant

LNG Process

Page 28: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2005 Air Products & Chemicals, Inc. All Rights Reserved

Page 29: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

MCR® Heat Exchanger Tube Bundle Fabrication

© 2005 Air Products & Chemicals, Inc. All Rights Reserved

Page 30: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

MCR® Heat Exchanger Tube Bundle Fabrication

© 2005 Air Products & Chemicals, Inc. All Rights Reserved

Page 31: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

MCR® Heat Exchanger Tube Bundle Shipping

© 2005 Air Products & Chemicals, Inc. All Rights Reserved

Page 32: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

NG LNG

PROCESS

POWER

HEAT SINK

40C60bar

-162C1bara230MW

160MW

390MW

LNG Production 3.7mtpy (500tph)

Based on a 3.7mtpy train

The Liquefaction Heat Balance

Page 33: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Centrifugal Compressors

Horizontally SplitGenerally used in high volume/low pressure applications

Page 34: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Axial Turbine Blades

Page 35: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Overview of LNG ProductionFacilities Technologies

• Established Technologies– ConocoPhillips (Optimized Cascade)– APCI (Propane Precooled)

• New Process Technologies– APCI (AP-X)– Linde (MFC)– Shell (DMR)– IFP (Liquefin)

Page 36: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNG Facility Comparison

• There are 80 operating trains with a total capacity of 197mtpy (2.5 mtpy/train)

– APCI C3MR (60) 152 mtpy 76.6%– ConocoPhillips Optimised Cascade (9) 30mtpy 15.3%– Shell C3MR(1) 4.2mtpy 2.3%– Linde MFC (1) 4.2mtpy 2.1%– Others (TEAL/SMR) (9) 7.3mtpy 3.7%

• There are 27 trains under construction with a total capacity of 137mtpy (5.1mtpy/train)

– APCI (14) 61mtpy 45%– APCI AP-X (6) 47mtpy 34%– ConocoPhillips Optimised Cascade (3) 10.5mtpy 7.7%– Shell C3MR (2) 8.5mtpy 6.2%– Shell DMR (2) 9.6mtpy 7.0%

Page 37: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

ConocoPhillips Optimized LNG Process

Courtesy ConocoPhillips Petroleum Company

Page 38: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Egypt Idku

• 2 Trains 3.4mtpy• On stream in 2006• COP Optimised

Cascade process• Air cooled process• Very long jetty• Space for expansion

Page 39: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Darwin LNG: First LNG March 06

Page 40: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2003 Atlantic LNG All Rights Reserved

Atlantic LNG - Train 1

Page 41: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Atlantic LNG

• Train 4: 5.2mtpy from 8 Frame 5 GTs• Started up in March 2006

Page 42: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Atlantic LNG Project Expansion Trinidad

© 2002 LNG Journal & Reproduced with Permission

Page 43: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Overview of LNG ProductionFacilities Trends

• Larger facilities– Bigger Trains– Bigger Turbines

• Reduce Environmental Impact– CO2

• Produced with gas• Developed by turbines

– NOx– Marine Environment

Page 44: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 45: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Typical Project ScheduleGreenfield LNG Export Project

Year 0 1 2 3 4 5 6 7 8 9 10

study drilling and appraisal design construction

selection acquisition, approvals prepn.

study concept design FEED EPC - construction

study shipping arrangements ship building

Upstream

Terminal Site

LNG Plant

Shipping

& Evaluation study negotiations -j.v. evaluation first LNGexports

Project Structure

analysis marketing, sales agreementsMarkets

Financingadvice and analysis securing financing

© 2000 LNG Journal All Rights Reserved

Page 46: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Photo Courtesy of CB&I All Rights Reserved

Page 47: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

190,000m3 LNG Storage Tank

Page 48: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 49: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

The Basic LNG Chain

Shipping

LNG Production

LNG Reception

Gas Utilization

Gas Production

Page 50: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

1959 – The Methane Pioneer

© 2004 LNG Journal & Reproduced with Permission

Page 51: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2008 Hamworthy, Used With Permission, All Rights Reserved

Page 52: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNG Carrier Fleet

• As at 1 January 2008 the Carrier Fleet was– 250 ships, average age 13 years– 400 ships in 2011– 52% Membrane, 45% Moss, 3% others

• Small carriers 20-80,000m3

• Typical Carriers 125-145,000m3

• New very large carriers on order for Qatar long distance trades (205-265,000m3).

• The order book is 142 ships• Some Fleet owners now looking to replace older

ships >35 years

Page 53: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

One of the World’s Smallest LNG Carriers The 19,100 m3 Capacity Surya Aki

Page 54: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2008 Hamworthy, Used With Permission, All Rights Reserved

Page 55: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 56: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 57: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Partial Loading of LNG Cargoes

Photo Courtesy of ABS

Page 58: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

A Typical Large-Size LNG CarrierThe 135,000 m3 Capacity Al Bidda

© 2002 LNG Journal & Reproduced with Permission

Page 59: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Qflex

Page 60: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2008 Hamworthy, Used With Permission, All Rights Reserved

Page 61: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

©2008 Hamworthy©Used With Permission©All Rights Reserved

Page 62: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2008 Hamworthy, Used With Permission, All Rights Reserved

Page 63: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

The Basic LNG Chain

LNG Reception

LNG Production

Shipping

Gas Utilization

Gas Production

Page 64: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 65: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Costs in an LNG Project

Gas Gathering US$ 1.5 – 2.0 billion

Liquefaction (1 train) US$ 1.5 – 2.0 billion

Ships 5 @ $250 m US$ 1.3 billion

Regasification US$ 0.5 – 1.0 billion

TOTAL US$ 4.8 – 6.3 billion

Could easily reach $7,000,000,000

Page 66: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Negishi Terminal, Japan : Single Containment Tanks (background)

Inground Tanks (foreground)

© 2002 LNG Journal & Reproduced with Permission

Page 67: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 68: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

US LNG Terminal: Elba Island

Page 69: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

The Basic LNG Chain

Gas Utilization

LNG Production

Shipping

LNG Reception

Gas Production

Page 70: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Seasonal Demand PatternEurope & North America

Page 71: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Gas Markets

1. Residential & Commerciala. Heating demand highly seasonal (low load

factor)b. No fuel switching capabilities

2. Industriala. Fuel for factories, chemical plants, steel

mills, etc.b. Power generation for factories, chemical

plants, steel mills, etc.c. Chemical feedstock – ammonia, methanol,

GTLd. High load factore. Fuel switching capability

Page 72: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 73: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Ship-to-Ship Transfer

Page 74: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

• Power Generationa. Combined cycle most popular

• GT + waste heat boiler Eff.~55%• Low CO2 emissions

7 – 8 tonnes/MW compared to25 – 27 tonnes/MW for coal

b. Higher load factor than residential & commercial

c. Quick response to demand swingsd. Summer demand higher than winter

(A/C)e. Fuel switching capability

Gas Markets

Page 75: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Gas-Fired Electric Power Generation

© 2002 GE All Rights Reserved

Page 76: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

GE GAS TURBINESH-Technology

400-480 MW combined cycle output

Firing at 2600°F, 1430°C

23:1 compressor, 18 stages4 stage turbine

60% combined cycle efficiency

Page 77: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Example Heating Values

36 38 40 42 44 46 48 50

UK

USA - Florida

Japan – Power Plant

MJ/m3Adapted from: Bramoulle, Morin and Capelle, “LNG Quality and Market FlexibilChallenges and Solutions”, LNG 14, Doha, Qatar 2004

Page 78: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Examples of Sales Gas SpecificationsQualityQuality USAUSA CanadaCanada EuropeEurope UKUK

Water ContentWater ContentDew PointDew Point

44--7lb H2O/MMscf7lb H2O/MMscf3232ooF at 1000psiF at 1000psi

--1010ooC at 7000kPaC at 7000kPa65mg/std m65mg/std m33

--88ooC@C@70barg70barg

--1010ooC@C@85barg85barg

HH22SS0.250.25--1gr/100scf1gr/100scf

(4(4--16ppm 16ppm volvol))66--23 mg/m23 mg/m33

(0.25(0.25--1 gr/100scf)1 gr/100scf)5mg/m5mg/m33 4mg/m4mg/m33

Total STotal S 55--20 gr/100scf20 gr/100scf(20(20--100 100 ppmppm volvol)) 2323--115 mg/m115 mg/m33 30mg/m30mg/m33 50mg/m50mg/m33

COCO22 22--3%3% 2%2% 2.5 mole%2.5 mole% 2.0 mole%2.0 mole%

NN22 22--3%3% Typically not Typically not specifiedspecified

Typically not Typically not specifiedspecified 5 mole%5 mole%

OO22 0.1%0.1% 0.4%0.4% 0.01 mole%0.01 mole% 0.001 mole%0.001 mole%

HydrocarbonHydrocarbonDew PointDew Point

+15+15ooF @ F @ 800psia800psia

--1010ooC @C @Specified pressureSpecified pressure

--22ooC@70bargC@70barg --22ooC@85bargC@85barg

WobbeWobbe IndexIndex Typically not Typically not specifiedspecified

Typically not Typically not specifiedspecified

13.613.6--15.8kWh/m15.8kWh/m33 47.247.2--

51.4MJ/m51.4MJ/m33

Gross Heating Gross Heating ValueValue

10001000--1200 1200 btu/scfbtu/scf3737--45 MJ/std m45 MJ/std m33 3535--39 mJ.m39 mJ.m33

8.48.4--13.113.1kWh/mkWh/m33 36.936.9--

42.3MJ/m42.3MJ/m33

Page 79: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Gas Interchange Diagram

Non Methane components %

Adapted from “A Guide to the Gas Safety (Management) Regulations

1996 – Guidance on Regulations Health & Safety Executive.

© Crown Copyright (UK) 1996

Page 80: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Commercial Trends1. Rapid increase in capital cost2. More competition, more risk-taking. Global supply

strategies3. Building ships/terminals in advance of firm

supply/sales contracts. Merchant facilities4. Increasing power generation market

5. Regional market trendsa. Asia. Liberalization of existing markets. India.

China.b. Europe. Open access. Market related prices.

LNG and pipeline supplies.c. Americas. USA – more terminals? Price volatility. d. Central/South America.

6. Market niches: small-scale supply projects, reception, satellites.

Page 81: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Flex LNG concept

• SPB type Cargo Containment• Flat deck to mount process plant

Page 82: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNG – Roaring Ahead

Where Will it End?

Page 83: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2008 Hamworthy, Used With Permission, All Rights Reserved

Page 84: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Reduce Environmental Impact

1. Reduce CO2– Inject Produced CO2– Install most efficient drivers

• Cogeneration• Larger Turbines• Electric Motor Drivers

2. Reduce NOx– Install “Clean-burn” technology

3. Effect on Marine Environment– Use of air coolers

Page 85: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

UK Gas Supply and Demand

Page 86: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

World LNG Trade

© 2005 LNG Journal & Reproduced with Permission

Page 87: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Some of Today’s Challenges in LNG…..Many

• Permits for US Imports

• Crews for LNG Carriers

• LNG quality variations

• Security

• Materials and Staffing

Page 88: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

LNG – Roaring Ahead

John MorganJohn M. Campbell & Company

Exclusive Provider of PetroSkills Facilities TrainingHeadquarters Office

1215 Crossroads Blvd., Norman, OK 73072 USA

(405) 321-1383 Office / (405) 321-4533 Fax / (303) 523-6797 Cell

[email protected] / www.jmcampbell.com

©2008 John M. Campbell & Co. and Other Copyright Holders

All Rights Reserved

Where Will it End?

Page 89: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Melkoya Island

Page 90: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

StatoilHydro Snøhvit Plant

• Europe's first LNG export facility

• Capacity 4.2mtpy• Linde MFC process• First shipment 20th

October 2007• 140km tie-back to

subsea templates• CO2 sequestration

Page 91: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

THE END

Thank You!

Page 92: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 93: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 94: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 95: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 96: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Bontang Train B Incident April 1983

Page 97: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Natural Gas Reserves/Consumption

1. Russia (Gazprom) 26.6%) 14.7%2. Iran (NIOC) 14.9%) 56% 3.2%3. Qatar (Qatargas) 14.3%) 0.6%4. Saudi (Saudi Aramco) 3.8% 2.5%5. UAE (Adnoc) 3.4% 1.5%6. USA 3.0% 23.0%7. Nigeria (NNPC) 2.9%8. Algeria (Sonatrach) 2.5% 0.9%9. Venezuela (PDVSA) 2.4% 1.1%10. Iraq (INOC) 1.8%11. Indonesia 1.5% 1.3%12.Australia 1.4% 0.9%13.Malaysia 1.4% 1.3%14.China 1.3% 1.7%15.Norway 1.3% 0.2%16.ROW 17.5% 37.1%

Courtesy BP Statistical Review 2006

Page 98: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Prices in 2006 (77) ($/MMBtu)

• Japan 7.14

• EU 8.77• UK 7.87

• USA (HH) 6.76

• Oil 10.66 (20)

• Current Prices 10-15

Page 99: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

© 2008 Hamworthy, Used With Permission, All Rights Reserved

Page 100: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –
Page 101: SPE DISTINGUISHED LECTURER SERIES SPE … · NG LNG PROCESS POWER HEAT SINK 40C 60bar-162C 1bara 230MW 160MW 390MW LNG Production 3.7mtpy (500tph) Based on a 3.7mtpy train ... –

Costs in an LNG Project

Gas Gathering US$ 1 – 1.5 billion

Liquefaction (1 train) US$ 1 – 1.5 billion

Ships 5 @ $180 m US$ 0.9 billion

Regasification US$ 0.5 billion

TOTAL US$ 3.4 – 4.4 billion