space - franklin township public schools • net gain (new) classrooms – claremont = +47 –...
TRANSCRIPT
SPACE • Net Gain (new) Classrooms
– Claremont = +47
– Hillcrest & Elizabeth = +20
• Utilization Gain
– SGS = +25 at 6-8 MS level
SAFETY • Annex Connection To Franklin Park
• Repair Parking Lots, Sidewalks &
Outdoor Lighting
• Expanding Fire Alarm & Security
Systems To Match Capacity Growth
EDUCATION • ES & MS Grade Reconfiguration after
Claremont comes online in Fall 2018
OPERATION – Upgrade Classrooms & Science Labs
– Renovate Bathrooms & Replace
Fixtures and Ventilation
– Improve Handicap Access
– Repair & Update Unit Vents
– Repair Exterior Walls/Masonry
– Replace Aging & Energy-Inefficient
Windows
– Upgrade Electrical Service & Power
Distribution
– Replace & Upgrade Aging Interior
Doors & Hardware
– Repair/Replace Aging Ceilings & Aging
Floors
– Replace Aging Boilers with High
Efficiency Equipment
Referendum Implementation
ADDITIONS/ALTERATIONS SGS for conversion to middle school
Elizabeth Avenue & Hillcrest
Pine Grove Manor Elevator
CAPITAL/GRANT WORK Windows @ Hillcrest, Conerly &
MacAfee
Doors @ Pine Grove Manor &
Hillcrest
Unit Ventilators @ Elizabeth
Windows @ SGS
Doors @ SGS & FMS
Paving and Site Work
@ SGS & FMS
Toilet Rooms @ SGS & FMS
Unit Ventilators @ SGS
NEW CONSTRUCTION Claremont Elementary School
Capital/Grant Projects – Annual Budget & State Grants
ESIP Projects – Energy Savings
Improvement Bond
Referendum Projects – Voter Approval Dec 2014
Funding Resources
Capital/Grant Projects – Annual Budget & State Grants
PRESENT TO 2RD QTR 2016
Continuation of Design Process:
Additions/Alterations for all schools &
New Claremont School
Complete ESIP Implementation
HVAC Capital Work
1ST QTR 2016 TO 3RD QTR 2016
Continuation of Capital Work
Windows at Conerly & Hillcrest
Bid, Award, and Start Construction @ Hillcrest, PGM
and Elizabeth Ave.
Bid, Award, and Start Construction @ SGS &
Claremont Site
2ND QTR 2016 TO 3RD QTR 2017
Complete Hillcrest & PGM
Complete SGS Additions/Alterations and
Misc. Capital
Interior Renovations at FMS
2ND QTR 2016 TO 3RD QTR 2018
Elizabeth Ave.
Claremont New School
Grade Reconfiguration
Project Focus
DESIGN
ESIP
CAPITAL
START CONSTRUCTION
CONTINUE CONSTRUCTION
COMPLETE CONSTRUCTION
Bleachers @ SGS, FMS Main Gym and Auxiliary Gym
Summer 2015 Work Completed
Lighting
Controls
Boiler Room Upgrades
• Weekly Design Meetings
• Alternating Focus Rotating Between New School Design & MS Conversion With SGS/FMS Involvement
• Field Visits and Building Tours Plus On-site Meetings
• Input From BOE, Administration, Principals, Maintenance And Curriculum Staff
Additions &
Renovations to
convert SGS into a
Grade 6-8 Middle
School with target
871-968 FES Middle
School capacity
Project Goals
MISSION STATEMENT To build environmentally friendly, healthy,
learning spaces.
In a way that is supportive of the school
district’s academic mission.
So that the building will serve as a model of
innovative strategies for conserving
resources.
GOALS
• Energy Star 90 (26.9 Kbtu/Sf)
• 50% Water Use Reduction
• 100% Daylighting In All Instructional Spaces
• Provide High Air Quality – Low VOC Materials
– Displacement Ventilation
– Monitor CO2
• Maintain High Acoustical Quality Of School
New 128,000 SQ.FT. PreK-5 ES I Targeted design for LEED GOLD I 43.8 acres previously farmed land with environmental educational opportunities
NEW Site Plan
New PreK-5 Elementary School located on BOE Claremont Road property with target FES capacity of 853-948 (based on 6cr/grade plus 2 PK, 3 PKSE, and 6 SE CRs = Total 47 CRs)
Roof Projects (Architect of Record)
After
Before
SKYLIGHT
Roof Projects (Architect of Record)
Hillcrest Elementary School
Roof Projects (Architect of Record)
Middle School
HVAC Projects (Architect of Record)
HVAC over Kitchen and Auditorium
HVAC Projects (Architect of Record)
ROOFTOP HVAC
Existing Equipment
New Equipment
Middle School
Fire Alarms (Referendum)
Conerly Road
Franklin Park Annex
(Franklin Park School)
Pine Grove Manor
Hillcrest
MacAfee
Site Work (Referendum)
PAVEMENT AND STRIPING
RESTORATION
Before After
Pine Grove Manor School
Site Work (Referendum)
After
Conerly Road School
PAVEMENT AND STRIPING RESTORATION
Site Work (Referendum)
PAVEMENT, RESTRIPING, AND SITE LIGHTING
MacAfee Road School
Pine Grove Manor Elementary School
Original Site Plan
Pine Grove Manor Elementary School
Overall Floor Plan
ELEVATOR ADDITION
Pine Grove Manor Elementary School
Elevator Addition Plan
Lower level floor plan
Elevator Addition Plan
Second level floor plan
Hillcrest Elementary School
Original Site Plan
Hillcrest Elementary School
STORAGE AND I.T. CLOSET
Floor Plan
Hillcrest Elementary School
Newly Developed Addition Floor Plan
(Without Mechanical RM)
Classroom Rendered Plan
(Special Education Classroom)
Special Ed.
Classroom
Floor Plan
Elizabeth Avenue Elementary School
Original Site Plan
Elizabeth Avenue Elementary School
Original Floor Plan
Elizabeth Avenue Elementary School
New Site Plan
Elizabeth Avenue Elementary School
NEW 1ST
FLOOR
PLAN
NEW 2ND
FLOOR PLAN
Floor Plan
Elizabeth Avenue Elementary School
North – Classroom Addition
Elizabeth Avenue Elementary School
West – Classroom and Gymnasium Additions
Elizabeth Avenue Elementary School
3D Arial
Summer 2015 – Remainder of
Capital & ESIP Work
Spring/Fall/Winter 2015 – Design
Process
Winter/Spring 2016 – Bidding & Award
Summer 2016 to Summer 2017 –
Additions/ Alterations @ SGS
Summer 2016 to Summer 2018 –
Claremont Hillcrest Elizabeth
Bus Routes (Planning 2017-18
for Fall 2018 Implementation)
Grade Reconfiguration
(Planning 2015-18 for Fall 2018)
ONE LESS MOVE Successful FALL 2018