S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Upload: ian-morgan

Post on 27-Mar-2015

221 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

S.P. 8503-46 (TH 43) Winona Bridge ProjectMississippi River in WinonaIndustry Outreach Meeting

July 29, 2013

Page 2: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

OutlineoIntroductionsoDisclaimersoGround RulesoCMGC ProgramoProject BackgroundoCMGC RFQ / RFPoCMGC ProcessesoConsultant ContractsoConflict of InterestoDBE OpportunitiesoQuestions

Page 3: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Introductions

MnDOT Project Manager: Terry Ward

MnDOT Deputy PM: Tory Thompson

Our job is to ensure all proposers have the same information and to partner with the successful CMGC team and consultants.

Feel free to ask questions at any time.

Page 4: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Introductions

MnDOT• CMGC Program Manager: Kevin Hagness• Bridge Consultant Contracts: Keith Molnau• Office of Civil Rights: Addi Batica

FHWA

City of Winona

Page 5: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Introductions

Handouts

o Listing of Letters of Interest Responses.

o Winona Project CMGC OPCC Process.

o Winona Project CMGC GMC Process.

o Conflict of Interest.

Page 6: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Disclaimers

We plan to post the final CMGC RFQ this week.

This meeting represents the last opportunity for non-written questions DURING THE PRESENTATION.

Page 7: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Disclaimers

We are taking notes during this meeting and will be posting any questions asked we feel need to be shared with those not in attendance.

This presentation will be posted on-line.

Page 8: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Disclaimer

What is discussed today is informational only, meant to assist proposers in the preparation of their proposals.

The ultimate RFQ and RFP requirements are included in the final posted documents.

If there are any discrepancies, submit a clarification request.

Page 9: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Ground Rules As per the CMGC RFQ:

• Terry Ward is the Single Point of Contact.

• Each Proposing team needs to identify a S.P.O.C.

Page 10: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC Program Kevin Hagness, CMGC Program Manager

• S.P.O.C. for CMGC Program Questions.• Winona is our first CMGC project.• Working to help support delivering the Winona Project.• Continue working on building our program, including further industry

outreach. • Educating MnDOT Staff/Districts about CMGC.

Page 11: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Goals

• Start Construction in 2014. (Between July 2014 to March 2015)

• Place Traffic on New Bridge No. 85851 as expeditiously as possible. Keep river crossing open during construction.

• Minimize Scheduling Impacts / Constraints.

• Meet the Chapter 152 Maximum Price Cap of $142 million (not including ROW)

Page 12: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Scopeo New Bridge No. 85851

• Concrete Segmental Box Girder – river spans.

• PCB approach spans.

o Rehabilitation and Reconstruct Bridge No. 5900• Rehabilitate Through Truss.• Replicate Deck Truss Approach Spans.• Eligible for National Register of Historic

Places. • SHPO Programmatic Agreement.

Page 13: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Scope

Page 14: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Scope

Page 15: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Scope

Page 16: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Scope

Page 17: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Schedule

o Municipal Consent – August 19th Public Hearing.o ROW offers start 1-2 months after Municipal

Consent (approx. 28 parcels).o Environmental Assessment (EA) Public Hearing

this fall.o FONSI by end of year.o Environmental Permits by July 1, 2014.

Page 18: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Schedule

o Construction Schedule• Phase I: July 2014 – March 2015

• Bridge No. 85851 River Piers• Phase II: March 2015

• Remainder of Bridge No. 85851 and Roadway

• Phase II: Fall 2016• Bridge No. 5900 and Remaining Roadway.

Complete Construction Fall 2019 / Spring 2020

Page 19: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Project Background - Cost

o Based on our Current Project Scope and Risk Profile:

• Bridge No. 5900 costs: $56-$63 million• Bridge No. 85851 costs: $52-$59 million• Roadway costs: $7-$9 million

Total Estimated Construction Cost: $115-$131 million

Page 20: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o Final CMGC RFQ Scheduled to be posted this week.

o CMGC RFP Release: September 3, 2013.• Need Municipal Consent from City of

Winona.

Page 21: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o Two Step Process – RFQ / RFP.

o Best Value Selection.

o Evaluation Manual has been prepared and Technical Review Committee membership has been determined.

o RFP has been drafted.

Page 22: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o RFQ may be a bit more work compared to other DOT CMGC RFQ’s (6 pages).

o Designed to try and spread out the proposal work amongst the RFQ / RFP.

Page 23: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o Posted Draft RFQ

o Plan to Post Draft RFP

Page 24: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o CMGC Experience is not required.• There are other ways to show collaboration,

partnering, risk and design coordination experience.

o Our Technical Review Committee will be trained in CMGC procurement / delivery and other procurement methodologies.

Page 25: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o We plan to have multiple severable work packages (construction phases).

Page 26: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

Issue LOI June 18, 2013Issue CMGC RFQ By: August 2, 2013Deadline for Submitters to Submit SOQs August 19, 2013Shortlisting of CMGC Contractors for RFP August 30, 2013CMGC RFP Issued September 3, 2013Deadline for Submitters to Submit Requests for Clarification on the RFP

September 23, 2013

Responses to Requests for Clarification on RFP Issued

September 26, 2013

Deadline for Submitters to Submit Proposal October 8, 2013 Hold Interviews October 16, 2013CMGC Contractor Selected October 25, 2013Pre-Construction Services Contract Negotiated November 2013

Page 27: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o Watch not only the MnDOT CMGC Website but the Consultant Services Website also.

o Any changes that need to be made to this RFQ will be posted MnDOT’s Consultant Services Web Page at www.dot.state.mn.us/consult/ under the “P/T Notices” section.

Page 28: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o Other Sources of Project Information:

o MnDOT CMGC Website:www.dot.state.mn.us/const/tools/const-manager-general-contractor.html

o MnDOT Project Website:www.dot.state.mn.us/d6/projects/winonabridge/index.html

Page 29: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o RFQ Scoring Criteria:

• Project Team/Capability. • Concrete Segmental Box Girder Bridge

Experience.• Bridge Rehabilitation Experience.• Major River Crossing Experience.• Historic Bridge Rehabilitation and

Reconstruction Experience.

Page 30: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o RFQ Details:• No Interviews.• Email Proposal Submittals Required.

• Make Sure you get a confirmation.• No Stipends.• No minimum of maximum # of teams in statute

to be shortlisted.• Personal preference of Project Manager is 3-5

teams, but if we have more highly qualified teams, we may go with more than 5 on this project.

Page 31: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o FTP Site for Background Information:

ftp://ftp2.dot.state.mn.us/pub/outbound/district6/Winona%20Bridge/Proposal_Information/

Page 32: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o RFP Potential Requirements:

• Not anticipated to have a requirement to price a portion of the project.

• Anticipated to require submittal of Profit and Overhead costs that will carry forward to the construction phase.

Page 33: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o RFP Potential Requirements:

• DBE Goal for Construction.• No DBE Goal for CMGC P/T Contract.• CMGC Team to develop a Subcontracting Plan

• Includes approach to DBE engagement and goal setting for the project as a whole and for each severable package.

Page 34: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC RFQ / RFP

o RFP Potential Requirements:

• Interviews highly likely.

• Potentially targeted towards approach to CMGC project details (Overall Project Approach, Estimating, Scheduling, Risk, Design Collaboration etc….).

Page 35: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC Processes

o Winona Project Specific Processes:

• Opinion of Probable Construction Costs (OPCC).

• Guaranteed Maximum Price (GMP).

These will be posted on the MnDOT CMGC Program website shortly under the Winona Project.

Page 36: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC OPCC Process

Page 37: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC OPCC Process

oOPCC’s anticipated at 30%, 60%, 90% of Design.

oOwner’s Estimate is planned for this project.

oOverall Project Target Price at the first 90% OPCC is likely.

Page 38: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC GMP Process

Page 39: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

CMGC GMP Process

oProcess Allows one GMP re-bid.

oIf GMP is less than 10% of the ICE, it does not mean MnDOT will Award the contract.

Page 40: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Consultant Contacts

oFinal Design Bridge No. 85851 and Roadway.oBridge No. 85851 Peer Review.oFinal Design Bridge No. 5900 Rehabilitation and Reconstruction.oBridge No. 5900 Peer Review.

Page 41: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Consultant Contacts

oIndependent Cost Estimate.oOwner’s Estimate by CMGC GEC.oPossible MnDOT Estimating Office ContractoSubsurface Utility Exploration (SUE).oConstruction Oversight.oOther Misc. Consultant Contracts.

Page 42: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Consultant Contacts - Schedule

Bridge 85851 Design: RFP: Aug 8th (3 week ad)• Consultant selected: Sept 10th

Peer Review: RFP: Aug 26th (2 week ad)• Peer Review Selection: Sept 23rd

Bridge 5900 Design: RFP: Sept 23rd (3 week ad)• Br 5900 Design Selection: Oct 24th

Bridge 5900 Peer Review: RFP: Oct 14th (2 week ad)• Br 5900 Peer Review Selection: Nov 7th

Page 43: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Consultant Contacts - Schedule

ICE RFP: Anticipated release in early September.

Page 44: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Conflict of Interest

o Applies to the Winona Project

o Will be posted shortly on the CMGC Website under the Winona project.

Page 45: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Conflict of Interest

Page 46: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

DBE

oAddi Batica, MnDOT Office of Civil Rights

oFuture DBE Meet and Greet Opportunities.

Page 47: S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013