McGillivray Blvd. Pembina Hwy. Markham Rd. Investors Group Field University of Manitoba Bishop Grandin Blvd. SOUTHWEST RAPID TRANSITWAY (STAGE 2) AND PEMBINA HIGHWAY UNDERPASS PROJECT U OF M/ STADIUM STATION Frequent, high-speed transit right to IGF Fast, reliable service to U of M Major upgrades to main campus transit station Temporary lane closures/pedestrian restrictions in local area SOUTHPARK RECONSTRUCTION Reconstruction of Southpark from Pembina to the Transitway Active transportation paths and sidewalks Intersection improvements at Pembina PEMBINA UNDERPASS Underpass widened and enhanced to benefit all users Pembina widened to three lanes from Stafford to Point Road to improve traffic flow New active transportation pathways on both sides Temporary lane closures on Pembina MARKHAM, CHANCELLOR & PLAZA STATIONS Temporary pedestrian restrictions and traffic diversions in local area (no lane closures) during active construction CHEVRIER, CLARENCE & SEEL STATIONS Temporary traffic, transit and pedestrian restrictions in local area LETELLIER OVERPASS New Letellier rail overpass Temporary, localized parking restrictions; temporary changes to Transit service on Chevrier BISHOP GRANDIN OVERPASS New transit and active transportation structures Temporary lane closures on Bishop Grandin (see info sheet) CHEVRIER RECONSTRUCTION Chevrier Boulevard street renewal between the Transitway to Pembina Highway Chevrier active transportation pathway Temporary traffic, transit and pedestrian restrictions in local area MCGILLIVRAY OVERPASS Construction of new McGillivray overpass Realignment of AT pathway on south side of McGillivray Temporary lane closures in local area; temporary closure of existing active transportation pathway BRENDA LEIPSEC DOG PARK New, upgraded Brenda Leipsic Dog Park Temporary relocation of dog park during construction LEGEND NEW STAGE 2 RAPID TRANSITWAY EXISTING (STAGE 1) RAPID TRANSITWAY NEW ACTIVE TRANSPORTATION PATHWAY ROADWAY NEW RAPID TRANSIT STATIONS PARK & RIDE KISS & RIDE QUICKER COMMUTES Reliable: Buses on the Transitway not affected by traffic congestion and delays Fast: Buses on the Transitway travel safely at high speeds Convenient: Easy connections with existing Transit routes; ample parking at new Park & Rides BEAUMONT STATION Temporary traffic, transit and pedestrian restrictions in local area NEW, MODERN STATIONS Comfortable heated, landscaped, accessible stations Prominent, real-time next-bus displays Secure bike lockers at every station New Park & Ride/Kiss & Ride options ROADWAY IMPROVEMENTS & ENHANCED LIVEABILITY Traffic improvements that benefit everyone Significant new investment in local roads Enhanced landscaping and area beautification NEW ACTIVE TRANSPORTATION OPTIONS New cycling/pedestrian path along full length of Transitway Modern, protected and accessible Will connect with all intersecting active transportation routes Pathway will be lluminated at night for enhanced visibility and safety All rapid transit stations will include bike racks and lockers COMPLETE

Upload: habao

Post on 10-May-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOUTHWEST RAPID TRANSITWAY (STAGE 2) AND PEMBINA … · UNDERPASS PROJECT U OF M/ STADIUM STATION • Frequent, high-speed transit right to IGF • Fast, reliable service to U of

McG

illivray B

lvd.

Pembina Hwy.

Markham

Rd.

Investors Group Field

University of Manitoba

Bishop G

randin

Blvd.

SOUTHWEST RAPID TRANSITWAY (STAGE 2) AND PEMBINA HIGHWAY UNDERPASS PROJECT

U OF M/STADIUM STATION• Frequent, high-speed transit right to IGF• Fast, reliable service to U of M• Major upgrades to main campus transit station

Temporary lane closures/pedestrian restrictions in local area

SOUTHPARK RECONSTRUCTION• Reconstruction of Southpark from Pembina to the Transitway• Active transportation paths and sidewalks• Intersection improvements at Pembina

PEMBINA UNDERPASS• Underpass widened and enhanced to benefit all users• Pembina widened to three lanes from Stafford to Point Road to improve traffic flow• New active transportation pathways on both sides

Temporary lane closures on Pembina

MARKHAM, CHANCELLOR & PLAZA STATIONSTemporary pedestrian restrictions and traffic diversions in local area (no lane closures) during active construction

CHEVRIER, CLARENCE & SEEL STATIONSTemporary traffic, transit and pedestrian restrictions in local area

LETELLIER OVERPASS• New Letellier rail overpass

Temporary, localized parkingrestrictions; temporary changes toTransit service on Chevrier

BISHOP GRANDIN OVERPASS• New transit and active transportation structures

Temporary lane closures on Bishop Grandin (see info sheet)

CHEVRIER RECONSTRUCTION• Chevrier Boulevard street renewal between the Transitway to Pembina Highway • Chevrier active transportation pathway

Temporary traffic, transit andpedestrian restrictions in local area

MCGILLIVRAY OVERPASS• Construction of new McGillivray overpass• Realignment of AT pathway on south side of McGillivray Temporary lane closures in local area;temporary closure of existing activetransportation pathway

BRENDA LEIPSEC DOG PARK • New, upgraded Brenda Leipsic Dog Park• Temporary relocation of dog park during construction

LEGEND

NEW STAGE 2 RAPID TRANSITWAY

EXISTING (STAGE 1) RAPID TRANSITWAY

NEW ACTIVE TRANSPORTATION PATHWAY

ROADWAY

NEW RAPID TRANSIT STATIONS

PARK & RIDE KISS & RIDE

QUICKER COMMUTES • Reliable: Buses on the Transitway not affected by traffic congestion and delays

• Fast: Buses on the Transitway travel safely at high speeds

• Convenient: Easy connections with existing Transit routes; ample parking at new Park & Rides

BEAUMONT STATIONTemporary traffic, transit and pedestrian restrictions in local area

NEW, MODERN STATIONS • Comfortable heated, landscaped, accessible stations

• Prominent, real-time next-bus displays

• Secure bike lockers at every station

• New Park & Ride/Kiss & Ride options

ROADWAY IMPROVEMENTS & ENHANCED LIVEABILITY• Traffic improvements that benefit everyone

• Significant new investment in local roads

• Enhanced landscaping and area beautification

NEW ACTIVE TRANSPORTATION OPTIONS• New cycling/pedestrian path along full length of Transitway • Modern, protected and accessible • Will connect with all intersecting active transportation routes • Pathway will be lluminated at night for enhanced visibility and safety

• All rapid transit stations will include bike racks and lockers