SOUTHWEST RAPID TRANSITWAY (STAGE 2) AND PEMBINA HIGHWAY UNDERPASS PROJECT
U OF M/STADIUM STATION• Frequent, high-speed transit right to IGF• Fast, reliable service to U of M• Major upgrades to main campus transit station
Temporary lane closures/pedestrian restrictions in local area
SOUTHPARK RECONSTRUCTION• Reconstruction of Southpark from Pembina to the Transitway• Active transportation paths and sidewalks• Intersection improvements at Pembina
PEMBINA UNDERPASS• Underpass widened and enhanced to benefit all users• Pembina widened to three lanes from Stafford to Point Road to improve traffic flow• New active transportation pathways on both sides
Temporary lane closures on Pembina
MARKHAM, CHANCELLOR & PLAZA STATIONSTemporary pedestrian restrictions and traffic diversions in local area (no lane closures) during active construction
CHEVRIER, CLARENCE & SEEL STATIONSTemporary traffic, transit and pedestrian restrictions in local area
LETELLIER OVERPASS• New Letellier rail overpass
Temporary, localized parkingrestrictions; temporary changes toTransit service on Chevrier
BISHOP GRANDIN OVERPASS• New transit and active transportation structures
Temporary lane closures on Bishop Grandin (see info sheet)
CHEVRIER RECONSTRUCTION• Chevrier Boulevard street renewal between the Transitway to Pembina Highway • Chevrier active transportation pathway
Temporary traffic, transit andpedestrian restrictions in local area
MCGILLIVRAY OVERPASS• Construction of new McGillivray overpass• Realignment of AT pathway on south side of McGillivray Temporary lane closures in local area;temporary closure of existing activetransportation pathway
BRENDA LEIPSEC DOG PARK • New, upgraded Brenda Leipsic Dog Park• Temporary relocation of dog park during construction
LEGEND
NEW STAGE 2 RAPID TRANSITWAY
EXISTING (STAGE 1) RAPID TRANSITWAY
NEW ACTIVE TRANSPORTATION PATHWAY
ROADWAY
NEW RAPID TRANSIT STATIONS
PARK & RIDE KISS & RIDE
QUICKER COMMUTES • Reliable: Buses on the Transitway not affected by traffic congestion and delays
• Fast: Buses on the Transitway travel safely at high speeds
• Convenient: Easy connections with existing Transit routes; ample parking at new Park & Rides
BEAUMONT STATIONTemporary traffic, transit and pedestrian restrictions in local area
NEW, MODERN STATIONS • Comfortable heated, landscaped, accessible stations
• Prominent, real-time next-bus displays
• Secure bike lockers at every station
• New Park & Ride/Kiss & Ride options
ROADWAY IMPROVEMENTS & ENHANCED LIVEABILITY• Traffic improvements that benefit everyone
• Significant new investment in local roads
• Enhanced landscaping and area beautification
NEW ACTIVE TRANSPORTATION OPTIONS• New cycling/pedestrian path along full length of Transitway • Modern, protected and accessible • Will connect with all intersecting active transportation routes • Pathway will be lluminated at night for enhanced visibility and safety