southside green - team 4
TRANSCRIPT
April 10 through 12, 2014
Study Area B – Team 4
Study Area A
Study Area B
Study Area C
http://www.southsidegreen.com
Michele AcitelliJason Borne
Frank DawsonJoe Fello
Tracy HudakAJ Schwartz
Gregory ScottAddy Smith-Reiman
April 10 through 12, 2014
Study Area B – East Carson Street to Mary Street
http://www.southsidegreen.com
April 10 through 12, 2014
Study Area B – Conduit Corridor Design Features
http://www.southsidegreen.com
• Boulevard Concept– Safe Passage for Pedestrians, Bicyclists and Motorists– Maintain Residential Parking
• Green Infrastructure Controls– Reduction in Combined System Overflow– Vegetated Bioswales and Tree Pods/Trenches– Pervious Paving (Parking Areas)– Stone Infiltration Beds
• Platform for Community Programming– Performative Platform adjacent to Brew House– Triangular Plaza (Dining/Café Space)– Gateway Area Adjacent to Carson Street
April 10 through 12, 2014
Program Space
http://www.southsidegreen.com
April 10 through 12, 2014
Program Space
http://www.southsidegreen.com
April 10 through 12, 2014
Program Space
http://www.southsidegreen.com
April 10 through 12, 2014
Program Space
http://www.southsidegreen.com
April 10 through 12, 2014
Program Space
http://www.southsidegreen.com
Deck Cross Section
April 10 through 12, 2014
Bioswale
http://www.southsidegreen.com
April 10 through 12, 2014
Program Space
http://www.southsidegreen.com
Plaza/Café Space
April 10 through 12, 2014
Bioswale
http://www.southsidegreen.com
Roadway Cross Section
April 10 through 12, 2014
Stormwater Details
http://www.southsidegreen.com
April 10 through 12, 2014
Residential
http://www.southsidegreen.com
April 10 through 12, 2014
Residential
http://www.southsidegreen.com
Roadway Cross Section
April 10 through 12, 2014
Transition
http://www.southsidegreen.com
April 10 through 12, 2014
Stormwater Impact
http://www.southsidegreen.com
Available Storage Volume1" Rainfall Volume