1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI A. MANGLIK EXECUTIVE DIRECTOR

Upload: avye-burt

Post on 02-Jan-2016

45 views

Category:

Documents


3 download

DESCRIPTION

WELCOME TO SHRI A. MANGLIK EXECUTIVE DIRECTOR. POWER GRID CORPORATION OF INDIA LIMITED. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. PRESENTATION OVERVIEW. GRID OPERATION – AN OVERVIEW GRID OPERATION – TYPICAL ISSUES IN THE PAST GRID OPERATION - PRESENT STATUS - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

1SOUTHERN REGIONAL LOAD DESPATCH CENTRE

POWER GRID CORPORATION OF INDIA LIMITED

WELCOMETO

SHRI A. MANGLIKEXECUTIVE DIRECTOR

Page 2: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

2

PRESENTATION OVERVIEW GRID OPERATION – AN OVERVIEW

GRID OPERATION – TYPICAL ISSUES IN THE PAST

GRID OPERATION - PRESENT STATUS

OPEN ACCESS – REGULATIONS BY CERC

SHORT TERM OPEN ACCESS – EXPERIENCE SO FAR

SHORT TERM OPEN ACCESS – CASE STUDIES

OPEN ACCESS – CHALLENGES AND TASKS AHEAD

Page 3: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

3

THANK YOU

Page 4: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

4

REGIONAL GRIDS

QUICK FACTS

Page 5: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

5

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

INSTALLED CAPACITY

NORTHERN :- 33,782 MW

EASTERN :- 16,681 MW

SOUTHERN :- 34,743 MW

WESTERN :- 33,162 MW

NORTH-EASTERN :- 2,444 MW

TOTAL 1,20,812 MW

REGIONAL GRIDS

Page 6: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

6

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

‘ ELECTRICAL’

REGIONS1

2

3

SAME FREQUENCY FROM GUJARAT TO ARUNACHAL PRADESH WITH EFFECT FROM MARCH 2003

ABOUT 2800 KMS! APART

Page 7: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

7

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

‘ELECTRICAL’

REGIONS

1

2

WITH THE COMMISSIONING OF THE TALA PROJECT CONNECTING THE EASTERN AND NORTHERN GRIDS, INDIA WILL HAVE ONLY TWO GRIDS

Page 8: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

8

Growth of installed capacity Growth of installed capacity for electricity in Indiafor electricity in India

0

20000

40000

60000

80000

100000

120000

140000

1990

-91

1992

-93

1994

-95

1996

-97

1998

-99

2000

-01

2002

-03

2004

-05

in MW

Page 9: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

9

Source-wise Source-wise composition of composition of

installed capacity in installed capacity in IndiaIndia

((1,20,812 in 2005)1,20,812 in 2005)2.68%

5.00% 26.02%

66.30%

HydroThermalNuclearWind/Non Con.

Page 10: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

10

SOUTHERN REGION – GEOGRAPHY

ANDHRA PRADESH

TAMIL NADU

KARNATAKA

KE

RA

LA

POPULATION :- 22.5 CRORES ( 22% OF INDIA)

AREA :- 651 (‘000 SQ KM)(19% OF INDIA)

INSTALLED CAPACITY:- 33,162 MW(27.6%)

WEATHER :- South-west monsoon

North-east monsoon

SEA COAST :- AROUND 4000 KM

Page 11: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

11

GROWTH OF INSTALLED CAPACITY OF SR

19475 19830 2030421298

22133 2298324173

26163

28501

3079432734

10000

15000

20000

25000

30000

35000

1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05

YEARS --->

IN MW

Page 12: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

12

INSTALLED CAPACITY IN SR as on 30-11-05

STATES HYDRO THERMAL NUCLEARDIESEL/

GAS WIND/IPP OTHERS TOTAL %

AP 3586 2963   272 2   6823 21%

KAR 3387 1470   128 5   4989 15%

KER 1831     235 2   2068 6%

TN 2137 2970   423 19   5550 16%

C.S   8090 830 360     9280 28%

IPP 278 387 0 2684 1071

4421

13%

TOTAL 11219 15880 830 4133 721 377 33162  

% 34% 48% 3% 12% 2% 1%    

The above capacity does not includes

--- About 1342 MW of Wind Mill Capacity in Tamil Nadu.

--- Micro and Captive plants in different states.

Page 13: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

13

15880 (48%)

11219 (34%)

377 (1%)

830 (3%)722 (2.2%)

4134 (12%)

HYDRO THERMAL GAS WIND NUCLEAR OTHERS

SOURCE-WISE INSTALLED CAPACITY OF SR

IN MW

33,162 MW

HYDRO

THERMAL

WIND NUCLEAR

OTHERS

GAS

Page 14: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

GENERATING UNITS IN SOUTHERN REGION

A.PKAR

TNKERGENERATORS ABOVE 1000 MW

GENERATORS 500 – 1000 MW

GENERATORS BELOW 500 MW

TYPICAL

GENERATOR

SPREAD

IN SR

UNIT CAPACITY AP KAR KER TN CGS TOTAL

THERMAL (500 MW) 2 8 10

THERMAL

(200-250 MW)10 7 13 15 45

GAS/THERMAL

(100-150 MW)9 2 3 10 24

HYDRO

(>50 MW)27 27 16 15 85

TOTAL 48 36 19 38 164

- HYDRO

- THERMAL

- GAS / NAPTHA

- NUCLEAR

Page 15: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

15

LOAD 500-1200 MW

LOAD 200-500 MW

TYPICAL

LOAD

SPREAD

IN SR

Page 16: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

16

11000

13000

15000

17000

19000

21000

23000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

HOUR ---->

DE

MA

ND

IN

MW

--->

TYPICAL LOAD CURVE OF SR

WINTER

MONSOON

SUMMER

EVENING PEAK

WEATHERRESERVOIR CONSUMPTION

Page 17: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

17

GRID OPERATION

TYPICAL ISSUES IN THE PAST

Page 18: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

18

GRID OPERATION – TYPICAL ISSUES IN PAST

• LOW / HIGH FREQUENCY PROBLEMS

– FREQUENCY EXCURSES TO LOW/HIGH VALUES

• LOW / HIGH VOLTAGE OPERATION

– CRITICALLY LOW VOLTAGES AT LOAD CENTRES

– SUBSTANTIALLY HIGH VOLTAGES AT FAR ENDS

• SYSTEM BROWNOUTS / BLACK OUTS

– SEPERATION OF SYSTEMS / LOSS OF LOAD

• ECONOMIC IN-STABILITY / INCREASED ELECTRICAL LOSSES– UNRELIABLE / INEFFICIENT OPERATION OF EQUIPMENT

Page 19: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

19

GRID OPERATION: A TIGHT ROPE WALK

BLACK-OUTVOLTAGE

COLLAPSE IN-ECONOMIC

OPERATION

INSTABILITYPOWER

SWINGSINCREASED

LOSSES

Page 20: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

20

GRID PRESENT STATUS

Page 21: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

21

GRID OPERATION – PRESENT STATUS

STABILISED SYSTEM FREQUENCY

IMPROVED VOLTAGES

MERIT ORDER OPERATION

INTER REGIONAL EXCHANGES

IMPROVED GRID SECURITY

Page 22: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

22

GRID PRESENT STATUS

CARDINAL EVENTS

Page 23: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

23

GRID PRESENT STATUS -- CARDINAL EVENTS

• AVAILABILITY BASED TARIFF

• UNIFIED LOAD DESPATCH SCHEME

• GENERATION ADDITION

• INTERREGIONAL AC / HVDC LINKS

• INTER REGIONAL EXCHANGES

• OPERATIONAL EXCELLENCE

UI

Page 24: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

24

Page 25: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

25

MONSOONS

SOUTH WEST MONSOON NORTH EAST

MONSOON

Page 26: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

26

STABILISED SYSTEM FREQUENCY

• TYPICAL FREQUENCY CURVE

• FREQUENCY DURATION CURVE

• RECORD FVI OF 0.04

Page 27: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

27

47.50

48.00

48.50

49.00

49.50

50.00

50.50

51.00

25 26 27 28 29 30 31

DAYS ----->

FR

EQ

UE

NC

Y IN

HZ

---

->FREQUENCY PROFILE

2002, 2003 & 2004

Page 28: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

28

47.00

47.50

48.00

48.50

49.00

49.50

50.00

50.50

51.00

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95

% OF TIME --->

FR

EQ

IN H

Z -

-->

2004-05

2003-04

 

<49.049.0 & <50.5

50.5 & Above

Max Min Avg FVI

 

2004-05 0.13 98.70 0.17 50.90 48.62 49.85 0.83

2003-04 2.30 97.30 0.44 51.17 48.18 49.69 1.95

2002-03 49.48 48.51 2.01 51.37 47.69 48.95 18.86

2002-03

FREQUENCY DURATION CURVE 2002-03, 2003-04 & 2004-05

FVI

Page 29: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

29

YEAR

FREQUENCY (Hz) % OF TIME WHEN FREQUECY WAS BETWEEN

AVERAGFVIMAXIMUM

MINIMUM

AVERAGE< 48.5

HZ

48.5 TO 49.0 HZ

49.0 TO 49.5 HZ

49.5 TO 50.0 HZ

50.0 TO 50.5 HZ

> 50.5 HZ

00 – 01 51.56 47.76 48.67 53.79 17.68 13.63 12.26 2.64 ---

01 – 02 51.44 47.72 48.52 68.08 9.96 6.48 11.39 4.10 29.71

02 – 03 51.37 47.69 48.95 39.31 10.17 14.48 23.93 10.10 2.01 18.86

03 – 04 51.17 48.18 49.69 0.10 2.20 22.03 63.00 12.23 0.44 1.95

04 - 05 50.90 48.62 49.85 0.00 0.13 8.49 63.81 27.40 0.17 0.83

FREQUENCY SPECTRUM OF SOUTHERN REGION FOR PAST FIVE YEARS

Page 30: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

30

320

330

340

350

360

370

380

390

400

410

42000

:05

01:0

5

02:0

5

03:0

5

04:0

5

05:0

5

06:0

5

07:0

5

08:0

5

09:0

5

10:0

5

11:0

5

12:0

5

13:0

5

14:0

5

15:0

5

16:0

5

17:0

5

18:0

5

19:0

5

20:0

5

21:0

5

22:0

5

23:0

5

TIME IN HRS --->

VO

LT

AG

E IN

KV

---

>

REALITY BITE:

FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.

EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!

COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY

BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES

Page 31: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

31

VARIABLE COST(Ps) OF POWER STATION IN SR AS ON JUNE 2004

0

2000

4000

6000

8000

10000

12000

14000

16000

18000P

ON

DY

PC

L (3

2.5

MW

)(19

.61

PS

)

NE

YV

ELI

-II S

TG

1 *

*(63

0 M

W)(

67.9

9 P

S)

KO

VIL

KA

LAP

PA

L *(

105

MW

)(68

PS

)

JEG

UR

UP

AD

U (

GA

S)(

216

MW

)(82

PS

)

SP

EC

TR

UM

(G

AS

)(20

8 M

W)(

83 P

S)

VIJ

JES

WA

RA

M -

I(10

0 M

W)(

84 P

S)

VIJ

JES

WA

RA

M -

II(17

2.5

MW

)(86

PS

)

B S

E S

(A

P)(

GA

S)(

140

MW

)(87

PS

)

RE

INS

CA

LCIN

ING

LT

D.(

41 M

W)(

90 P

S)

RA

MA

GU

ND

AM

(210

0 M

W)(

90 P

S)

LAN

CO

(350

MW

)(91

.48

PS

)

NE

YV

ELI

-II S

TG

-II *

*(84

0 M

W)(

94.6

1 P

S)

SIM

HA

DR

I(10

00 M

W)(

96 P

S)

RA

MA

GU

ND

AM

-B(6

2.5

MW

)(96

PS

)

VIJ

AY

AW

AD

A T

.P.S

.-1&

2(10

50 M

W)(

101

PS

)

VIJ

AY

AW

AD

A T

.P.S

.-3(

210

MW

)(10

1 P

S)

KO

TH

AG

UD

EM

(B)(

210

MW

)(10

8 P

S)

RA

ICH

UR

.T.P

S. *

*(12

60 M

W)(

110

PS

)

KO

TH

AG

UD

EM

(A)(

240

MW

)(11

0 P

S)

KO

TH

AG

UD

EM

(C)(

220

MW

)(12

3.1

PS

)

KO

TH

AG

UD

EM

(D)(

500

MW

)(12

4 P

S)

RA

YA

LAS

EE

MA

TP

P(4

20 M

W)(

126

PS

)

NO

RT

H M

AD

RA

S.T

.P.S

(630

MW

)(13

0.98

PS

)

TU

TU

CO

RIN

.T.P

.S(1

050

MW

)(13

3.5

PS

)

ME

TT

UR

.T.P

.S(8

40 M

W)(

150

PS

)

V S

P *

(120

MW

)(16

9.11

PS

)

ST

-CM

S(2

50 M

W)(

171

PS

)

NE

YV

ELI

-I(6

00 M

W)(

185.

86 P

S)

EN

NO

RE

.T.P

.S(4

50 M

W)(

190.

2 P

S)

L V

S(3

7.8

MW

)(20

0 P

S)

YE

LEH

AN

KA

DE

ISE

L(12

7.92

MW

)(20

3.36

PS

)

NA

VB

HA

RA

T(3

5 M

W)(

205

PS

)

BR

AH

MA

PU

AM

D P

P(1

06.5

MW

)(21

4 P

S)

NE

LLO

RE

(30

MW

)(22

5 P

S)

B S

E S

(K

ER

ALA

)(16

5.5

MW

)(22

5 P

S)

TH

AN

NE

ER

BA

VI(

235

MW

)(22

8 P

S)

JIN

DA

L(26

0 M

W)(

247

PS

)

BA

LAJI

(SA

MA

YA

NA

LLU

R)(

105

MW

)(24

7 P

S)

KO

ZH

IKO

DE

DP

P(1

28.8

MW

)(25

0 P

S)

GM

R V

AS

AV

I(19

6 M

W)(

254

PS

)

SA

MA

LPA

TT

Y IP

P(1

05 M

W)(

263

PS

)

TA

TA

DE

ISE

L(81

.3 M

W)(

280

PS

)

KA

YA

MK

ULA

M N

TP

C(3

50 M

W)(

290

PS

)

KA

SA

RG

OD

P C

L(2

1 M

W)(

300

PS

)

RA

YA

LAS

EE

MA

(37.

8 M

W)(

330

PS

)

PP

NA

LLU

R(3

30.5

MW

)(41

5 P

S)

BA

SIN

BR

IDG

E(1

20 M

W)(

468

PS

)

CU

MU

LA

TIV

E IN

ST

AL

LE

D C

AP

AC

ITY

IN M

W

0

50

100

150

200

250

300

350

400

450

VA

RIA

BL

E C

OS

T IN

Ps/

UN

IT

VARIABLE COST

CUMULATIVEINSTALLE

ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps

ABOUT 16000 MW OF CAPACITY IS BELOW 300 Ps

CUM. INS. CAP.

Page 32: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

32

49.72 HZ

Page 33: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

33

MERIT ORDER : UNITS BOXED UP

POWER STATION STATE CAPACITY(MW) FUELVARIABLE

COST

TATA DIESELKARNATAK

A 79 DIESEL 308

RAYALSEEMA DGPP

KARNATAKA 27 DIESEL 360

YELEHANKA DIESEL

KARNATAKA 128 DIESEL 314

THANRBHAVIKARNATAK

A 220 NAPTHA 325

SUB-TOTAL 454    

BRAHAMPURAM DPP KERALA 107 DIESEL 275

BSES KERALA 157 NAPTHA 308

KASARGODE PCL KERALA 22 NAPTHA 298

KAYAMKULAM KERALA 360 NAPTHA 322

SUB-TOTAL 646    

BASIN BRIDGETAMIL NADU 120 NAPTHA 584

P.P.NALLURTAMIL NADU 330 NAPTHA 415

SUB-TOTAL 450    

TOTAL 1550    

Page 34: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

34

DEEP VALLEY

DEEP VALLEY

SHARP

PEAK

Page 35: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

35

KADAMPARAI PUMP OPERATION

-300

-200

-100

0

100

200

300

400

5000:

001:

002:

003:

004:

005:

006:

007:

008:

009:

0010

:00

11:0

012

:00

13:0

014

:00

15:0

016

:00

17:0

018

:00

19:0

020

:00

21:0

022

:00

23:0

00:

00

TIME ---->

IN M

W --

-->

48.50

49.00

49.50

50.00

50.50

51.00

FREQ

UENC

Y IN

HZ

---->

GENERATOR MODE

PUMP PUMP

SAVINGS OF RS 40 LAKHS EVERY DAY

INVESTMENT OF 1600 CRORES SAVED

Page 36: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

36

OPPORTUNISTIC UI TRADEEXPORT TO WR ON 13/05/03-14/05/03

-300

-200

-100

0

100

200

300

400

500

600

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00 01 02 03 04 05 06 07 08

49

49.2

49.4

49.6

49.8

50

50.2

50.4

50.6

50.8

51POWER EXPORT TO WR ON

UI BASIS DURING LOAD CRASH

FREQ

Page 37: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

37

GENERATION vs FREQUENCY FOR

10

30

50

70

90

08

:21

09

:21

10

:21

11

:21

TIME IN HH:MM ----->

MW

---

-->

49.00

49.20

49.40

49.60

49.80

50.00

50.20

50.40

FR

EQ

IN

HZ

---

-->

FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04

SHARAVATHI -1

FREQ DROP FROM 49.72 HZ TO 49.27 HZ

i.e. ~ 0.45HZ

Page 38: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

38

GENERATION vs FREQUENCY FOR

10

30

50

70

90

08

:21

09

:21

10

:21

11

:21

TIME IN HH:MM ----->

MW

---

-->

49.00

49.20

49.40

49.60

49.80

50.00

50.20

50.40

FR

EQ

IN

HZ

---

-->

FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04

SHARAVATHI -4

FREQ DROP FROM 49.72 HZ TO 49.27 HZ

i.e. ~ 0.45HZ

Page 39: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

39

OPTIMAL RESERVOIR UTILISATIONSHARAVATHY IN KARNATAKA

THE COST OF GENERATION AT SHARAVATHY IS LESS THAN 20 Ps /UNIT

AVERAGE SELLING UI RATE OF KARNATAKA IS 372 Ps/UNIT

PLANT OPERATORS AT SHARAVATHY THINK OF THE RESERVOIR LEVEL IN RUPEES

RATHER THAN IN FEET!!!

Rs. Rs.

Rs.

Rs.

Rs.

Rs.Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.Rs.

Page 40: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

40

Growth of Inter Regional Energy Exchanges

73508230

9730

13000

22500

0

5000

10000

15000

20000

25000

1999-2000 2000-2001 2001-2002 2002-2003 2003-2004

Year

To

tal

MU

Du

rin

g T

he

Yea

r

IR Energy Exchanges

Page 41: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

41

INTER REGIONAL EXCHANGES upto 20-11-05

221

265

138150

0

50

100

150

200

250

300

1 2

SR RATE WR RATE SR RATE ER RATE

RA

TE

(P

AIS

E/K

WH

)Import from

WR(668 MU)Import from

ER (805 MU)

Page 42: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

42

INTER REGIONAL EXCHANGES up to 20-11-05

139147

297287

0

100

200

300

400

1 2SR RATE WR RATE SR RATE ER RATE

RA

TE

(P

AIS

E/K

WH

)

SR rate

WR/ER rate

Export to WR(592MU)

Export to ER (301 MU)

Page 43: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

43

Reconciliation of UI Accounts

• 218 th Commercial Committee Meeting of SREB held on 06-12-2005

• UI and Reactive Energy Charges Pool Accounts Payment and distribution for the year 2004-05 have been reconciled by all the constituents except AP.

Page 44: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

44

AP KAR KER TN PONDY

Total UI exported(-) /

Imported(+) in MUs

-4666 4688 693 1702 -189

Total amount paid in Crores

Rs.-897 857 119 447 -35

Average rate of UI in paise/unit 192 183 172 262 187

SUMMARY OF UI – 142WKS(FROM 01/JAN/03 TO 20/NOV/05)

Page 45: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

45

UI IN SR (FROM 01/01/03 TO 20/11/05)

• TOTAL UI TURNOVER :- 10059 MU

• TOTAL UI AMOUNT DISBURSED:- 1923 CR

• AVG WEEKLY TRANSACTION:- 67 MU

• AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR

Page 46: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

46Back

OD UD AND UI RATES OF CONSTITUENTS

188 179

242

202184

151

407

259

0

50

100

150

200

250

300

350

400

450

AP KAR KER TN

RA

TE

(P

AIS

E/U

NIT

)

OVER DRAWAL (PURCHASE) UNDER DRAWAL (SOLD)

207MU

4825MU

4470MU

31MU

1315MU

334MU

2090MU

573MU

Page 47: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

47

INTER-REGIONAL EXCHANGES DETAILS UPTO 151 WKS (Till 20.11.05)

WR ER

Net Energy Transaction

76.6 MU

IMPORT BY SR

503.8MU

IMPORT BY SR

Amount Due to

SR Constituents

Rs. 79.7 Cr. Rs. 24.5 Cr.*

Amount Credited TO SR

Constituents

Rs. 76.2 Cr. Rs. 24.5 Cr.

*from 06.09.04 (when ER exchanges computed @ respective frequencies)

Page 48: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

48

MAJOR AND MINOR DISTURBANCES SINCE 1994

0

1

2

3

4

5

6

7

8

9

10N

UM

BE

R O

F D

IST

UR

BA

NC

ES

---

----

->

1994

-95

1995

-96

1996

-97

1997

-98

1998

-99

1999

-00

2000

-01

2001

-02

2002

-03

2003

-04

2004

-05

YEAR ->

MAJOR MINOR

NO DISTURBANCES DESPITE LOSING ENTIRE SUPER GENERATING PLANTS LIKE

RAMAGUNDAM,VIJAYAWADA,KOTHAGUDEM, NORTH CHENNAI, SHARAVATHY ETC

Page 49: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

49RTU RTU RTU

SUB LDC SUB LDC SUB LDC

SLDC SLDC SLDC

ERLDC

WRLDC NRLDC SRLDC

NERLDC

NLDC

32 Nos.

51 Nos.

1160Nos.

Unified Grid OperationUnified Grid Operation

5 Nos.

NationalLevel

RegionalLevel

State HQLevel

Group / Distt Level

Plant / Sub-Station Level

Page 50: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

50

RLDC,Bangalore

KalamasseryHyderabad BangaloreChennai

Cuddapah

Warangal

Vijayawada

Kalam’erry

Kannur

Trivandrum

Chennai

Erode

Madurai

Bangalore

Lingusugur

Hubli

CPCC SCC, Pondy

Hyderabad

Hierarchy of The ULDC Scheme in Southern Region

Andhra Kerala Tamilnadu Karnataka

Page 51: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

51

COMPLEXITY OF MONITORING

Annual Inter-Regional Energy Transfer

≈10,000MU

Transformers (220kV and

above)480 nos.

Installed Capacity

≈32800 MW

Integrated Opn

of Ten Power Utilities

Dynamic Grid

Conditions

Generators –Hydro,

Thermal,Gas/IPP

422 nos.

Transmission

Network 400/220kV

≈ 40700 Ckm

30,000 POINTSActive Power, Reactive

Power,Voltage, Frequency,

TransformerTap Position, Circuit

Breaker Position, Isolator Position etc

Transformation

Capacity ≈45000 MVA

Page 52: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

52

Kolar

Chintamani

Cudappah

HoodyHosur

Salem

Udumalpet

Madras B’lore

+/- 500 KV DC line 1370 KM

ElectrodeStation

ElectrodeStation

TALCHER

400kv System

220kv system

KOLAR

TALCHER KOLAR TALCHER KOLAR SCHEMATICSCHEMATIC

Page 53: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

53

Inter Regional Links

Present IR CapacityPresent IR Capacity= 9,500 MW= 9,500 MW

700 MW700 MW

1200MW1200MW

2000MW2000MW

1200 MW1200 MW

900 MW900 MW30,500 MW

16,000

32,700 MW

30,500 MW

2300

1850 MW1850 MW

1650 MW1650 MW

Page 54: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

54

13450 MW

1000 MW6450 MW

4600 MW

1300 MW3200 MW

30,000 MW OF INTER-REGIONAL POWER BY 2012

EASTERN REGION

SOUTHERN REGION

WESTERNREGION

NORTHERN REGION

NORTH-EASTERN REGION

INTER-REGIONAL TRANSFER BY INTER-REGIONAL TRANSFER BY END OF 11END OF 11thth PLAN (2012) PLAN (2012)

Page 55: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

55

RESERVOIR LEVEL - RESERVOIR LEVEL - COMPARISONCOMPARISON

LEVEL IN MTSLEVEL IN MTS LEVELLEVEL30-Nov-0430-Nov-04

LEVELLEVEL30-Nov-0530-Nov-05

JALAPUTJALAPUT 836.14836.14 837.58837.58

LINGANMAKKILINGANMAKKI 548.56548.56 553.04553.04

SUPASUPA 540.40540.40 559.57559.57

IDUKKIIDUKKI 722.87722.87 729.50729.50

KAKKIKAKKI 972.35972.35 979.60979.60

NILGIRISNILGIRIS

TOTALTOTAL

ENERGYENERGY30-Nov-0430-Nov-04

ENERGYENERGY30-Nov-0530-Nov-05

RISE IN RISE IN MUMU

% % RISERISE

438438 501501 6363 1414

26982698 41064106 14081408 5252

17811781 27592759 978978 5555

14071407 19461946 538538 3838

609609 829829 220220 3636

14591459 14421442 -1717 -11

83938393 1158411584 31903190 31903190

Page 56: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

56

320

330

340

350

360

370

380

390

400

410

42000

:05

01:0

5

02:0

5

03:0

5

04:0

5

05:0

5

06:0

5

07:0

5

08:0

5

09:0

5

10:0

5

11:0

5

12:0

5

13:0

5

14:0

5

15:0

5

16:0

5

17:0

5

18:0

5

19:0

5

20:0

5

21:0

5

22:0

5

23:0

5

TIME IN HRS --->

VO

LT

AG

E IN

KV

---

>

REALITY BITE:

FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.

EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!

COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY

BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES

(water supply to b’lore- next page )

Page 57: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

57

WATER SUPPLY TO BANGALORE

LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER

WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED

400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID

PUMPING LOSSES REDUCED

ENORMOUS SAVINGS TO THE STATE

MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY

Page 58: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

58

FREQUENCY CURVE FOR 9th SEPTEMBER 2004FVI = 0.04

Avg Freq = 49.99Hz

48.5

49.0

49.5

50.0

50.5

51.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

10 * ∑ (F – 50) 2

FVI = -------------------------------

24 * 60

Page 59: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

59

THANK YOU

Page 60: SOUTHERN REGIONAL LOAD DESPATCH CENTRE

60

0

20000

40000

60000

80000

100000

120000

140000

in MW

Growth of installed capacity for electricity in India