south king & pierce cooperation. cooperative objectives comply with standards 1.wac...

5
South King & Pierce Cooperation

Upload: randolph-spencer

Post on 19-Jan-2018

219 views

Category:

Documents


0 download

DESCRIPTION

Historical

TRANSCRIPT

Page 2: South King & Pierce Cooperation. Cooperative Objectives Comply with standards 1.WAC 296-800-16005, 10 & 15 2.WAC 296-305-02001 a.NFPA 1851 Optimize PPE

Cooperative Objectives

Comply with standards1. WAC 296-800-16005, 10 & 152. WAC 296-305-02001

a. NFPA 1851

Optimize PPE performance withinbudget constraints

Establish an evidence-based standard

Drive reform in turnout manufacturing

Page 3: South King & Pierce Cooperation. Cooperative Objectives Comply with standards 1.WAC 296-800-16005, 10 & 15 2.WAC 296-305-02001 a.NFPA 1851 Optimize PPE

Historical

Page 4: South King & Pierce Cooperation. Cooperative Objectives Comply with standards 1.WAC 296-800-16005, 10 & 15 2.WAC 296-305-02001 a.NFPA 1851 Optimize PPE

• Phase One “User Satisfaction”– Break In– Primary Set

• Real incidents/drills• One “month” operations

– Secondary Set• Ten specified workouts

• Evaluations– 20 Dimensions each for

coat and pants• Summarized as a

percentage of satisfaction

74%

Page 5: South King & Pierce Cooperation. Cooperative Objectives Comply with standards 1.WAC 296-800-16005, 10 & 15 2.WAC 296-305-02001 a.NFPA 1851 Optimize PPE

Phase Two “Head to Head”– Six CPAT-based stations

executed in all turnouts sequentially• Tailboard step• Stairclimb• Ceiling pull• Crawl• Lift and drag• Ladder manipulation

Choose the highest performing ensemble.