Prequalification No. 1372 for General Contractors Major Subcontractors South Fork Water Treatment Plant Issue date: September 6, 2012 Closing Location Purchasing Department 2020 Labieux Road Nanaimo, BC V9T 6J9 City Contact Bill Sims, AScT, Manager, Water Resources City of Nanaimo - Engineering & Public Works 2020 Labieux Road Nanaimo, BC V9T 6J9 Telephone: (250) 756-5302 Fax: (250) 756-5326 Email: [email protected] Closing date and time Responses must be received at the Purchasing Department before 3:00 PM Pacific Time on September 26, 2012

Upload: others

Post on 03-Nov-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

Prequalification No. 1372 for

General Contractors

Major Subcontractors

South Fork Water Treatment Plant

Issue date: September 6, 2012

Closing Location Purchasing Department

2020 Labieux Road Nanaimo, BC V9T 6J9

City Contact Bill Sims, AScT, Manager, Water Resources

City of Nanaimo - Engineering & Public Works 2020 Labieux Road

Nanaimo, BC V9T 6J9 Telephone: (250) 756-5302

Fax: (250) 756-5326 Email: [email protected]

Closing date and time Responses must be received at the Purchasing Department before

3:00 PM Pacific Time on September 26, 2012

Page 2: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

PREQUALIFICATION No. 1372 CITY OF NANAIMO

South Fork Water Treatment Plant

GENERAL CONTRACT – PREQUALIFICATION

The City of Nanaimo is seeking the services of a Contractor and Subcontractors for the construction of its new South Fork Water Treatment Plant and ancillary facilities. Briefly, the scope of work includes:

1. Rock and common excavation, structural steel, reinforced concrete , building envelop and interior and exterior architectural finishing of the water treatment plant building and ancillary buildings, including clearwell

2. Assuming responsibility for the novation of a pre-existing membrane equipment supply contract with GE Water & Power

3. Mechanical piping, raw water screening equipment, coagulation/flocculation, two-stage GE siphon membrane systems installation, chemical handling systems, residuals processing systems, disinfection using chlorine gas

4. Electrical installation, instrumentation and control, office/operations area, building mechanical and security

5. Site civil works, roadworks, parking areas, landscaping, environmental features

6. Testing and commissioning

This is NOT a Request for Proposal or a Tender. It is a request for qualifications only. No contractual obligations will exist on either party. Firms wishing to be considered for the Prequalification List MUST submit a Prequalification Package. Evaluation by the City of Nanaimo and its appointed representatives will determine which Contractors and Subcontractors will be invited to participate in the Tender, if conducted. The City’s decision regarding Contractor and Subcontractor selection and prequalification shall be final.

All submissions shall be in a sealed envelope labelled “City of Nanaimo, South Fork Water Treatment Plant Qualifications Submission”. Submissions will be received up to 3:00 pm Pacific Daylight Time, September 26, 2012, by:

Purchasing Department City of Nanaimo 2020 Labieux Rd

Nanaimo BC V9T 6J9 Interested Contractors are encouraged to complete the attached Receipt Confirmation Form for addenda to be sent directly. However, it is still the responsibility of the interested Contractor to check the City of Nanaimo website and BC Bid website for any addenda issued for this prequalification up to the closing date and time.

Page 3: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

Receipt CONFIRMATION Form

CITY OF NANAIMO

PREQUALIFICATION No. 1372

South Fork Water Treatment Plant

Closing date and time: 3:00 PM, Pacific Daylight Time, September 26, 2012 As receipt of this document, and to directly receive any further information about this

Prequalification, please return this form to:

Attention: Kurtis Felker

Manager, Purchasing & Stores City of Nanaimo

2020 Labieux Road, Nanaimo, BC, V2T 4M7 Fax: 250.756.5327

Email: [email protected]

COMPANY NAME: ________________________________________________

STREET ADDRESS: _______________________________________________

CITY/PROVINCE: _________________________________________________

POSTAL CODE: __________________________________________________

PHONE NUMBER: ________________________________________________

FAX NUMBER: ___________________________________________________

CONTACT PERSON: ______________________________________________

EMAIL ADDRESS: ________________________________________________

SIGNATURE: ___________________________________________________________ DATE: __________________________________________________________

Page 4: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

1 Instructions to Contractors 1.1 PURPOSE

.1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors for short listing to be invited to tender to construct the City’s new South Fork Water Treatment Plant and ancillary facilities.

.2 It is the intent of the City to prequalify general contractors, and major ubcontractors. The City reserves the right to reject general contractors or subcontractors not meeting its requirements.

.3 General Contractors wishing to undertake Major Subtrade work on the project themselves must submit both as a General Contractor and as a Major Subcontractor.

.4 Major Subcontractors are considered to be the following:

.1 Concrete forming/placement

.2 Process Mechanical

.3 Electrical

.4 Instrumentation & Controls

1.2 QUALIFICATIONS SUBMISSIONS

.1 Submissions will be received by the City of Nanaimo, Purchasing Deprtment, 2020 Labieux Rd, Nanaimo BC V9T 6J9. Attention: Manager of Purchasing & Stores, before 3:00 pm, local time, on September 26, 2012. Late submissions will be returned unopened.

.2 Provide a letter from a bonding company stating the Contractor’s bonding capability qualifications.

.3 Submit one copy of the submission in a sealed envelope along with one electronic copy on a memory stick or DVD, clearly identified with the name of the Contractor, the City of Nanaimo, and the Project Name and plainly marked “QUALIFICATION SUBMISSION”. Alternatively, submissions can be submitted electronically, in their entirety, at the only acceptable email address: [email protected]. Please note: Maximum email size limit is 8 MB. Respondents are responsible to ensure that electronically submitted files have been received by the closing time.

.4 Changes to submissions will be accepted by facsimile at the only acceptable facsimile number 250.756.5327, via email at the only acceptable email address [email protected] or by hand delivery at the posted closing address and building. Changes shall clearly show which section of the submission is to be amended. The City of Nanaimo will not be responsible for failure to receive any changes to submissions. Contractors are responsible for allowing themselves enough time to ensure their submissions are received complete prior to the posted closing date and time.

.5 Qualification responses will not be publicly opened.

Page 5: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

.6 Addenda may be issued by the City’s Purchasing Department. All such addenda shall become part of the prequalification package. Interested Contractors are encouraged to complete the attached Receipt Confirmation Form for addenda to be sent directly.

1.3 QUALIFICATION FORMS

.1 Supply all information requested on the Request for Qualification forms supplied by the City of Nanaimo and latest CCDC 11 – Contractor’s Qualification Statement, available from the CCDC website www.ccdc.org both in paper or “e-fillable” form.

.2 All forms must be completed whether they are hard copy or electronic. Failure to do so may result in rejection of the submission. If space provided is insufficient, extra sheets may be attached. All such sheets must be identified by the contractor as being part of the submission.

.3 A complete submission includes:

.1 Signed and completed Qualification Forms and latest version of CCDC 11 – Contractor’s Qualification Statement, including Appendices, resumes and additional pages as necessary .2 Letter from bonding company .3 An acknowledgement of the ability to take on the role of Prime Contractor as defined in the WorkSafe BC Occupational Health and Safety Regulation. (Applies to General Contractors only) .4 A description of the Contractor’s safety and environmental management programs, along with safety statistics and Worksafe rating over the past 5 years.

.4 Reference contact information for similar water treatment plant construction.

.5 Contractors are welcome to submit additional information that demonstrates their capabilities and that will aid the City in its determination of qualified candidates.

1.4 REJECTION OF SUBMISSIONS

.1 The City of Nanaimo reserves the right to reject any or all submissions. Submissions that are incomplete may be rejected.

.2 The City of Nanaimo, at its sole discretion, reserves the right to waive any irregularity or insufficiency in any qualification submission.

.3 The City of Nanaimo may reject a submission if:

.1 After investigation and consideration, the City concludes that the Contractor is not fully qualified to do the work and/or may not be able to do the work and perform the Contract in a manner satisfactory to the City of Nanaimo.

.2 A submission contains qualifying conditions or otherwise fails to conform to these Qualification Instructions.

.3 A submission is incomplete, is considered incomplete in these Qualification Instructions, is obscure or irregular, or which has erasures or corrections in the Submission Form.

Page 6: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

.4 The City of Nanaimo may, in its absolute discretion, reject a Submission submitted by Contractor if the Contractor, or any officer or director of the Contractor is or has been engaged either directly or indirectly through another corporation in a legal action against the City of Nanaimo, its elected or appointed officers and employees in relation to:

.1 any other contract for works or services; or

.2 any matter arising from the City of Nanaimo’s exercise of its powers, duties, or functions under the Local Government Act or another enactment.

within five years of the date of this Call for Pre-Qualifications.

In determining whether to reject a submission under this clause, the City of Nanaimo will consider whether the litigation is likely to affect the Contractor’s ability to work with the City of Nanaimo, its consultants and representatives and whether the City of Nanaimo’s experience with the Contractor indicates that the City of Nanaimo is likely to incur increased staff and legal costs in the administration of this contract if it is awarded to the Contractor.

.5 The City of Nanaimo, however, may at its sole discretion elect to retain for consideration a submission which is non-conforming because it does not contain the content or form required by these Instructions or because a Contractor has not complied with the procedures set out in the Instructions provided that the Contractor complies substantially with the Instructions.

.4 The City of Nanaimo may reject all submissions if:

.1 the City of Nanaimo on reasonable grounds decides that it will not proceed with the project at all.

.5 The City of Nanaimo reserves the right to consider and to reject any submission or all submissions without notice to a Contractor or Contractors and without permitting a Contractor to provide additional information.

.6 In no event will the City of Nanaimo be responsible for a Contractor’s costs of preparing or submitting a submission.

.7 Except as expressly and specifically permitted in these Qualification Instructions, no Contractor shall have any claim for any compensation of any kind whatsoever, as a result of participating in the submission, and by submitting a Qualification Submission each Contractor shall be deemed to have agreed that it has no claim.

Page 7: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

1.5 INTERPRETATIONS AND MODIFICATIONS OF QUALIFICATION FORM DOCUMENTS

.1 Submit questions in writing to the City’s representative: Bill Sims, AScT, Manager, Water Resources City of Nanaimo - Engineering & Public Works 2020 Labieux Road Nanaimo, BC V9T 6J9 Telephone: (250) 756-5302 Fax: (250) 756-5326 Email: [email protected]

.2 Promptly notify the representative of any ambiguity, inconsistency or error which they may discover upon examination of the documents.

1.6 QUALIFICATION EVALUATION AND SELECTION

.1 The City of Nanaimo and its engineering consultants will evaluate the submissions based on the following criteria:

.1 Demonstrated relevant experience with constructing, testing and commissioning public drinking water filtration plants exceeding 50 ML/d and exceeding $20 Million in capital cost. (30%) (Note: preference will be given to those with experience in membrane filtration plants) .2 Demonstrated ability to work in and around existing water supply facilities and to make interconnections to existing facilities without creating major unplanned operational disruptions (10%)

.3 Capacity to complete work on schedule and budget, given current workload (15%) .4 Suitable project management, qualifications, supervisory staff and resources assigned for the duration of the project. (20%) .5 Demonstrated team approach and ability to establish relationships with past clients and consultants, including references from same. (10%) .6 Safety and environmental management programs implemented in the organization. (10%) .7 Satisfactory financial resources including bonding capability. (5%)

.2 The City of Nanaimo may invite up to six of the highest rated qualified General Contractors to submit formal tenders for the work.

.3 The City will publish a list of prequalified major subcontractors, from which qualified General Contractors may seek pricing.

.4 Only pre-qualified Contractors and Subcontractors selected from this process will be invited and permitted to submit bids for this project. The City of Nanaimo’s decision regarding Contractor and Subcontractor selection shall be based on the established criteria and shall be final.

.5 This process shall not obligate the City of Nanaimo to proceed with a tender process.

Page 8: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

1.7 SCOPE OF THE WORK

.1 The components of the works include:

a. Rock and common excavation, structural steel, reinforced concrete, building envelope and interior and exterior architectural finishing of the water treatment plant building and ancillary buildings, including 7.5 ML reinforced concrete clearwell

b. Assuming responsibility for the novation of a pre-existing membrane equipment supply contract with GE Water & Power

c. Mechanical piping, raw water screening equipment, coagulation/flocculation, two-stage GE siphon membrane systems installation, chemical handling systems, residuals processing systems, disinfection using chlorine gas

d. Electrical installation, instrumentation and control, office/operations area, building mechanical and security

e. Site civil works, roadworks, parking areas, landscaping, environmental features f. Testing and commissioning

2. Attached are site plans that give a general overview of the project scope 3. Water supply pipeline installation is currently under construction. Raw water supply

main and treated water main will be terminated close to the excavation for each structure. Preliminary rough-in and grading of the access road will be completed under the existing pipeline installation contract

4. The entire site has been cleared and grubbed in preparation for this work 5. The City has contracted with GE Water for the purchase of the membranes and ancillary

equipment. This contract will be assumed by the general contractor, without change. 6. GE has provided a contractor information package which will be forwarded to

shortlisted general contractors. This will help clarify the relationship that exists between GE as supplier, and the contractor as installer.

7. The City plans to take out Owner-controlled Builder’s Risk and Wrap-up Liability Insurance for the Project. Contractors and Subcontractors will be expected to carry their own Comprehensive General Liability and Automotive Insurance.

1.8 SCHEDULE OF THE WORK

.1 The proposed schedule is as follows (note dates except PQ close are approximate):

a. Close prequalification 26 Sep 12 b. Develop shortlists 20 Oct 12 c. Issue tender 15 Nov 12 d. Tender close 15 Jan 13 e. Award 01 Feb 13 f. Mobilization 01 Mar 13 g. Complete construction 15 Dec 14 h. Complete testing & commissioning 15 Feb 15

Note: the City is bound to the completion date by its Waterworks Operating Permit

END OF SECTION

Page 9: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

REQUEST FOR QUALIFICATION No.1372

QUALIFICATIONS FOR: CITY OF NANAIMO South Fork Water Treatment Plant THE UNDERSIGNED DOES HEREBY RESPOND to the City of Nanaimo in accordance with all the terms and conditions of the Qualification Package. AND WE HEREBY AGREE:

(i) That the City of Nanaimo is in no way obligated to accept this Response. (ii) That, should the Qualification Forms be improperly completed or be incomplete,

the City of Nanaimo shall have the right, but no obligation, to disqualify and/or reject this Response.

(iii) The submission of a Response constitutes the agreement of the Respondent to be solely responsible for any and all costs and expenses incurred by it in preparing and submitting its Response, including all costs incurred by the Respondent after the submission.

(iv) To allow the City of Nanaimo and its appointed representatives to check and verify the information provided in the submission. Reference checks will be kept confidential and will not be reviewed or discussed with Contractors applying for prequalification.

(v) Any submission will not necessarily be accepted.

AND WE DO HEREBY ACKNOWLEDGE the qualification package is to allow the City of Nanaimo and their appointed representatives to shortlist general contractors and major subcontractors for the purpose of the future invitation only tender for the City of Nanaimo, South Fork Water Treatment Plant. The City of Nanaimo will not award a contract based on the qualification package provided herein, and the City of Nanaimo will only issue drawings and tender documents to Contractors it deems are qualified to perform the works as per the Qualification Instructions.

Page 10: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

This Response is executed at on this day of , 2012. A Addenda: I/We acknowledge receipt of the following Addenda related to this Request for Qualification and have incorporated the information received in preparing this Prequalification Package. .1 Addendum # ______ Date Issued ______________________________

.2 Addendum # ______ Date Issued ______________________________

.3 Addendum # ______ Date Issued ______________________________

.4 Addendum # ______ Date Issued ______________________________

Name of Firm:

Submitting as: General Contractor OR Major Subcontractor State Discipline:

Address:

SIGNED AND DELIVERED, this day of , 2012 (Respondent - please print) (Signature of Respondent)

Page 11: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 12: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 13: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 14: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 15: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 16: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 17: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 18: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 19: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors
Page 20: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

T/O

SLA

BE

L 21

3.50

m

T/O

CO

NC

SLA

BE

L 22

1.22

m

SEC

TIO

N2

3202

1:10

0

T/O

FIN

GR

DE

L 21

6.50

m

3900

0 ID

SEE

DET

AIL

C -T/

O C

ON

C R

OO

FE

L 22

1.41

5 m

SEE

DET

AIL

D -

T/O

SLA

BE

L 21

3.30

5 m

T/O

FIN

GR

D

EL

215.

50 m

1%S

LOPE

1%S

LOPE

1%SL

OP

ER

AD

IAL

T/O

WAT

ER L

VLE

L 21

9.75

m

1%SL

OP

ER

AD

IAL

TILL

200

CO

MPA

TED

GR

AN

ULA

R F

ILL

600

BED

RO

CK

CU

T60

0 B

ELO

WFO

OTI

NG

S

BED

RO

CK

75 M

UD

SLA

BTY

PP

ERIM

ETER

DR

AIN

PER

IMET

ERD

RA

INTY

PE

1C

OM

PAC

TED

GR

AN

ULA

R F

ILL

1000

TYP

FILT

ERFA

BR

ICFI

LTER

FAB

RIC

TYP

E 2

CO

MPA

CTE

DG

RA

NU

LAR

TYP

550

550

450

250

76

54

32

1

EXI

STIN

GTO

P O

F TI

LL

LEA

N C

ON

CFI

LL21

31

OU

TSID

ELA

DD

ER

SEC

TIO

N3

3202

ELE

VATI

ON

1:10

0

T/O

FIN

GR

DE

L 21

6.50

mT/

O F

IN G

RD

EL

215.

50 m

SH

EAR

KEY

B/O

RIB

BED

WA

LL

EL

216.

60 m

T/O

RIB

BED

WA

LL

EL

220.

10 m

76

54

32

1

600

T/O

SLA

BE

L 21

3.30

5 m

DET

AIL

D -D

IVID

ING

WA

LL

1:25

11

150

530OPEN

40695

T/O

WAT

ER L

VLE

L 21

9.75

m

DIV

IDIN

G W

ALL

T/O

RO

OF

SLAB

EL

221.

415

m

4B

EAM

T2

T/O

PIL

ASTE

RE

L 22

0.68

m

U/S

BEA

ME

L 22

0.72

m

T/O

WAL

LE

L 22

0.15

m

550

2000

2000

600

SE

CTI

ON

TH

RO

UG

HS

UM

PS

EC

TIO

N T

HR

OU

GH

FOO

TIN

G

T/O

SLA

BE

L 21

3.30

5 m

550

1%1%

250

1500

500

DET

AIL

B 3202

1:50

OP

EN

500

4000

C/C

TYP

500

250

250

3500

℄PIL

ASTE

R℄

DIV

IDIN

G W

ALL

BR

GTY

PEP

ILAS

TER

510TYP

P1

B2

3210

SEE

SEC

TIO

N6

3202

400TYP

400

Ø C

OL

TYP

11

250

450

2200

x 2

200

550

DET

AIL

C -O

UTE

R W

ALL

& C

OLU

MN

1:50

220

500

PER

IMET

ER W

ALL

76

2200

x 2

200

DR

OP

PAN

EL

350

1600

300

1050

℄PIL

ASTE

R

℄PIL

ASTE

R

11.25°3927TYPSEGMENT

3040=

R=

2000

0

DET

AIL

RIB

BE

D W

ALL

LA

YO

UT1:

25

50 TYP

25110 TYP

LOC

ATIO

N O

FV

ERT

WA

LLC

ON

STR

. JO

INT TY

PIC

AL D

ETAI

L FO

R A

LL E

XPO

SED

WAL

L SU

RFA

CES

BET

WE

EN E

L 21

6.60

mA

ND

EL

220.

10 m

38

100 =

P:\20092493\01_Detailed_Design\Working_Dwgs\300_Structural\CLEARWELL\092493-02-3203.dwgDATE:2012-08-14,JhunnDualan

A20

12/0

3/12

D.E

.H

.A.D

.IS

SU

ED

FO

R IN

TER

NAL

REV

IEW

B20

12/0

3/20

D.E

.H

.A.D

.IS

SU

ED

FO

R C

LIE

NT

REV

IEW

C20

12M

AY11

D.E

.H

.A.D

.IS

SU

ED

FO

R 5

0% D

ESI

GN

SU

BM

ISSI

ON

Eng

inee

ring

Ass

ocia

ted

D20

12A

UG

10D

.E.

H.A

.D.

ISS

UE

D F

OR

INTE

RN

AL R

EVIE

W

PROGRESS

PRIN

T14

AU

GU

ST 2

012

FOR

DIS

CU

SS

ION

ON

LY

Page 21: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

A

1 2 3

B70

00

515012500

PLAN

GR

OU

ND

FLO

OR

1:10

0

WT2

WT1

WT1

WT1

WT2

WT2

WT1

FT2

1565

7000

708

PU

MP

RO

OM

1100

WID

EP

LATF

OR

M

7RUNS@275=19258RISERS@175=1400

1400

14 R

UN

S @

275

= 3

850

15 R

ISE

RS

@ 1

80 =

270

0

RM

-01

914 186

A

1 2 3

B70

00

515012500

PLAN

LOW

ER F

LOO

R

1:10

0

WT1

WT1

WT1

WT1

FT1

VAL

VE C

HA

MBE

RR

M-0

2

STE

EL L

AD

DE

R T

YPE

-1S

EE

DW

G 2

493-

02-3

310

STE

EL L

AD

DE

R T

YPE

-1S

EE

DW

G 2

493-

02-3

310

3400

ELE

VA

TIO

NS

OU

TH

1:10

0

GR

OU

ND

FLO

OR

T/O

SLA

BE

L 21

3.70

0m

B/O

CO

NC

RO

OF

EL

217.

500m

3800

FIN

ISH

GR

ADE

EL

213.

500m

RIB

BED

WA

LL

AB

ELE

VA

TIO

NW

ES

T

1:10

0

GR

OU

ND

FLO

OR

T/O

SLA

BE

L 21

3.70

0m

B/O

CO

NC

RO

OF

EL

217.

500m

3800

FIN

ISH

GR

ADE

EL

216.

500m

LOW

ER

FLO

OR

T/O

SLA

BE

L 21

1.00

0m

2700

T/O

PLA

TFO

RM

EL

215.

100m

RIB

BED

WA

LL

12

3

1000

11

A

1 2 3

B70

00

515012500

PLAN

RO

OF

1:50

RT1

1%1%

RID

GE

200

RO

OF

OVE

RH

AN

GTY

P A

LL A

RO

UN

D

P:\20092493\01_Detailed_Design\Working_Dwgs\300_Structural\VALVECHAMBER\092493-02-3301.dwgDATE:2012-08-14,JhunnDualan

Eng

inee

ring

Ass

ocia

ted

AR

CH

ITE

CTU

RA

L N

OTE

S

1.FO

R G

EN

ER

AL

NO

TES

SE

E D

WG

249

3-02

-330

3.

2.FO

R F

IXTU

RE

, FIN

ISH

ING

AN

D D

OO

R S

CH

ED

ULE

S SE

E D

WG

249

3-02

-330

2.

3.FO

R O

PEN

ING

SIZ

ES A

ND

LO

CAT

ION

S R

EFER

TO

STR

UC

TUR

AL,

PR

OC

ESS

, ME

CH

ANIC

AL A

ND

ELE

CTR

ICA

L D

RA

WIN

GS.

REP

OR

T AN

YD

ISC

REP

AN

CIE

S P

RIO

R T

O C

ON

STR

UC

TIO

N.

4.D

ESIG

N U

ND

ER

PA

RT

3 O

F B.

C.B

.C. 1

998.

5.M

AJO

R O

CC

UP

ANC

Y: L

OW

HA

ZAR

D IN

DU

STR

IAL.

6.B

UIL

DIN

G A

RE

A: 1

37.9

0 m²

7.B

UIL

DIN

G C

LAS

SIFI

CA

TIO

N:

SPE

CIA

L S

TRU

CTU

RE

, CLA

USE

3.2

.2.2

.

WA

LL T

YP

ES

LE

GE

ND

200

CO

NC

RET

E W

ALL

STR

UC

TUR

E

300

CO

NC

RET

E W

ALL

STR

UC

TUR

E

FLO

OR

TY

PE

S L

EG

EN

D

300

CO

NC

RET

EFL

OO

R S

TRU

CTU

RE

260

CO

NC

RET

EFL

OO

R S

TRU

CTU

RE

RO

OF

TYP

ES

LE

GE

ND

200

CO

NC

RE

TE R

OO

FS

TRU

CTU

RE

WT1

WT2

FT1

FT2

RT1

A20

12A

UG

10D

.E.

H.A

.D.

ISS

UE

D F

OR

INTE

RN

AL R

EVIE

W

PROGRESS

PRIN

T14

AU

GU

ST 2

012

FOR

DIS

CU

SS

ION

ON

LY

Page 22: South Fork Water Treatment Plant - Nanaimo Prequalification... · .1 The purpose of this document is to obtain qualification information from Contractors and Major Subcontractors

PLAN

CLE

ARW

ELL1:10

0

A

1 2 3 4 5 6 7

BC

DE

FG

1400 1400 20002000

VA

LVE

CH

AMBE

R

PUM

P R

OO

M

7000

2550

4000 4000

1630

(TY

P)

1915

(TY

P)1

4505

1000

2000

(TY

P)

900-

MP

-H1

900-

MP

-H1

1200

-OV

-H1

1050

-PW

-H1

1050

-PW

-H1

(TY

P)

1000

(TY

P)12

00-O

V-H

1

P:\20092493\01_Detailed_Design\Working_Dwgs\400_Process_Mech\CLEARWELL\092493-02-4504.dwgDATE:2012-08-09,SamLui

A20

12M

AY11

M.L

.E.

M.

ISS

UE

D F

OR

50%

DE

SIG

N S

UB

MIS

SIO

N

PROGRESS

PRIN

T10

AU

G 2

012

Eng

inee

ring

Ass

ocia

ted

B20

12A

UG

10M

.L.

E.M

.IS

SU

ED

FO

R IN

TER

NAL

REV

IEW