south florida resilient redesign · underground parking • reef enhancement. flood control •...

15
South Florida Resilient Redesign Workshop Summary

Upload: others

Post on 27-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

South Florida Resilient RedesignWorkshopSummary

Page 2: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Site Overview

South Florida Resilient Redesign

• City of Dania Beach ▫ Population ~ 30,000▫ $44,500 median income

• East Dania Beach Boulevard is main corridor

• Economy depends on ▫ Tourism- beach▫ Marine industry▫ Small business

Port Everglades

Fort Lauderdale Airport

I-95

Dania Beach

Commercial

Residential

Dania Beach Canal

Page 3: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Characteristics

South Florida Resilient Redesign

Multi-family/ Small Business/ Jai Alai

Historic

Evacuation Route Commercial Corridor

Small Business

Page 4: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Natural Infrastructure

South Florida Resilient Redesign

Dania Beach

West Lake Mangrove Wetland

Page 5: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

South Florida Resilient Redesign

Site Topography

~11’ ~-1’~6’

~6-7’

Elevation in Feet NAVD

~7’

Storm Surge Limit

Page 6: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Team Focus• Underutilized assets & economic

opportunities▫ Natural infrastructure (beach and

wetlands)▫ Airport (new runway)▫ Rail passenger transport▫ Port expansion▫ Population growth (40%)

• Flood hazards▫ SLR, surge, rainfall

• Limited infrastructure resilience

Page 7: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Vulnerability to Climate Change

South Florida Resilient Redesign

3 Feet Sea Level Rise (50-150 year projection)

2 Feet Sea Level Rise (30-70 year projection)

Flooding

Page 8: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Urban: East Dania Beach Boulevard

Page 9: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Urban Densification at City Center

• City Center▫ Vertical expansion▫ Invest along ridge▫ Evacuation shelter▫ Layered design

• Marina Expansion▫ Build adaptively▫ Hotel area

Page 10: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Enhancement and Multi-purposing of Natural Infrastructure

• Resiliency Center and Wetland Bike Path

• Mangrove restoration

• Dune (barrier island) enhancement with underground parking

• Reef enhancement

Page 11: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Flood Control• Polder▫ Raise perimeter roads to act

as levees▫ Add pump system▫ Incorporate canals

Polder

Page 12: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Interconnectivity

South Florida Resilient Redesign

TODCanal

Dune

Resiliency Center

Promenade

City CenterJai Alai

Polder

Page 13: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Team Recommendations

• Consider regional context• Develop long term plan with strategic approach▫ Decision making process▫ Community engagement

• Consider temporal scale of planning• Develop a roadmap

• Use concepts as inspiration!

Page 14: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Implementation of Prototype

• Urban communities in South Florida▫ Strategic investment and densification in dry areas

▫ Maximize potential economic opportunities to facilitate resilient redesign of infrastructure

▫ Integration of natural infrastructure

▫ Active flood control of low lying areas where and when feasible

Page 15: South Florida Resilient Redesign · underground parking • Reef enhancement. Flood Control • Polder Raise perimeter roads to act as levees Add pump system Incorporate canals Polder

Next steps• Idea refinement process▫ Resilient redesign is an evolutionary process ▫ Cultivate agreement upon a shared vision▫ Seize moments of opportunity

• Follow-up workshop with local officials▫ Get officials to champion concepts▫ Local implementation strategies

• Design concept outreach▫ Booklet/ Brochure▫ Mini- design workshops for decision-makers

• Identify funding opportunities