Solar Thermal Install …KR Construction Arroyo Grande Central Coast

KR &

HaywardLumber

Install

Page 2: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

THE INTEGRATED FULL SYSTEM

1

2

9

Solar loop

3

5

4

67

3

1

2

3

5

4

Collectors

Flashings/connector tube

Flextubes

Air separator

Pump station/controller

Expansion tank

Solar storage tank

Mixing valve

Temperature sensor

6

7

8

9

HW

CW

Existing gas or electric Water Heater

8

Page 3: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Tiles Removed for Collector Placement

Page 4: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Opening the Collector Boxes Preparing to Lift to the Roof

Page 5: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Lifting the U-12Collector on to the

Roof

130 lbs

4 ft x 6 ft

Page 6: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

2 U-12 Collector Placement on the Roof

Access Holes Cut for Flex Tubes

Page 7: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

2 U-12 Collectors Ready for Flex Tube Conical Secure Connections

Page 8: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Roof Ready for Collector Placement and InstallWith Membrane Wrapping

Page 9: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Hi Performance Collector Placement on Roof

Page 10: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

On the Roof Deck InstallWith

Integrated Tile Flashings

Even the Sill

Skirting

Page 11: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Feeding the Flex TubeThru the rafters and trussesFrom the Collectors Heading to the Pump Station

Page 12: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Quick and Simple AssemblyOf the Pump Station and

Controller thatMonitors & Optimizes Tank

& Collector Temperatures 24/7

Page 13: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Installation Complete andReady for Commissioning

In under 6 hours

Hot Water later that Evening for theHomeowner !!!!

Page 14: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Final Stages of Install

Commissioning the System

Glycol Solution and Doing

Pressure Testing

Alls well and Leak Free !!

Page 15: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Skilled and Trained

Craftsmen at Work

With another

Successful VELUX

Solar Hot Water

Install

Page 16: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

All VELUX Flashings SecuredAnd Integrated into the CollectorsWith a proven Low Profile Aesthetically Pleasing Look

Head & Sill

Flashings

For

Leakproof

Security

Page 17: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Early Morning

Dew @ 8 am

Dew is Gone

By 9 am

Collector Temp

Is 1240 F &

Rising Rapidly

Page 18: Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install

Final Inspection on the Roof and All’s Well !!!