CSC-3324: Chapter 3
Title: The Feasibility study
Mandatory reading: I. Sommerville, Section 7.1
Soft. Eng. I, Spring 2007 Dr Driss Kettani, from I. Sommerville 2
Wrap up... What is Software Engineering (SE) ?
The major goal of SE is to produce good
software cost effectively… What is good
software?
In order to produce good software, we need to
follow a good SE process… What is a good
process?
Some SE process models are widely used and
universally recognized…
Software engineering is concerned with theories, methods and tools for professional software development
Maintainability, Dependability,
Efficiency, Usability
Understandable, Visible, Supported, Accepted, Reliable,
Rapid, etc.Structured set of activities
(steps) required to develop a software system....
The waterfall model
Separate and distinct phases of specification and
development
Prototyping development
Specification and development are interleaved
Component-based development
The system is assembled from existing components
Soft. Eng. I, Spring 2007 Dr Driss Kettani, from I. Sommerville 3
The feasibility study...
Requirementsdefinition
System andsoftware design
Implementationand unit testing
Integration andsystem testing
Operation andmaintenance
ValidationFinal
version
DevelopmentIntermediate
versions
SpecificationInitial
version
Outlinedescription
Concurrentactivities
Soft. Eng. I, Spring 2007 Dr Driss Kettani, from I. Sommerville 4
The feasibility study... No matter which SE process we want/expect to follow,
we must previously perform a feasibly study in order to demonstrate:
The business opportunity; The feasibility of the project in terms of technology enablers
and schedule constraints… Our global understanding of the requirements and our
confidence in a future better understanding… Must be quick and cheap... Typically in Morocco, it is about 10M/D, 2000-
5000Dhs… Depends on the context…
Soft. Eng. I, Spring 2007 Dr Driss Kettani, from I. Sommerville 5
The feasibility study... The formal deliverable of the feasibility study is a document
that contains at least the following information: An overview of the clients requirements; How the projected system will help... The feasibility of the project with respect to our expertise... The feasibility of the project with respect to the available of
technology enablers... The Business opportunity for our company... A formal Go (or Stop)... An expected schedule…
Soft. Eng. I, Spring 2007 Dr Driss Kettani, from I. Sommerville 6
Important issues to check...
What are current problems? How will the proposed system help? What will be the integration problems?
(Current and projected systems) Is new technology needed? What skills? Users... Budget... Schedule...
Soft. Eng. I, Spring 2007 Dr Driss Kettani, from I. Sommerville 7
Homework and deliverable for next week
Find out in the web the standard layout and contents of the
feasibility report for the following organizations (only one)
and use it in the FOD of your project:
DoD: The US Department of Defense;
S.E.I.: The Software Engineering Institute (Carnegie Mellon U.);
C.S.E.: The Center of Software Engineering (U. of Southern
California.
Your feasibility and orientation report due on Feb. 12th 2007