Social Safeguard Due Diligence Report (SSDDR) Project Number: 47282-003 May 2020
AFG: Multitranche Financing Facility II - Energy
Supply Improvement Investment Program Tranche 1
Prepared by Da Afghanistan Breshna Sherkat (DABS) for the Asian Development Bank. This Social Safeguard Due Diligence Report (SSDDR) is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
1
Islamic Republic of Afghanistan
DA AFGHANISTAN BRESHNA SHERKAT (DABS)
500 kV Sheberghan – Dasht-e-Alwan Transmission Line Construction
Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
Contract Number: NPA/DABS/95/W-1404/ICB
Social Safeguard Due Diligence Report (DDR)
Section-2 (Balkh Province)
May 2020
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
2
Contents 1. Introduction ....................................................................................................................... 3
2. Scope of Due Diligence Report (DDR) ............................................................................ 14
3. Rationale for the Due Diligence Report ........................................................................... 14
4. Project Description .......................................................................................................... 15
5. Location of Sub-Project ................................................................................................... 16
6. Legal and Policy Framework ........................................................................................... 17
7. Methodology ................................................................................................................... 17
8. Fieldwork - Surveys and Public Consultations ................................................................. 18
8.1. Field visits ................................................................................................................. 18
9. Stakeholder and/or Public Consultations ......................................................................... 19
10. Confirmation of State Ownership of Land from MUDL ................................................... 24
11. Grievance Redress Mechanism and Project Institutional Arrangements ........................ 24
12. Institutional Arrangements for Safeguards Compliance ................................................. 25
13. Conclusion .................................................................................................................... 27
Tables:
Table 1: LAR and Non-LAR Affected Sub-sections of Section-2 (Balkh Province) ................ 4
Table 2: Summary of Sub-sections of Section-2 (Balkh Province) ......................................... 5
Table 3: Resettlement team under supervision of CSC ....................................................... 13
Table 4: Types of towers with the types of foundation ........................................................ 15
Table 5: Involuntary Resettlement Screening Checklist for the Non-LAR Impact Area ....... 18
Table 6: LIVVC members for land identification and consultation processes ....................... 20
Figures:
Figures 1-9: Non-LAR Affected Area (159 Towers within 60.38 km) ..................................... 6
Figures 10-14: LAR Affected Area (31 Towers within 10.68 km) ........................................... 9
Figure 15-18: Unidentified Area (yet to be identified), 115 Towers within 48.91 km
............................................................................................................................................ 11
Figure 19: Geographical location of Balkh province ............................................................ 16
Figure 20: Consultation with government departments regarding land Identification ........... 21
Figure 21: Attendance sheet of a meeting with people on January 20. 2020 ....................... 22
Figure 22-23: Land identification committee consultation with the local people ................... 22
Figure 24: Process of Grievance Redress ........................................................................... 25
Figure 25: Institutional Arrangement ................................................................................... 27
Annexes:
Annex 1: Governor Consent Letter, LIVVC Report and relevant filled out forms .................. 29
Annex 2: Non-LAR Affected Area of Section 2 (Balkh province) ....................................... 187
Annex 3: LAR impact area of Section 1 (Balkh Province) .................................................. 193
Annex 4: Unidentified Area of Section 2 (Balkh Province) that yet to be identified ............ 194
Annex 5: Social Safeguards Project Management Arrangements ..................................... 199
Annex 6: ESSU and PMPIC staff with their titles ............................................................... 204
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
3
Abbreviations:
ADB - Asian Development Bank
AF - Affected Family
APs - Affected Persons
AP - Angle Point
DABS - Da Afghanistan Breshna Sherkat
DDR - Due Diligence Report
DP - Displaced Person
CDC - Community Development Council
CSC - Construction Supervision Consultants
GWh - Giga Watt Hour
TA -Technical Assistance
EA - Executing Agency (DABS)
EMA - External Monitoring Agency
ESIIP - Energy Supply Improvement Investment Program
Ha - Hectare
HH - Households
IoL -Inventory of Losses
kV - Kilo volt
LAL - Land Acquisition Law
LAR - Land Acquisition and Resettlement
LARF - Land Acquisition and Resettlement Framework
LIVVC - Land Identification, Verification and Valuation Committee
MUDL - Ministry of Urban Development and Land
LARP - Land Acquisition and Resettlement Plan
NGO - Non-government Organization
OPGW - Optical Ground Wire
PMO - Project Management Office
PMPI - Project Management and Project Implementation
RP - Resettlement Plan
RoW - Right of Way
SPS -Safeguard Policy Statement
Sqm -Square meter
SS -Substation
TL - Transmission Line
1. Introduction
1. Afghanistan is a net energy importer. While indigenous renewable energy and fossil
fuels resources exist, these need to be developed. By 2032, the power demand in
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
4
Afghanistan is forecast to reach 3,500 MW and electric consumption to touch 18,400 GWh,
and meeting this demand requires development of all viable import and local generation.
2. The Asian Development Bank (ADB) has been supporting Afghanistan’s energy sector since 2001 and is the largest on-budget development partner of the Government of
Afghanistan.
3. Energy Sector Development Investment Program (ESIIP) is being implemented in
Afghanistan through financing from Asian Development Bank (ADB) under a Multi-tranche
Financial Facility (MFF) that has been divided into a number of tranches or groups of
subprojects. Each of the program’s tranches constitutes a project which, in turn, has been divided into several subprojects involving the construction of the power transmission,
substation and distribution projects. The 500 kV Sheberghan – Dasht-e-Alwan
Transmission Line (TL) a sub-project under Tranche-1 of the MFF-II.
4. The construction of 500 kV Sheberghan – Dasht- TL a sub-project of the Project is part of the donor assisted development of the North East Power System (NEPS) enables power import from Tajikistan and Uzbekistan to Afghanistan. 5. The subject TL in its total length of 304.31 km is crossing through four provinces
(Jawzjan, Balkh, Samangan and Baghlan) of the northern region of Afghanistan. Each
province is designated as a section where sub-sections with LAR and non-LAR affected
areas are identified in Tables 1 & 2 below. The 500 kV Sheberghan – Dasht-e-Alwan TL is
containing a total of 775 various types of towers in its total length of 304.31 km (crossing 4
provinces). Out of 775 towers, 305 towers’ foundations will be constructed in Balkh province
(Section-2) of the TL. As per the detailed design (final plan and profile), 119.97 km of this
TL is crossing through Balkh, Nehr-i-Shahi, Khulm districts of Balkh province. The non-LAR
and LAR affected sub-sections with the borderlines and coordinates for each sub-section
are shown in Table 1, Annex 2 and Annex 3 respectively.
Table 1: LAR and Non-LAR Affected Sub-sections of Section-2 (Balkh Province)
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
5
Sub-section Length (Km) LAR and
Involuntary resettlement
Actions Needed
Sub-section 1: The TL section on Towers # from 11/6 to 29/0 48.72 TBD To Be Identified (TBD)
Sub-section 2: The TL section on Towers # from 29/1 to 29/3 in Nahr-i-Shahi District, Langar khana
0.85 Yes Implementation of LARP and
ADB acceptance of compliance report
Sub-section 3: The TL section on Towers # from 29/4 to 29/7 in Langar Khana of Nahr-i-Shahi district
1.94 NO Social Due Diligence Report
measures
Sub-section 4: The TL section on Towers # from 29/8 to 29/9
0.19
TBD TBD
Sub-section 5: The TL section in between Langer khana Kalan Village on Towers # from 29/10 to 29/14
1.68 Yes Implementation of LARP and
ADB acceptance of compliance report
Sub-section 6: The TL section between Langer khana kalan Village to Aqab sarak siya gerd Village on Towers # from 29/15 to 30/35
18.56
No Social Due Diligence Report
measures
Sub-section 7: The TL section in between Jafer- Abad Village to Dasht -e- Hyratan Village on Towers # from 30/36 to 30/54
7.16 Yes Implementation of LARP and
ADB acceptance of compliance report
Sub-section 8: The TL section in between Shamal Sharq camp sakhi Village to Deh Naw Village on Towers # from 30/55 to 34/1
17.49 No Social Due Diligence Report
measures
Sub-section 9: The TL section between in Deh Naw Village on Towers # from 34/2 to 34/5
0.99
Yes Implementation of LARP and
ADB acceptance of compliance report
Sub-section 10: The TL section between inVoljatoo Village on Towers # from 34/6 to 41D/0
22.39
No Social Due Diligence Report
measures
Total length of subsections 119.97
Table 2: Summary of Sub-sections of Section-2 (Balkh Province)
Non-LAR Affected Sub-sections LAR Affected Sub-sub-sections
Sub-section 3 (1.94 km) Sub-section 2 (0.85 km)
Sub-section 6 (18.56 km) Sub-section 5 (1.68 km)
Sub-section 8 (17.49 km) Sub-section 7 (7.16 km)
Sub-section 10 (22.39 km) Sub-Section 9 (0.99 km)
Total length: 60.38 km Total length: 10.68 km
Sub-section 1: To Be Identified whether it should be LAR or Non-LAR Affected area
(48.72 Km)
Sub-section 4: To Be Identified whether it should be LAR or Non-LAR Affected area (0.19
Km). Total of Sub-section 1 and Sub-section 4 = 48.91 km
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
6
Total length of Section-2 (Balkh Section): 119.97 km
6. A team comprising Site Engineer and Social Safeguard/Resettlement Team form
DABS conducted a joint field review of the 500 kV Sheberghan – Dasht-e-Alwan
transmission line during June 2019 – January 2020 and still continuing. According to the
site visit results, it was found that 60.38 km sub-sections out of the total 119.97 km of
Section-2 (Balkh province) of the transmission line towers’ foundation identified as non-
LAR impact area in this province (Section-2). The required land for the towers’ foundations of Sub-sections 3, 6, 8 and 10 of Section-2 (Balkh province) is entirely government owned
land (Annex 2, Figures 1-9). This non-LAR impact sub-sections have been verified,
confirmed by the Land Identification, Verification and Valuation Committee (LIVVC) and
provincial MUDL (Annex 1).
Figures 1-9: Non-LAR Affected Area (159 Towers within 60.38 km)
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
7
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
8
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
9
7. The survey of the LVCC confirmed that 10.68 km of sub-sections area, out of the total
119.97 km length of Section-2, which have been also certified by the provincial government,
identified as LAR impact area (Figures 10-14 and Annex 3). The sub-sections numbers are
determined as 2, 5, 7 and 9.
Figures 10-14: LAR Affected Area (31 Towers within 10.68 km)
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
10
8. The 48.91 km out of 119.97 km of Section-2 of the TL (sub-sections 1 and 4 as
described in Table 1 above) area has yet to be identified by the LIVVC (Figures 15-18,
Annex 4). This segment of the TL will consider LAR or non-LAR area once the land
identification and verification is finalized by the LIVVC. Security issues have been
affected/delayed the land identification and verification process.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
11
Figures 15-18: Unidentified Area (yet to be identified), 115 Towers within 48.91 km
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
12
9. The total non-LAR affected sub-sections (60.38 km) of the transmission line towers’ foundation are located in barren land with no irrigation facilities and no crops are cultivated
on these pieces of lands. Similarly, there are no trees on these pieces of land (Figures 1-
9). Any residential or other structures were also not found/observed on these lands. The
residential area is located at the distance of 1-2 km from the TL corridor or RoW - the
construction activities, within the Non-LAR affected sub-sections, and flux generated
around the line do not impact the residential areas, people and daily activities of the people
living in the villages related to the districts stated in Annex 2, 3 and 4 within the stated
distance from the TL. As such, the land is free from any LAR impact. It was observed that
activities relating to construction and erection of towers have not been started as yet at the
site.
10. The Da Afghanistan Breshna Sherkat (DABS - Afghanistan Electricity Corporation),
established as an independent and autonomous corporation for the generation, import,
transmission and distribution of power across the country, is responsible as the
Implementation agency (IA) to implement the Project through its Program Management
Office (PMO), supported by a Program Management and Project Implementation
Consultants (PMPIC). The PMPIC team and Social Safeguard employees of DABS
composed of 4 nationals who were mobilized to site and are closely working with LIVVC,
Local DABS, provincial and district government officials, elders of villages, Shura, to find
out if there is temporary and permanent impact, impact, land acquisition and
physical/economic displacement due to construction of the TL. The third party monitor,
whenever hired, will monitor sectional approach and make sure that the contractor does
not encroach into LAR sections or other than any section/sub-section for which NTP has
not been given by DABS. The third party monitor will be mobilized in June 2020.
11. The PMPIC with the support of CSC will monitor construction activities, by utilizing its
site engineers and social safeguard experts, in Non-LAR areas and report to DABS and
ADB bi-weekly bases until the third party monitoring firm is contracted and mobilized to the
relevant sites. The project management action plan on monitoring project management
arrangements on DDR sections is attached as Annex 5. The CSC resettlement staff under
supervision of CSC will be mobilized no later than 4th of June 2020 (Table 3).
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
13
Table 3: Resettlement team under supervision of CSC
12. As pre the detailed design, the total length of 500 kV Sheberghan – Dasht-e-Alwan TL
is 304.31 km which is divided into four sections on province bases (Jawzjan-Section 1,
Balkh-Section 2, Samangan-Section 3 and Baghlan-Section 4). LARP and DDR are
prepared for each section (province) of the TL. LARP will be finalized, details provided in
Annex 5, for the LAR affected areas covering land acquisition, physical/economic
displacement, crops, trees and other temporary and permanent impacts. Affected lands, to
be required for acquisition, are identified and verified by the LIVVC established at the
provincial level. As per the project contract, the census combined with socioeconomic
survey is being carried out by the contractor social and resettlement team with the
supervision of PMPIC for the purpose of estimating the LAR impacts of the project
interventions and preparation of LARP.
13. The LIVVC identified non-LAR and LAR affected land plots/area of 159 and 31 towers
locations respectively of the total 305 towers’ foundation land plots in total 119.97 km of
this section of the TL crossing through Balkh, Nehre-Shahi, Khulm districts of Balkh
province (Section22). The LIVVC with the support of resettlement/social safeguard team
has been working at the site to finalize the land identification of the remaining 115 towers’ foundation land (sub-section 1 and 4) located in 48.91 km of Section-2. Out of the identified
towers’ foundation, 159 towers’ foundation (sub-sections no 3, 6, 8 and 10) and 31 towers’ foundation located in the government own and privately owned land respectively (Annex 2
and Annex 3). LARP will be prepared and submitted to ADB consent for 31 towers’ foundation (sub-sections no. 2, 5, 7 and 9) of 10.68 km out the total 119.97 km of Section-
2 (Balkh province), plus other towers’ foundation land that are under identification process,
of the TL that might have LAR impact on the privately owned land, assets/property and
economic activities of APs.
14. The data collected for preparation of this DDR showing that the LIVVC along with the
resettlement/social safeguard team surveyed/visited 71.06 km of Section-2 and identified
60.38 km as Non-LAR and 10.68 km as LAR affected areas respectively. The 48.91 km of
this Section-2 yet to be identified.
Sl
No
Name of the
Project
Section Name of the Person
nominated
Remarks
1 500
kV,Sgheberghan-
Dasht-e-Alwan
Transmission Line
Balkh Mr. Naseer Hakimi As of now the Site Engineers
assisted by one LAR Asst will
monitor and report on the
activities in Non-LAR areas and
other LAR issues, if required.
LAR Assistant –Mr.
Makhlis
LAR Assistant (National) will
undertake overall monitoring
and assist
Mr. Zyarmal Safi from
PMPIC
Mr. Safi will support MUDL in
identification and verification of
affected lands.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
14
15. This DDR is prepared for sub-sections at the length of 60.38 km surveyed/identified
route (Non-LAR sub-sections no. 3, 6, 8 and 10) of the TL containing 159 towers. There is
no livelihood activity and all land belong to state on the entire non-LAR impact area, GPS
coordinates (Annex 2). The Non-LAR sub-sections of the TL are passing through the barren
land - no irrigation facilities and crops are cultivated on the said sub-sections of the land
(Figure 1-9). Similarly, there are no trees on these towers’ foundation pieces of the government owned land. Any residential or other structures were also not found on these
plots of land. As such, the land is free from any LAR impact or activities (Annex 2 and 3).
16. The Project Implementing Agency (IA) and Employer is Da Afghanistan Breshna
Sherkat (DABS). DABS established Environmental and Social Safeguard Unit (ESSU)
within the structure of PMO a few months ago. The ESSU work closely with the Contractor
and mainly with the PMPIC in preparation of DDR, LARP, SMR, LARP implementation,
compliance reports and environmental relevant reports. The ESSU (Annex 6) staff work
with LIVVC, provincial government, community Shura, and CDC in implementation of LARP
and project compliance. The ESSU field staff also work thoroughly with the provincial
governments’ designated LIVVC in identification of affected lands or permanent losses,
assessment of all damage and losses and valuation of compensation. The ESSU with the
support of PMPIC assures temporary and permanent compensation to the AHs and work
with the GRC in handling grievances of APs, if any.
2. Scope of Due Diligence Report (DDR)
17. This Power Transmission line Project in Afghanistan has been classified as an IR
Category B project in accordance with ADB Safeguards Policy Statement 2009. This DDR
relates to the non-LAR affected area of the subject 500 kV transmission line. The DDR area
(Non-LAR affected area) is defined where all the civil work and other construction related
activities in connection to towers’ foundation, structuring and installation of towers, overhead wire stringing are taken place in the government owned lands - and these
activities should not have impact on the livelihood, structures, crops, economic activities,
land and other properties/assets of the people living in the area where the transmission line
will be crossing through. This DDR has been prepared by DABS to substantiate that the
land required for the towers’ foundation of this section of the TL is the government owned land department and there is no physical and economic displacement of the people in this
area. The non-LAR affected area (sub-sections) are clearly defined in Table 1 above and
Annex 2 with GPS coordinates.
3. Rationale for the Due Diligence Report
18. The investment program, including its Tranches 1 - 6 have been categorized as
Involuntary Resettlement (IR) Category B with insignificant LAR impacts and all other
subsequent tranches are also expected to be IR category B. Following ADB’s Safeguard Policy Statement (SPS 2009), and the Afghanistan’s amended Land Acquisition Law, the
LARF was initially prepared by DABS in October 2015 to guide the preparation of LARPs
for subprojects and mitigate any impacts, should they arise. It was further updated in
October 2017-18. The latest update was done in October 2019 to apply sectional project
site handover approach, where upon availability of final project design, LAR impact and
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
15
non-LAR impact areas will be identified based on sectional due diligence reports (DDRs)
and sectional implementation ready LARPs. The LARF updated in October 2109 applies to
all subprojects of this MFF.
19. Based on the ADB Safeguards Policy Statement (SPS) 2009 and the provisions of
updated version (dated October 2019) of Land Acquisition and Resettlement Framework
(LARF) for the ESIIP, Tranche 1-6. If there are no land acquisition and resettlement
impacts, a Due Diligence Report (DDR) is required. To comply with the requirement of
Afghanistan Land Acquisition Law (LAL) and relevant procedures for linear projects,
updated LARF and ADB SPS 2009, this DDR for Section-2 (Balkh province) of 500 kV
Sheberghan – Dasht-e-Alwan transmission line has been prepared by DABS to provide
information on presence of any no LAR impact in connection to the construction of
transmission line.
4. Project Description
20. The Sheberghan – Dasht-e-Alwan 500 kV TL is the continuity of 500 kV Aqina –
Sheberghan 500 kV transmission line that will be energized by Turkmenistan power grid
and will carry imported power from the said country for enhancing power capacity and/or
covering power shortages of North East Power System particularly in the capital (Kabul) of
Afghanistan and its neighboring provinces. This TL will be jointed/connected with the 500
kV Dasht-e-Alwan – Arghandi TL (North-South Power project) at Baghlan (Dasht-e-Alwan
substation).
21. The expected project-level impacts of this 500 kV TL are to (i) Increasing electrical
energy supply to NEPS and even South East Power System and provinces in north of
Afghanistan resulting in improvement of livelihood, education, economic growth and
industrial development, (ii) enhance energy security in the said power grid (systems), and
(iii) increase further private sector participation in industrial and commercial business.
22. The sub-projects in total are expected to increase the power transmission capacity on
the North-South route which conveys power from imports and domestic power plants in the
north to the load centers at the southern end of the transmission line.
23. This TL is consisted of the following construction works and technical details:
I. Excavation, construction, backfilling around 4 legs, and compaction around
legs of foundations.
II. Structuring of towers at the site
III. Installation and/or erection of towers on their constructed legs Installation of
insulators
IV. Stringing of overhead line including OPGW on the top of towers
Table 4: Types of towers with the types of foundation
Tower Type Area (Sqm)/Foundation Number of Towers Total Area (sqm)
NS5 289
618 178,602
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
16
LA5 324 82 26,568
MA5 400 41 16,400
HA5 552 34 18,768
DE5 1,024 1 1,024
Total 776 241,362
24. Clearance Criteria of the TL:
a. Normal ground 8.5m b. Rockface or sleep slope 5.5m c. Vegetation under the line (vertical) 3.5m d. Vegetation beside the line (horizontal) 3.5m e. Trees under the line (vertical and horizontal) 5m f. Line above building (vertical dist.) 10m g. Line adjacent to buildings (horizontal dist.) 7m h. Antennas, street lamps, flag poles, signs 5.5m i. Roads crossings (vertical) 9.5m j. Crossing of lines (vertical dist.) 4m k. Playgrounds, sports areas 12m
Since there is no vegetation, trees, building, street lamps, playground and sports areas, in the Non-LAR impact area, the clearance criteria is well considered. ROW corridor for this TL is 60 meter i.e, 30 meters from or either side of the TL centre line.
5. Location of Sub-Project
25. The subject TL is crossing through four provinces (Jawzjan, Balkh, Samangan and
Baghlan) of the northern region of Afghanistan. This particular/identified DDR area of the
TL is crossing through Nehre-Shahi and Khulm district and of Balkh province. Balkh
province is situated in the eastern part of the northern region of Afghanistan bordering with
Uzbekistan and Tajikistan in the North, Samangan provinces in the South, Kunduz province
in the East, and Sari-Pol and Jawzjan provinces in West. This province covers an area of
16,186 km². Khulm is one of the Balkh province districts located in the neighbourhood of
Samangan province. The 71.06 km route of the TL surveyed/identified by LIVVC in order
to identify/clarify and/or differentiate LAR and non-LAR impact areas of the TL crossing
through Balkh, Nehre-Shahi and Khulm districts of Balkh province (Section-2) and
continuing towards , Samangan and Dast-e-Alwan 500/220 kV substation located in
Baghlan province. The below figure is indicating geographical location of Balkh province
Figure 19: Geographical location of Balkh province
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
17
26. Institutional Support: The construction of this TL and its management within the life
cycle of the project by the PMPIC will also provide project management and implementation
support for Da Afghanistan Breshna Sherkat (DABS) and tis institutional capacity will be
further enhanced.
27. The project will be implemented by the DABS as the Implementing agency (IA) through
its Program Management Office (PMO) and supported by a Program Management and
Project Implementation Consultants (PMPIC) for the project as planned.
6. Legal and Policy Framework
28. The legal and policy framework through which resettlement impacts are mitigated
under the project and particularly the project will follow the Afghanistan Land Acquisition
Law and procedure/guideline for linear projects and ADB’s Safeguards Policy Statement,
2009. The Land law of Afghanistan confirms that government lands are regulated by MUDL
and that public welfare projects on government lands must be approved by MUDL. Once of
the article of the Law on Land Acquisition allows the transfer of government owned
properties for the implementation of projects of public interest as well as allowing
implementation of urban master plans and all other plans for projects of public interest.
7. Methodology
29. The methodology applied in preparation of the DDR for this project is enumerated as
follows:
i. The scope of the project was studied including the technical details of the project by
reviewing the Detailed Design (final plan and profile) Report prepared for the project
and had discussions with the team leader, PMO officers, and the relevant members
of the team. The final plan and profile of the project was prepared and submitted to
DABS and eventually approved on 4 November 2019. The plan and profile are
composed of the final rout of the line with GPS locations of the towers’ foundation.
ii. Field visits were made from June 2019 to January 2020, and still continuing, to
ascertain the impacts due to resettlement and it was understood no livelihood activity
in the project area/corridor and confirm with relevant authorities and communities on
state ownership of the land required for reviewed section of the TL.
iii. Committee with local authority members was , based on the request of Land
Department and instruction dated July 31, 2019 of Balkh Governor, for due diligence
of this Non-LAR impact sub-sections. The Due diligence surveys included the field
visit and discussion with the relevant local organizations and collecting information
and/or records on land ownership which have been concurred by various provincial
government organizations as a committee and eventually certified by the respected
governor’s office (Annex 1).
iv. Above listed activities with Committee were followed by a detailed public consultation
to inform the public and/or stakeholders on the project components and to ascertain if
there are any social impacts. A number of consultation meetings were conducted
after designation of LIVVC on 31 July 2019. Safeguards/resettlement team and the
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
18
committee organized consultations with people living in nearby villages (all at least 1-
2 km away from the non-LAR sub-sections of the TL). During consultations and with
villagers, DABS confirmed absence of any livelihood activities and state ownership of
the land under this DDR TL section.
v. This DDR was then prepared by assimilating the detailed design report, findings of
the field visits, and discussions with relevant government officials and
information/documents collected/gathered during public consultation as per ADB
requirements.
8. Fieldwork - Surveys and Public Consultations
8.1. Field visits
30. An initial field visit was carried out and the resettlement screening and indigenous
people screening was done (Table 4). Since there were no LAR impacts, DDR sub-sections
3, 6, 8 and 10 covering 60.38 km out of 71.06 km identified/surveyed route of the TL
alignment or out of the total 119.97 km of this section crossing through Balkh province
districts; the study was continued for a due diligence with further field visits and public
consultations. The identification of the LAR and Non-LAR affected area is still continuing
for the sub-sections 1 and 4 that yet to be identified of impact(s).
Table 5: Involuntary Resettlement Screening Checklist for the Non-LAR Impact Area
Probable Involuntary Resettlement Effects
Yes No Not Known Remarks
Involuntary Acquisition of Land
1. Will there be land acquisition? √
Land acquisition for the DDR area of non-LAR impact area is not needed.
2. Is the site for land acquisition known?
√
It is not privately owned.
3. Is the ownership status and current usage of land to be acquired known?
√
The land plots are government owned property.
4. Will easement be utilized within an existing Right of Way (ROW)?
√
As the non-LAR impact area is government owned land, so easement can be utilized any time.
5. Will there be loss of shelter and residential land due to land acquisition?
√
There is no shelters and residential land within the non-LAR identified area.
6. Will there be loss of agricultural and other productive assets due to land acquisition?
√
The non-LAR area is not cultivated and does not have any types of products.
7. Will there be losses of crops, trees, and fixed assets due to land acquisition?
√
There was no trees and other assets and were not seen any crops growing.
8. Will there be loss of businesses or enterprises due to land acquisition?
√
The non-LAR identified area was seen without any businesses.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
19
9. Will there be loss of income sources and means of livelihoods due to land acquisition?
√
Since the non-LAR identified areas are either desert or hills or mountainous, businesses for income sources were not seen.
Involuntary restrictions on land use or on access to legally designated parks and protected areas
10. Will people lose access to natural resources, communal facilities and services?
√
The villages or comminutes residential area are a bit for away from the non-LAR identified area and their natural resources are close to their villages, so their access are not interrupted by using the non-LAR impact area for construction of the TL.
11. If land use is changed, will it have an adverse impact on social and economic activities?
√
Since the non-LAR impact land does not have any charges and its government property, no impact on social and economics was seen.
12. Will access to land and resources owned communally or by the state be restricted?
√
Even access to public land and resource were not seen to be restricted by this no-LAR impact area identified for the construction of the TL.
Information on Displaced Persons:
Any estimate of the likely number of persons that will be displaced by the Project? [ ] No [ ] Yes [√ ] Not applicable
If yes, approximately how many? _____
Are any of them poor, female-heads of households, or vulnerable to poverty risks? [ ] No [ ] Yes [ √ ] Not applicable
Are any displaced persons from indigenous or ethnic minority groups? [ ] No [ ] Yes [√ ] Not applicable
31. The project team visited the areas where the proposed project is to be implemented.
The team visited the full sub-sections (2, 3, 5, 6, 7, 8, 9 and 10) alignment of the proposed
transmission line to ascertain the present land ownership and use and need for further
surveys and consultations. Documents approving the implementation of the project from
the concerned authorities were also collected during the field visit. The project staff visited
the Balkh province governor office, Department of land (MUDL), Department of agriculture,
Department of irrigation, Department of Land, local DABS, Municipality and other
departments at the provincial and relevant districts governors to obtain a copy of the
consent over the construction of the transmission line. The consent letter and no objection
letter along with relevant Land Department forms were collected from the Land Department
in collaboration with all these departments and attached the copy of the same is enclosed
vide Annex 1. Full attention was paid during the field visits to the potential issues related
the construction of the transmission line and the ownership of lands. Since Non-LAR sub-
sections of the TL construction will be done in the government owned land which belongs
to MUDL (land department), the approval letter for the construction in the government land
was also collected from the governor office under whose jurisdiction the project areas lies
during the field inspections. A copy of the mentioned letter is attached as Annex 1.
9. Stakeholder and/or Public Consultations
32. The Governor of Balkh province assigned, based on the DABS official request, the
land identification committee (Table no. 5) to conduct meetings and consult with all relevant
departments including the relevant district(s) where the TL is crossing through for land
identification to verify whether the land to be used by the above mentioned sections of the
TL are government or privately owned land. The public consultation will be carried out until
the Detailed Measurement Survey and Census complete, LARP prepared and
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
20
implemented, and compliance report is submitted. The summery of records of public
consultation will be part of the LARP implementation compliance report. The consultation
meetings (Figure 20) were carried out with the relevant governmental department in relation
to the land ownership of the stated section of the TL at the provincial level and district level.
The designated committee reported and certify that the land where the DDR Section of the
TL is crossing through is government owned land. The designated committee (LIVVC) also
confirmed to conduct survey and visits to the area that its identification process is pending
due to some minor security issues that will be resolved soon. The designated committee
identified and confirmed the government owned land to DABS through the attached latter
collectively signed by the committee members and certified by the governor office (Annex
1).
Table 6: LIVVC members for land identification and consultation processes
Name Position Province District
Mr. Azimullah Representative of Land Department,
Head of Committee
Balkh Balkh
Mr. Abobaker Representative of DABS Provincial
Dept.
Balkh Balkh
Mr. Manzor Hussain Representative of Municipality Dept. Balkh Balkh
Mr. Ghulam Maroof Representative of Finance Dept. Balkh Balkh
Mr. Zabiullah Representative of Agricultural Dept. Balkh Balkh
Mr. Mohammad Nadir Representative of Geodesy Dept. Balkh Balkh
Mr. Mohammad Nasim Representative of Cadaster Dept. Balkh Balkh
Mr. Mohammad Amin Salih Administrator of Complaint Resolution Balkh Balkh
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
21
Figure 20: Consultation with government departments regarding land Identification
33. During field visit and consultation, the representatives from different provincial
departments were briefed regarding the aim of the project and its impact on the livelihood,
health and education of Balkh and other provinces residents taking benefit of the electrical
energy carrying by this TL as well as industry enhancement by suppling reliable electrical
energy subsequent to completion of this TL. The representatives confirmed, during
discussion, that the pieces of land allocated for the identified towers’ foundation for construction of the 500 kV Sheberghan – Doshti-e-Alwan (Section-2, Balkh province) TL
was never planned for other development activities and it’s free from heritages and never
used as agricultural land because of its location on the hill or mostly mountainous areas.
34. The respected communities living at the vicinity for faraway from the route of the
subject TL were met during site visits and found that they do not have issue with the
construction of the TL even they are pleased to have reliable electrical energy and their
homes will be lighted with reliable power once the construction of TL is completed and
energized. The people who were met also confirmed that some portion of the TL crosses
through barren areas owned by government and the land was never used in the past for
any purposes. The people met were also briefed regarding the project and its benefits to
population of the province. The attendance sheet with the pictures of one of the meetings
held on 20 January 2020 is attached (Figures 21 to 23).
35. In this respect, a series (during the land identification and verification processes,
consultation meetings were conducted and held with the people of the affected village every
week in order to complete the long identification and verification process – the team had
numerous meetings during the process) of consultations were made through assistance of
the local government authorities, at the provincial and district level, and concerned
stakeholders regarding land identification and verification of land. The consultant Social
Safeguard & LARP (SS-LARP) resettlement team visited to site in June 2019 – January
2020 and still continuing. The team only provided record of one meeting as a sample which
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
22
was held on 29 January 2020 and can be consider sufficient for this report. The consultation
meeting included scoping sessions with stakeholders and focused group discussions with
local communities as shown in the bellow figures.
Figure 21: Attendance sheet of a meeting with people on January 20, 2020
Figures 22-23: Land identification committee consultation with the local people
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
23
36. The NGOs in the area are active mainly in the water and sanitation sector, in health
care, education, women‘s empowerment, agricultural development, human rights, child
care, socio-economic development, cultural and community development. Most are run by
local politicians. They can be more involved in development works but most of them are
based in the city itself with limited access to the districts.
37. Local government, local electricity department, and the Departments for Women’s Issues at provincial level are quite active and it would be possible to involve them in
supporting the project.
38. Local units of DABS and the Ministry of Energy and Water are the overall responsible
organizations for all electricity-related issues: planning, development and operation of the
existing properties. They are also key players when addressing supply issues and conflicts.
39. In general, when it comes to the impacts of the project the primary stakeholders are
the people in the provinces which are affected in different ways according to the type of
losses to be expected and by the construction works themselves. This section of the TL
project does not have negative impact on the people living at a certain distance from the
TL corridor other than they would be hired as unskilled labor for civil work and get benefit
of it.
40. During the field survey, various meetings were held with regional and local
stakeholders. The meetings focused on the collection of information regarding the socio-
economic conditions in the wider areas of the planned line corridor. At the same time,
information on the project was provided to those stakeholders who, until that point, had not
been informed.
41. People living across the corridor of the line relevant to the Balkh province districts
areas are considered poor, or at least not wealthy, but every group member immediately
agreed with the crossing the transmission line through this district and did not show any
reaction in this regards. People living in Khulm district of Balkh province is getting electricity
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
24
from the 220/20 kV substation located in Mazar substation. They pay the tariffs and
connections costs themselves. One strong argument in favor of regular payment of the
public supply is the current high costs for power produced by generators.
10. Confirmation of State Ownership of Land from MUDL
42. DABS requested MUDL to provide confirmation of status of government land in DDR
Section of the TL (Annex-1).
43. Based on the recommended new site for the subject transmission line, DABS started
its process with the governors’ office and MUDL land department of Balkh province to
identify and subsequently confirm the state land officially to DABS.
44. The Balkh provincial DABS, based on its HQ official letter, made an official request to
the head of local land department to confirm the state ownership of land. A committee was
established with the official direction of Governor to visit the site and consult with relevant
government entities. The committee included representatives from agriculture department,
land department, DABS, Municipality and Cadaster departments of Balkh province along
with other relevant governmental departments.
45. The committee visited the TL site and physically observed 190 towers’ foundation land and confirmed that out of the above stated towers’ foundation of land, 159 towers’ foundation surveyed/identified are related to the government owned land. The area of 159
towers’ foundation was an uncultivated land, no structures to be demolished and no crops or trees to be affected by the said number of towers covered under sub-sections 3, 6, 8 and
10 (Table 1 and Annex 2). Eventually, the committee prepared and submitted its report to
the Governor’s office for further consideration. The report certified by the governor’s office (Annex-1).
11. Grievance Redress Mechanism and Project Institutional Arrangements
46. A grievance redress mechanism has been established and available at project site
locations. DABS has formed grievance redress committees (GRCs) to address project
grievances. The chairman and members designated from the concerned departments and
local communities for the GRCs for the subproject in order to receive and facilitate the
resolution of peoples’ concerns, and grievances about the project’s activities. Each GRC is composed of the following members:
• Representative of the District Governor In-Chair
• Representative from the Security HQ Member
• Representative from Land Department Member
• Representative from Provincial Council Member
• Representative of DABS Office from concerned District Member
• Representative from CSC (Local Resettlement Specialist) Member
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
25
• Affected persons appointed by Representatives Member
47. The committees will be chaired by the representative of the concerned District
Governor or his representative. Grievances will be sent in written form to the committee
and will be heard and resolved within 21 days of submission of the complaint.
48. The safeguards unit of DABS and supervision consultant will conduct monitoring of
project implementation activities and ensure effectiveness of GRM. In case, if any
unanticipated impact will be identified during project implementation (construction period),
DABS will stop construction works in areas for unanticipated impact areas until corrective
action plan is prepared and implemented in accordance with the latest land acquisition and
resettlement framework (LARF) for all MFF subprojects which work for this . There has not
been any grievances received/recorded so far.
49. Semi-annual and annual social safeguards monitoring reports will be prepared and
submitted for ADB review and further disclosure. These social safeguards monitoring
reports shall provide summary of all social grievances or other relevant issues on this
subproject
Figure 24: Process of Grievance Redress
12. Institutional Arrangements for Safeguards Compliance
50. Well established institutional arrangements for Safeguards Compliance are in place.
The Da Afghanistan Breshna Sherkat (DABS) has the overall responsibility for
the Program including preparation, implementation and financing of all LAR tasks
and cross-agency coordination. DABS is executing the Program related activities through
Project Management Office (PMO).
AP has a grievance
Grievance Redress Committee
Not Redressed
Resolve with PMO/DABS at Kabul
Not Redressed
Appeal to appropriate Court under the applicable Laws of Afghanistan
Redressed
Redressed
Grie
van
ce R
edre
ss C
om
mitte
e
Assisted by ESSU & PMPIC
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
26
51. The Project Management Office (PMO) is responsible for the overall preparation,
implementation and monitoring of LARP and other day to day LAR issues. As necessary
the PMO is coordinating with the Ministry of Agriculture, Irrigation and Livestock (MAIL),
Cadaster Survey Department, local Governorates, NGOs, the community shuras and
locally elected councils. The PMO is undertaking the LAR activities through the
Environmental and Social Safeguard Unit (ESSU) that has been established in the PMO
exclusively to deal with and pursue the safeguards issues of the projects.
52. The ESSU (Annex 6) is responsible internally to monitor LARP preparation and
implementation (including surveys, asset valuation, and community consultation), LAR-
related cross-agency/inter-departmental coordination, LARP approval, preparation of
internal monitoring reports, approval of ToR for EMA from ADB and select and
appoint an External Monitor for independent monitoring of LARP implementation
and other LAR tasks, as assigned; and ensure the availability of required budget for
the implementation of LARP. ESSU is also working with PMPIC/CSC and getting its
support, to the extent possible in LARP preparation, updating and implementation and
compliance report. ESSU will subsequently take full responsibility of LARP preparation
and its implementation and other required reports once the capacity of the staff is fully
strengthen.
53. The ESSU is supported by the PMO of DABS. They are assisting in LAR
planning/implementation, internal monitoring and evaluation (M&E), and training LAR as
per ADB resettlement policy requirements. The PMO has engaged social development/
resettlement specialist to work with on all LAR related tasks and to liaise with the contractor
to ensure smooth implementation of related social development/ resettlement
requirements.
54. DABS will appoint an independent external / third party monitor (EM) for external
monitoring of sectional LARP implementation and preparation of sectional LARP
compliance reports as well as routine bi-annual safeguards reports. External monitoring will
cover all aspects of LARP implementation. For external monitoring a third party firm or
individual consultants will be engaged.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
27
MUDL
PVCC/LIVVC
Cr
Provincial Governor
Figure 25: Institutional Arrangement
13. Conclusion
55. The site visits, study of government records and the public consultation, final plan and
profile of the project have confirmed that there are no land acquisition, physical
displacement and resettlement impacts in the non-LAR affected sub-sections 3, 6, 8 and
10.
56. The subject TL in its total length of 304.31 km is crossing through four provinces
(Jawzjan, Balkh, Samangan and Baghlan) of the northern region of Afghanistan. The 500
kV Sheberghan – Dasht-e-Alwan TL is containing 776 various types of towers in its total
length of 304.31 km. Out of 776 towers, 305 towers, in its 119.97 km length, will be
constructed in Balkh province related districts.
IA for the project and the
primary responsible for LAR
planning, implementation and
financing as well responsible
for DDR of non-LAR impact
areas ad per updated LARF.
External monitoring of
sectional LARP
implementation and
preparation of sectional
LARP compliance reports as
well as routine bi-annual
safeguards reports.
ADB reviews and
approve LARP, DDR(s),
SMR and compliance
reports, and to provide
it’s no objection for issuance of Notice to
Proceed.
LARP preparation, updating and
implementation will be assisted by the
construction supervision consultants
(CSC) who will also provide for the
compliance reports required.
ADB
Certification of land identification
and valuation docs provided by
the provincial govt. of PVCC and
submitting to DABS for
compensation and project
affected stuff of the APs.
Clarification of Govt. own land
used for project.
Will ensure government functions
at provincial level and, following
the land identification and
valuation survey or negotiation,
will provide official endorsement
of land compensation rates.
Approval of PVCC designation in
response to DABS and Land
Dept. request respectively.
Land Department, Municipality,
Finance Dept., Cadaster Dept.,
Water and Irrigation Dept.,
Agriculture Dept., Culture and
Information Dept., Local DABS and
Security Dept. A rep of each of
these entities become member of
PVCC.
DABS/PMO
EM
PMPIC/CSC
- LARP Budget
Process and
Approval
Provincial Govt. Entities
MOF
Assist in the communication between DABS and the
affected communities in a variety of ways, including
facilitating public consultation, monitoring the
management of complaints and grievances.
Those whose
homestead land,
buildings, structure,
crop lands, trees, shops
and establishments,
and other assets such
as cultural heritage.
Affected
Communities or APs
Community Shuras, Local
Jirgas & CDC Provincial Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project,
Section-2 (Balkh Province)
28
57. The project non-LAR affected sub-sections covering 60.38 km area, out of 71.06 km
identified/surveyed portion or out of the total 119.97 km TL crossing Balkh province
(Section-2), has no impacts on private lands and livelihoods of people. Specific GPS
locations of towers of Non-LAR affected sub-sections are listed in Annex 2.
58. According to the finding of due diligence study like the site visits, study of government
records, the public consultations, final design documents (plan and profile), that the 159
towers’ foundation in 60.38 km TL, non-LAR affected sub-sections (Table 1 and Annex 2),
through which the transmission line passes, belong to the government. It is entirely bare
land with no livelihood activities. Neither permanent nor temporary impact to households,
farmers and private legal entities are expected due to the construction of the 60.38 km
non-LAR sub-sections of Section-2 (Balkh Province) of the TL. There will be also no impact
regarding land acquisition and no physical/economic displacement that may trigger
involuntary resettlement.
59. LARP for the LAR affected sub-sections (2, 5, 7, and 9) of Section-2 of the
transmission line is being processed in accordance with the updated land acquisition and
resettlement framework (LARF) and will submitted to ADB review by Mid July 2020.
Compliance report on implementation of the LARP will be submitted by September 2020.
60. The TL construction contractor is only allowed to work in the non-LAR sub-sections
(Annex 2) and will work in the LAR impact areas while the LARP is prepared and ADB
consent is obtained. The contractor will be formally directed to work in non-LAR subsection
once this DDR is approved by ADB and will be later on directed to work in LAR subsection
once the LARP is approved and its implementation is accomplished.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
29
Annex 1: Governor Consent Letter, LIVVC Report and relevant filled out forms
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
30
Translation of the above document:
Islamic Republic of Afghanistan
Ministry of Urban Development and Land
Land Affairs Deputyship
Acquisition and Pricing Directorate
Corresponding Office
Ref: 45710/3130 Date: Dec 19, 2019
To DABS,
We received letter No (779) dated Nov 25, 2019 along with (16) land ownership right identification
forms from Balkh province Land Department for (21976 m2) land which will be utilized for (64) tower of
500 kV transmission line located in Mazar province. The subject transmission line is starting from
Turkmenistan border and forwarding toward Dashte Khoja Alwan of Baghlan province.
As the documents assessed, the area was completely governmental and there is no legal problems.
The copy of letter along with the attachment are sent to you for your further action to be taken and
legal process.
Regards,
Gul Rahman Totakhil
Deputy of Ministry of Land Affairs
Ministry of Urban Development and Land
{Signed}
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
31
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
32
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
33
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (3) Province :( Balkh) Name: Governmental land Name:
Number of this form (1) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (West of Siah Gerd twon Type & # of Doc. Relation with the owner:
North of Residential Proj of Azadi) Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its validation Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid /Invalid
Based on decree No(3552)dated:Mar14,2017 of
Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No (
26575/ 1066) dated: Sep 11, 2018 of Ministry urban
development and lands also considering the article 9th
and 10th of lineal and extensional regulation as well as
article 17th and 18th of land holding affairs management
regulation, the area (1550m2 grade 7 land) included 5
power tower set forth in this form are property of
government which is not acquirable. (No need for
acquisition procedure).
1 Eng. Manzoor
Hussain
Feda Hussain Municipality Court
2 Ghulam Maroof Ghulam Sediq State accounting Properties
3 Azimullah Abdul Wahed Land Finance
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Naseem Rasool Bik Cadaster
8 Mohammad Nader Mohammad Shah Cadaster
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( )
Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
34
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 324 m2
// // // // // 324 m2
// // // // // 289 m2
// // // // // 324 m2
289 m2
Total of this sheet 1550 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
35
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Pole 30/0
Pole 30/1
Pole 30/2
Pole
30/3
Pole
30/4
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
36
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
37
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
38
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (13) Province :( Balkh) Name: Governmental land Name:
Number of this form (13) District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto Hillside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its validation Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid /Invalid
Based on decree No(3552)dated:Mar14,2017 of
Afghanistan Presidential Office in regards to
lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep
11, 2018 of Ministry urban development and
lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article
17th and 18th of land holding affairs management
regulation, the area (578m2 grade 7 land)
included 2 power tower set forth in this form are
property of government which is not acquirable.
(No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad Naseem Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( )
Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
39
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 289 m2
// // // // //
// // // // //
Total of this sheet 578 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
40
Hillside
Hillside Hillside
Hillside
Hillside
Hillside
Hillside
Pole
41D/0
Pole
41C/13
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
41
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
42
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
43
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (2) Province :( Balkh) Name: Governmental land Name:
Number of this form (2) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North of Aliabad project) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (613m2 grade 7 land)
included 2 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land Court
2 Mohammad Naseem Rasool Bik Cadaster Properties
3 Ghulam Maroof Ghulam Sediq State
accounting
Finance
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and
water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
44
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 324 m2
// // // // // 289 m2
// // // // //
// // // // //
Total of this sheet 613 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
45
Uncultivated land
Gh. Sakhi farm Ab. Karim’s farm
Ab. Shokoor’s farm
Gh. Sakhi farm Ab. Karim’s farm
Ab. Shokoor’s farm
Pole
30/1
8
Pole
30/1
9
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
46
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
47
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
48
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner ( ) Province :( Balkh) Name: Governmental land Name:
Number of this form ( ) District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto Hillside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1601m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land Court
2 Mohammad Naseem Rasool Bik Cadaster Properties
3 Ghulam Maroof Ghulam Sediq State accounting Finance
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad
Hasan
Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad
Shah
Cadaster
8 Manzoor Husain Feda Hussain Municipality
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
49
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 256 m2
// // // // // 400 m2
// // // // // 400 m2
256 m2
Total of this sheet 1601 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
50
Hillside
Hillside Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Hillside
Pole
41C/0
Pole
41C/9
Pole
41C/10
Pole
41C/11
Pole
41C/12
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
51
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
52
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
53
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (2) Province :( Balkh) Name: Governmental land Name:
Number of this form (2) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North of Hairatan road) Type & # of Doc. Relation with the owner:
Massoud’s residential town Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its validation Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid /Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1024m2 grade 7 land)
included 1 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad
Naseem
Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad
Amin
Ramzanali Energy and water
7 Mohammad
Nader
Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
54
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Town Paikal 360 Jirib
Yes 60 jirib 3500
jirib
1024 m2
// // // // //
// // // // //
// // // // //
Total of this sheet 1024 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
55
M. Nazir’s land
Gov.Prop Mazar street
ROW 220kv Mazar-Hairatan
Pole
30/60
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
56
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
57
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
58
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (3) Province :( Balkh) Name: Governmental land Name:
Number of this form (1) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North east of Sakhi camp) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its validation Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid /Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1517m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad
Naseem
Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad
Amin
Ramzanali Energy and water
7 Mohammad
Nader
Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9 Azimullah Abdul Wahed Land
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
59
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 324 m2
// // // // // 324 m2
// // // // // 256 m2
// // // // // 289 m2
324 m2
Total of this sheet 1517 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
60
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Pole
30/55
Pole
30/56
Pole
30/57
Pole
30/58
Pole
30/59
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
61
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
62
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
63
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (2) Province :( Balkh) Name: Governmental land Name:
Number of this form (2) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North of Aliabad project) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1550m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad Naseem Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
64
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 289 m2
// // // // // 324 m2
// // // // // 324 m2
324 m2
Total of this sheet 1550 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
65
Uncultivated land
Gh. Sakhi farm Ab. Karim’s farm
Ab. Shokoor’s farm
Gh. Sakhi farm Ab. Karim’s farm
Ab. Shokoor’s farm
Gh. Sakhi farm Ab. Karim’s farm
Ab. Shokoor’s farm
Gh. Sakhi farm Ab. Karim’s farm
Ab. Shokoor’s farm
Gh. Sakhi farm Ab. Karim’s farm
Ab. Shokoor’s farm
Pole
30/20
Pole
30/21
Pole
30/22
Pole
30/23
Pole
30/24
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
66
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
67
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
68
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (3) Province :( Balkh) Name: Governmental land Name:
Number of this form (2) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North east of Qalae Gul M.) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its validation Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid /Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1480m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad
Naseem
Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad
Amin
Ramzanali Energy and water
7 Mohammad
Nader
Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
69
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 289 m2
// // // // // 289 m2
// // // // // 289 m2
324 m2
Total of this sheet 1480 m2 289 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
70
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Pole
30/26
Pole
30/27
Pole
30/28
Pole
30/29
Pole
30/30
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
71
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
72
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
73
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (2) Province :( Balkh) Name: Governmental land Name:
Number of this form (1) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North of Hairatan road) Type & # of Doc. Relation with the owner:
Ahmad Shah Massoud town Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its validation Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid /Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1310m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad
Naseem
Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad
Amin
Ramzanali Energy and water
7 Mohammad
Nader
Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
74
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of lot The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 3500
jirib
256 m2
// // // // // 3500
jirib 224 m2
// // // // // 3500
jirib 289 m2
// // // // // 3500
jirib 252 m2
3500
jirib 289 m2
Total of this sheet 3500
jirib
1310 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
75
M. Nazeer’s land
Gov.land Mazar road
ROW of 220kv Mazar -Hairatan
Pole
31/61
Pole 31/0
Pole 31/1
Pole 31/2
Pole
31/3
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
76
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
77
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
78
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (13) Province :( Balkh) Name: Governmental land Name:
Number of this form (11) District: (Khulm ) F/Name: F/Name:
Reg #: Village: ( Alejto hillside ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1669m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land Court
2 Mohammad Naseem Rasool Bik Cadaster Properties
3 Ghulam Maroof Ghulam Sediq State accounting Finance
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
79
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 361 m2
// // // // // 289 m2
// // // // // 289 m2
441 m2
Total of this sheet 1669 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
80
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Pole 41
C/3
Pole 41
C/4
Pole 41
C/5
Pole 41
C/6
Pole 41
C/7
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
81
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
82
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
83
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (3) Province :( Balkh) Name: Governmental land Name:
Number of this form (1) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North east of Qalae Gul M.) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (324m2 grade 7 land)
included 1 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad Naseem Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
84
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 324 m2
Total of this sheet 324 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
85
Gov. land
Gov. land Gov. land
Gov. land
Pole
30/25
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
86
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
87
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
88
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (3) Province :( Balkh) Name: Governmental land Name:
Number of this form (3) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (East of Langarkhane Kalan) Type & # of Doc. Relation with the owner:
North of Azadi projects Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1156m2 grade 7 land)
included 4 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad Naseem Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
89
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 289 m2
// // // // // 289 m2
// // // // // 289 m2
Total of this sheet 1156 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
90
Gov.land
Gov.land Gov.land
Gov.land
Gov.land
Gov.land Gov.land
Gov.land
Gov.land
Gov.land Gov.land
Gov.land
Gov.land
Gov.land Gov.land
Gov.land
Pole 29
/15
Pole 29
/16
Pole 29
/17
Pole 29
/18
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
91
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
92
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
93
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form (1) District: (Khulm) F/Name: F/Name:
Reg #: Village: (West of Dehnow) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (2661m2 grade 7 land)
included 4 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land Court
2 Mohammad
Naseem
Rasool Bik Cadaster Properties
3 Ghulam Maroof Ghulam Sediq State accounting Finance
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad
Nader
Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
94
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 1024 m2
// // // // // 1024 m2
// // // // // 324 m2
// // // // // 289 m2
Total of this sheet 2661 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
95
Uncultivated
Uncultivated Uncultivated
Uncultivated
Uncultivated
Uncultivated Uncultivated
Uncultivated
Uncultivated
Uncultivated Uncultivated
Uncultivated
Uncultivated
Uncultivated Uncultivated
Uncultivated
Pole
31A/0
Pole
31A/1 Pole
31A/2
Pole
31A/3
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
96
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
97
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
98
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (3) Province :( Balkh) Name: Governmental land Name:
Number of this form (2) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North of Azadi projects) Type & # of Doc. Relation with the owner:
West of Siah Gerd street) Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1515m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad Naseem Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
99
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 289 m2
// // // // // 289 m2
// // // // // 324 m2
324 m2
Total of this sheet 1515 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
100
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Pole
29/19 Pole
29/20
Pole
29/21 Pole
29/22
Pole
29/23
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
101
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
102
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
103
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (3) Province :( Balkh) Name: Governmental land Name:
Number of this form (3) District: (Nahre Shahi) F/Name: F/Name:
Reg #: Village: (North east of Qalae Gul M.) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1515m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad Naseem Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
104
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 289 m2
// // // // // 289 m2
// // // // // 289 m2
// // // // // 324 m2
324 m2
Total of this sheet 1515 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
105
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Gov. land
Gov. land Gov. land
Gov. land
Pole
30/31 Pole
30/32
Pole
30/33 Pole
30/34
Pole
30/35
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
106
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
107
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
108
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (13) Province :( Balkh) Name: Governmental land Name:
Number of this form (5) District: (Khulm) F/Name: F/Name:
Reg #: Village: ( Alejto hillside ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2017 of Afghanistan Presidential
Office in regards to lineal and extensional projects and due to
instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of
lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1913m2 grade 7 land)
included 5 power tower set forth in this form are property of government
which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Land
2 Mohammad Naseem Rasool Bik Cadaster
3 Ghulam Maroof Ghulam Sediq State accounting
4 Sayed Abubakr Sayed Faqir DABS
Effective law article based on validation Doc. ( )
Effective law article based on extra Jerib ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture
6 Mohammad Amin Ramzanali Energy and water
7 Mohammad Nader Mohammad Shah Cadaster
8 Manzoor Husain Feda Hussain Municipality
9
Signatures of the committee: Cadaster team( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Province Governor signature ( )
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
109
Technical Information and Karaoke/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the project
(Jirib/m2)
The extra Jirib or
occupied by the
landowner
Governmental
property
Name
of scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
Original
area
Equivalent
to the 1st
grade
non-
cultivated
Paikal 360 Jirib
Yes 60 jirib 324 m2
// // // // // 324 m2
// // // // // 576 m2
// // // // // 400 m2
289 m2
Total of this sheet 1913 m2
Karaoke/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
110
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Pole
41C/2
1
Pole
41C/1 Pole
41C/0
Pole
41B/5
Pole
41B/4
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
111
Land identification and verification documents of 73 tower locate in Govt. land:
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
112
Translation of Above Document
Islamic Republic of Afghanistan
Ministry of Urban Development and Land
Balkh Province
Land Authority
Settlement General Office
Ref: 745/435 Nov 6, 2019
To Ministry of Urban Development and Land
Attention: Resettlement and Acquisition Authority,
Sheberghan – Mazare Sharif 500kv line project goes through Bandare Aqina Faryab province Turkminestan border up to Baghlan Dashte Alwan substation
and continues through Balkh province districts (Charbolak, Nahre Shahi, Khulm and Dehdadi).
In Balkh districts (292) twers are to be erected, however in Khulm district the lands for (73) poles were identified as governmental land and the forms of
ownership right have been proceeded and completed and the Governor of the province has signed the forms as well.
Herewith, the mentioned forms within (15) sheets which include (73) poles, are sent to you for further process.
Regards,
Engr. Shirshah Hotak
Director of Balkh Land
{Signed}
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
113
Land identification relevant forms filled in by the LIVVC:
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
114
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
115
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
116
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
117
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
118
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
119
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
120
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
121
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
122
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
123
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
124
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
125
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
126
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
127
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
128
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
129
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
130
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
131
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
132
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
133
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
134
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
135
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
136
Translation of the above forms:
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: Dehnawa Westside Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its validation Committee’s comment
Sr
.
Name F/Name Job Organizatio
ns
Reg
#
page Volum
e
Valid /Invalid
Based on decree No(3552)dated:Sep14,2017 of Afghanistan Presidential Office in regards to lineal and extensional p
due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry urban development and lands also cons
article 9th and 10th of lineal and extensional regulation as well as article 17th and 18th of land holding affairs mana
regulation, the area (1263m2 grade 7 land) included 4 power towers set forth in this form including on lots # 1-2-3-4 of
the above mentioned lands are property of government which is not acquirable. (No need for acquisition procedure).
1 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Court
2 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Properties
3 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Finance
4 Azimullah Abdul Wahed Settlement General Manager
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture Affairs Officer
6 Mohammad Amin Ramzanali Dispute Solution Officer
7 Mohammad Naseem Rasool Bik Cadaster Member
8 Mohammad Nader Mohammad Shah Geodesy Team Leader
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
137
Technical Information and Croquis/ Design of the lots
Lot # Cada
ster
#
Grade
of lot
Type of lot The area due to
location scale
Location scale
adjustment by Jirib/ m2
The original and
equivalent to 1st grade
The measure of
the land under
the project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental property
Name of
scale
Area Adjustme
nt of the
scale
unite
Adjustme
nt of the
area
Original area Equivale
nt to the
1st grade
Origina
l area
Equiv
alent
to the
1st
grade
Original
area
Equivalent
to the 1st
grade
Original area Equivalent to the 1st grade
1 non-cultivated Paikal 360 Jirib
Yes 60 jigib 289m2
2 // // // // // 324m2
3 // // // // // 289m2
4 // // // // // 361m2
5
Total of this sheet 1263m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
138
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner ( ) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto hillside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Mar14,2018 of Afghanistan Presidential Office in regards
to lineal and extensional projects and due to instructional letter No ( 26575/ 1066) dated:
Sep 11, 2018 of Ministry urban development and lands also considering the article 9th and
10th of lineal and extensional regulation as well as article 17th and 18th of land holding
affairs management regulation, the area (1989m2 grade 7 land) included 5 power towers
set forth in this form including on lots # 1-2-3-4-5 of cadaster, the above mentioned lands
are property of government which is not acquirable. (No need for acquisition procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Court
2 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Finance
4 Zabihullah Mohammad Hasan Agriculture Affairs Officer
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Azimullah Abdul Wahed Settlement General Manager
6 Mohammad Naseem Rasool Bik Member of Cadaster
7 Mohammad Nader Mohammad Shah Geodesy Team Leader
8 Mohammad Amin Ramzanali Dispute Solution Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( )
Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
139
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of lot The area due
to location
scale
Location scale adjustment by Jirib/ m2 The original and equivalent to 1st grade The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment of the scale unite Adjustment
of the area
Original
area
Equivalent of the 1st grade Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Hillside Paikal 360
Jirib
Yes 60 jigib 506.25m2
2 // // // // // 361m2
3 // // // // // 361m2
4 // // // // // 361m2
5 400m2
Total of this sheet 1989.25m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
140
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Tower
41/0
Tower
41A/0
Tower
41A/1
Tower
41A/2
Tower
41A/3
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
141
Islamic Republic of Afghanistan Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto/West mountain hillside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated:Mar14,2018 of Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of lineal and extensional regulation
as well as article 17th and 18th of land holding affairs management regulation, the area (1550m2 grade 7
land) included 5 power towers ( 41A/4 , 41B0, 41B/1, 41B/2 , 41B/3) including on lots # 1-2-3-4-5 of
cadaster, the above mentioned lands are property of government which is not acquirable. (No need for
acquisition procedure).
1 Eng. Abubakr Sayed Faqir DABS General
Manager of Plan
Court
2 Manzoor
Hussain
Feda Hussain Municipality
Elec. Engr.
Properties
3 Ghulam
Maroof
Ghulam Sediq Accounting
Coordination
Officer
Finance
4 Mohammad
Amin
Ramazan Ali Dispute Solution
Officer
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad
Hasan
Agriculture
Affairs Officer
6 Azimullah Abdul Wahed Settlement
General
Manager
7 Mohammad
Nader
Mohammad
Shah
Geodesy Team
Leader
8 Mohammad
Naseem
Rasool Bik Cadaster
Member
9
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
142
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( )
Signed and stamped by Province Governor
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Mountain
hillside
Paikal 360 Jirib
Yes 60 jigib 289m2
2 // // // // // 324m2
3 // // // // // 289m2
4 // // // // // 324m2
5 // // // // // 324m2
Total of this sheet 1550m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
143
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Tower
41A/4
Tower
41B/0
Tower
41B/1
Tower
41B/2
Tower
41B/3
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
144
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto Westside ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Sep14,2017 of Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of lineal and extensional regulation
as well as article 17th and 18th of land holding affairs management regulation, the area (1412m2 grade 7
land) included 5 power towers set forth in this form including on lots # 1-2-3-4-5 of cadaster, the above
mentioned lands are property of government which is not acquirable. (No need for acquisition
procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Court
2 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Finance
4 Azimullah Abdul Wahed Settlement General Manager
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Mohammad Amin Ramzanali Dispute Solution Officer
6 Mohammad Nader Mohammad
Shah
Geodesy Team Leader
7 Mohammad Naseem Rasool Bik Cadaster member
8 Zabihullah Mohammad
Hasan
Agriculture Affairs Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
145
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Stony Paikal 360 Jirib
Yes 60 jigib 256m2
2 // // // // // 289m2
3 // // // // // 289m2
4 // // // // // 289m2
5 289m2
Total of this sheet 1412m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
146
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Tower
34/10
Tower
34/11
Tower
34/12
Tower
34/13
Tower
35/0
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
147
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto Westside ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Mar 14,2018 of Afghanistan Presidential Office in regards to lineal
and extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of
Ministry urban development and lands also considering the article 9th and 10th of lineal and extensional
regulation as well as article 17th and 18th of land holding affairs management regulation, the area
(1447m2 grade 7 land) included 5 power towers set forth in this form including on lots # 1-2-3-4-5 of
cadaster, the above mentioned lands are property of government which is not acquirable. (No need for
acquisition procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager
of Plan
Court
2 Ghulam Maroof Ghulam Sediq Accounting
Coordination Officer
Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Finance
4 Azimullah Abdul Wahed General manager of
settlement
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Mohammad Nader Mohammad Shah Geodesy Team Leader
6 Mohammad Amin Ramzanali Dispute Solution Officer
7 Zabihullah Mohammad Hasan Agriculture Affairs
Officer
8 Mohammad Naseem Rasool Bik Cadaster member
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
148
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Stony Paikal 360 Jirib
Yes 60 jigib 256m2
2 // // // // // 289m2
3 // // // // // 289m2
4 // // // // // 289m2
5 324m2
Total of this sheet 1447m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
149
Governmental Property
Gov. Prop Gov.Prop
Governmental Property
Governmental Property
Gov. Prop Gov.Prop
Governmental Property
Governmental Property
Gov. Prop Gov.Prop
Governmental Property
Governmental Property
Gov. Prop Gov.Prop
Governmental Property
Governmental Property
Gov. Prop Gov.Prop
Governmental Property
Tower
35/1
Tower
35/2
Tower
35/3
Tower
35/4
Tower
35/5
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
150
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner ( ) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto Hillside ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee
Members ID
Registry which the property
has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Mar 14,2018 of Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of lineal and extensional regulation
as well as article 17th and 18th of land holding affairs management regulation, the area (1698m2 grade 7
land) included 5 power towers set forth in this form including on lots # 1-2-3-4-5 of cadaster, the above
mentioned lands are property of government which is not acquirable. (No need for acquisition
procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager
of Plan
Court
2 Ghulam Maroof Ghulam Sediq Accounting Coordination
Officer
Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Finance
4 Azimullah Abdul Wahed Settlement General
Manager
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad
Hasan
Agriculture Affairs
Officer
6 Mohammad Nader Mohammad
Shah
Geodesy Team Leader
7 Mohammad Naseem Rasool Bik Cadaster member
8 Mohammad Amin Ramzanali Dispute Solution Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
151
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Rocky
Stony
Paikal 360 Jirib
Yes 60 jigib 289m2
2 // // // // // 324m2
3 // // // // // 324m2
4 // // // // // 361m2
5 400m2
Total of this sheet 1698m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
152
Governmental property
Gov. Prop Gov. Prop
Governmental property
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Tower
35/4
Tower
Tower
36/0
Tower
Tower
36/1
Tower
Tower
36/2
Tower
37/0
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
153
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto hillside ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in
and its validation
Committee’s comment
Sr. Name F/Name Job Organization
s
Reg
#
page Volum
e
Valid
/Invalid
Based on decree No(3552)dated: Mar 14,2018 of Afghanistan Presidential Office in regards to lineal and extensional projects
and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry urban development and lands also
considering the article 9th and 10th of lineal and extensional regulation as well as article 17th and 18th of land holding affairs
management regulation, the area (1381m2 grade 7 land) included 5 power towers set forth in this form including on lots #
1-2-3-4-5 of cadaster, the above mentioned lands are property of government which is not acquirable. (No need for
acquisition procedure).
1 Eng. Manzoor
Hussain
Feda Hussain Municipality Elec. Engr. Court
2 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Properties
3 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Finance
4 Azimullah Abdul Wahed Settlement General Manager
Effective law article based on validation Doc. (
)
Effective law article based on extra Jeribi (
)
Effective law article based on occupation (
)
5 Zabihullah Mohammad
Hasan
Agriculture Affairs Officer
6 Mohammad
Amin
Ramzanali Dispute Solution Officer
7 Mohammad
Naseem
Rasool Bik Cadaster member
8 Mohammad
Nader
Mohammad
Shah
Geodesy Team Leader
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
154
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Hillside Paikal 360 Jirib
Yes 60 jigib 256m2
2 // // // // // 289m2
3 // // // // // 256m2
4 // // // // // 256m2
5 324m2
Total of this sheet 1381m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
155
Hillside
Hillside G Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Tower
37/1
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
Tower
38/0
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
156
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto Hillside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Mar 14,2018 of Afghanistan Presidential Office in regards to
lineal and extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11,
2018 of Ministry urban development and lands also considering the article 9th and 10th of lineal
and extensional regulation as well as article 17th and 18th of land holding affairs management
regulation, the area (1661m2 grade 7 land) included 5 power towers set forth in this form including
on lots # 1-2-3-4-5 of cadaster, the above mentioned lands are property of government which is
not acquirable. (No need for acquisition procedure).
1 Eng. Manzoor
Hussain
Feda Hussain Municipality Elec. Engr. Court
2 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Properties
3 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Finance
4 Azimullah Abdul Wahed Settlement General Manager
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Zabihullah Mohammad Hasan Agriculture Affairs Officer
6 Mohammad Nader Mohammad Shah Geodesy Team Leader
7 Mohammad
Naseem
Rasool Bik Cadaster member
8 Mohammad Amin Ramzanali Dispute Solution Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
157
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Hillside Paikal 360 Jirib
Yes 60 jigib 324m2
2 // // // // // 289m2
3 // // // // // 400m2
4 // // // // // 324m2
5 324m2
Total of this sheet 1661m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
158
Hillside
Hillside G Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Tower
38/1
Tower
38/2
Tower
38/3
Tower
38/4
Tower
38/5
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
159
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto Hillside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in
and its validation
Committee’s comment
Sr
.
Name F/Name Job Organizatio
ns
Reg
#
page Volum
e
Valid
/Invali
d
Based on decree No(3552)dated: Mar 14,2018 of Afghanistan Presidential Office in regards to lineal and extensional
projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry urban development and
lands also considering the article 9th and 10th of lineal and extensional regulation as well as article 17th and 18th of land
holding affairs management regulation, the area (1759m2 grade 7 land) included 5 power towers set forth in this
form including on lots # 1-2-3-4-5 of cadaster, the above mentioned lands are property of government which is not
acquirable. (No need for acquisition procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Court
2 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Finance
4 Zabihullah Mohammad Hasan Agriculture Affairs Officer
Effective law article based on validation Doc. (
)
Effective law article based on extra Jeribi (
)
Effective law article based on occupation (
)
5 Mohammad Nader Mohammad Shah Geodesy Team Leader
6 Mohammad Amin Ramzanali Dispute Solution Officer
7 Mohammad Naseem Rasool Bik Cadaster member
8 Azimullah Abdul Wahed Settlement General Manager
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
160
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Hillside Paikal 360 Jirib
Yes 60 jigib 256m2
2 // // // // // 400m2
3 // // // // // 342.25m2
4 // // // // // 361m2
5 400m2
Total of this sheet 1759.25m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
161
Hillside
Hillside G Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Hillside
Hillside Hillside
Hillside
Tower
38/6
Tower
38/7
Tower
38/8
Tower
39/0
Tower
40/0
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
162
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Dehnawa westside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in
and its validation
Committee’s comment
Sr
.
Name F/Name Job Organizatio
ns
Reg
#
page Volum
e
Valid
/Invali
d
Based on decree No(3552)dated: Sep 14,2017 of Afghanistan Presidential Office in regards to lineal and extensional
projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry urban development and lands
also considering the article 17th and 18th of land holding affairs management regulation, the area (1445m2 grade 7 land)
included 5 power towers set forth in this form including on lots # 1-2-3-4-5 of cadaster, the above mentioned lands are
property of government which is not acquirable. (No need for acquisition procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Court
2 Ghulam Maroof Ghulam Sediq Accounting Coordination
Officer
Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Finance
4 Azimullah Abdul Wahed Settlement General Manager
Effective law article based on validation Doc. (
)
Effective law article based on extra Jeribi (
)
Effective law article based on occupation (
)
5 Zabihullah Mohammad Hasan Agriculture Affairs Officer
6 Mohammad Amin Ramzanali Dispute Solution Officer
7 Mohammad Nader Mohammad Shah Geodesy Team Leader
8 Mohammad Naseem Rasool Bik Cadaster member
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
163
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Non-
cultivated
Paikal 360 Jirib
Yes 60 jigib 289m2
2 // // // // // 289m2
3 // // // // // 289m2
4 // // // // // 289m2
5 289m2
Total of this sheet 1445m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
164
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Tower
32/10
Tower
32/11
Tower
32/12
Tower
32/13
Tower
32/14
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
165
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Dehnawa westside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Sep14,2017 of Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of lineal and extensional regulation
as well as article 17th and 18th of land holding affairs management regulation, the area (1191m2 grade 7
land) included 4 power towers set forth in this form including on lots # 1-2-3-4- of cadaster, the above
mentioned lands are property of government which is not acquirable. (No need for acquisition
procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Court
2 Eng. Manzoor
Hussain
Feda Hussain Municipality Elec. Engr. Properties
3 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Finance
4 Azimullah Abdul Wahed Settlement General Manager
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Mohammad
Naseem
Rasool Bik Cadaster member
6 Mohammad Amin Ramzanali Dispute Solution Officer
7 Mohammad Nader Mohammad Shah Geodesy Team Leader
8 Zabihullah Mohammad Hasan Agriculture Affairs Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( )
Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
166
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type of
lot
The area due to
location scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Non-
cultivated
Paikal 360 Jirib
Yes 60 jigib 289m2
2 // // // // // 289m2
3 // // // // // 289m2
4 // // // // // 324m2
5
Total of this sheet 1191m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
167
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Tower
32/15
Tower
32/16
Tower
32/17
Tower
32/18
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
168
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner ( ) Province :( Balkh) Name: Governmental land Name:
Number of this form District: (Khulm) F/Name: F/Name:
Reg #: Village: (Alejto westside) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Mar14,2018 of Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of lineal and extensional regulation
as well as article 17th and 18th of land holding affairs management regulation, the area (1445m2 grade 7
land) included 5 power towers set forth in this form including on lots # 1-2-3-4-5 of cadaster, the above
mentioned lands are property of government which is not acquirable. (No need for acquisition
procedure).
1 Eng. Abubakr Sayed Faqir DABS General
Manager of Plan
Court
2 Eng. Manzoor Hussain Feda Hussain Municipality Elec.
Engr.
Properties
3 Ghulam Maroof Ghulam Sediq Accounting
Coordination Officer
Finance
4 Azimullah Abdul Wahed Settlement General
Manager
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Mohammad Nader Mohammad Shah Geodesy Team Leader
6 Mohammad Amin Ramzanali Dispute Solution
Officer
7 Mohammad Naseem Rasool Bik Cadaster member
8 Zabihullah Mohammad Hasan Agriculture Affairs
Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
169
Technical Information and Croquis/ Design of the lots
Lot
#
Cadaster
#
Grade
of lot
Type
of lot
The area due
to location
scale
Location scale adjustment
by Jirib/ m2
The original and
equivalent to 1st
grade
The measure of the
land under the
project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Name
of
scale
Area Adjustment
of the scale
unite
Adjustment
of the area
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
Original
area
Equivalent
of the 1st
grade
1 Stony Paikal 360
Jirib
Yes 60 jigib 289m2
2 // // // // // 289m2
3 // // // // // 289m2
4 // // // // // 289m2
5 // // // // // 289m2
Total of this sheet 1445m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
170
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Governmental Property
Gov.Prop Gov.Prop
Governmental Property
Tower
35/6
Tower
35/7
Tower
35/8
Tower
35/9
Tower
35/10
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
171
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( ) Name: Governmental land Name:
Number of this form District: ( ) F/Name: F/Name:
Reg #: Village: ( ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in
and its validation
Committee’s comment
Sr
.
Name F/Name Job Organizatio
ns
Reg
#
page Volum
e
Valid
/Invali
d
Based on decree No(3552)dated: Sep14,2017 of Afghanistan Presidential Office in
regards to lineal and extensional projects and due to instructional letter No ( 26575/
1066) dated: Sep 11, 2018 of Ministry urban development and lands also
considering the article 9th and 10th of lineal and extensional regulation as well as
article 17th and 18th of land holding affairs management regulation, the area
(2950m2 grade 7 land) included 5 power towers set forth in this form including on
lots # 1-2-3-4-5 of cadaster, the above mentioned lands are property of government
which is not acquirable. (No need for acquisition procedure).
1 Eng. Abubakr Sayed Faqir DABS General Manager of Plan Court
2 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Properties
3 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer Finance
4 Azimullah Abdul Wahed Settlement General Manager
Effective law article based on validation Doc. (
)
Effective law article based on extra Jeribi (
)
Effective law article based on occupation (
)
5 Mohammad Naseem Rasool Bik Cadaster member
6 Mohammad Nader Mohammad Shah Geodesy Team Leader
7 Zabihullah Mohammad Hasan Agriculture Affairs Officer
8 Mohammad Amin Ramzanali Dispute Solution Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
172
Technical Information and Croquis/ Design of the lots
L
ot
#
Cadas
ter #
Gra
de
of
lot
Type
of lot
The area due
to location
scale
Location scale
adjustment by
Jirib/ m2
The original and
equivalent to 1st
grade
The measure of
the land under
the project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Nam
e of
scale
Area Adjust
ment
of the
scale
unite
Adjustm
ent of
the area
Origin
al area
Equival
ent of
the 1st
grade
Origi
nal
area
Equival
ent of
the 1st
grade
Origin
al area
Equival
ent of
the 1st
grade
Origi
nal
area
Equival
ent of
the 1st
grade
1 Non-
cultiva
ted
Paika
l
360
Jirib
Yes 60 jigib 1024m2
2 // // // // // 1024m2
3 // // // // // 289m2
4 // // // // // 289m2
5 // // // // // 324m2
Total of this sheet 2950m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
173
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Tower
AP32/0
Tower
AP32/1
Tower
AP32/2
Tower
AP32/3
Tower
AP32/4
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
174
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :(Balkh ) Name: Governmental land Name:
Number of this form District: ( Khulm ) F/Name: F/Name:
Reg #: Village: (Dehnawa westside ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in and its
validation
Committee’s comment
Sr. Name F/Name Job Organizations Reg # page Volume Valid
/Invalid
Based on decree No(3552)dated: Sep14,2017 of Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry
urban development and lands also considering the article 9th and 10th of lineal and extensional regulation
as well as article 17th and 18th of land holding affairs management regulation, the area (1632m2 grade 7
land) included 5 power towers set forth in this form including on lots # 1-2-3-4-5 of cadaster, the above
mentioned lands are property of government which is not acquirable. (No need for acquisition
procedure).
1 Eng. Abubakr Sayed Faqir DABS General
Manager of Plan
Court
2 Ghulam Maroof Ghulam Sediq Accounting
Coordination Officer
Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec.
Engr.
Finance
4 Azimullah Abdul Wahed Settlement General
Manager
Effective law article based on validation Doc. ( )
Effective law article based on extra Jeribi ( )
Effective law article based on occupation ( )
5 Mohammad Amin Ramzanali Dispute Solution
Officer
6 Mohammad Nader Mohammad Shah Geodesy Team Leader
7 Mohammad Naseem Rasool Bik Cadaster member
8 Zabihullah Mohammad Hasan Agriculture Affairs
Officer
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
175
Technical Information and Croquis/ Design of the lots
L
ot
#
Cadas
ter #
Gra
de
of
lot
Type
of lot
The area due
to location
scale
Location scale
adjustment by
Jirib/ m2
The original and
equivalent to 1st
grade
The measure of
the land under
the project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Nam
e of
scale
Area Adjust
ment
of the
scale
unite
Adjustm
ent of
the area
Origin
al area
Equival
ent of
the 1st
grade
Origi
nal
area
Equival
ent of
the 1st
grade
Origin
al area
Equival
ent of
the 1st
grade
Origi
nal
area
Equival
ent of
the 1st
grade
1 Non-
cultiva
ted
Paika
l
360
Jirib
Yes 60 jigib 324m2
2 // // // // // 289m2
3 // // // // // 289m2
4 // // // // // 289m2
5 // // // // // 441m2
Total of this sheet 1632
m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
176
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Tower
AP33/0
Tower
AP33/1
Tower
AP33/2
Tower
AP33/3
Tower
AP33/4
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
177
Islamic Republic of Afghanistan
Afghanistan Lands Authority
Land settlement department
Ownership right identification form
Form specification Location of the lot Owner/occupier’s ID Attorney/Heirs ID
Number of the forms relating to the landowner (1) Province :( ) Name: Governmental land Name:
Number of this form District: ( ) F/Name: F/Name:
Reg #: Village: ( ) Type & # of Doc. Relation with the owner:
Letter of attorney #:
Committee Members ID Registry which the property has been set forth in
and its validation
Committee’s comment
Sr
.
Name F/Name Job Organizatio
ns
Reg
#
page Volu
me
Valid
/Invali
d
Based on decree No(3552)dated: Sep14,2017 of Afghanistan Presidential Office in regards to lineal and
extensional projects and due to instructional letter No ( 26575/ 1066) dated: Sep 11, 2018 of Ministry urban
development and lands also considering the article 9th and 10th of lineal and extensional regulation as well as
article 17th and 18th of land holding affairs management regulation, the area (1480m2 grade 7 land) included
5 power towers set forth in this form including on lots # 1-2-3-4-5 of cadaster, the above mentioned lands are
property of government which is not acquirable. (No need for acquisition procedure).
1 Azimullah Abdul Wahed Settlement General Manager Court
2 Eng. Aminullah Irrigation officer Properties
3 Eng. Manzoor Hussain Feda Hussain Municipality Elec. Engr. Finance
4 Zabihullah Mohammad Hasan Agriculture Affairs Officer
Effective law article based on validation Doc. (
)
Effective law article based on extra Jeribi (
)
Effective law article based on occupation (
)
5 Eng. Abubakr Sayed Faqir DABS General Manager of Plan
6 Mohammad Naseem Rasool Bik Cadaster member
7 Ghulam Maroof Ghulam Sediq Accounting Coordination Officer
8 Mohammad Nader Mohammad Shah Geodesy Team Leader
9
Signatures of the committee:
Cadaster team ( ) Energy and water ( ) Promotion ( ) Finance ( ) Project implementer ( ) Representative of municipality
Representative of the landowners ( ) Head of the committee ( ) Signed and stamped by Province Governor
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
178
Technical Information and Croquis/ Design of the lots
L
ot
#
Cadas
ter #
Gra
de
of
lot
Type
of lot
The area due
to location
scale
Location scale
adjustment by
Jirib/ m2
The original and
equivalent to 1st
grade
The measure of
the land under
the project
(Jirib/m2)
The extra Jiribi or
occupied by the
landowner
Governmental
property
Nam
e of
scale
Area Adjust
ment
of the
scale
unite
Adjustm
ent of
the area
Origin
al area
Equival
ent of
the 1st
grade
Origi
nal
area
Equival
ent of
the 1st
grade
Origin
al area
Equival
ent of
the 1st
grade
Origi
nal
area
Equival
ent of
the 1st
grade
1 Non-
cultiva
ted
Paika
l
360
Jirib
Yes 60 jigib 289m2
2 // // // // // 289m2
3 // // // // // 289m2
4 // // // // // 324m2
5 // // // // // 289m2
Total of this sheet 1480
m2
Croquis/ Design of the lots
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
179
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Governmental
Property
Gov.Prop
Gov.Prop
Governmental
Property
Tower
AP32/5
Tower
AP32/6
Tower
AP32/7
Tower
AP32/8
Tower
AP32/9
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
180
Land identification and verification documents of 19 tower located in Govt. land: Note: Each identified tower is indicated in a square figure along with the specific number of tower
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
181
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
182
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
183
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
184
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
185
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
186
Land identification and verification documents of 4 tower located in Govt. land: Note: The number of towers are 29/4, 29/5, 29/6 and 29/7.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
187
Annex 2: Non-LAR Affected Area of Section 2 (Balkh province)
No. Tower No. Sub-section No Province Name District Name Land Identification Easting X Northing Y Length (km)
1 29/4
3
Balkh Nehre shahi Government land 321562.48 4071139.58
1.94 2 29/5 Balkh Nehre shahi Government land 321897.06 4071416
3 29/6 Balkh Nehre shahi Government land 322223.93 4071686.06
4 29/7 Balkh Nehre shahi Government land 322555.43 4071959.93
5 29/15
6
Balkh Nehre shahi Government land 325215.13 4074157.32
18.56
6 29/16 Balkh Nehre shahi Government land 325551.25 4074435.02
7 29/17 Balkh Nehre shahi Government land 325881.98 4074708.26
8 29/18 Balkh Nehre shahi Government land 326215.79 4074984.05
9 29/19 Balkh Nehre shahi Government land 326551.92 4075261.75
10 29/20 Balkh Nehre shahi Government land 326886.5 4075538.17
11 29/21 Balkh Nehre shahi Government land 327211.83 4075806.95
12 29/22 Balkh Nehre shahi Government land 327541.79 4076079.56
13 29/23 Balkh Nehre shahi Government land 327869.43 4076350.25
14 30/0 Balkh Nehre shahi Government land 328201.99 4076625
15 30/1 Balkh Nehre shahi Government land 328637.9 4076616.09
16 30/2 Balkh Nehre shahi Government land 329047.82 4076607.71
17 30/3 Balkh Nehre shahi Government land 329468.73 4076599.1
18 30/4 Balkh Nehre shahi Government land 329905.64 4076590.17
19 30/5 Balkh Nehre shahi Government land 330313.55 4076581.83
20 30/6 Balkh Nehre shahi Government land 330736.46 4076573.18
21 30/7 Balkh Nehre shahi Government land 331168.37 4076564.35
22 30/8 Balkh Nehre shahi Government land 331608.28 4076555.36
23 30/9 Balkh Nehre shahi Government land 332042.19 4076546.49
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
188
24 30/10 Balkh Nehre shahi Government land 332475.1 4076537.63
25 30/11 Balkh Nehre shahi Government land 332897.01 4076529.01
26 30/12 Balkh Nehre shahi Government land 333323.92 4076520.28
27 30/13 Balkh Nehre shahi Government land 333759.83 4076511.37
28 30/14 Balkh Nehre shahi Government land 334199.74 4076502.37
29 30/15 Balkh Nehre shahi Government land 334619.65 4076493.79
30 30/16 Balkh Nehre shahi Government land 335063.56 4076484.71
31 30/17 Balkh Nehre shahi Government land 335488.47 4076476.02
32 30/18 Balkh Nehre shahi Government land 335925.38 4076467.09
33 30/19 Balkh Nehre shahi Government land 336364.29 4076458.12
34 30/20 Balkh Nehre shahi Government land 336799.2 4076449.22
35 30/21 Balkh Nehre shahi Government land 337235.1 4076440.31
36 30/22 Balkh Nehre shahi Government land 337664.01 4076431.54
37 30/23 Balkh Nehre shahi Government land 338101.92 4076422.59
38 30/24 Balkh Nehre shahi Government land 338530.83 4076413.82
39 30/25 Balkh Nehre shahi Government land 338960.74 4076405.03
40 30/26 Balkh Nehre shahi Government land 339397.65 4076396.09
41 30/27 Balkh Nehre shahi Government land 339832.56 4076387.2
42 30/28 Balkh Nehre shahi Government land 340252.47 4076378.62
43 30/29 Balkh Nehre shahi Government land 340677.38 4076369.93
44 30/30 Balkh Nehre shahi Government land 341101.3 4076361.26
45 30/31 Balkh Nehre shahi Government land 341529.21 4076352.51
46 30/32 Balkh Nehre shahi Government land 341965.12 4076343.6
47 30/33 Balkh Nehre shahi Government land 342392.03 4076334.87
48 30/34 Balkh Nehre shahi Government land 342798.94 4076326.55
49 30/35 Balkh Nehre shahi Government land 343206.86 4076318.21
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
189
50 30/55
8
Balkh Nehre shahi Government land 351300.16 4076152.73
17.49
51 30/56 Balkh Nehre shahi Government land 351763.07 4076143.27
52 30/57 Balkh Nehre shahi Government land 352156.99 4076135.22
53 30/58 Balkh Nehre shahi Government land 352575.9 4076126.65
54 30/59 Balkh Nehre shahi Government land 353023.8 4076117.49
55 30/60 Balkh Nehre shahi Government land 353428.72 4076109.21
56 30/61 Balkh Nehre shahi Government land 353843.63 4076100.73
57 31/0 Balkh Nehre shahi Government land 354249.55 4076092.43
58 31/1 Balkh Nehre shahi Government land 354492.06 4076160.95
59 31/2 Balkh Nehre shahi Government land 354767.28 4076238.71
60 31/3 Balkh Nehre shahi Government land 355095.44 4076331.43
61 31A/0 Balkh Nehre shahi Government land 355370.01 4076409.01
62 31A/1 Balkh Nehre shahi Government land 355741.74 4076395.02
63 31A/2 Balkh Nehre shahi Government land 356091.5 4076381.87
64 31A/3 Balkh Nehre shahi Government land 356538.18 4076365.06
65 31A/4 Balkh khulm Government land 356963.88 4076349.05
66 31A/5 Balkh khulm Government land 357400.57 4076332.62
67 31A/6 Balkh khulm Government land 357841.26 4076316.05
68 31A/7 Balkh khulm Government land 358173.02 4076303.57
69 32/0 Balkh khulm Government land 358559.99 4076289.01
70 32/1 Balkh khulm Government land 358751.13 4076199.01
71 32/2 Balkh khulm Government land 359183.59 4075995.39
72 32/3 Balkh khulm Government land 359540.05 4075827.54
73 32/4 Balkh khulm Government land 359946.27 4075636.27
74 32/5 Balkh khulm Government land 360334.4 4075453.52
75 32/6 Balkh khulm Government land 360734.29 4075265.23
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
190
76 32/7 Balkh khulm Government land 361127.84 4075079.92
77 32/8 Balkh khulm Government land 361525.02 4074892.9
78 32/9 Balkh khulm Government land 361914.95 4074709.3
79 32/10 Balkh khulm Government land 362307.6 4074524.42
80 32/11 Balkh khulm Government land 362698.44 4074340.39
81 32/12 Balkh khulm Government land 363091.09 4074155.5
82 32/13 Balkh khulm Government land 363480.13 4073972.32
83 32/14 Balkh khulm Government land 363869.16 4073789.14
84 32/15 Balkh khulm Government land 364262.71 4073603.84
85 32/16 Balkh khulm Government land 364639.08 4073426.62
86 32/17 Balkh khulm Government land 365031.73 4073241.74
87 32/18 Balkh khulm Government land 365429.81 4073054.3
88 33/0 Balkh khulm Government land 365817.02 4072871.98
89 33/1 Balkh khulm Government land 366075.87 4072563.09
90 33/2 Balkh khulm Government land 366352.05 4072233.52
91 33/3 Balkh khulm Government land 366615.4 4071919.27
92 33/4 Balkh khulm Government land 366878.09 4071605.79
93 34/0 Balkh khulm Government land 367063.98 4071383.97
94 34/1 Balkh khulm Government land 367198.51 4070989.27
95 34/6
10
Balkh khulm Government land 367861.17 4069045.09
22.39
96 34/7 Balkh khulm Government land 367993.44 4068657.02
97 34/8 Balkh khulm Government land 368126.04 4068267.99
98 34/9 Balkh khulm Government land 368264.44 4067861.93
99 34/10 Balkh khulm Government land 368398.97 4067467.23
100 34/11 Balkh khulm Government land 368529.95 4067082.94
101 34/12 Balkh khulm Government land 368669.32 4066674.04
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
191
102 34/13 Balkh khulm Government land 368805.47 4066274.6
103 35/0 Balkh khulm Government land 368938.45 4065884.43
104 35/1 Balkh khulm Government land 369118.69 4065546.5
105 35/2 Balkh khulm Government land 369304.11 4065198.85
106 35/3 Balkh khulm Government land 369492.35 4064845.91
107 35/4 Balkh khulm Government land 369689.06 4064477.09
108 35/5 Balkh khulm Government land 369893.77 4064093.27
109 35/6 Balkh khulm Government land 370095.65 4063714.74
110 35/7 Balkh khulm Government land 370282.48 4063364.45
111 35/8 Balkh khulm Government land 370462.25 4063027.39
112 35/9 Balkh khulm Government land 370642.96 4062688.57
113 35/10 Balkh khulm Government land 370838.26 4062322.4
114 35/11 Balkh khulm Government land 371027.91 4061966.81
115 36/0 Balkh khulm Government land 371221.95 4061602.98
116 36/1 Balkh khulm Government land 371441.94 4061213.86
117 36/2 Balkh khulm Government land 371592.54 4060947.48
118 37/0 Balkh khulm Government land 371787.68 4060602.3
119 37/1 Balkh khulm Government land 371777.21 4060352.52
120 37/2 Balkh khulm Government land 371758.44 4059904.91
121 37/3 Balkh khulm Government land 371740.84 4059485.28
122 37/4 Balkh khulm Government land 371724.33 4059091.63
123 38/0 Balkh khulm Government land 371706.46 4058665.63
124 38/1 Balkh khulm Government land 371716.73 4058250.76
125 38/2 Balkh khulm Government land 371727.47 4057816.89
126 38/3 Balkh khulm Government land 371737.18 4057425.01
127 38/4 Balkh khulm Government land 371745.57 4057086.11
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
192
128 38/5 Balkh khulm Government land 371755.24 4056695.23
129 38/6 Balkh khulm Government land 371766.8 4056228.37
130 38/7 Balkh khulm Government land 371774.55 4055915.47
131 38/8 Balkh khulm Government land 371784.92 4055496.58
132 38/9 Balkh khulm Government land 371791.02 4055250
133 40/0 Balkh khulm Government land 371667.69 4054743.97
134 41/0 Balkh khulm Government land 371579.09 4054501.03
135 41A/0 Balkh khulm Government land 371708.05 4054343.03
136 41A/1 Balkh khulm Government land 371966.93 4054151.55
137 41A/2 Balkh khulm Government land 372130.14 4054030.83
138 41A/3 Balkh khulm Government land 372356.05 4053863.73
139 41A/4 Balkh khulm Government land 372526.5 4053737.66
140 41B/0 Balkh khulm Government land 372669 4053632.27
141 41B/1 Balkh khulm Government land 372741.2 4053537.73
142 41B/2 Balkh khulm Government land 372834.71 4053415.31
143 41B/3 Balkh khulm Government land 372981.6 4053223
144 41B/5 Balkh khulm Government land 373295.43 4052812.14
145 41C/0 Balkh khulm Government land 373432.14 4052633.15
146 41C/1 Balkh khulm Government land 373698.68 4052529.45
147 41C/2 Balkh khulm Government land 373818.89 4052482.68
148 41C/3 Balkh khulm Government land 374104.08 4052371.72
149 41C/4 Balkh khulm Government land 374310.97 4052291.23
150 41C/5 Balkh khulm Government land 374539.3 4052202.39
151 41C/6 Balkh khulm Government land 374773.22 4052111.38
152 41C/7 Balkh khulm Government land 374976.38 4052032.34
153 41C/8 Balkh khulm Government land 375464.72 4051842.34
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
193
154 41C/9 Balkh khulm Government land 375731.26 4051738.64
155 41C/10 Balkh khulm Government land 375887.8 4051677.74
156 41C/11 Balkh khulm Government land 376211.22 4051551.91
157 41C/12 Balkh khulm Government land 376675.33 4051371.34
158 41C/13 Balkh khulm Government land 376950.25 4051264.38
159 41D/0 Balkh khulm Government land 377383 4051096.01
Annex 3: LAR impact area of Section 1 (Balkh Province)
No. Tower No. Sub-section No. Province Name District Name Land Identification Easting X Northing Y Length (km)
1 29/1
2
Balkh Nehre shahi Private land 320565 4070315
0.85 2 29/2 Balkh Nehre shahi Private land 320904 4070596
3 29/3 Balkh Nehre shahi Private land 321243 4070875
4 29/10
5
Balkh Nehre shahi Private land 323559 4072789
5 29/11 Balkh Nehre shahi Private land 323897 4073068
1.68 6 29/12 Balkh Nehre shahi Private land 324214 4073331
7 29/13 Balkh Nehre shahi Private land 324547 4073605
8 29/14 Balkh Nehre shahi Private land 324879 4073880
9 30/36
7
Balkh Nehre shahi Private land 343628 4076310
7.16
10 30/37 Balkh Nehre shahi Private land 344056 4076301
11 30/38 Balkh Nehre shahi Private land 344482 4076292
12 30/39 Balkh Nehre shahi Private land 344903 4076284
13 30/40 Balkh Nehre shahi Private land 345327 4076275
14 30/41 Balkh Nehre shahi Private land 345750 4076266
15 30/42 Balkh Nehre shahi Private land 346173 4076258
16 30/43 Balkh Nehre shahi Private land 346598 4076249
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
194
17 30/44 Balkh Nehre shahi Private land 347024 4076240
18 30/45 Balkh Nehre shahi Private land 347366 4076233
19 30/46 Balkh Nehre shahi Private land 347776 4076225
20 30/47 Balkh Nehre shahi Private land 348171 4076217
21 30/48 Balkh Nehre shahi Private land 348533 4076209
22 30/49 Balkh Nehre shahi Private land 348925 4076201
23 30/50 Balkh Nehre shahi Private land 349337 4076193
24 30/51 Balkh Nehre shahi Private land 349736 4076185
25 30/52 Balkh Nehre shahi Private land 350135 4076177
26 30/53 Balkh Nehre shahi Private land 350541 4076168
27 30/54 Balkh Nehre shahi Private land 350930 4076160
28 34/2
9
Balkh khulm Private land 367327 4070613
0.99 29 34/3 Balkh khulm Private land 367464 4070211
30 34/4 Balkh khulm Private land 367601 4069808
31 34/5 Balkh khulm Private land 367730 4069429
Annex 4: Unidentified Area of Section 2 (Balkh Province) that yet to be identified
No. Tower No. Province Name Sub-section No. Land Identification Easting X Northing Y Length (km)
1 11/6 Balkh
1
To be Identified 279076.72 4072805.14
44.07
2 11/7 Balkh To be Identified 279457.36 4072724.94
3 11/8 Balkh To be Identified 279865.4 4072638.98
4 11/9 Balkh To be Identified 280284.21 4072550.74
5 11/10 Balkh To be Identified 280706.93 4072461.68
6 11/11 Balkh To be Identified 281128.67 4072372.82
7 11/12 Balkh To be Identified 281549.43 4072284.17
8 11/13 Balkh To be Identified 281978.02 4072193.87
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
195
9 11/14 Balkh To be Identified 282400.74 4072104.81
10 11/15 Balkh To be Identified 282829.33 4072014.51
11 11A/0 Balkh To be Identified 283259 4071923.99
12 11A/1 Balkh To be Identified 283683.92 4071813.7
13 11A/2 Balkh To be Identified 284085.61 4071709.44
14 12/0 Balkh To be Identified 284374.02 4071634.58
15 12/1 Balkh To be Identified 284570.84 4071515.58
16 12A/0 Balkh To be Identified 284761.99 4071400
17 12A/1 Balkh To be Identified 285120.29 4071348.35
18 12A/2 Balkh To be Identified 285558.76 4071285.15
19 13/0 Balkh To be Identified 285980.07 4071224.41
20 13/1 Balkh To be Identified 286363.92 4071049.07
21 13/2 Balkh To be Identified 286732.31 4070880.8
22 13/3 Balkh To be Identified 287103.42 4070711.28
23 13/4 Balkh To be Identified 287478.18 4070711.28
24 13/5 Balkh To be Identified 287850.2 4070370.16
25 13/6 Balkh To be Identified 288242.24 4070191.08
26 13/7 Balkh To be Identified 288608.8 4070023.63
27 13/8 Balkh To be Identified 288979.01 4069854.53
28 13/9 Balkh To be Identified 289348.3 4069685.84
29 13/10 Balkh To be Identified 289711.23 4069520.06
30 14/0 Balkh To be Identified 290094.66 4069344.91
31 14/1 Balkh To be Identified 290475.66 4069343.19
32 14/2 Balkh To be Identified 290884.65 4069341.34
33 14/3 Balkh To be Identified 291287.65 4069339.52
34 14/4 Balkh To be Identified 291671.64 4069337.79
35 14/5 Balkh To be Identified 292092.64 4069335.89
36 15/0 Balkh To be Identified 292511.01 4069334
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
196
37 15/1 Balkh To be Identified 292915.72 4069256.84
38 15/2 Balkh To be Identified 293335.17 4069176.88
39 15/3 Balkh To be Identified 293758.54 4069096.16
40 15/4 Balkh To be Identified 294179.95 4069015.82
41 15/5 Balkh To be Identified 294613.15 4068933.23
42 15/6 Balkh To be Identified 295032.59 4068853.27
43 15/7 Balkh To be Identified 295463.83 4068771.06
44 15/8 Balkh To be Identified 295893.1 4068689.22
45 15/9 Balkh To be Identified 296301.74 4068611.31
46 15/10 Balkh To be Identified 296720.2 4068531.53
47 15/11 Balkh To be Identified 297159.29 4068447.82
48 15/12 Balkh To be Identified 297540.43 4068375.16
49 15/13 Balkh To be Identified 297951.03 4068296.88
50 15/14 Balkh To be Identified 298347.88 4068221.22
51 15/15 Balkh To be Identified 298735.9 4068147.25
52 15/16 Balkh To be Identified 299123.91 4068073.27
53 15/17 Balkh To be Identified 299496.2 4068002.3
54 15/18 Balkh To be Identified 299856.71 4067933.57
55 15/19 Balkh To be Identified 300231.95 4067862.03
56 15/20 Balkh To be Identified 300574.78 4067796.67
57 16/0 Balkh To be Identified 300956 4067723.99
58 16/1 Balkh To be Identified 301143.63 4067670.56
59 16/2 Balkh To be Identified 301587.96 4067544.03
60 16/3 Balkh To be Identified 301939.89 4067443.82
61 17/0 Balkh To be Identified 302315.01 4067337
62 17/1 Balkh To be Identified 302706.79 4067188.43
63 17/2 Balkh To be Identified 303119.02 4067032.1
64 17/3 Balkh To be Identified 303499.69 4066887.74
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
197
65 17/4 Balkh To be Identified 303908.29 4066732.79
66 17/5 Balkh To be Identified 304275.76 4066593.44
67 17/6 Balkh To be Identified 304661.92 4066447
68 18/0 Balkh To be Identified 305068 4066293
69 18/1 Balkh To be Identified 305424.59 4066324.77
70 18/2 Balkh To be Identified 305835.96 4066361.42
71 18/3 Balkh To be Identified 306213.46 4066395.05
72 18/4 Balkh To be Identified 306636.79 4066432.76
73 18/5 Balkh To be Identified 307003.34 4066465.42
74 18/6 Balkh To be Identified 307353.95 4066496.66
75 18/7 Balkh To be Identified 307723.94 4066529.62
76 18/8 Balkh To be Identified 308155.77 4066568.09
77 18/9 Balkh To be Identified 308563.16 4066604.39
78 18/10 Balkh To be Identified 308958.59 4066639.62
79 18/11 Balkh To be Identified 309354.92 4066674.92
80 19/0 Balkh To be Identified 309790.61 4066713.74
81 19/1 Balkh To be Identified 310180.86 4066605.42
82 19/2 Balkh To be Identified 310519.07 4066511.55
83 19/3 Balkh To be Identified 310889.08 4066408.85
84 19/4 Balkh To be Identified 311268.73 4066303.47
85 19/5 Balkh To be Identified 311574.18 4066218.69
86 20/0 Balkh To be Identified 311987.85 4066103.87
87 20/1 Balkh To be Identified 312355.11 4066068.06
88 20/2 Balkh To be Identified 312798.01 4066024.87
89 20/3 Balkh To be Identified 313229.96 4065982.74
90 20/4 Balkh To be Identified 313667.88 4065940.04
91 20/5 Balkh To be Identified 314101.82 4065897.72
92 20/6 Balkh To be Identified 314539.75 4065855.02
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
198
93 20/7 Balkh To be Identified 314952.79 4065814.74
94 21/0 Balkh To be Identified 315389.38 4065772.16
95 21/1 Balkh To be Identified 315719.12 4066049.7
96 21/2 Balkh To be Identified 316053.46 4066331.11
97 21/3 Balkh To be Identified 316391.62 4066615.74
98 21/4 Balkh To be Identified 316720.6 4066892.64
99 22/0 Balkh To be Identified 317062.01 4067180
100 23/0 Balkh To be Identified 317084.99 4067414.99
101 24/0 Balkh To be Identified 317232.44 4067589.98
102 24/1 Balkh To be Identified 317369.58 4067922.84
103 24/2 Balkh To be Identified 317480.43 4068191.9
104 25/0 Balkh To be Identified 317609.01 4068503.99
105 25/1 Balkh To be Identified 317953.15 4068703.92
106 25/2 Balkh To be Identified 318362.14 4068941.52
107 25/3 Balkh To be Identified 318671.7 4069121.35
108 26/0 Balkh To be Identified 318981.83 4069301.52
109 26/1 Balkh To be Identified 319387.09 4069465.02
110 26/2 Balkh To be Identified 319791.42 4069628.15
111 28/0 Balkh To be Identified 320190.01 4069788.96
112 29/0 Balkh To be Identified 320233.4 4070041.53
113 29/8 Balkh 4
To be identified 322884.62 4072231.9
0.19 114 29/9 Balkh To be identified 323220.74 4072509.6
115 41B/4 Balkh To be Identified 373134.57 4053022.73
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
199
Annex 5: Social Safeguards Project Management Arrangements
MFF-II (ESIIP), Tranche 1, Grant 0464-AFG
500 kV Sheberghan – Dasht-e-Alwan Transmission Line Section 2, Balkh Province
SECTION 2, Balkh PROVINCE
# Milestone activity Output Responsible Party DATE Status 1. Supervision’s resettlement
team on board Names of resettlement team mobilized:
- Mr. Sayed Salai from Vision RI (CSC)
- Mr. Mirwais Noor from DABS
- Mr. Waris from Contractor
Mr. Makhlis Social Safeguard Expert (National), Vision RI, is undertake over all monitoring and Assist. Mr. Ajay Sharma, Social Safeguard Specialist (Expat) will undertake overall planning, coordination, guidance and report preparation.
DABS and supervision firm
DABS Team in Jan 2019. The Contractor Team in October 2019. The Vision RI (CSC) Team in May 2020.
Working with MUDL in identification and verification of lands and other losses and monitoring of contactor activities in Non-LAR and LAR areas that have be already identified.
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
200
2. Detailed design completed Input from resettlement team to minimize LAR impact and develop this action plan
DABS and supervision firm
Oct 2019 Done
DDR Section: Please refer to Table 1 on Page 5 and Annex 2
3. Social safeguards surveys Field social safeguards surveys, review of land and other property documents;
DABS with supervision consultant and MULD support
Jan to Nov 2019 Done
4. GRM GRM established (IA and local communities)
Supervision consultant, DABS
Feb 2019 Done
5. Meaningful consultations Meaningful consultations completed, project information, including GRM shared
DABS with support of supervision consultant
Jan to Nov 2019 Done
6. Submission of due diligence report to ADB
DDR compliance with SPS, LARF, Project management arrangements in place
DABS 24 Nov 2019 Submitted, first version
7. ADB review of DDR Comments, if any ADB 31 Jan 2020 Reviewed, first version 8. Address ADB comments Updated DDR and
project management arrangements in place
DABS 24 Feb 2020 Comments incorporated to the first version
9. External/third party monitors engaged and mobilized
Monitor the construction works
External/third party monitors
TBD TOR was sent to ADB on Oct 29, 2019. As per AFRM, the External/Third
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
201
Party Monitor will be mobilized by August 2020
10. ADB acceptance of DDR Confirmation on DDR compliance with SPS, LARF, social safeguards project management arrangements in place
ADB (Safeguards) TBD Pending with ADB. Clean version of DDR submitted along with official letter dated 6/24/2020
11. All non-resettlement arrangements in place
Internal, optional DABS ADB (CWEN)
Nov 2019 In place
12.
ADB no objection letter to commence construction works on DDR sections
Commencement of construction work
ADB (CWEN) TBD Pending with ADB. Yet to be received.
13. Social Safeguards Monitoring
Social safeguards section in monthly progress report
DABS and supervision consultant
Monthly After issuance of NOL
14. Confirmation on results of social safeguards monitoring
Summary of observations, identify issues to DABS and ADB or confirm monthly progress reports
Third/external party monitors
Bi-monthly or more frequent as per need.
After issuance of NOL
15. Social Safeguards Monitoring Reports
Summary of monitoring and status of grievances, if any
DABS and supervision consultant
30 July (first part of each year) 31 January (second part each year)
After issuance of NOL
Commencement of construction works for section [coordinates] confirmed by DDR Corrective Action Plan need to be prepared and implemented, if unanticipated impact identified in DDR sub-section during construction
Parallel LARP Preparation and Implementation for: Please refer to Table 1 page 5 and Annex 3
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
202
3. Social safeguards surveys Inventory of Losses, census, DMS, Valuation Report, verification of title documents, etc.
DABS with supervision consultant and MULD support
End of August 2020 As per the contract, Inventory of Losses, census, DMS are being done by the Contractor – committees heading by MUDL for verification and valuation have been designated by local govt.
4. GRM GRM established (IA and local communities)
Supervision consultant, DABS
August 2020 To be established
5. Meaningful consultations Meaningful consultations completed, project information, including GRM shared
DABS with support of supervision consultant
July and August 2020 In progress
6. Submission of implementation ready LARP to ADB
LARP compliance with SPS, LARF, Project management arrangements in place
DABS October 2020 To be prepared
7. ADB review of the LARP Comments, if any ADB Middle of November 2020
To be reviewed
8. Address ADB comments Updated LARP and project management arrangements in place
DABS End of November 2020
To be incorporated
9. External/third party monitors engaged and mobilized
Monitor the construction works
External/third party monitors
TBD TOR was sent to ADB on Oct 29, 2019. As per AFRM, the External/Third Party Monitor will be mobilized by August 2020
10. ADB acceptance of LARP Confirmation on LARP compliance with SPS,
ADB (Safeguards) Middle of December 2020
To be accepted
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
203
LARF, social safeguards project management arrangements in place
11. Implementation ready LARP disclosed
Publication on website
DABS ADB
20 December 2020
To be disclosed
12. LARP implementation and preparation of the compliance report
LARP implemented; Compliance report verified by external monitor
DABS, External/third party monitor
January 2021 to February 2021
To be implemented and CR prepared
13. Submit compliance report to ADB
Compliance report verified by external monitor
DABS March 2021 To be submitted
14. ADB review compliance of LARP implementation with LARP, LARF and SPS
Comments, questions ADB (Social Safeguards)
Middle of March 2021 To be reviewed
15 ADB comments addressed Updated compliance report
DABS 25th of March 2021 To be incorporated
16 Compliance Report Disclosure
Confidential information excluded
DABS, ADB
End of March 2021
To be disclosed
17. All non-resettlement arrangements in place
Internal, optional DABS ADB (CWEN)
Middle of April 2021 To be in place
18. ADB no objection letter to commence construction works on the implemented LARP for section [coordinates]
Compliance report accepted by ADB
ADB April 2021 To be prepared
Commencement of construction works for approved section
19. Social Safeguards Monitoring Report 30 July (first part of the year and 31
After getting NOL for CR
Social Safeguard Due Diligence Report (DDR), 500 kV Sheberghan – Dasht-e-Alwan TL Project
ESIIP, MFF-II, Tranche-1, ADB Grant 0464-AFG
204
January (second part the year)
20 Corrective Action Plan need to be prepared and implemented, if unanticipated impact identified
Annex 6: ESSU and PMPIC staff with their titles
No. Name Title 1 ESSU Staff Mr. Mohammad Anwar Kohistani Land Acquisition Specialist 2 Mr. Nurollah Halif Sr. Environmental Specialist 3 Mr. Gul Ahmad Hanif Land Acquisition Expert (Legal) 4 Mr. Abdul Rasool Wardak Sr. Social Safeguard Specialist 5 Mr. Abdul Bashir Maroof Environmental Expert 6 Mr. Musa Rahimi Environmental Expert 7 Mr. Ahmad Munir Royeq Social Safeguard Expert 8 Staff
Deployed under PMPIC
Mr. Zyarmal Safi Social Safeguard/Resettlement Employee 9 M. Mirwias Noor Social Safeguard/Resettlement Employee 10 Mr. Hakim Haris Social Safeguard/Resettlement Employee 11 Mr. Mukhtar Social Safeguard/Resettlement Employee 12 Mr. Mirwais Social Safeguard/Resettlement Employee