social n parking

15
Social Aspect of Sri Gombak ation and Races hment of over 300,000 population-well connected-Kepong-Batu Caves-Se up of varied cultures of the different groups uage and Religion y, Chinese and English arin, Cantonese, Hokkien and Hakka 40% 35% 15% 10% Races Malay Chinese Indian Others

Upload: patricia-lim

Post on 10-Feb-2016

214 views

Category:

Documents


1 download

DESCRIPTION

Parking condition in Sri Gombak.

TRANSCRIPT

Social Aspect of Sri Gombak

• Population and Races Catchment of over 300,000 population-well connected-Kepong-Batu Caves-Setapak Made up of varied cultures of the different groups • Language and Religion Malay, Chinese and English Mandarin, Cantonese, Hokkien and Hakka

40%

35%

15%10%

Races

Malay Chinese

Indian Others

• Daily activities, Social and Entertainment Activities Taman Tasik Sri Gombak -main recreational area Leisure area for the all sectors age of the residents Tai Chi-Dancing activities-for teenagers

• Daily activities, Social and Entertainment Activities Night market -twice in a week in every Monday and Saturday

• Daily activities, Social and Entertainment Activities KSL Futsal Sri Gombak Teenagers 15- 23 years old Sinamax Badminton Court

Sinamax Badminton Court

KSL Futsal Court

• Education

• Education 1 secondary school- SMK Hillcrest 2 primary school- SK Seri Gombak & SK Seri Gombak 2

SMK Hillcrest

SK Seri Gombak

Tadika Disney

Tadika Seri Ayu

• Security Gated and guarded- Villa Kristal Height & Taman Sri Gombak Phase 6 Non-gated- Taman Sri Gombak Phase 1 to 5 & Phase 7 to 10

• Security Gated and guarded- Villa Kristal Height & Taman Sri Gombak Phase 6 Non-gated- Taman Sri Gombak Phase 1 to 5 & Phase 7 to 10

•Villa Kristal Height

•Taman Seri Gombak Phase 6

• Parking at Sri Gombak Public Parking Private Parking On-street Parking Off-street Parking

• Residential Area Taman Villa Kristal Heights On-street visitor parking On-street parallel parking Off-street parking

• Taman Sri Gombak Phase 9 and Phase 10 Available with one to two bays of parking lots space at car porch (off-street parking) Shortage of parking spaces, on-street parking along the roadside Parking at the backlane

• Taman Sri Gombak Phase 2 to Phase7 Terrace house maximum two bays of parking lots at car porch (off-street parking) Parallel to road parking types due to shortage of spaces Create own car porch outside building

• Pangsapuri Seri Laman Private off-street car park Park in front of apartment

• Commercial and Service Area Private off-street parking Public on-street parking Private reserved parking

• Taman Industri Bolton Private basement parking

• Prima Sri Gombak New development Wider services road-reduce traffic congestion Available of parking for disabled

• Taman Sri Gombak On-street parking 45° oblique parking Parallel to road parking