smaw appendix
DESCRIPTION
okTRANSCRIPT
APPENDIX A
a.1.2. Assessment Area
SHIELDED METAL ARC WELDING (SMAW) NC IITECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITYEast Service Road, South Superhighway, Taguig City, Metro ManilaMETALS AND ENGINEERING SECTORTRAINING REGULATIONS
1
TABLE OF CONTENTS
METALS AND ENGINEERING SECTOR
SHIELDED METAL ARC WELDING (SMAW) NC II
Page No.
SECTION 1 SHIELDED METAL ARC WELDING (SMAW) NC II QUALIFICATION1
SECTION 2 COMPETENCY STANDARDS2-46
Basic Competencies Common Competencies Core Competencies2-1516-4344-46
SECTION 3 TRAINING STANDARDS47-54
3.1 Curriculum Design47-50
3.2 Training Delivery51
3.3 Trainee Entry Requirements52
3.4 List of Tools, Equipment and Materials52-53
3.5 Training Facilities53
3.6 Trainers' Qualifications54
3.7 Institutional Assessment54
SECTION 4 NATIONAL ASSESSMENT AND CERTIFICATION ARRANGEMENTS55
COMPETENCY MAP56
DEFINITION OF TERMS57
ACKNOWLEDGEMENTS58
3.5 TRAINING FACILITIES SMAW NC II
The welding workshop must be of concrete structure. Based on class size of 25 students/trainees the space requirements for the teaching/learning and circulation areas are as follows:
TEACHING/LEARNING AREASSIZE IN METERSAREA IN SQ. METERSQTYTOTAL AREA IN SQ. METERS
Welding Booth2 X 1.5 3 824
Grinding Booth2 X 1.5 3 26
Materials/Preparation Area* 2 X 244
Bench work Area1.5 X 2.54 28
Tool Room & S/M Storage Area4 X 52020
Learning Resource Area*5 X 94545
Wash Area /Comfort Room (male & female) *2.5 X 41010
Total117
Circulation Area**35
Total Workshop Area152
* This area can also be used by other welding courses.** Area requirement is equivalent to 30% of the total teaching/learning areas
a.2.1 Assessment room or LaboratoriesAPPENDIX BA.2 Lighting And Ventilation
*Based on Accreditation of Assessment Center Self-Assessment Check List, TSU-CT is within the minimum TESDA requirement lighted at an average of 30-40 foot-candle with minimal tolerance dark spot.
a.2.3 Air Condition Unit a.2.3 Blowers/Fans
a.3.1. Store Room APPENDIX CA.3 Auxiliary Room
*Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, the tools are kept in a customize cabinets.
a.3.2. Room for Performance Assessment *Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, TSU-CT can accommodate at least 10 candidates/ batch
a.3.3. Chairs and Tables *Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, TSU-CT is provided with chairs, tables, chalkboard/whiteboards, and other needed furniture as needed in the laboratory.
a.3.3. Comfort Rooms
*Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, TSU-CT is neat and orderly maintained by the universitys General Services Office (GSO).
A.4 ASSESSMENT EQUIPMENT, HAND TOOLS, SUPPLIES MATERIALS
LABORATORY UPGRADING MODERNIZATION
TOOLS
No. UnitItem Specification Unit CostQTYTotal Amount
1 pcsChipping Hammer10001212000
2 pcsSteel brush300123600
3 pcsBallpeen Hammer100088000
4 pcsPlier/tong300123600
5 pcs Files-bastard cut 10001010000
6 pcsHead shield/helmet800129600
7 setsLeather apron/jacket300123600
8 sets Leather glove, long300123600
9 pcsSafety goggle, wide vision, clear3002600
10 pcsOxy-acetylene goggles50021000
11 pcsTry square 300 mm. long10001212000
12 pcsSteel square 300 mm. long10001212000
13 pcs Files-half round 10001010000
14 pcsFillet gauge250025000
Total 94600
EQUIPMENT
No. UnitItem Specification Unit CostQTYTotal Amount
1unitsArc Welding machine AC/DC and accessories15,0008120000
2pcs Welding table/positioners5,000840000
3unitElectrode oven 3,00013000
4unitAutomatic gas cutting machine20,000120000
5unitsPortable disc grinder10,000550000
6unitExhaust fan1,00055000
7unitPower hacksaw12,000112000
8unitsAnvil1,00022000
9unitsWork bench w/ bench vice on 4 corners5,000210000
10setsOxy-acetylene/Oxy-LPG cylinder with content 5,000210000
11unitPedestal /bench grinding machine 12,000112000
12unit Industrial fan3,00026000
Total 290000
Materials
No. UnitItem Specification Unit CostQTYTotal Amount
1MetersBI Pipe 5 in Dia Schedule 6020002550000
2PcMild Steel Plate (4ft X4ft X 3/8in)500025125000
3BoxE7018 Electrode 3.2 mm dia. (20kg/box)250040100000
4BoxE6011 Electrode 3.2 mm dia. (20kg/box)23004092000
5BoxE7013 Electrode 3.2 mm dia. (20kg/box)20004080000
6tankLPG Refill 11.5 kg6504026000
7TankOxygen refill 1800 psig5004020000
8pcsCut-off Disc (14in dia)4002510000
9pcsGrinding Disc (4in Dia)80252000
10pcsSteel Brush2525625
11pcsCarbide Tool bit (5/16)120253000
Total 508625
LABORATORY UPGRADING MODERNIZATION
Equipment 94,600
Tools 290,000
Material508,625
Total893,225
Facilities and Equipment Requirements
No.Items and SpecificationsQuantityUnit CostTotal Amount
1Construct Additional Welding Booth5 units15,00075,000
2Upgrade welding machine to Inverter type dual process (SMAW and GTAW)5 unit35,000175,000
3Bench Grinder 1 HP2 units12,00024,000
4Automatic Gas Cutting Machine1 set60,00060,000
5Electrical installation for the new equipment1 set40,00040,000
TOTAL374,000
a.5.1 Medicine CabinetAPPENDIX DA.5 Safety Provisions
A first-aid cabinet for antidotes and neutralizing solution are present on the laboratory
a.5.2 Open Floor SpacesAre appropriately grouped to provide ease of movement
a.5.4. Fire Extinguisher
a.5.4. Equipment LayoutTraining equipment are arrange according to sequence of operation
a.5.6. Color Coded Buttons
*Based on TESDA Accreditation of Assessment Center Self-Assessment Check List, TSU-CT SMAW emergency switches are installed for safety.
35