A short slide show of job-site progress pictures from the Boschert Greenway Trail and the building of a new SmartSlope Living Retaining Wall. http://www.thelivingwallco.comTRANSCRIPT
![Page 1: SmartSlope Boschert Progress 10 10-2011](https://reader036.vdocuments.site/reader036/viewer/2022062513/5554f1abb4c90566278b508d/html5/thumbnails/1.jpg)
Ideal Landscape Group Starts the SmartSlope Wall at Boschert Greenway Trail for Great Rivers Greenway.
Check out our Website @ SmartSlope.com
![Page 2: SmartSlope Boschert Progress 10 10-2011](https://reader036.vdocuments.site/reader036/viewer/2022062513/5554f1abb4c90566278b508d/html5/thumbnails/2.jpg)
Wall area is excavated, footing is marked and then dug out – ready for base rock.
![Page 3: SmartSlope Boschert Progress 10 10-2011](https://reader036.vdocuments.site/reader036/viewer/2022062513/5554f1abb4c90566278b508d/html5/thumbnails/3.jpg)
Base rock is placed, leveled and compacted – ready for SmartSlope modules in the morning!