smart ppt presentation
DESCRIPTION
Smart introduction and capabilitiesTRANSCRIPT
![Page 1: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/1.jpg)
Smart
By Darren Wellard
![Page 2: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/2.jpg)
About Smart
• Privately Owned Company• Established in 1995• Specialises in Data and Electrical Solutions• Members of BICSI, TIA, FIA & ECA• Certified to EN ISO 9001 Quality Standards• Accredited installers for Panduit; Brand Rex,
Conectix and Hellerman Tyton solutions. • EMEA Coverage
![Page 3: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/3.jpg)
SmartManagement Services
• Consultants are TIA accredited
• RCDD qualified Design Team
• BICSI, FIA ECA approved
• Certified Project Managers
• Cisco certified Networking Consultants
• Work carried out to ISO9001 Quality Standards
![Page 4: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/4.jpg)
Smart Operations Services
• Structured Data Cabling - Copper Solutions- Optical Fibre - Blown Fibre
• Electrical Services- CCTV- Fire & Security- Access Control Systems- Infrastructure Design & Installation
• Networking Solutions- Design- Supply & Installation- Configuration- Diagnostic Testing
![Page 5: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/5.jpg)
Smart Projects
• WHAT WE HAVE DONE• Case Studies• THE HUB, Regents Park• THE HUB : A prestigious electrical and data
installation recently completed in Central London
• CRS CISCO Router Installation• CRS Paris : A routine installation was identified
as being potentially dangerous by SMART technicians, and a dynamic solution was offered
• NHS critical systems development• NHS Winchester : Metro had secured the
refurbishment project of The South Central Ambulance Service in Winchester and needed an experienced, reliable electrical contractor to take on the demanding roles of designers, consultants and installers for the various new critical installations. SMART was there to help
![Page 6: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/6.jpg)
A CRS CASE STUDY
Smart were engaged by one of the leading suppliers of networking equipment and network management for the Internet to assist with the deployment of their CRS1-16 Core Routers across a number of major European cities.
Smart’s involvement within this project was for the supply of resource and materials to:
Project Manage
Survey
Installation
Configuration
![Page 7: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/7.jpg)
For this project the Client arranged delivery of each Cisco CRS16 to the site, with Smart having responsibility for relocating the Cisco CRS 1-16 to the footprint within the data centre from the loading bay.
During the survey of the Paris data centre, Smart raised concerns as to the maximum loading the existing raised floor would be able to safely accommodate.
Smart were then asked by the client to undertake further investigations to ascertain the implications of the proposed installation.
Smart engaged a Structural Engineer to undertake a detailed survey in direct relationship to the raised floor, the building fabrication and the site access to confirm the viability of the proposed installation.
CRS1-16 In final Location
![Page 8: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/8.jpg)
As a result of the Structural survey it was ascertained that with a maximum existing floor loading of 500kg and a fully loaded CRS1-16 weighing in at 750kg some additional works would have to be undertaken to facilitate the installation.
Smart then worked closely with the Structural Engineer, the client and the management department of the Paris data centre to design, install and test a suitable strengthened floor support solution to permit the installation of the CRS1-16.
Upon completion of the alterations to the raised floor Smart continued with the installation of the CRS1-16 including:Siting of the CRS1-16 on the footprintInstallation and connection of the DC power connectivity, First power up, Configuration,Final testing, Hand over
DC Powered CRS1-16
![Page 9: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/9.jpg)
Smart Projects
Colt TelecomSmart has carried out numerous projects for Colt direct and their
clients
FidelityHiscox – London & Paris
RS ComponentsOracle
LastMinute.Com
![Page 10: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/10.jpg)
Some of the Companieswe work with
![Page 11: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/11.jpg)
Where we Work
•UK•Ireland•Spain•Hungary•France•Germany•Turkey•Greece•Egypt•Holland
![Page 12: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/12.jpg)
CISCO
• SMART have worked with CISCO on many projects for over 6 years. We have installed, tested and commissioned all current switching and routing equipment. Some of the projects in which we have worked in partnership with CISCO on are:
• TELE2; CRS1-16’s into 4 sites in Europe• SAVVIS; CRS1-8’s and GSR 12416’s across 6 sites in Europe• BT21CN; CRS1-16’s, 6509’s, MGX’s and 3845’s over 130+ sites
throughout the UK.• EASYNET; CRS1-16’s, GSR 12410’s across 30 sites including
managing specialist deliveries required due to obscure locations.
![Page 13: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/13.jpg)
Smart Design & Implementation Process
DESIGN
&
IMPLEMENTATION
PROCESS
Handover Initial
Consultancy
Detailed
Consultancy
Definitive
Design
Project
Management
ImplementationProvisional
Design
![Page 14: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/14.jpg)
DESIGN &
IMPLEMENTATIONPROCESS
Handover InitialConsultancy
DetailedConsultancy
DefinitiveDesign
ProjectManagement
ImplementationProvisional
Design
Initial Consultancy
![Page 15: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/15.jpg)
• Understand Business Objectives (short and medium term)
• Understand Business Constraints (budgets and timescale)
• Understand Building Environment
• Overview of Existing Infrastructure
• Identify Technology Preferences (existing investments)
• Capture Technical Objectives & Constraints
o High Bandwidth users CAD, Design etc
o Communal Areas
o Planned Technology refreshes over cabling lifecycle
o Understanding the customers technical capabilities
o Level of resilience required
Initial Consultancy
![Page 16: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/16.jpg)
Provisional Design
DESIGN &
IMPLEMENTATIONPROCESS
Handover InitialConsultancy
DetailedConsultancy
DefinitiveDesign
ProjectManagement
ImplementationProvisional
Design
![Page 17: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/17.jpg)
Provisional Design
• Based on Information Gleaned from Initial Consultancy
• Usually Includes Options
• Output in the form of a Discussion Document which may include;
o Solution overview (may include several options)
o Schematics, Layouts and Routing diagrams
o Top level project plan
o Budgetary costs
![Page 18: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/18.jpg)
DESIGN &
IMPLEMENTATIONPROCESS
Handover InitialConsultancy
DetailedConsultancy
DefinitiveDesign
ProjectManagement
ImplementationProvisional
Design
Detailed Consultancy
![Page 19: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/19.jpg)
Detailed Consultancy
Recommendations based on Initial Consultancy
• Proposed Cabling solution based on:
o Technology Plans
o Business plans
o Physical building constraints
o Space Planning
• Standards Compliant
• Unique design fit for purpose
![Page 20: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/20.jpg)
Detailed Consultancy
Project Planning & Resources
• Installation plan and phases
• Scope of initial phase(s)
• Major activities
• Responsibility client representation ( Sign off, Change Control)
• Testing requirements – Phased, Witness, Sign off
• Documentation requirements – content, format CAD, Test Results
![Page 21: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/21.jpg)
DESIGN &
IMPLEMENTATIONPROCESS
Handover InitialConsultancy
DetailedConsultancy
DefinitiveDesign
ProjectManagement
ImplementationProvisional
Design
Definitive Design
![Page 22: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/22.jpg)
Definitive Design
• Full schedule of equipment, components and variables
• Schematics
• Project Plan
• Scope of Works document
• Pricing Schedule
![Page 23: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/23.jpg)
DESIGN &
IMPLEMENTATIONPROCESS
Handover InitialConsultancy
DetailedConsultancy
DefinitiveDesign
ProjectManagement
ImplementationProvisional
Design
Project Management
![Page 24: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/24.jpg)
Project Management
INITIATION
DESIGN
IMPLEMENTATION
CLOSE
PLANNING, COMMUNICATION & CHANGE CONTROL
RISK MANAGEMENT & LESSONS LEARNED
![Page 25: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/25.jpg)
• Full schedule of equipment, software and licences
• Logical and physical schematics of LAN
• WAN schematic
• Project Plan
• Scope of Works document (maybe a draft PID)
• Pricing Schedule
Project Management
![Page 26: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/26.jpg)
DESIGN &
IMPLEMENTATIONPROCESS
Handover InitialConsultancy
DetailedConsultancy
DefinitiveDesign
ProjectManagement
ImplementationProvisional
Design
Implementation
![Page 27: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/27.jpg)
• Full schedule of equipment, software and licences
• Logical and physical schematics of LAN
• WAN schematic
• Project Plan
• Scope of Works document (maybe a draft PID)
• Pricing Schedule
Implementation
![Page 28: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/28.jpg)
DESIGN &
IMPLEMENTATIONPROCESS
Handover InitialConsultancy
DetailedConsultancy
DefinitiveDesign
ProjectManagement
ProvisionalDesignImplementation
![Page 29: Smart PPT Presentation](https://reader036.vdocuments.site/reader036/viewer/2022081412/544f1e04af79595e6a8b46c2/html5/thumbnails/29.jpg)
Handover
• Full inspection of all works.
• Quality Assurance Checklists
• Final Inspection and Walk About
• Documentation
• Testing Certificates
• O&M Manuals