Page 1: Small Hydro Power Schemes Kerala

PROJECT PROFILES

ON

SMALL HYDRO POWER SCHEMES

Prepared by:

Small Hydro Promotion Cell

Energy Management Centre (EMC)

Department of Power, Government of Kerala

Page 2: Small Hydro Power Schemes Kerala

Item Description Pages 1 Govt. of Kerala Power Dept.Announcement of

allotment of SHP`s through Bidding route(IPP/CPP)

2

2 Small Hydro Power‐Scenario in Kerala 3

3 Roll of private sector in SHP field in Kerala 3‐4

4 State Government initiatives 4‐5

5 Policy Highlights 5

6 Small Hydro Promotion Cell 5‐6

7 Promotional Incentives 6

(i) MNRE 6

(ii) CDM 6‐7

8 Project Cost 7

9 Purchase of Power 7

CONTENTS

ATTACHMENTS 1 List of SHP Schemes opened up fro CPP/IPP

2 Salient Features of Projects

3 MNRE‐Incentive Schemes

Page 3: Small Hydro Power Schemes Kerala

Power Department

Government of Kerala

Small Hydro Electric Projects for implementation thr’ bidding route to

Captive and Independent Power Producers

Government of Kerala intends to allow private Participation in the developing and running

Small Hydro Power Plants. The State which has an abundance of natural streams has a large

number of sites through the length of State with potential for Small Hydro Power

generation, is also investor friendly, with its power sector reforms and labour reforms.

Independent Power Producer (IPP)/ Captive Power Producer (CPP) initiative will be available

to individual/ company/ partnership firm/ joint venture for a maximum capacity of 25MW

on a Build‐ Own‐ Operate and Transfer (BOOT) basis for a maximum concession period of 30

years from the date of allotment. Selection of promoter will be through competitive bidding

based on RFQ/ RFP to be issued. Developer will be required to offer bids within two months

from the date of advertisement. The prospective bidders are advised to visit our website for

general guidelines, and be ready to respond to the RFQ/RFP.

The data of the schemes and a gist of incentives, project cost, etc. are detailed below:

Contact Address: Small Hydro Promotion Cell

Power Department, Government of Kerala

Energy Management Centre

Sreekariyam P.O

Thiruvananthapuram, Pin- 695017

Kerala. INDIA

Tel : +91-471- 2594922 /2594924 Fax: +91-471-2594923

E-Mail : [email protected]

Web site: www.keralaenergy.org

On behalf of Governor of Kerala

Sd/-

Secretary Power

Government of Kerala

The State of Kerala is having a non‐conventional energy potential (theoretical) of

approximately 1715 MW. The Share of various sources is Small hydro – 700MW, Wind –605

MW, Solar‐310 MW and Bio‐mass ‐ 300 MW.

Page 4: Small Hydro Power Schemes Kerala

Small Hydro Power

Government of Kerala has issued several guidelines from time to time for the development

of small hydro development since 1992. The measures have encouraged private investment

to harness green energy from natural resources.

Till the end of March 2011, 19 Small Hydro projects with a cumulative installed capacity of

133.87 MW have been commissioned in the State. The State needs to evaluate the

experience with them and to fine‐tune policy so as to speed up investments in the area. The

Mission under this Policy shall be to (i) Enhance the contribution of environmentally benign

natural resources to the socio‐economic development of the State and to supplement rural

energy needs through speedy and expeditious commissioning of Small Hydro Projects, (ii)

Create an environment conducive to public /private /community participation and

investment in Small Hydro Projects and (iii) Enhance the contribution of Small Hydro

Projects in the total installed capacity of the State from 133 MW to about 300 MW by 2021.

The Kerala Electricity Regulatory Commission (KSERC) has issued guidelines for purchase of

electricity from Renewable Energy sources including SHPs, making it mandatory for the

distribution licensees to source a certain percentage of their power purchases from

Renewable Energy sources.

Presently Renewable Energy (RE) sources contribute about 272 Mu of energy per annum

(1.7 %) of the total 15437 Mu available from various installed capacities including share

from CGS stations in the State. The energy demand is projected to attain 10% growth. Over

the next ten years, the energy consumption is anticipated to be around 40,000 Mu per

annum.

If RE sources are to attain 10% of the energy supplies by 2021, they will have to contribute

4,000 Mu by 2021. As per KSERC norms, 40% share of RE sources is to be from Small Hydro

Projects ie. 1,600 Mu. Considering average plant load factor of 30% from SHPs, this

necessitates the SHP addition of ~ 500MW by 2021.

Role of Private Sector in Power sector participation, their contributions in generation in

Kerala

At present the participation by Private Sector in power generation is mainly concentrated in

the development of small hydro electric projects, wind electric generators and a few

thermal power stations. The timely implementation of schemes by the allotees is also to be

improved to have more confidence in them.

The contributions from Private Sector so far in Small Hydro Power, Wind and major thermal

generation are 43 MW, 28 MW and 187 MW respectively.

Overview

Page 5: Small Hydro Power Schemes Kerala

Power is the prime mover of the economic development of a State and one of the major

infrastructure requirements for industrial, rural and agricultural development and it helps in

linking rural population with the fast changing technological world. The State could achieve

tremendous progress in the social and health fronts and the Kerala model is often referred

as a good model in these fronts. The next focus has to be in capitalising this basic strength

for the economic progress of the society at large. Energy plays a major role in the economic

progress and tapping natural resources including renewable energy sources are important

as these can ensure energy security.

There are about 44 river systems in Kerala, all of them are rain fed. There are about 25

hydro stations totaling 1868 MW in the State. Mountains of Kerala with their topography

are fascinating, and are rich in water resources. This provides ample opportunity for

development of hydro stations and run of the river schemes in the state. There is a growing

need for harnessing the non‐conventional potential available in the State for long term

energy security and to check the impact of spiraling cost of fossil fuels including imported

coal. It is estimated that Kerala has gross small hydro potential of about 600MW, out which

94.10 MW (15%) only is tapped so far.

State Government Initiatives and Policies

Government of Kerala during 1990 had laid down conditions for allotment of Small/Mini

Hydro projects to private developers. Government of Kerala announced an amendment to

this policy vide GO(MS)No.5/92/PD dated 12‐03‐1992. Based on the policy, certain small

hydro projects were allotted to captive and IPP developers, out of which two projects viz.

Maniyar (12 MW) and Kuthungal (21MW) have commissioned.

Later, Government vide GO(MS) No.16/2002/STED dated 03‐04‐2002 framed Kerala

renewable energy policy as per MNRE guidelines. As per the policy, power generated from

Small Hydro Power plants, if purchased by KSEB, will be at a ceiling rate fixed by the Kerala

State Energy Regulatory Commission, the current rate being Rs.2.94 per unit (kWh).

In 2003, Government of Kerala have announced guidelines for setting up Small Hydro

Projects through private participation vide GO (MS)NO. 02/03/PD dated 16‐01‐2003. Based

on this policy, 11 projects totaling 43.75 MW were allotted to CPP and IPP developers. With

the enactment of EA 2003, the guidelines were modified during 2006 to incorporate the

provisions of Electricity Act 2003. The guidelines are being modified now to make more

investor friendly. The schemes are allotted on BOOT basis under IPP/CPP mode. These

schemes are allotted for thirty year period from the date of allotment. After the BOOT

period, these projects are to be transferred back to the Government. The Small Hydro

Electric projects commissioned under this policy are (i) 7MW Ullungal (Pathanamthitta

District) and (ii) 3MW Iruttukanam (Idukki District). The additional capacity of 1.5MW

allotted at Iruttukanam is poised for commissioning by the end of February 2012 and the

first stage of 10.5MW Karikkayam SHP is scheduled for commissioning by the end of March

2012 under the “One Year Programme” of the Government.

Policy highlights

• Eligibility: Any Individual / Company / Partnership firm /Joint Venture

Page 6: Small Hydro Power Schemes Kerala

• BOOT Period: 30 years from date of allotment.

• Selection Criteria: through competitive bidding route ‐ RFQ and RFP. Allotment is

based on highest premium/MW of installed capacity.

• Evacuation facility and Grid Interface: Construction and Maintenance of transmission

facility up to KSEB’s Grid shall be Developers responsibility.

• Third party sale permitted in case KSEB is not purchasing energy from the project

• Water Cess: No water Cess will be levied by Government for the water utilised for

generation.

• Group Captive permitted

Small Hydro Promotion Cell under Department of Power at Energy Management Centre

(EMC) for Implementation, monitoring & Promotional Activities on SHP:

In this connection, Govt. of Kerala has formed a technical cell viz. Small Hydro Promotion

Cell (SHP Cell) (Ref: Go:MS:29/2002/PD‐21.1.02) under the direct control of Principal

Secretary, Power, Govt. of Kerala for assisting the High Power Committee constituted by

Government (Ref: GO:Rt:167/2003/PD‐29.4.03) and obtains approval of Govt. for projects

open up for private participation under the captive and independent power producer

categories.

The SHP Cell offers SHP projects for implementation through competitive bidding route to

investors on behalf of the Government, coordinates the project implementation schedules

and monitors the various agreements of the investors with the Government. Prior to the

Government guidelines on SHP issued vide GO(MS)No.2/2003/PD dated 16.1.2003, the

allotment off SHP schemes to private investors were on MoU basis only.

Consequent to the introduction of Electricity Act 2003, the above guidelines on SHP have

been revised vide Government order GO(MS) No.5/2006 dated 17.3.2006.

Further, the High Power Committee has been enlarged with the introduction of new

members to speed up the whole process especially in the areas of forest and land

acquisition vide Government order GO(Rt)No.203/2010/PD dated 20.8.2010.

The SHP Committee Members are: (i) Principal Secretary – Power, (ii) Secretary (Finance &

Expenditure), (iii) Chairman KSEB, (iv) Additional Secretary (Law) and (v) Director, Energy

management Centre. The newly introduced Committee members are (i) Principal Chief

Conservator of Forest or his nominee, (ii) Principal Secretary – Water resources Department

or nominee and (iii) Principal Secretary ‐ Revenue or nominee.

The Committee also monitors the SHP activities undertaken by Local Bodies, private builders

who undertake such schemes in their own land and other Government enterprises. The

Page 7: Small Hydro Power Schemes Kerala

Committee meets frequently, invites the promoters and other stake holders to these

meetings for monitoring and for solving the issues of the investors on a war footing basis.

Promotional activities

By availing capital subsidy from MNRE and carbon credits from UNFCCC, projects could be

completed in a cost effective & commercially viable manner, thus producing power at a

lower rate than the power available from the state utility.

MNRE Subsidies

As per Ministry of New and Renewable Energy (MNRE, Government of India notification No.

14(1)/2008‐SHP dated 11.12.2009, there are incentives for the survey & investigation for SHP

schemes and capital subsidy for project implementation subject to conditions stipulated in the

notification.

Survey & Investigation

• Financial support of Rs.2.00 lakhs for each project up to 1MW capacity and

• Rs. 5.00 lakhs for each project with more than 1.00MW & up to 25MW capacity.

Financial support for new SHP Projects (Pvt. Sector)

• Rs.12,000/kW for projects above 100kW & up to 1000kW

• Rs. 1.20 Crores for 1st

MW + Rs. 20 Lakhs for each additional MW for projects above 1MW &

up to 25MW.

CDM benefits

Clean Development Mechanism (CDM) is an arrangement under the Kyoto Protocol, which

allows the industrialised countries to invest in greenhouse gas reduction projects in

developing countries. It enables reduction of net global greenhouse gas emissions by

financing emission reduction projects.

The utilisation of small hydel resources will save the country crores of rupees worth of

foreign exchange and will invite considerable investment even from developed countries

due to the positive impact on GHG emissions. (Small Hydel Power ‐ Carbon dioxide

abatement ‐ 1.02 Kg/kWh).

There are a number of formalities for registering a project under the United Nations Frame

work Convention on Climate Change (UNFCCC). A project registered and implemented

under CDM is allotted credits called Certified Emission Reductions (CERs), commonly known

as carbon credits, where each unit is equivalent to the reduction of one metric ton of carbon

dioxide.

The expected CERs from a 1.0 MW (3Mu ~ 35% PLF) SHP project is ~ 2500 CERs/annum. By

the sale of these CERS, even at the prevailing prices which are low due to the global financial

crisis, company may be in a position to reduce the cost of generation by Rs. 0.30/‐ Rs. 0.50

per unit. The 3.0 MW Iruttukanam SHEP (IPP), CERs have already been approved by UNFCC

and the 7MW Ullungal SHP Project has been registered with UNFCCC.

Page 8: Small Hydro Power Schemes Kerala

Project cost

The current approximate cost of implementation of the small hydro schemes in Kerala varies

from Rs.55 Million to Rs. 85 Million. The cost depends mainly on the location, land

acquisition cost, the civil constructions involved, the size of the turbine, generator &

auxiliaries/ water head of the scheme, accessibility, the evacuation system involved etc.

The average plant load factor varies from 25% to 40% or more depending upon the water

availability.

The commercial lending rate for these type of schemes is ~13% with a repayment period of

10 years with two years for moratorium for construction period.

Purchase of Power

Section 86(1)(e) of the Electricity Act 2003 mandates the Kerala State Electricity Regulatory

Commission to promote generation of electricity from renewable sources of energy by

providing suitable measures for connectivity grid and sale of electricity to any person, and

also specify, for purchase of electricity from sources, a percentage of the total consumption

of the electricity in the area of a distribution licensee. Section 62(1) of the Act empowers the

commission to determine the tariff for the supply of electricity by a generating company to

a distribution licensee in accordance with the provisions of the Act.

The allottee is permitted to sell the generated power to any third party as well as per EA

2003.

In exercise of the power vested in the commission under the above sections, the

Commission has issued regulations on 24‐06‐2006 for procurement of Power from

renewable sources by distribution licensee. In its regulation, Commission has fixed 5% as

purchase quantum from renewable sources by a distribution licensee, which is expressed as

percentage of its total consumption during a year. The breakup of the 5% shall be 2% from

SHP, 2% from Wind and 1% from all other sources except SHP and Wind. Commission has

fixed the levelised tariff at 12% discount rate for 25 years at Rs. 2.94 per unit, as purchase

rate of power from SHPs.

Page 9: Small Hydro Power Schemes Kerala

List of SHP Schemes Now Opened up

for

CPP/IPP

Page 10: Small Hydro Power Schemes Kerala

LIST OF SHP SCHEMES NOW OPENED UP FOR CPP/IPP

Sl.No.

Name of the Scheme

District

Basin

Installed capacity

(MW)

Annual energy

Generation (Mu)

Projects for which DPR is available

1 Parakkadavu Kottayam Pamba 10.00 21.58

2 Kalladathani Kollam Ithikkara 3.50 9.50

3 Adakkathode Kannur Valapattanam 2.50 7.70

4 Kokkamullu Kannur Valapattanam 2.00 4.80

5 Onipuzha Kozhikkode Onipuzha 1.50 3.16

6 Mundakayam Kottayam /Idukki Manimala Ar 1.25 3.08

7 Chathamala Kannur Valapattanam 1.00 2.08

8 Peruva Kannur Peruva 2.00 5.00

9 Thirunelli Wynad Bharathapuzha 1.20 2.60

10 Madatharuvi Pathanamthitta Madatharuvi 1.00 2.00

11 Malothi II Kasargod Malothi puzha 0.80 1.50

12 Kakkadampoyil

Stage-I

Kozhikkode Chaliyar 21.00 52.22

13 Kakkadampoyil

Stage-II (8+3MW)

Kozhikode Chaliyar 11 19.87

14 Arippara Kozhikkode Chaliyar 3 10

Detailed investigations done

15 Kozhiyilakuthu Idukki Pooyankutty 1.00 4.57

16 Panamkudantha Pathanamthitta Pamba basin 0.50 1.69

17 Kishumam Pathanamthitta Pamba basin 3.00 7.78

18 Malothi I Kasargod Malothi puzha 2.00 4.70

19 Perimpala Kannur Perumpuzha 0.80 1.94

20 Kuthirachattam # Kasargod Payaswini 2.00 10.20

21 Malothy III Kasargod Malothi puzha 0.45 0.92

22 Fulongkara Kannur Kilikattthode 0.35 1.04

23 Pilachikkara Kasargod Pilachikkara 0.35 1.00

24 Odanpuzha Kannur Bharathapuzha 0.30 0.98

25 Peruthody # Kasargod Chandragiri 0.85 1.95

26 Pathankayam Kozhikkode Iruvanchi puzha 4.00 10.62

27 Anakampoil Kozhikkode Iruvanchi puzha 6.75 21.98

Preliminary investigation done

28 Keezharkuthu Idukki Kaliyar basin 15.00 49.80

29 Chittur upper** Idukki Chittur 6.00 14.24

30 Kuliramutty Kozhikkode Perumboola 3.00 6.58

Page 11: Small Hydro Power Schemes Kerala

31

Urulikuzhi (Mamalakandam)

Ernakulam

Periyar basin

3.00

7.82

32 Thoniyar** Ernakulam Thoniyar 2.60 8.40

33 Urumbini Pathanamthitta Kakkad 2.20 10.97

34 Thuval Idukki Eastern Kallar 1.00 3.00

35 Thanniyadi Kasargod Kuyangad thodu 0.50 1.57

36 Haritheerthakkara Kannur Peruvamba 0.10 0.25

Feasibility studies conducted

37

Kaithakolli diversion

Wynad /Kannur

Kaithakolli

10.00

25.01

38 Kanjirakolly Kannur Urumbinipuzha 5.00 11.18

39 Ezhamthala Pathanamthitta Pamba /Kallar 3.50 16.47

40 Mukkadavu Kollam Mukkadavu Ar 2.25 5.83

41 Anakkal Kottayam Azhutha 2.00 8.64

42 Kazhuthurutti Kollam Kazhuthuruthi river 2.00 2.27

43 Meenmutti Wynad Kabani 1.50 3.30

44 Muthappanpuzha Kozhikkode Iruvanki puzha 1.50 3.59

45 Uruttipuzha Kannur Cheruthi puzha 1.00 3.43

46 Lower Marmala Kottayam Meenachal 0.90 4.20

47 Kozhichal Kannur Kariyamkode 0.75 1.82

48 Cheruvakkilchola Thrissur Mangad 0.74

49 Aruvikkal Ernakulam Valiathodu 0.50 1.36

50 Anavilasam Idukki Periyar 0.30 1.15

Other Identified schemes

51 Chembukatti Palakkad Palakkuzhipuzha 6.50 14.32

52 Koodam Palakkad Siruvani/Kallanthode 4.00 9.76

53 Inchavarakuthu Idukki Periyar 3.00 6.00

54 Chemmannar Idukki Chemmannur 1.00 2.62

55 Kangapuzha Idukki Panniar 0.75 3.00

56 Randamkadavu Kannur Randamkadavu 0.50 0.99

57 Aruvikuzhipara/ Marangattupally

Kottayam

0.30

1.32

Total MW/Mu 165.49 443.35

* Incentives sanctioned by MNES to KSEB for DPR preperation

Incentives sanctioned by MNES to KSEB for survey and ** investigation

# Salient Features not available/investor to conduct studies

************ May add more schemes based on inputs from KSEB before floating tenders

Page 12: Small Hydro Power Schemes Kerala

Salient Features of the Project

Page 13: Small Hydro Power Schemes Kerala

PROJECTS FOR WHICH DPR IS AVAILABLE

1 PARAKKADAVU

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR

River basin Parakkadavu

District Kottayam

Access to site The site is 13 km from Erumeli (Railway station – Kottayam)

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Division, Konni,

Phone : 0473 - 242217

Investigation Circle, Kothamangalam

Phone : 0485 - 822364

a. Dam/ weir with dimensions (approx) A diversion weir of length 126m and

height 15m above bed level. Spillway

length (80m) Height of non-overflow

section – 22m,

b. Water conductor system with dimensions (approx) A main penstock of 4.8m dia & 20m

length and three feeder pipes of length

10m

c. Power house with No. of machines and capacity 10MW (2 x 2.5MW + 1 x 5MW)

d. Annual average generation potential 21.58Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.

Nearest Substation – Ranni, (tentative).

f. Design Head 12m

Land particulars ( Excluding right of way for transmission line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 6Ha (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Nil

Page 14: Small Hydro Power Schemes Kerala

Litigations or any other issues including previous agreements etc.

2 KALLADATHANI

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR

River basin Ithikkara

District Kollam

Access to site In Vellenoor panchayat, 7km from Ayoor and 26 km from

Kottarakkara

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Division, Konni

Phone: 0473 - 242217

Investigation Circle, Kothamangalam

Phone : 0485 - 822364

a. Dam/ weir with dimensions (approx) Diversion weir 120m length, 10m

height. Power tunnel 2.9m dia and

390m length.

b. Water conductor system with dimensions (approx) Penstock 2.9m dia 15m length

c. Power house with No. of machines and capacity 3.5MW (2 x 1500kw + 1 x 500kw)

d. Annual average generation potential 9.5Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.Nearest

Substation – Ayoor, 5km, (tentative).

f. Design Head 15m

Land particulars( Excluding right of way for transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 90Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Page 15: Small Hydro Power Schemes Kerala

Litigations or any other issues including previous agreements etc.

Present Status of the

Project:

3 ADAKKATHODE

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR

River basin Valapattanam

District Kannur

Access to site 65 km by road from Thalassery

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Division, Padinjarathara

Phone : 0493 - 693507

Investigation Circle, Thrissur

Phone : 0487 - 380343

a. Dam/ weir with dimensions (approx) Diversion weir of length 61m and height

5m.

b. Water conductor system with dimensions (approx) Power channel –2200m length, 1.5m

bottom width, 2.1m depth with side slope

1:1, forebay- frustrum of a cone top dia

26m. bottom dia –4m,Penstock 175m

length 1.7m dia

c. Power house with No. of machines and capacity 2.5MW (2 x 1000kw + 1 x 500kw)

3 nos.

d. Annual average generation potential 7.7Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the cost

of the developer. Evacuation Scheme shall

be prepared by developer and get it

approved from KSEB.11kv line 10km

away from project site, (tentative).

f. Design Head 35.4m

Land particulars( excluding right of way for transmission

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 6.5Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the

proposed scheme (existing / proposed)

Page 16: Small Hydro Power Schemes Kerala

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 17: Small Hydro Power Schemes Kerala

4 KOKKAMULLU

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR

River basin Valapattanam

District Kannur

Access to site 35 km from Thaliparamba

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Division, Padinjarathara

Phone :0493 - 693507

Investigation Circle, Thrissur

Phone : 0487 - 380343

a. Dam/ weir with dimensions (approx) Diversion weir 59m length and 5m

height.

b. Water conductor system with dimensions (approx) Power channel –750m long bottom

width 2m, side slope 1:1, depth –2m,

forebay- 15m.dia. Penstock 1 no. 1.4m

dia and 73.5m long

c. Power house with No. of machines and capacity 2MW (1 x 1000kw + 2 x 500kw)

d. Annual average generation potential 4.8Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.Nearest

11kv line 1.5km away, (tentative).

f. Design Head 32m

Land particulars( excluding right of way for transmission line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 10Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details 5 families (approx)

Litigations or any other issues including previous agreements etc.

Page 18: Small Hydro Power Schemes Kerala

5 ONIPUZHA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR

River basin Onipuzha

District Kozhikode

Access to site 60 km from Kozhikode in Quilandy taluk

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Division, Padinjarathara

Phone : 0493 – 693507

Investigation Circle, Thrissur

Phone : 0487 – 380343

a. Dam/ weir with dimensions (approx) Diversion weir 29m length, 4.6m

height.

b. Water conductor system with dimensions (approx) Power channel 515m length, 1.95m

bottom width, 2.45m depth, side slope

1:1 forebay – 22m dia. ,Penstock –

65m long and 1.3m dia

c. Power house with No. of machines and capacity 1.5MW (3 x 500kw) 3 nos

d. Annual average generation potential 3.16Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.11kv

line available near the P. H site

(tentative).

f. Design Head 31.3m

Land particulars( excluding right of way for transmission line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 6Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 19: Small Hydro Power Schemes Kerala

6 MUNDAKAYAM

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR

River basin Manimala Ar

District Kottayam / Idukki

Access to site 65 km from Pathanamthitta and about 1.5 km from

Mundakkayam

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division, Konni

Phone : 0473 - 242217

a. Dam/ weir with dimensions (approx) Diversion weir 70m length, 10m

height.

b. Water conductor system with dimensions (approx) Penstock of 14m length and 2.5m dia

feeder pipe of 8m long 1.5 and 1m dia

c. Power house with No. of machines and capacity 1.25MW (2 x 500kw + 1 x 250kw)

d. Annual average generation potential 3.08Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.Nearest

Substation – Kanjirapally, (tentative).

f. Design Head 8m

Land particulars( excluding right of way for transmission line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 6Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 20: Small Hydro Power Schemes Kerala

Present Status of the

Project:

7 CHATHAMALA

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR

River basin Valapattanam

District Kannur

Access to site 67 km from Kannur

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division,

Padinjarathara

Phone :0493 – 693507

Investigation Circle, North, Vydyuthi

Bhavanam, Thrissur

Phone : 0487 – 380343

a. Dam/ weir with dimensions (approx) Diversion weir 41m long and 5m

height.

b. Water conductor system with dimensions (approx) Power channel 720m long bottom width

–40cm and depth – 2.0m, side slope 1:1

forebay 10m dia. Penstock 1 no. –127m

length, 0.8m dia, feeder pipes – 2nos.

0.7m dia 10m length

c. Power house with No. of machines and capacity 1MW (2 x 500kw) 2 nos.

d. Annual average generation potential 2.08Mu

e. Evacuation details Alignment of transmission line will be surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer and get it approved from KSEB.11kv

line 3 km from the project site,

(tentative).

f. Design Head 63m

Land particulars( excluding right of way for transmission line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 3Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details Approx. 5 families

Litigations or any other issues including previous agreements etc.

Page 21: Small Hydro Power Schemes Kerala

8 PERUVA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Draft DPR

River basin Peruva

District Kannur

Access to site 30 km from Thalassery

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division –

Padinjarathara

Phone 0493 – 693507

Investigation Circle North, V. B,

Thrissur

Phone : 0487 -380343

a. Dam/ weir with dimensions (approx) Two weirs of height 5m, length 29m

and 43m,

b. Water conductor system with dimensions (approx) 2 power channels 950m and 170m

length, forebay 13.5m dia. Penstock –

610m length 1.2m dia

c. Power house with No. of machines and capacity 2MW (1 x 1.5MW + 1 x 0.5MW)

2 nos.

d. Annual average generation potential 5Mu

e. Evacuation details Alignment of transmission line will be surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer and get it approved from KSEB.66kv

Substation at Nedumpoil – 5 km

from project site, (tentative).

f. Design Head 74m

Land particulars( excluding right of way for transmission line)

a. Extent of Forest land required (approx) 10.5 Ha

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 22: Small Hydro Power Schemes Kerala

Present Status of the

Project:

9 THIRUNELLI

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR under preparation

River basin Kabani

District Wynad

Access to site 34 km from Mananthavadi

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division –

Padinjarathara

Phone 0493 – 693507

Investigation Circle North, V. B,

Thrissur

Phone : 0487 -380343

a. Dam/ weir with dimensions (approx) A diversion weir 70m length and 5m

height,

b. Water conductor system with dimensions (approx) Power channel 1710m, bottom width

2m, depth of flow 1.5m, side slope 1:1

forebay 13m dia. Penstock 40m, 1.2m

dia

c. Power house with No. of machines and capacity 800kw (2 x 400kw)

d. Annual average generation potential 2.15Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.11kv

line 300m away, (tentative).

f. Design Head 24m

Land particulars

a. Extent of Forest land required (approx) 2.5Ha

b. Extent of Private land required (approx) 1.5Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 23: Small Hydro Power Schemes Kerala

10 MADATHARUVI

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR under preparation

River basin Madatharuvi

District Pathanamthitta

Access to site The site is 6 km from Ranny

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Konni

Phone 0473 – 242217

Investigation Circle South,

Kothamangalam

Phone : 0485 –822364

a. Dam/ weir with dimensions (approx) A diversion weir of 41m length and 5m

height,

b. Water conductor system with dimensions (approx) Rectangular channel 1.4m width and

2m depth, 350m length, forebay 12m

dia. Penstock 1m dia, 150m length

c. Power house with No. of machines and capacity 1MW (Single machine)

d. Annual average generation potential 2.04Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer.Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.Nearest

Substation – Ranny, (tentative).

f. Design Head 38m

Land particulars ( excluding right of way clearance for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 3.2Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 24: Small Hydro Power Schemes Kerala

Present Status of the

Project:

11 MALOTHI-II

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

DPR under preparation

River basin Malothipuzha

District Kasargod

Access to site About 70km away from Payyannoor via Neeleswaram,

Bheemanadi, Konnakkad

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division

Padinjarethara

Phone 0493 – 693507

Investigation Circle North, V. B,

Thrissur

Phone : 0487 –380343

a. Dam/ weir with dimensions (approx) A diversion weir of 49m length and 5m

height,

b. Water conductor system with dimensions (approx) A power channel 1060m length, 1.2m

bottom width, 1.3m depth, 1:1 side

slope, a circular forebay tank – 12.5m

dia

c. Power house with No. of machines and capacity 800kw (2 x 400kw)

d. Annual average generation potential 1.5Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.11 kv

line 1 km length, (tentative).

f. Design Head 32m

Land particulars( excluding right of way clearance for transmission

line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 4Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 25: Small Hydro Power Schemes Kerala

12 KAKKADAMPOIL (STAGE‐I)

Name of the project : kakkadampoyil

River Basin : Chaliyar

District : Malappuram/Kozhikkode

Access to site : From Kozhikkode‐via Omessary

Main Project Components VIZ.

a) Dam/Weir with dimen.(appr.): Concrete gravity type leangth‐170.00m

bed level‐El 498.00

b) Water conductor system with

dimen. (appr.) : Leangth 75m, Diameter‐2.8m Surge shaft dia‐

7.00m, Height‐28m Penstock‐1.85m dia,

437m leangth

c) Power house with No.of

machines and capacity : 21MW (3 x7MW)

d) Annual average generation

Potential : 52.22 Mu ( 54.54Mu considering 10%

Over loading provision during monsoon)

Design Head : 308m

Page 26: Small Hydro Power Schemes Kerala

13 KAKKADAMPOIL (STAGE‐II)

Name of the project : kakkadampoyil

River Basin : Chaliyar

District : Malappuram/Kozhikkode

Access to site : From Kozhikkode‐via Omessary

Main Project Components VIZ.

a) Dam/Weir with dimen.(appr.): Concrete gravity type Length‐66m, bed level

EL 404.00

b) Water conductor system with

dimen. (appr.) : Length‐500m, dia‐0.9m, surge shaft dia‐3m

hight‐410.135m, penstock‐0.9m dia,578m

length

c) Power house with No.of

machines and capacity : 3MW(2 x 1.5MW)

d) Annual average generation

Potential : 6.34Mu (6.56Mu with 10% overload)

Design Head : 308m

Page 27: Small Hydro Power Schemes Kerala

14 ARIPPARA

Name of the project :Arippara

River Basin : Chaliyar

District : Kozhikkode

Access to site : 60km from Kozhikkode via (Kunnamagala,

Omassery, Kodanchery)

Main Project Components VIZ.

a) Dam/Weir with dimen.(appr.): Trench type weir, length‐ 45m,bed level+116.5

b) Water conductor system with

dimen. (appr.) :

c) Power house with No.of

machines and capacity : Over ground, installed capacity‐3.0MW

(2 x 1.5MW)

d) Annual average generation

Potential : 10.00 Mu @ 50% dependable year

Design Head : 30m

Page 28: Small Hydro Power Schemes Kerala

PROJECTS FOR WHICH DETAILED INVESTIGATIONS ARE DONE

15 KOZHIYILAKUTHU

Name of the project : Kozhiyilakuthu

River Basin : pooyamkutty

District : Idukki

Access to site :15km from Kallar up to Mankulam, then 12km

jeep road from Mankulam to PH site via

Anakkulam, then 3km from PH site and then

Footpath of 400m to weir site.

Main Project Components VIZ.

a) Dam/Weir with dimen.(appr.): Gravity Weir with un‐gated overflow portion.

b) Water conductor system with

dimen. (appr.) : Desilting chamber‐ Rectangular with slopping

bottom.Diameter of the penstock pipe‐0.60m

leangth‐700m

c) Power house with No.of

machines and capacity : Over ground leangth 9m width 7m installed

capacity 1000kW, 2x500kW

d) Annual average generation

Potential : 4.57Mu

Design Head : 216m

Page 29: Small Hydro Power Schemes Kerala

16 PANAMKUDANTHA

Name of the project : Panamkudantha

River basin : Pampa

District : Pathanamthitta

Access to site : 22km from Ranni up to Chathanthara, then

1.5km jeep road to Kurumpanmoozhi, then

0.5km by foot path to weir site.

Main Project Components VIZ.

a) Dam/Weir with dimen.(appr.): Gravity Weir with un gated overflow portion

b) Water conductor system with

dimen. (appr.) : With concrete column support and steel racks

Penstock pipe dia‐0.5m leangth‐ 340m

c) Power house with No.of

machines and capacity : Over ground leangth‐9m, width‐7m installed

capacity‐500kW, 2 x 250kW

d) Annual average generation

Potential : 1.69Mu

Design Head : 165m

Page 30: Small Hydro Power Schemes Kerala

17 KISHUMAM

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Detailed investigation completed

River basin Pamba

District Pathanamthitta

Access to site Perinadu Panchayat in Pathanamthitta Dist

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Konni

Phone 0473 – 242 217

Investigation Circle, South

Kothamangalam

Phone : 0485 –822 364

a. Dam/ weir with dimensions (approx) Height of weir 10m, top length of weir

95m

b. Water conductor system with dimensions (approx) Power house at the toe of dam ,

penstock 2 Nos. length 50m, dia 2.75m

and 0.75m

c. Power house with No. of machines and capacity 3.3MW

d. Annual average generation potential 9Mu

e. Evacuation details Alignment of transmission line will be

surveyed and finalised by KSEB at the

cost of the developer. Evacuation

Scheme shall be prepared by developer

and get it approved from KSEB.Nearest

Ssubstation is Kanjirappally, (tentative).

f. Design Head 10m

Land particulars( excluding right of way clearance for

transmission line)

a. Extent of Forest land required (approx) 4Ha

b. Extent of Private land required (approx) 3Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the proposed

scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements etc.

Page 31: Small Hydro Power Schemes Kerala

Present Status of the

Project:

18 MALOTHI-I

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Detailed investigation completed

River basin Malothipuzha

District Kasargod

Access to site The project site is about 2km away from Konnakkad town which

is about 45km from Neeleswaram via, Vellarikkundu, Bheemanadi

and Malom

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara,

Phone 0493 – 693507

Investigation Circle North, V. B, Thrissur

Phone : 0487 –380343

a. Dam/ weir with dimensions (approx) Non overflow section length 15m, height 6.1m, overflow section length 30m, height 5m, bottom

width 5m,

b. Water conductor system with dimensions (approx) Length of intake canal 87m, size of rectangular

chamber 8 x 6.2 x 4, length of power channel 1615m Penstock length 150m, dia 1.70m

c. Power house with No. of machines and capacity 18 x 7 x 11 Installed capacity 2000kw (2 x 800 + 1

x 400)

d. Annual average generation potential 4.70Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Generated power is proposed to be conveyed to the nearest 11kv feeder

at Konnakkad, (tentative).

f. Design Head 31.5m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 5Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 32: Small Hydro Power Schemes Kerala

Present Status of the

Project:

19 PERIMPALA

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Detailed investigation completed

River basin Perumpuzha

District Kannur

Access to site 44km East of Thalipparamba via Manakkadavu by road, nearest

Railway Kannur.

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle North, V. B, Thrissur

Phone : 0487 –380343

a. Dam/ weir with dimensions (approx) Length 40m, height of overflow section 4m,

desalting chamber 3.5 x 3.5.

b. Water conductor system with dimensions (approx) Power channel 750.75m trapezoidal bottom

width 2.5m , depth 1.4m forebay tank 17m dia,

circular. Penstock 1.2m dia, 45m long

c. Power house with No. of machines and capacity 800kw (100+ 300+ 400kw)

d. Annual average generation potential 1.935Mu

e. Evacuation details Alignment of transmission line will be surveyed

and finalised by KSEB at the cost of the

developer. Evacuation Scheme shall be

prepared by developer and get it approved from

KSEB.It is proposed to feed to substation at

Sreekandapuram (proposed), (tentative).

f. Design Head 16m

Land particulars (excluding right of way clearance for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 4Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from the

proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous agreements

Page 33: Small Hydro Power Schemes Kerala

Present Status of the

Project:

21 MALOTHI -III

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Detailed investigation completed

River basin Malothipuzha, Kariangad river (basin)

District Kasargod

Access to site Road 68 km from Payanoor town, Rail Nileswar (nearest) 42km

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle North, V. B, Thrissur

Phone : 0487 –380343

a. Dam/ weir with dimensions (approx) Concrete gravity weir, length 47m height 6.35m,

intake canal 55m long , 3 x 25m rectangular.

b. Water conductor system with dimensions (approx) Rectangular chamber 5 x 5 x 3.5m, power channel

Trapezoidal 340m long forebay tank 15 x 15 x 8.5 m.

Penstock 25m length 1.2m dia

c. Power house with No. of machines and capacity 1 x 100+1x 150 +1x200kw =450kw

d. Annual average generation potential 0.9203Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Stepped up to 11kv

and conveyed to 11kv feeder at Malom, 1 km from the

power house by a single circuit 11 kv line, (tentative).

f. Design Head 9.37m

Land particulars ( excluding right of way for

transmission line )

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

3 Ha.

Page 34: Small Hydro Power Schemes Kerala

22 FURLONGKARA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Detailed investigation completed

River basin Kilikattuthode / Kuppam basin

District Kannur

Access to site The project site is approximately 30 km from Thaliparamba via

Alakode. Nearest Railway Kannur

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle North, V. B, Thrissur

Phone : 0487 –380343

a. Dam/ weir with dimensions (approx) Length 37m, height 5m.

b. Water conductor system with dimensions (approx) Desilting chamber 3.5m wide and 2.5m deep, length

10m, Power channel 1342.50m size 0.7m bottom

width 0.7m height forebay 7m dia height 6.25m

penstock 137.5m long, 70cm dia

c. Power house with No. of machines and capacity Power house 350kw (1 x 200 + 1x 100 + 1x 50)

d. Annual average generation potential 1.043Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.The 11kv line now

available at Alakode has to be extended by 4km to

the project site, (tentative).

f. Design Head 50.0m

Land particulars

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

3Ha

Page 35: Small Hydro Power Schemes Kerala

23 PILACHIKKARA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Detailed investigation completed

River basin Pilachikkarama, Karangot river basin

District Kasargod

Access to site Project site is at Bheemanadi which is 67 km from Thaliparamba

and 25km from Neleswaram

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle North, V. B, Thrissur

Phone : 0487 –380343

a. Dam/ weir with dimensions (approx) Concrete gravity weir, overflow type, height 5m

length 34m

b. Water conductor system with dimensions (approx) Desilting chamber 50m length, conduit channel 3m

dia 198m length forebay tank 15m dia and 10.6m

height, penstock 1.4m dia 40m length

c. Power house with No. of machines and capacity 1 x 250kw +1 x 100kw =350kw

d. Annual average generation potential 1.004Mu

e. Evacuation details Alignment of transmission line will be surveyed and finalised by KSEB at the cost of the developer. Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.11kv line at

Bheemanadi, (tentative).

f. Design Head 6m

Land particulars

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 3Ha

c. Extent of Government land required (approx) Nil

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Nil

Page 36: Small Hydro Power Schemes Kerala

24 ODANPUZHA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Detailed investigation completed

River basin Bharathapuzha

District Kannur

Access to site 51 km from Thalassery – Nearest Railway station at Thalassery

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle North, V. B, Thrissur

Phone : 0487 -380343

a. Dam/ weir with dimensions (approx) Over flow type concrete gravity ungated Ogee weir

of 35m long and 5m high

b. Water conductor system with dimensions (approx) Concrete lined open channel of 275m long

(Trapezoidal ) having bottom width 1m

c. Power house with No. of machines and capacity Overground 300kw –(1 x 200 + 1 x 100)

d. Annual average generation potential 0.9843Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.11kv line is

available at Tondy at 6 km from site, (tentative).

f. Design Head 40.81m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

2Ha

Nil

Page 37: Small Hydro Power Schemes Kerala

26 PATHANKAYAM

Name of the project : Pathankayam

River Basin : Chaliyar

District : Kozhikkode

Access to site : 45km from Kozhikkode to Kodenchery and

8km to Narangathode from kodenchery by

Road and 400m to the river near weir site by

Coup road on right bank.

Main Project Components VIZ.

a) Dam/Weir with dimen.(appr.): Trench type length 35m, bed level‐ +235.290m

b) Water conductor system with

dimen. (appr.) : Length of disiliting chamber‐60m, size‐5m

wide, 4.5m deep, Penstock length‐140m

dia‐1.60m

c) Power house with No.of

machines and capacity : Over ground power house, installed capacity

4000kW (1 x 1000kW & 2 x 500kW)

d) Annual average generation

Potential : 10.92Mu

Design Head : 36.50m

Page 38: Small Hydro Power Schemes Kerala

27 ANAKKAMPOIL

Name of the project : Anakkampoil

River Basin : Chaliyar

District : Kozhikkode

Main Project Components VIZ.

a) Dam/Weir with dimen.(appr.) : Trench type, bed level‐463.00m

b) Capacity : 6.75MW

d) Annual average generation

Potential : 21.78

Page 39: Small Hydro Power Schemes Kerala

PROJECTS FOR WHICH PRELIMINARY INVESTIGATION DONE

28 KEEZHARKUTHU

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Kaliyar basin

District Idukki

Access to site Weir site is about 12km from Udumbannoor. P.H site is about

8km from Udumbannoor

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Idamalayar

Phone 0485 – 583228

Investigation Circle, South, Kothamangalam

Phone : 0485 –822364

a. Dam/ weir with dimensions (approx) Weir of 6m high, 40m long

b. Water conductor system with dimensions (approx) Power tunnel 2500m, forebay tank. Penstock 1m

dia, 1750m long

c. Power house with No. of machines and capacity 15MW

d. Annual average generation potential 47.94Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.The tower line from

Sengulam power house is passing over the proposed

Substation near Udumpannoor. Length of Tower

line comes to 6km, (tentative).

f. Design Head 470m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx) 30Ha

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 40: Small Hydro Power Schemes Kerala

29 CHITTUR UPPER

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Chittur

District Idukki

Access to site The area locally known as Averkuth, approachable by a coup

road taking off from 6th mile from Neriamangalam in Alwaye –

Munnar road. Total distance from Kothamangalam to site is

43km.

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division, Idamalayar

Phone 0485 –583228

Investigation Circle South Kothamangalam

Phone : 0485 – 822364

a. Dam/ weir with dimensions (approx) Weir 5m high, 35m long

b. Water conductor system with dimensions (approx) Penstock 600m long 2m dia

c. Power house with No. of machines and capacity Installed capacity 6000kw

d. Annual average generation potential 14.24Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.66kv line passes

through the right bank ridge of Devi Ar and crosses

the coup road at about 2km away from 6th mile and

Arial distance from the site is about 8km,

(tentative).

f. Design Head 39m

Land particulars( excluding right of way clearance

for transmission line)

a. Extent of Forest land required (approx) Reserve forest 8Ha

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Chittur lower scheme capacity 6000kw, Energy –

14.75Mu

Page 41: Small Hydro Power Schemes Kerala

Present Status of the

Project:

30 KULIRAMUTTY

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Perumboola

District Kozhikode

Access to site 43 km from Kozhikode to Perumboola via Koduvalli, Omassery,

Thiruvanmbady and Karimutti junction to left bank of weir site

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle, North, V. B, Thrissur

Phone : 0487 -380343

a. Dam/ weir with dimensions (approx) Trench weir, height 2.6m, length 21m,

b. Water conductor system with dimensions (approx) Power channel 1405m, penstock 1.2m dia and

length 285m, forebay tank circular 15m dia height

8.94m

c. Power house with No. of machines and capacity Over ground type, 18m x 7m size, no. of

machines3,capacity 3000kw (1500+1000+500)

d. Annual average generation potential 6.579Mu

e. Evacuation details Alignment of transmission line will be surveyed

and finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Power can be

evacuated through 11kv line to a centrally oriented

switching station near Koodaranhi , (tentative).

f. Design Head 70m (net head)

Land particulars ( excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) Private land

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 42: Small Hydro Power Schemes Kerala

31 URULIKUZHI (MAMALAKANDAM)

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Periyar

District Ernakulam

Access to site The weir site is approachable by 10 km long coup road from 6th

mile Mamalakandam road starting from 6th mile from Always-

Munnar road- it is 40km from Kothamangalam

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Idamalayar

Phone 0485 – 583228

Investigation Circle, South Kothamangalam

Phone : 0485 - 822364

a. Dam/ weir with dimensions (approx) Length of weir 77.0m, height 5.0m

b. Water conductor system with dimensions (approx) Penstock length 789m 2m dia

c. Power house with No. of machines and capacity 3000kw

d. Annual average generation potential 7.82Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Nearest 11kv line is

6th

mile about 14 km from the power house,

(tentative).

f. Design Head 64m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx) ¾ Ha (forest)

b. Extent of Private land required (approx) 1.5Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details Eviction of encroaches and acquisition of involved.

Forest clearance required

Litigations or any other issues including previous

agreements etc.

Page 43: Small Hydro Power Schemes Kerala

32 THONIYAR

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Thoniyar

District Ernakulam

Access to site The weir is located at Chelakkadu about 20 km away from

Thodupuzha and 62km from Kothamangalam PH site is very near

to Malayinchi

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Idamalayar

Phone 0485 – 583228

Investigation Circle, South, Kothamangalam

Phone : 0485 - 822364

a. Dam/ weir with dimensions (approx) Length 70m, height 6m

b. Water conductor system with dimensions (approx) Penstock 2 nos 700mm dia length 1500m

c. Power house with No. of machines and capacity Size 30 x 15 capacity 2600kw

d. Annual average generation potential 8.4Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.

f. Design Head 65m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx) 3 Ha

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 44: Small Hydro Power Schemes Kerala

Present Status of the

Project:

33 URUMBINI

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Kakakad

District Pathanamthitta

Access to site 40 km from Pathanamthitta by road – 1km upstream of

Seethathode power house, nearest railway station Chenganoor

66km

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Konni

Phone 0473 – 242217

Investigation Circle, South, Kothamangalam

Phone : 0485 - 822364

a. Dam/ weir with dimensions (approx) A concrete gravity overflow type weir with height

15 m and length at top 62m

b. Water conductor system with dimensions (approx)

c. Power house with No. of machines and capacity Dam toe PH – 2.20MW

d. Annual average generation potential 10.971Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the

developer.Evacuation Scheme shall be prepared by

developer and get it approved from KSEB.To link

with 110kv Substation at Seethathodu, (tentative).

f. Design Head 15m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 12 Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Ullunkal, Karikkayam, Maniyar, Maniyar tail race

scheme – down stream of Seethathodu

Nil

Page 45: Small Hydro Power Schemes Kerala

34 THUVAL

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Eastern Kallar

District Idukki

Access to site 7 km coup road from Irattayar North, Nedumkandam village,

Nedumkandam taluk

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Munnar

Phone 0485 – 530388

Investigation Circle, South, Kothamangalam

Phone : 0485 - 822364

a. Dam/ weir with dimensions (approx) Height 3m length 40m

b. Water conductor system with dimensions (approx) Pipeline 205m long, dia 34cm

c. Power house with No. of machines and capacity Installed capacity 1MW (500kw, 400kw,100kw) 3

machines

d. Annual average generation potential 3Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.

f. Design Head 85m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 2 Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 46: Small Hydro Power Schemes Kerala

Present Status of the

Project:

35 THANNIYADI

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Kuyangad thodu / Chandragiri basin

District Kasargod

Access to site The site is approximately 20km – east of Kanhangad near Eriya

in Kanhangad - Iriya road

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle, North, V. B, Thrissur

a. Dam/ weir with dimensions (approx) Height of weir 5.0m length 36.0m

b. Water conductor system with dimensions (approx) Desilting chamber 40m long size 3.50 x 3.50m

power channel – length 1005m bottom width 1.5m,

forebay 19m dia circular height 3.5m, penstock

length 36m, 1.2m dia

c. Power house with No. of machines and capacity Power house 450kw (200+150+100kw)

d. Annual average generation potential 1.57Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Power produced can

be linked to the existing 11kv line at Thanniyadi,

(tentative).

f. Design Head 10.5m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 12Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Page 47: Small Hydro Power Schemes Kerala

Litigations or any other issues including previous

agreements etc.

36 HARITHEERTHAKKARA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Preliminary investigation completed

River basin Peruvamba river basin Hariyilthodu

District Kannur

Access to site 15km north east of Payyannoor town

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle, North, V. B, Thrissur

Phone : 0487 -380343

a. Dam/ weir with dimensions (approx) Trench type diversion weir.

b. Water conductor system with dimensions (approx) Desilting chamber, Trapezoidal power channel to

lead water from desilting chamber to forebay,

circular forebay 7m dia Penstock 50cm dia 35m

length

c. Power house with No. of machines and capacity 2 x 50kw Horizontal shaft frances turbine = 100kw

d. Annual average generation potential 0.251Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.11kv line upto

Chooral nearly 1km from project site, (tentative).

f. Design Head Net head 13.50m

Land particulars

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 2Ha

c. Extent of Government land required (approx) Nil

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Page 48: Small Hydro Power Schemes Kerala

Litigations or any other issues including previous

agreements etc.

FEASIBILITY STUDIES CONDUCTED

38 KAITHAKOLLI

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Kabani

District Wyanad and Kannur

Access to site 10km from Mananthavadi

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division, Padinjarathara

Phone : 0493 – 693507

Investigation Circle, Thrissur,

Phone 0487 - 380343

a. Dam/ weir with dimensions (approx) Trench type diversion weir 25m length

b. Water conductor system with dimensions (approx) LPP 1.5m dia and 560m length forebay 210m x 35m

size. Penstock 1.2m dia 1900m length

c. Power house with No. of machines and capacity 10MW (2 x 5MW) 2 units

d. Annual average generation potential 25Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Nearest Substation

Mananthavadi (15km), (tentative).

f. Design Head 323m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx) 1.75Ha

b. Extent of Private land required (approx) 0.05Ha

c. Extent of Government land required (approx) 0.7Ha

Particulars of any upstream/ down stream structures from

Page 49: Small Hydro Power Schemes Kerala

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 50: Small Hydro Power Schemes Kerala

39 kanjirakolly

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Valpattanam basin

District Kannur

Access to site 10 km from Manikkadavu Bazaar, which is 13km from Iritty.

Iritty is 40km east of Kannur town

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Padinjarethara

Phone 0493 – 693507

Investigation Circle, North, V. B, Thrissur

Phone : 0487 –380343

a. Dam/ weir with dimensions (approx) A trench type diversion weir of 45m long and 3m

high

b. Water conductor system with dimensions (approx) LPP 2m dia for a length of 1620m. A penstock of

length 66.5m, dia 1.70m and thickness 10mm

c. Power house with No. of machines and capacity 2 machines (1x 2000kw +1 x 3000kw), 5MW

d. Annual average generation potential 11.182Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.33kv Substation is

proposed at Madathil near Iritty at a distance of 17

km from project site, (tentative).

f. Design Head 45.675m

Land particulars(excluding right of way for

transmission)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 8Ha

c. Extent of Government land required (approx) Nil

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 51: Small Hydro Power Schemes Kerala

40 EZHAMTHALA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Pamba/Kallar

District Pathanamthitta

Access to site 5km from Thekkuthode which is 20km from Konni Aruvappulam

panchayat in Kozhencheri taluk

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Konni

Phone 0473 – 242217

Investigation Circle, South, Kothamangalam

Phone : 0485 –822364

a. Dam/ weir with dimensions (approx) A diversion weir of about 11m height

b. Water conductor system with dimensions (approx) Dam toe

c. Power house with No. of machines and capacity 3.75MW

d. Annual average generation potential 12Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Nearest Substation

Koodal 35km away, (tentative)..

f. Design Head 11m

Land particulars( excluding right of way for

transmission)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Not

Not assessed

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Down stream of proposed Chelikkall Ar and Vakkal

Ar schemes

Page 52: Small Hydro Power Schemes Kerala

41 MUKKADAVU MINI HE SCHEME

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Chittar

District Kollam

Access to site The site is 3km from Punalur towards Pathanapuram

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division Konni

Phone 0473 – 242217

Investigation Circle, South, Kothamangalam

Phone : 0485 -822364

a. Dam/ weir with dimensions (approx) Concrete overflow weir height 8.5m length at top

41m

b. Water conductor system with dimensions (approx) Power tunnel of clear dia 2.25m

c. Power house with No. of machines and capacity 3 nos. 750kw each, 2.25MW

d. Annual average generation potential 5.83Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.11kv line is

available at about 1km from the station, (tentative).

f. Design Head 15m

Land particulars(excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 7Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 53: Small Hydro Power Schemes Kerala

42 ANAKKAL

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Azhutha

District Kottayam

Access to site The project site is accessible by road from Mundakkayam to

power house site. Nearest Railway Kottayam 70km

Nearest KSEB investigation field office

(Address and Telephone No.) Investigation Circle, South, Kothamangalam

Phone : 0485 -822364

Main project components viz.

a. Dam/ weir with dimensions (approx) Height of weir 13m

b. Water conductor system with dimensions (approx)

c. Power house with No. of machines and capacity Dam toe power house, capacity 2MW

d. Annual average generation potential 8.64Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared and get it

approved from KSEB.Nearest Substation

Kanjirappally 66kv Substation, 1km, 11kv line to be

constructed, (tentative).

f. Design Head 13m

Land particulars( excluding right of way for

transmission)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

There is a proposal to use the tail water again for

Parakkadavu low head scheme

Page 54: Small Hydro Power Schemes Kerala

43 KAZHUTHURUTTI

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Kazhuthurutti river, Kallada Ar basin

District Kollam

Access to site The sites are accessible and nearby Kollam – Shenkotta Road

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

a. Dam/ weir with dimensions (approx)

b. Water conductor system with dimensions (approx)

Investigation Field Division – Konni

Phone : 0473 - 242217

Investigation Circle South Kothamangalam

Phone : 0485 -822364

To be finalised

c. Power house with No. of machines and capacity 2MW

d. Annual average generation potential 2.27Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Power can be

transmitted to Thenmala Substation, (tentative).

f. Design Head 32m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Page 55: Small Hydro Power Schemes Kerala

Present Status of the

Project:

44 MEENMUTTI

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Kabani / Cauvery basin

District Wayanad

Access to site 30km from Vythiri in the Kozhikode – Kalpatta road

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Padinjarathara

Phone : 0493 -693507

Investigation Circle, North, V. B Thrissur

Phone : 0487- 380343

a. Dam/ weir with dimensions (approx) A trench type diversion weir of 5m height and 12m

length

b. Water conductor system with dimensions (approx) LPP of 320m length, 1.1m dia. A single line

penstock of 0.6m dia and 620m length

c. Power house with No. of machines and capacity 2 turbines (1 x 0.5MW+1 x 1MW), 1.5MW

d. Annual average generation potential 3.3Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.The power

generated can be evacuated to 33kv Substation at

Padinjarathara (under construction), (tentative).

f. Design Head 145m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx) 0.5Ha

b. Extent of Private land required (approx) 2 Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Page 56: Small Hydro Power Schemes Kerala

Litigations or any other issues including previous

agreements etc.

45 MUTHAPPANPUZHA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Chaliyar

District Kozhikode

Access to site Road 52km from Kozhikode via Omassery, Thiruvampadi and

Anakkampoyil through left bank of Mundathodu

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Padinjarathara

Phone : 0493 –693507

Investigation Circle, North, V. B Thrissur

Phone : 0487- 380343

a. Dam/ weir with dimensions (approx) Trench type weir of length 30m

b. Water conductor system with dimensions (approx) Power channel of length 488m trapezoidal side

slope 1:2 bed slope 1 in 2000 base width 2.35m top

5m

c. Power house with No. of machines and capacity 18m x 7m with machine 1 x 1000, 2 x 250, 1.5MW

d. Annual average generation potential 3.59Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.

f. Design Head 16m

Land particulars ( excluding right of way for

transmission

a. Extent of Forest lan)d required (approx) 0.5Ha

b. Extent of Private land required (approx) 2 Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

Page 57: Small Hydro Power Schemes Kerala

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

46 URUTTIPUZHA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Charuthipuzha, Valapattanam basin

District Kannur

Access to site 60km from Kannur by Road

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Padinjarathara

Phone : 0493 -693507

Investigation Circle, North, V. B Thrissur

Phone : 0487- 380343

a. Dam/ weir with dimensions (approx) Diversion weir, concrete gravity of 50m length 5m

height

b. Water conductor system with dimensions (approx) Power channel 1230m length, forebay, penstock

90m length 1.1m dia

c. Power house with No. of machines and capacity 2 x 400+1x 200 = 1000kw

d. Annual average generation potential 3.426Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.11kv feeder at

Aralam which is 4km from the project site,

(tentative).

f. Design Head 30m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

4Ha (Reserve forest)

Page 58: Small Hydro Power Schemes Kerala

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

47 LOWER MARMALA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Meenachal

District Kottayam

Access to site Located at Marmala in Theekoy Village, Meenachal taluk of

Kottayam Dist.

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Konni

Phone : 0473 – 242217

Investigation Circle, South, Kothamangalam

Phone : 0485- 822364

a. Dam/ weir with dimensions (approx) Height of weir 20m

b. Water conductor system with dimensions (approx) Free flow conduit, forebay tank, penstock

c. Power house with No. of machines and capacity 900kw

d. Annual average generation potential 4.20Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Nearest Substation

at Palai, (tentative)

f. Design Head 28m

Land particulars( excluding right of way for

transmission)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

Page 59: Small Hydro Power Schemes Kerala

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

Scheme envisages to utilise tail race water available

from Marmala Small HE Scheme

48 KOZHICHAL

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Kariyamkode

District Kannur

Access to site 55km from Thaliparamba

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division, Padinjarathara

Phone : 0493 –693507

Investigation Circle, Thrissur

Phone : 0487 380343

a. Dam/ weir with dimensions (approx) Diversion weir 25m length and 5m height

b. Water conductor system with dimensions (approx) Power channel 500m length 1m bottom width 0.75m

depth side slope 1:1, forebay tank 7.5m x 7.5m size,

penstock 1 no. 550m length, 0.75m dia

c. Power house with No. of machines and capacity 0.75MW (1 x 500kw + 1 x 250kw)

d. Annual average generation potential 1.82Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the

developer.Evacuation scheme shall be prepared by

developer and get it approved from KSEB.11kv

transmission line 1.5km away is available,

(tentative).

f. Design Head 108m

Land particulars( excluding right of way for

transmission line)

Page 60: Small Hydro Power Schemes Kerala

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 2.5Ha (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

49 CHERUVAKKILCHOLA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Mangad

District Thrissur

Access to site 12 km from Vadakkancheri, Thalapilly taluk

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – V. B Thrissur

Phone : 0487 –380486

Investigation Circle, North, V. B Thrissur

Phone : 0487- 380343

a. Dam/ weir with dimensions (approx) Diversion weir of 91m length and height 17.8m

b. Water conductor system with dimensions (approx) Penstock to be finalised

c. Power house with No. of machines and capacity 700kw

d. Annual average generation potential

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

evacuation and get it approved from KSEB.Nearest

Substation Vadakkancheri 14 km away, (tentative)

f. Design Head 80m

Land particulars ( excluding right of way clearance

for transmission line)

a. Extent of Forest land required (approx) Reserve forest

Page 61: Small Hydro Power Schemes Kerala

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

50 ARUVIKKAL

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Valiathodu

District Ernakulam

Access to site 14km from Muvattupuzha via Pambakuda

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Idamalayar

Phone : 0485 –583228

Investigation Circle, South, Kothamangalam

Phone : 0485- 822364

a. Dam/ weir with dimensions (approx) Length of weir 12m and height 3.5m at

Mavolimuttam and a weir of length 80m and 3m

height at Aruvikkal

b. Water conductor system with dimensions (approx) Channel 215.7m from weir I to weir II, penstock

pipe 110m length and 0.7m dia from weir II

c. Power house with No. of machines and capacity 500kw

d. Annual average generation potential 1.36Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.11kv line is

Page 62: Small Hydro Power Schemes Kerala

available 100m away from P.H, (tentative).

f. Design Head 40m

Land particulars( excluding right of way clearance

for transmission)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 5Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

51 ANAVILASAM

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Feasibility study conducted

River basin Periyar

District Idukki

Access to site 2 km of jeep road from Anavilasam and 200m of footpath

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Munnar

Phone : 0486 –530388

Investigation Circle, South, Kothamangalam

Phone : 0485- 822364

a. Dam/ weir with dimensions (approx) Weir about 30m length 5m height

b. Water conductor system with dimensions (approx) Pipe line of about 50m in length

c. Power house with No. of machines and capacity 300kw

d. Annual average generation potential

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB. 11kv line is

available at 2km, (tentative).

f. Design Head 40m

Land particulars( excluding right of way for

Page 63: Small Hydro Power Schemes Kerala

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) Less than 1Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

OTHER IDENTIFIED SCHEMES

52 CHEMBUKATTY SMALL HE SCHEME

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Identified

River basin Bharathapuzha

District Palakkad

Access to site 21km from Mannarkkad and 7 km from Thiruvizhemkannu

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – V. B Thrissur

Phone : 0487 –380486

Investigation Circle, North, V. B Thrissur

Phone : 0487- 380343

a. Dam/ weir with dimensions (approx) A concrete gravity overflow type weir of height

10m

b. Water conductor system with dimensions (approx) A contour canal of 1800m length. A single penstock

of 0.8m dia and length 1200m

c. Power house with No. of machines and capacity 2 turbines (1 x 2.5 + 1 x 4MW) 6.5MW

d. Annual average generation potential 14.324Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.The power

Page 64: Small Hydro Power Schemes Kerala

generated can be fed into the 33kv Substation at

Alanallur which is now under construction,

(tentative).

f. Design Head 240m

Land particulars( excluding right of way for

transmission 0

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

53 KOODAM SMALL HE SCHEME

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Identified

River basin Bhavani

District Palakkad

Access to site 10km away from Agali near to Siruvani estate of Bharani

Plantations Ltd

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – V.B Thrissur

Phone : 0487 – 380486

Investigation Circle, North, V. B Thrissur

Phone : 0487- 380343

a. Dam/ weir with dimensions (approx) A concrete gravity dam 10m height and 180m

length

b. Water conductor system with dimensions (approx) A surface penstock of 1080m length and 0.75m dia

c. Power house with No. of machines and capacity 2 turbines of 2MW each, 4MW

d. Annual average generation potential 9.76Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

Page 65: Small Hydro Power Schemes Kerala

and get it approved from KSEB.The power

generated can be fed into the 33kv Substation at

Agali which is now under construction (10km),

(tentative).

f. Design Head 180m

Land particulars( excluding right of way for

trasmisisonline)

a. Extent of Forest land required (approx) Nil

b. Extent of Private land required (approx) 20Ha

c. Extent of Government land required (approx) Nil

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

54 INCHAVARAKUTHU

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Identified

River basin Periyar

District Idukki

Access to site 20km from Idukki, Thodupuzha, Chelachuvadu

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Idamalayar

Phone : 0485 –583228

Investigation Circle, South, Kothamangalam

Phone : 0485- 822364

a. Dam/ weir with dimensions (approx) Weir and penstock

b. Water conductor system with dimensions (approx) Investigation to be done

c. Power house with No. of machines and capacity 3MW

d. Annual average generation potential 6Mu (approx)

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Page 66: Small Hydro Power Schemes Kerala

Evacuation Scheme shall be prepared and get it

approved from KSEB.

f. Design Head 15m

Land particulars(excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 2Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

55 CHEMMANNAR

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Identified

River basin Chemannar

District Idukki

Access to site Project site is near the Kuthungal HEP

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Munnar

Phone : 0486 –530388

Investigation Circle, South, Kothamangalam

Phone : 0485- 822364

a. Dam/ weir with dimensions (approx) A diversion weir of about 6m height a penstock of

200m length 0.8m dia

b. Water conductor system with dimensions (approx)

c. Power house with No. of machines and capacity 1.2MW

d. Annual average generation potential 2.6Mu

Page 67: Small Hydro Power Schemes Kerala

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB. 11kv line is

available near the site (tentative).

f. Design Head 50m

Land particulars(excluding right of way for

transmission)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

56 KANGAPUZHA

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Identified

River basin Panniar

District Idukki

Access to site Downstream of the bridge under construction across Panniar near

Kangapuzha

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Munnar

Phone : 0485 – 530388

Investigation Circle, South, Kothamangalam

Phone : 0485- 822364

a. Dam/ weir with dimensions (approx) A weir of 8m height with penstock

b. Water conductor system with dimensions (approx) Investigation to be done

c. Power house with No. of machines and capacity 750kw

Page 68: Small Hydro Power Schemes Kerala

d. Annual average generation potential 3.5Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.

f. Design Head 7m

Land particulars( excluding right of way for

transmission line)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

57 RANDAM KADAVU

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Identified

River basin Randam kadavu

District Kannur

Access to site From Thalasseri or Kannur Iritty Edoor –Angali kadavu,

Vaniappara – Random kadavu 60km

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Padinjarathara

Phone : 0493 –693507

Investigation Circle, North, V. B Thrissur

Phone : 0487- 380343

a. Dam/ weir with dimensions (approx) Diversion weir – gravity type 5m height

b. Water conductor system with dimensions (approx) Power channel length 400m

Page 69: Small Hydro Power Schemes Kerala

c. Power house with No. of machines and capacity Overground 1 x 200, 1 x 100lw

d. Annual average generation potential 0.985Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.11kv line from

Chavasseri Substation is available (tentative).

f. Design Head 18.50m

Land particulars(excluding right of way for

transmission)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx) 1.90Ha

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed)

Rehabilitation / resettlement issues, if any, with details

Litigations or any other issues including previous

agreements etc.

58 ARUVIKUZHIPARA/ MARANGATTUPALLY

Present Status of the

Project:

DPR Ready/ Detailed Investigation

completed/Preliminary Investigation

completed/Feasibility study conducted

Identified

River basin Meenachil river / Aruvekuzhy parathode

District Kottayam

Access to site Accessible by PWD road from Kurianad to Uzhavoor. Nearest

township Kuravilangad is about 5km from the site.

Nearest KSEB investigation field office

(Address and Telephone No.)

Main project components viz.

Investigation Field Division – Konni

Phone : 0473 – 242217

Investigation Circle, South, Kothamangalam

Phone : 0485- 822364

Page 70: Small Hydro Power Schemes Kerala

a. Dam/ weir with dimensions (approx) Dam 3m, length at top 37m, bottom 11m

b. Water conductor system with dimensions (approx) Penstock 240m long, contour channel 200m and

50m long penstock

c. Power house with No. of machines and capacity Installed capacity 300kw

d. Annual average generation potential 1.32Mu

e. Evacuation details Alignment of transmission line will be surveyed and

finalised by KSEB at the cost of the developer.

Evacuation Scheme shall be prepared by developer

and get it approved from KSEB.Nearest Substation

is at Kuthattukulam, (tentative)

f. Design Head

Land particulars(excluding right of way for

transmission)

a. Extent of Forest land required (approx)

b. Extent of Private land required (approx)

c. Extent of Government land required (approx)

Particulars of any upstream/ down stream structures from

the proposed scheme (existing / proposed) Rehabilitation / resettlement issues, if any, with details Three/f our permanently settled families

Litigations or any other issues including previous

agreements etc.

Page 71: Small Hydro Power Schemes Kerala

MNRE‐Incentive Schemes

Page 72: Small Hydro Power Schemes Kerala
Page 73: Small Hydro Power Schemes Kerala
Page 74: Small Hydro Power Schemes Kerala
Page 75: Small Hydro Power Schemes Kerala
Page 76: Small Hydro Power Schemes Kerala
Page 77: Small Hydro Power Schemes Kerala
Page 78: Small Hydro Power Schemes Kerala
Page 79: Small Hydro Power Schemes Kerala
Page 80: Small Hydro Power Schemes Kerala
Page 81: Small Hydro Power Schemes Kerala
Page 82: Small Hydro Power Schemes Kerala
Page 83: Small Hydro Power Schemes Kerala
Page 84: Small Hydro Power Schemes Kerala
Page 85: Small Hydro Power Schemes Kerala
Page 86: Small Hydro Power Schemes Kerala
Page 87: Small Hydro Power Schemes Kerala
Page 88: Small Hydro Power Schemes Kerala
Page 89: Small Hydro Power Schemes Kerala
Page 90: Small Hydro Power Schemes Kerala
Page 91: Small Hydro Power Schemes Kerala
Page 92: Small Hydro Power Schemes Kerala
Page 93: Small Hydro Power Schemes Kerala
Page 94: Small Hydro Power Schemes Kerala
Page 95: Small Hydro Power Schemes Kerala
Page 96: Small Hydro Power Schemes Kerala
Page 97: Small Hydro Power Schemes Kerala
Page 98: Small Hydro Power Schemes Kerala
Page 99: Small Hydro Power Schemes Kerala
Page 100: Small Hydro Power Schemes Kerala
Page 101: Small Hydro Power Schemes Kerala
Page 102: Small Hydro Power Schemes Kerala
Page 103: Small Hydro Power Schemes Kerala
Page 104: Small Hydro Power Schemes Kerala
Page 105: Small Hydro Power Schemes Kerala

For further details contact Energy Management Cell