slurry walls

Upload: anonymous-dlsmlsymh

Post on 04-Jun-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Slurry Walls

    1/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Plates\Fig_199.ai

    FIG_192: Title

    Slurry Walls

  • 8/13/2019 Slurry Walls

    2/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\Fig_193

    FIG_193: Settlements Caused by Diaphragm Wall Construction

    0

    0.1

    0.2

    0 0.5 1.0 1.5 2.0 2.5

    Distance from Excavation

    Maximum Trench Depth Clough and ORourke (1990)

    Project Name

    Hong Kong Excavations (12)

    London NPY (48)

    Bell Common (50)

    South Cove (22)

    Studenterlunden (24)

    Symbol

    S

    ettlement

    Maximu

    m

    TrenchDepth,%

    Heave

    Settlement

    Profile Assumed for Muni Analyses

    (0.14%)

    (1.1)

  • 8/13/2019 Slurry Walls

    3/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_194

    FIG_194 : Excavation for Muni Metro Turnback Project

    DepthBelo

    wG

    roundLevel,ft

    20

    0

    40

    60

    80

    100

    120

    140

    Horizontal Distance from West SPTC Wall, f t

    140 120 100 80 60 40 20 20 40 60 80 100 120 140

    I-24 I-23

    20

    0

    40

    60

    80

    100

    120

    140Inclinometer

    Inclinometer

    36 ft

    12 ft

    30 ft 52 ft

    Bay Mud

    Old Sea Wall

    Fill

    Existing Building

    Basement

    Marine SandMarine Sand

    Bay Mud

    Steel Sold ier Piles

    (Spaced 12 ft

    on Center)

    Concrete

    SPTC Walls

    A

    B

    C

  • 8/13/2019 Slurry Walls

    4/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_195

    FIG_195: Construct ion of Soldi er Piles for SPTC Wall

    DrillingEquipment

    BucketAuger

    SupportCrane

  • 8/13/2019 Slurry Walls

    5/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_196

    FIG_196: Installation of Soldier Piles fo r SPTC Wall

    Installation of Soldier Piles

    Drilling Equipment

  • 8/13/2019 Slurry Walls

    6/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_197

    FIG_197: Slurry Wall Constructi on

    Excavated Spoils

    Excavated Slurry Trench

    Clamshell

    Drilling Equipmentfor Soldier Piles

  • 8/13/2019 Slurry Walls

    7/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_198

    FIG_198: Settlements Measured at End of SPTC Wall Construc tion

    0

    0.5

    1.0

    1.5

    0 10 20 30 40 50 60 70 80 90

    0 10 20 30 40 50 60 70 80 90

    Settlement,in

    E

    xcavation

    SPTCWall

    Distance from Excavation, ft

    Distance from Excavation, ft

    Interpreted Trend

    SM7 SM8 SM9 SM10 SM11 SM12 SM13

    SM7 SM8 SM9 SM10 SM11 SM12 SM13Line 23

    Line 22

    Line No.

    2223

    Symbol

  • 8/13/2019 Slurry Walls

    8/22

    15

    10

    5

    0

    -5

    -10

    -15

    0 25 50 75 100 125 150 175 200 225 250 275 300 325 350

    Piezo

    metricLevel,(Elev

    ationsCCSFDatum

    ),ft

    Days After Piezometer Installation

    No Activity

    No Activity

    PileDriving

    Bay Mud

    Fill

    50 ft 70 ft

    9 ft 3 ft

    P-10

    P-9

    SPTCWall

    Piezometers

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_199

    FIG_199: Excess Pore Pressures Caused by SPTC Wall Construction

    P-9/P-10

    Installationof SPTC Walls

    Piezometer

    P-9

    P-10

    Symbol

  • 8/13/2019 Slurry Walls

    9/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)FIG_200

    FIG_200: Change in Pore Water Pressures: Effects of SPTC Wall Constructi on Pile Driving and Excavation

    2

    0

    -2

    -4

    -6

    -8

    -10

    -12

    -140 25 50 75 100 125 150 175 200 225 250 275 300 325

    Nov 1993

    Pie

    zometricLevel,(E

    levationsCCSFDatum),ft

    Days After Piezometer Installation

    Pile

    DrivingRest Period ExcavationP-7 Installation of

    SPTC WallsInstallation ofSPTC Walls

    PileDriving Rest Period ExcavationP-8

    Bay Mud

    Fill

    50 ft

    Piezometer

    70 ft

    12 ft

    P-7/P-8

    SPTCWall

    PiezometerP-7

    P-8

    Symbol

  • 8/13/2019 Slurry Walls

    10/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\Fig_201A

    FIG_201A: Lateral Deformations During SPTC Wall Construction

    10 5 0 5 10303540 25 20 15 10 0 55

    1010

    5 5

    15 15

    20 20

    25 25

    66m

    135m

    30 30

    35 35

    40 40

    45 45

    50 50

    W68 W70 W72 W74 W76

    5/16/94 5/16/94P69 P71 P73 P75

    5/13/94 5/10/94

    6.1 M6.1m

    CL 24Inclinometer CL-24

    ConstructionSequence

    3.7m 3.7m 3.7m

    COLMA

    SAND

    FILL

    MARINE

    SAND

    OLD

    BAY

    CLAY

    B

    A

    Y

    M

    U

    D

    DepthBelow

    GroundLevel,m

    DepthBelow

    GroundLevel,m

    Away from Excavation NORTHEASTWEST SOUTH

    SoldierP

    ile

    SPTC

    Wall

    Lateral Deformation, mm Lateral Deformation, mm

    P75P69 P71 P73

    After Instal lat ion

    of Soldier Piles

    and Panels North

    of W68

    4/5/94

    Deformations Parallel to the WallDeformations Transverse to the Wall Alignment

  • 8/13/2019 Slurry Walls

    11/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\Fig_201B

    FIG_201B: Lateral Deformations During SPTC Wall Construction

    10 5 0 5 10303540 25 20 15 10 0 55

    1010

    5 5

    15 15

    20 20

    25 25

    66m

    135m

    30 30

    35 35

    40 40

    45 45

    50 50

    W68 W70 W72 W74 W76

    5/16/94 5/16/94P69 P71 P73 P75

    5/13/94 5/10/94

    6.1 M6.1m

    CL 24Inclinometer CL-24

    ConstructionSequence

    3.7m 3.7m 3.7m

    COLMA

    SAND

    FILL

    MARINE

    SAND

    OLD

    BAY

    CLAY

    B

    A

    Y

    M

    U

    D

    DepthBelow

    GroundLevel,m

    DepthBelow

    GroundLevel,m

    Away from Excavation NORTHEASTWEST SOUTH

    SoldierP

    ile

    SPTC

    Wall

    Lateral Deformation, mm Lateral Deformation, mm

    P75P69 P71 P73

    After Instal lat ion

    of Soldier Piles

    and Panels North

    of W68

    4/5/94

    5/10/941

    After Construct ionof Panel P75

    Deformations Parallel to the WallDeformations Transverse to the Wall Alignment

  • 8/13/2019 Slurry Walls

    12/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\Fig_201C

    FIG_201C: Lateral Deformations During SPTC Wall Construc tion

    10 5 0 5 10303540 25 20 15 10 0 55

    1010

    5 5

    15 15

    20 20

    25 25

    66m

    135m

    30 30

    35 35

    40 40

    45 45

    50 50

    W68 W70 W72 W74 W76

    5/16/94 5/16/94P69 P71 P73 P75

    5/13/94 5/10/94

    6.1 M6.1m

    CL 24Inclinometer CL-24

    ConstructionSequence

    3.7m 3.7m 3.7m COLMA

    SAND

    FILL

    MARINE

    SAND

    OLD

    BAY

    CLAY

    B

    A

    Y

    M

    U

    D

    DepthBelow

    GroundLevel,m

    DepthBelow

    GroundLevel,m

    Away from Excavation NORTHEASTWEST SOUTH

    SoldierP

    ile

    SPTC

    Wall

    Lateral Deformation, mm Lateral Deformation, mm

    P75P69 P71 P73

    After Instal lat ion

    of Soldier Piles

    and Panels North

    of W68

    4/5/94

    5/10/941

    After Construct ionof Panel P75

    5/13/942

    After Construct ion

    of Panel P73

    Deformations Parallel to the WallDeformations Transverse to the Wall Alignment

  • 8/13/2019 Slurry Walls

    13/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\Fig_201D

    FIG_201D: Lateral Deformations During SPTC Wall Construc tion

    10 5 0 5 10303540 25 20 15 10 0 55

    10

    10

    5 5

    15 15

    20 20

    25 25

    66m

    135m

    30 30

    35 35

    40 40

    45 45

    50 50

    W68 W70 W72 W74 W76

    5/16/94 5/16/94P69 P71 P73 P75

    5/13/94 5/10/94

    6.1 M6.1m

    CL 24Inclinometer CL-24

    ConstructionSequence

    3.7m 3.7m 3.7m COLMA

    SAND

    FILL

    MARINE

    SAND

    OLD

    BAY

    CLAY

    B

    A

    Y

    M

    U

    D

    DepthBelow

    GroundLevel,m

    DepthBelow

    GroundLevel,m

    Away from Excavation NORTHEASTWEST SOUTH

    SoldierP

    ile

    SPTC

    Wall

    Lateral Deformation, mm Lateral Deformation, mm

    P75P69 P71 P73

    After Instal lat ion

    of Soldier Piles

    and Panels North

    of W68

    4/5/94

    5/10/941

    After Construct ionof Panel P75

    5/13/942

    After Construct ion

    of Panel P73

    5/16/943

    After Construct ion

    of Panel P71

    Deformations Parallel to the WallDeformations Transverse to the Wall Alignment

  • 8/13/2019 Slurry Walls

    14/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\Fig_201E

    FIG_201E: Lateral Deformations During SPTC Wall Construc tion

    10 5 0 5 10303540 25 20 15 10 0 55

    10

    10

    5 5

    15 15

    20 20

    25 25

    66m

    135m

    30 30

    35 35

    40 40

    45 45

    50 50

    W68 W70 W72 W74 W76

    5/16/94 5/16/94P69 P71 P73 P75

    5/13/94 5/10/94

    6.1 M6.1m

    CL 24Inclinometer CL-24

    ConstructionSequence

    3.7m 3.7m 3.7m COLMA

    SAND

    FILL

    MARINE

    SAND

    OLD

    BAY

    CLAY

    B

    A

    Y

    M

    U

    D

    DepthBelow

    GroundLevel,m

    DepthBelow

    GroundLevel,m

    Away from Excavation NORTHEASTWEST SOUTH

    SoldierP

    ile

    SPTC

    Wall

    Lateral Deformation, mm Lateral Deformation, mm

    P75P69 P71 P73

    After Instal lat ion

    of Soldier Piles

    and Panels North

    of W68

    4/5/94

    5/10/941

    After Construct ionof Panel P75

    5/13/942

    After Construct ion

    of Panel P73

    5/16/943

    After Construct ion

    of Panel P71

    5/16/944

    After Construct ion

    of Panel P69

    Deformations Parallel to the WallDeformations Transverse to the Wall Alignment

  • 8/13/2019 Slurry Walls

    15/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\Fig_202

    FIG_202: Variation o f Lateral Deformations with Distance from Excavation Effects of SPTC Wall Construction

    0 3 6 9 12 15 18 21 24 27

    35

    30

    15

    20

    25

    10

    5

    0

    40

    45

    Horizontal Distance fromSPTC Wall, m

    Inclinometers

    BetweenSoldierPiles

    Maximum

    Later

    alDisplacement,

    ,mm

    h

    I

    SPTCWall

    h

    Marine Sand

    BayMud

    Fill

    Inclinometer

    TypicalProfiles

  • 8/13/2019 Slurry Walls

    16/22

  • 8/13/2019 Slurry Walls

    17/22

    WW:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)FIG_203B

    FIG_203B: Lateral Deformations Caused by SPTC Wall Const ruction

    15 10 5 0 5 10 15 2025 20 1530 10 5 0 5 10 15

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    FILL

    B

    A

    Y

    M

    U

    D

    COLMA

    SAND

    OLD

    BAY

    CLAY

    MARINE

    DEPOSITS

    762mmO.D.

    GWT

    W920 x 313

    Away f rom Excavation Away f rom ExcavationTowards the Excavation Towards the Excavation

    Lateral Deformation, mm Lateral Deformation, mm

    DepthBelo

    wGroundLevel,m

    SteelCasing

    Predrilling

    406mmAuger

    Range ofPile Tips

    457mm

    Concrete

    Incremental Deformations Caused by Pile DrivingDeformations Caused by Construction of SPTC Walls

    SoldierP

    ile

    SPTC

    Wall

    W30 W32 W34 W36 W38

    5 16 94 5 16 94

    P69 P71 P73 P75

    5 13 94 5 1 94

    Inclinometer CL-17

    ConstructionSequence

    P37P31

    3.7m

    P33 P35

    0.9m

    Aft er Ins tal lat ion

    of Soldier Piles

    and Panel No P31

    3/6/941

    After Constructi on

    of Panel No P35

    3/7/942

  • 8/13/2019 Slurry Walls

    18/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_203C

    FIG_203C: Lateral Deformations Caused by SPTC Wall Cons truction

    15 10 5 0 5 10 15 2025 20 1530 10 5 0 5 10 15

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    FILL

    B

    A

    Y

    M

    U

    D

    COLMA

    SAND

    OLD

    BAY

    CLAY

    MARINE

    DEPOSITS

    762mmO.D.

    GWT

    W920 x 313

    Away f rom Excavation Away f rom ExcavationTowards the Excavation Towards the Excavation

    Lateral Deformation, mm Lateral Deformation, mm

    DepthBelo

    wGroundLevel,m

    SteelCasing

    Predrilling

    406mmAuger

    Range ofPile Tips

    457mm

    Concrete

    Incremental Deformations Caused by Pile DrivingDeformations Caused by Construction of SPTC Walls

    SoldierP

    ile

    SPTC

    Wall

    W30 W32 W34 W36 W38

    5 16 94 5 16 94

    P69 P71 P73 P75

    5 13 94 5 1 94

    Inclinometer CL-17

    ConstructionSequence

    P37P31

    3.7m

    P33 P35

    0.9m

    Aft er Ins tal lat ion

    of Soldier Piles

    and Panel No P31

    3/6/941

    After Constructi on

    of Panel No P35

    3/7/942

    Aft er Excavation

    of Panel No P37

    3/9/943

  • 8/13/2019 Slurry Walls

    19/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_203D

    FIG_203D: Lateral Deformations Caused by SPTC Wall Cons truction

    15 10 5 0 5 10 15 2025 20 1530 10 5 0 5 10 15

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    FILL

    B

    A

    Y

    M

    U

    D

    COLMA

    SAND

    OLD

    BAY

    CLAY

    MARINE

    DEPOSITS

    762mmO.D.

    GWT

    W920 x 313

    Away f rom Excavation Away f rom ExcavationTowards the Excavation Towards the Excavation

    Lateral Deformation, mm Lateral Deformation, mm

    DepthBelo

    wGroundLevel,m

    SteelCasing

    Predrilling

    406mmAuger

    Range ofPile Tips

    457mm

    Concrete

    Incremental Deformations Caused by Pile DrivingDeformations Caused by Construction of SPTC Walls

    SoldierP

    ile

    SPTC

    Wall

    W30 W32 W34 W36 W38

    5 16 94 5 16 94

    P69 P71 P73 P75

    5 13 94 5 1 94

    Inclinometer CL-17

    ConstructionSequence

    P37P31

    3.7m

    P33 P35

    0.9m

    Aft er Ins tal lat ion

    of Soldier Piles

    and Panel No P31

    3/6/941

    After Constructi on

    of Panel No P35

    3/7/942

    Aft er Excavation

    of Panel No P37

    3/9/943

    Aft er Constructi on

    of Panel No P37

    3/14/943

  • 8/13/2019 Slurry Walls

    20/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_203E

    FIG_203E: Lateral Deformations Caused by SPTC Wall Construction

    15 10 5 0 5 10 15 2025 20 1530 10 5 0 5 10 15

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    10

    5

    0

    15

    20

    25

    30

    35

    40

    45

    50

    FILL

    B

    A

    Y

    M

    U

    D

    COLMA

    SAND

    OLD

    BAY

    CLAY

    MARINE

    DEPOSITS

    762mmO.D.

    GWT

    W920 x 313

    Away f rom Excavation Away f rom ExcavationTowards the Excavation Towards the Excavation

    Lateral Deformation, mm Lateral Deformation, mm

    DepthBelo

    wGroundLevel,m

    SteelCasing

    Predrilling

    406mmAuger

    Range ofPile Tips

    457mm

    Concrete

    Incremental Deformations Caused by Pile DrivingDeformations Caused by Construction of SPTC Walls

    SoldierP

    ile

    SPTC

    Wall

    W30 W32 W34 W36 W38

    5 16 94 5 16 94

    P69 P71 P73 P75

    5 13 94 5 1 94

    Inclinometer CL-17

    ConstructionSequence

    P37P31

    3.7m

    P33 P35

    0.9m

    Aft er Ins tal lat ion

    of Soldier Piles

    and Panel No P31

    3/6/941

    After Constructi on

    of Panel No P35

    3/7/942

    Aft er Excavation

    of Panel No P37

    3/9/943

    Aft er Constructi on

    of Panel No P37

    3/14/943

    Aft er Constructi onof Panel No P33

    3/18/944

  • 8/13/2019 Slurry Walls

    21/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)Fig_204

    FIG_204: Deformations Caused by Construction of Slur ry Walls in Soft Clays in Singapore

    Source:(Poh and Wong, 1998)

    0 15 30 45

    10

    0

    20

    30

    40

    50

    60

    Lateral Soil Movement, mm Distance Behind Front Edge of Wall Panel, m

    0 3 6 9 12 15

    SoilSe

    ttlement,mm

    D

    epth,m

    5

    0

    -5

    -10

    -15

    -20

    -25

    -30

    -35

    -40

    Before Concreting

    Symbol Construction Stage

    After Concreting

    4 Hours After Concreting

    8 Hours After Concreting

    MEDIUM DENSECLAYEY SAND

    HARDSILTY CLAY

    FILL

    STIFFSILTY CLAY

    SOFT TOMEDIUMSTIFFMARINECLAY

    VERY SOFTTO SOFT

    MARINECLAY

    End of Excavation

    Before Concreting

    Symbol Construction Stage

    After Concreting

    4 Hours After Concreting

    8 Hours After Concreting

    Effect of Concreting of WallPanel on Lateral Soil Movements

    Affect of Concret ing of WallPanel on Soil Settlements

  • 8/13/2019 Slurry Walls

    22/22

    W:\Infrastructure\Geotech\UC Berkeley 2008 Seminar\Final Figures\09 SLURRY WALL (192-205)\FIG_205

    FIG_ 205: Stress Changes and Deformations During Slurry Wall Constructi on

    A

    C

    B

    O

    Axial Strain, a

    CompressionExtension

    -h +h

    Slurry

    Excavation

    Concrete

    Backfill

    +

    K f-Line (Compression)

    p'= '

    1+ '

    3

    2

    K f-Line(Extension)

    Ko-Line(Normally Consolidated)

    ShearStress,q'=

    '1-

    '3

    2

    Compression

    Extension

    O

    A'A

    BB'

    u

    u

    'vo

    -

    C'

    ESP

    TSP

    'vo

    hA h+

    = hB

    hB

    'vo

    +

    'vo

    +h h

    += hA

    hA

    'vo

    Excavation ofSlurry Trench

    Compression - Loading

    Physical Condition

    Trench Backfilledwith Concrete

    Concrete Shrinkage+ Inward Deflection

    of Wall

    Reduction in TotalHorizontal Stress

    Stress ChangesStressPath ID

    O-A'

    A'-B'

    B'-C'