Slough Mass Rapid Transit
Phase 2 (SMaRT P2)
Consultation
3
Slough Mass Rapid Transit Phase 2 (SMaRT P2)
2
Slough Mass Rapid Transit Phase 2 (SMaRT P2)
Slough Mass Rapid Transit Phase 2
(SMaRT P2)
In 2017, the council completed phase 1 ofthe Slough Mass Rapid Transit scheme fromDover Road to High Street Langley todeliver a more frequent, quicker and morereliable bus service for bus commuterstravelling along the A4 Bath Road.
We are now extending the scheme as partof phase 2 from High Street Langley to theeastern borough boundary and Heathrow.The scheme will encourage use ofsustainable transport for commuterstravelling between Slough Trading Estate,Slough Train Station, Langley andHeathrow airport.
The works aim to improve journey times,reduce congestion, enhance transportinterchanges and support regeneration inSlough.
In order to deliver this scheme, we havereceived funding from the Thames ValleyBerkshire Local Enterprise Partnership tointroduce phase 2 of the SMaRT scheme butbefore we go ahead with the scheme wewant to make sure that residents,businesses and statutory consultees havethe opportunity to have their say.
What are we proposing?
The following works are proposed:
SMaRT Phase 2 - the section fromHigh Street Langley and A4 LondonRoad junction to the M4 junction 5roundabout • Public realm enhancements on the
northern frontage of the A4 betweenLangley High Street and the M4 Junction5 roundabout (the Langley Interchange)are being proposed to enhance the‘gateway’ to Slough.
• Bus stop improvements.
• Localised changes to signs and lines onapproaches.
• Widening the south east quadrant of theM4 Junction 5 roundabout from 3 to 4lanes with modifications to the slip roadfor eastbound traffic.
• Creating a second lane on London Roadon the westbound approach to the M4junction 5 roundabout includingimprovements to facilitate the SMaRTscheme.
Sutton Lane and A4 London Roadjunction • Modifying the London Road/Sutton
Lane/Colnbrook Bypass gyratory.Pedestrian and cycle crossings onLondon Road will be improved and busstop waiting areas upgraded to providefor bus users to and from the residential,commercial and hotel properties.
• To the east of Colnbrook Bypass,carriageway realignment, safety worksand enhancing bus stops at LakesideRoad, including provision of shelters.
• Introducing a new Park and Ride facilityincluding cycle hub facility in order toreduce congestion into the town centre.
• Junction improvement works for accessand egress into the proposed Park andRide facility. In order to provide accessfor cars, buses and bicycles.
• Upgrading the existing National CycleNetwork route 61 (NCN 61) to make it amore attractive option for cyclistscommuting to and from Heathrow.
• New traffic signals including installationof MOVA (smart controlled signals at thejunctions) and junction improvementworks on the Sutton Lane gyratory.
• Extension of the existing eastbound buslane from High street Langley towardsHeathrow.
• Localised changes to signs and lines onapproaches.
5
Slough Mass Rapid Transit Phase 2 (SMaRT P2)
4
Slough Mass Rapid Transit Phase 2 (SMaRT P2)
EXHA
M RO
AD
CHALVE
Y GR
OVE
BARRY
SHERSCHEL STREET
THE C
RESC
ENT
HIGH STREET
AVEN
UE BLANDFORD ROAD SOUTH
HOR
UPTON COURT ROAD
LASC
ELLE
S ROAD
BUCKLA
ND AVEN
UE
MARLBOROUGH ROAD
RK R
OAD
AWNEY AVENUEREDDINGTON DRIVE
SWAB
EY R
OAD
SPEN
CER
ROAD
ST MARY'S ROAD
CHUR
CH S
TREE
T
PARK
STRE
ET
ROAD
Y ROAD
MIDD
LE G
REEN
ROA
D
DITT
ON R
OAD
RIDING COURT ROAD
E B3026
ETON ROAD B3026
LANE
TAMA
R W
AY
COMMON ROAD
NORTH PARK
HIGH S
HORT
ON R
OAD
BATH ROAD
POYL
E ROA
D
STANWELL ROAD
D
STANWELL MOOR ROAD
WIND
SOR
ROA YEW TR
EE
ALBERT STREET A412
WELLINGTON STREE
LONDON ROAD A4UX
BRID
GE R
COLNBROOK BY-PASS A4
MAJORS FARM ROAD
SLOUGH ROAD B376
GH R
OAD
B376
HORTON ROAD
WINDSOR ROAD
EDWARD VII AVENUE
ON R
OAD
HIGH S
TR
LEDG
ERS
RD
M25
M4
M4
M4
Pippins PrimarySchool
Colnbrook CofEPrimary School
FoxboroughPrimary School
Holy Family RCPrimary School
Langley GrammarSchool
Parlaunt ParkPrimary School
East BerkshireCollege
MarishPrimarySchool
Ryvers PrimarySchool
The LangleyAcademy
CastleviewPrimarySchool
Long CloseSchool
St. Bernards ConventRC Grammar School
h and Eton CofEondary School
St. Mary’s CofEPrimary School
Langley HallPrimarySchool
laycots
UptonHospital
LangleyStation
tion
WindsorCastle
DatchetStation
BusStation
LangleyLeisure Centre
Jubilee River
River Thames
Queen MotherReservoir
Grand Union Canal
Superstore
Superstore
UPTONCOURTPARK
DITTONPARK
KEDERMISTERPARK
DittonManor
RUGBYCLUB
CRICKETCLUB
Gate opening times
6am - 6pm Winter time6am - 8pm Summer time
Heathrow2 miles
SSSSHHEERRSCHEL STREET
THE CR
ESCE
NT
HIGH STREETT
AVAAEN
UE BLANDFORDRROOAD
SOUTH
HOR
UPTON COURT ROAD
LASC
ELLE
S ROADBBUU
CCKLAND AVAA
ENUE
MARAA LBOROUGH RROOAD
RRRKKKRRRROOOOO
AAAADDD
AWAA NEY AAVVAAA EENNUUEEREDDINGTON DRIVE
SWA
WWBE
YERO
AD
SPEN
CER
ROAADD
ST MARYRR'S ROAD
CHUR
CHSST
RREET
PAPRAA
KKSTTR
EET
ROAD
YYYYYYYYY RRRRRRRRRROOOOOOOOOOOOOAAAAAAAAAAADDDDD
MIDD
LEGR
EEN
ROAD
DITT
ONRO
AD
RIDING COURT ROAD
EEE BBB33333333330000002222226666666666
ETON ROAD B3026
LLLLLLLLAAAAAAAAAAAANNNNNNNNEEEEEEE
TATTMA
RW
AWW
YAA
CCOOMMMON RROORR
AD
NORTH PAPP RK
HHHIIIGGGHHH SSS
HORTR
ONRO
AD
BATAA H ROAD
POYL
E ROR
AD
STATT NWELL ROAD
DDDDDD
STATT NWELL MOOR ROAD
WIND
SOR
ROA YEW TR
EE
ALBERTR STREET A412
WELLINGTON STREE
LONDOON ROOOOAAADDD AAA444UX
BRID
GER
COLNBROOK BY-YY PAPP SS A4
MAJORS FAFF RMM RROAD
SLOUGH ROADB376
GHRO
ADB3
76
HORTON ROAD
WINDSOR ROAD
EDWAWW RD VII AVAA ENUE
OOOOOOOOOOONNNNNNNRRRRRRRRRRROOOOOOOOOOOO
AAAAAAAAAAADDDDD
HIGH ST
R
LLLEDG
ERS
RD
M25
M4
M4
M4
Pippins PrimarySchool
nbrook CofEColnbrook CofEmary SchPrimary School
FoxboroughFoxborouPrimary SchoolPrimary Schoo
Holy Family RCamily RCamily RCPrimary School
Langley Grammary GrammaSSchool
Parlaunt Parkaunt Primary SchoolPrimary S
East BerkshireCollege
MarishMarishPrimaryPrimaryScSchool
Ryvers Primaryyyvers PrimSchool
leyThe LanglmyAcadem
CastleviewastleviewPrimaryPrimarySchoSchool
Long CloseSchool
St. Bernards ConventRC Grammar School
h and EtoEton CofEondaryy School
t. Mary’s CofEMaryt MaryStPrimary SchoolmaryP maryP
Langley HallLangley HallPrimaryPrimaryPrimary
hooooohooccSccSSSc llhhhSchScScSSSchool
laycots
UptonnHospital
LangleyStation
tionti
WindsorCastle
DatchetStation
BuusssStaatiionion
LangleyLeisure Centre
Jubilee River
River Thames
Queen MotherReservoir
Grand Union Canal
Superstore
Superstoreupe oreupersrstor
UPTONCOURTTPARK
DITTONPARK
KEDERMISTERPARK
onDittonDManor
RUGBYCLUB
CRICKETCLUB
Gate opening times
6am - 6pm Winter time6am - 8pm Summer time
Heathrow2 miles
A4 between Langley High Street and the M4 Junction 5 roundabout
Proposed landscaping and other measures to enhance ‘gateway’ to Slough.
Sutton Lane Gyratory Junction
New Traffic signals including installation of MOVA (smart controlled signals at the junctions) and junction improvement works.
Proposed Park and Ride including Cycle Hub
Aimed at reducing traffic pressures along the A4 and enabling commuters to make use of the mass rapid transit service between Slough and Heathrow.
M4 Junction 5 to Sutton Lane
Widening the south east quadrant of the junction 5 roundabout from 3 to 4 lanes with modified slip road for eastbound traffic.
M4 Junction 5 to Sutton Lane
Creating a second lane on London Road on the westbound approach to the junction 5 roundabout including improvements to facilitate the SMaRT scheme.
Scheme overview
This map was produced by Slough Borough Council.The map is produced by permission of OrdinanceSurvey on behalf of HMSO Crown copyright anddatabase right 2018 Ordinance Survey Licensenumber 1000019446
Please tell us your comments about the proposed works
that will be carried out as part of SMaRT phase 2.
Please use this space to add any other comments you may have.
Thank you very much for your time.
7
Slough Mass Rapid Transit Phase 2 (SMaRT P2)
6
#
Slough Mass Rapid Transit Phase 2 (SMaRT P2)
Yes No Don’tknow
1. Do you agree with the junction improvement works on Sutton Lane Gyratoryincluding improved pedestrian crossings on London Road?
2. Do you support the proposed new traffic signals including installation of MOVA(smart controlled signals at the junctions) and junction improvement works on the Sutton Lane gyratory?
3. Do you support the carriageway realignment including new shelters on the east ofColnbrook By-Pass?
4. Do you support the proposed Park and Ride and cycle hub facility?
5. Do you support the junction improvement works for access and egress into theproposed Park and Ride facility?
6. Do you support the proposed extension of the existing eastbound bus lane fromHigh Street Langley towards Heathrow?
7. Do you support the proposed widening of the south east section of the M4 junction5 roundabout from 3 lanes to 4 lanes with a modified slip road for east bound traffic?
8. Do you support the proposed upgrade of the existing National Cycle Network route 61 (NCN61)?
9. Do you support the proposed second lane on London Road on the westboundapproach to the M4 junction 5 roundabout facilitate the SMaRT scheme?
10. Do you support public realm enhancements on the northern frontage of the A4between Langley High Street and the M4 Junction 5 roundabout (the LangleyInterchange)?
Please return the attached questionnaireusing the freepost address provided orcomplete the online survey atwww.slough.gov.uk/consultations.
Alternatively please email us [email protected]. The closing date isFriday 01 February 2019.
Give us your views
If you have any questions that you would like to ask about these proposals,please come along to the consultation events that will be held at:
• The Curve, William Street,Slough SL1 1XY21 January 2019 10:00-18:00
• Holiday Inn Express, London Road, Slough SL3 8QB 22 January 2019 15:00-19:00
• The Curve, William Street, Slough SL1 1XY 23 January 2019 15:00-19:00
• Marriott Hotel, Ditton Road, Slough SL3 8PT 24 January 2019 15:00-19:00
Fold over with address showing and stick together before posting
TD/6632/18-12-18