slide 5-88 side a exposure side a walk-around 100 r street command sequence # 8

87
Slide 5- Slide 5-1 Side A Side A Exposure Side A Exposure Side A Walk-around Walk-around 100 R Street 100 R Street Command Command Sequence # 8 Sequence # 8

Upload: jadon-fenney

Post on 14-Jan-2016

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-11

Side ASide A

Exposure Side AExposure Side A

Walk-around Walk-around 100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Page 2: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-22

R StreetR Street

Sprinkler/StandpipeSprinkler/StandpipeConnectionConnection

Side ASide A

Walk-around Walk-around 100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Page 3: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-33

Side BSide ASide A

Sides A and B

Walk-around Walk-around 100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Page 4: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-44

Side C Walk-around Walk-around 100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Page 5: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-55

Side DSide A

Sides A and D

Exposure D1

Exposure D2

Sprinkler/StandpipeSprinkler/StandpipeConnectionConnection

Walk-around Walk-around 100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Page 6: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-66

Interior of Outlet StoreHeavy Fire Load

Walk-around Walk-around 100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Sprinkler PipingSprinkler Piping

Heavy Timber Mill

Construction

Page 7: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-77

Walk-around Walk-around 100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Interior of Outlet StoreHeavy Fire Load

Sprinkler PipingSprinkler Piping

Heavy Timber Mill

Construction

Page 8: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-88

COMMAND SEQUENCE # 8COMMAND SEQUENCE # 81ST ALARM RESOURCES1ST ALARM RESOURCES

• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1

– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response

Page 9: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-99

Heavy fire, four windows second floor, Side A. Medium smoke upper floors. Occupants have been removed. Building contains sprinklers and standpipes.

Side BSide B

Side ASide A

100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

SaturdayMarch 2Wind out of the South 15 MPHTemperature25°F

Page 10: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1010

N

Rail Road Right of Way

Perth Street

4-StoryBuilding

Outlet Warehouse6-Story

4 Bay LoadingDock – 1 story

Row houses2-1/2 Story

Row houses3-Story

Parking Lot

R Street

16th

STREET

A

B

C

DSprinkler/Stand-

pipeConnection

Page 11: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1111

WHAT IS THE SITUATION?WHAT IS THE SITUATION?(SIZEUP)(SIZEUP)

• On location at 100 R Street, six-story building, 75' x On location at 100 R Street, six-story building, 75' x 300', mill construction, occupied as outlet stores.300', mill construction, occupied as outlet stores.

• Heavy fire and smoke windows showing from four Heavy fire and smoke windows showing from four windows, second floor Side A.windows, second floor Side A.

• All occupants have been removed.All occupants have been removed.• Exposures Side A are three-story occupied dwellings Exposures Side A are three-story occupied dwellings

separated by a 20 foot street.separated by a 20 foot street.• Exposure D1 is a one-story loading dock, directly Exposure D1 is a one-story loading dock, directly

attached.attached.• Exposure D2 is 2-1/2-story occupied dwelling 25 feet Exposure D2 is 2-1/2-story occupied dwelling 25 feet

from building. from building. • No other immediate exposures.No other immediate exposures.• Engine 1 is establishing R Street Command.Engine 1 is establishing R Street Command.

Sizeup report example: Sizeup report example:

Page 12: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1212

WATER SUPPLY WATER SUPPLY FIXED SYSTEMS FIXED SYSTEMS

ACTION PLANACTION PLAN

Page 13: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1313

WHAT CAN BE WHAT CAN BE ACCOMPLISHED?ACCOMPLISHED?

INCIDENT OBJECTIVESINCIDENT OBJECTIVES

Contain and control fire in room/ Contain and control fire in room/ building of origin.building of origin.

Page 14: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1414

WHAT NEEDS TO BE DONE?WHAT NEEDS TO BE DONE?INCIDENT STRATEGY(IES)INCIDENT STRATEGY(IES)

• Exposure protectionExposure protection

• Confinement/ExtinguishmentConfinement/Extinguishment

• Special equipmentSpecial equipment

• VentilationVentilation

Page 15: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1515

HOW ARE YOU GOING TO DO IT? HOW ARE YOU GOING TO DO IT? INCIDENT TACTICSINCIDENT TACTICS

• Exposure protectionExposure protection– – Deploy large-diameter hoseline for water supplyDeploy large-diameter hoseline for water supply– – Deploy one 2-1/2-inch hoseline to Side A second floor for interior Deploy one 2-1/2-inch hoseline to Side A second floor for interior exposure protectionexposure protection– – Deploy one 1-3/4-inch hoseline to Side A third floor for exposure Deploy one 1-3/4-inch hoseline to Side A third floor for exposure protectionprotection

• Confinement/ExtinguishmentConfinement/ExtinguishmentDeploy two 2-1/2-inch hoselines to second floor Side A for Deploy two 2-1/2-inch hoselines to second floor Side A for confinement/extinguishmentconfinement/extinguishment

• Special equipmentSpecial equipmentDeploy two 2-1/2-inch hoselines to sprinkler/standpipe connection Deploy two 2-1/2-inch hoselines to sprinkler/standpipe connection Side ASide A

• VentilationVentilation– – Vent roof apertures of fire buildingVent roof apertures of fire building– – Horizontal ventilation all floors of fire buildingHorizontal ventilation all floors of fire building

Page 16: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1616

IMPLEMENT THE WATER SUPPLY IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS ACTION PLANFIXED SYSTEMS ACTION PLAN

Communicate assignments clearly to Communicate assignments clearly to all resources operating on the all resources operating on the incident.incident.

Page 17: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1717

EVALUATE THE WATER EVALUATE THE WATER SUPPLY SUPPLY

FIXED SYSTEMS ACTION PLANFIXED SYSTEMS ACTION PLAN

• Evaluate progress every 10 minutes.Evaluate progress every 10 minutes.

• Obtain feedback reports from Obtain feedback reports from resources operating on the incident.resources operating on the incident.

Page 18: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1818

100 R Street100 R StreetCommand Command

Sequence # 8Sequence # 8

Side BSide B

Side ASide A

Heavy fire, four windows second floor, Side A.Medium smoke upper floors. Occupants have been removed.

Page 19: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-1919

SALVAGE OPERATIONSSALVAGE OPERATIONS

Page 20: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2020

SALVAGESALVAGE

The tactical operation of protecting The tactical operation of protecting property from damage.property from damage.

Page 21: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2121

PRINCIPLES OF PRINCIPLES OF SALVAGESALVAGE

• To minimize damage to building To minimize damage to building and contentsand contents

• To protect building from structural To protect building from structural damage due to weight of waterdamage due to weight of water

Page 22: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2222

SALVAGE TACTICSSALVAGE TACTICS

Protect building contentsProtect building contents

• In placeIn place

• By removal By removal

• Control water flow within buildingControl water flow within building

• Remove water from buildingRemove water from building

Page 23: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2323

SALVAGE TACTICS SALVAGE TACTICS (cont'd)(cont'd)

• Ventilate to remove smoke and heatVentilate to remove smoke and heat

• Remove debris from buildingRemove debris from building

• Cover building openings to protect Cover building openings to protect from weatherfrom weather

Page 24: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2424

COORDINATION AND COORDINATION AND PLANNINGPLANNING

• Rapid extinguishment reduces loss.Rapid extinguishment reduces loss.

• Conserve water during firefighting Conserve water during firefighting operations.operations.

• Ventilate early.Ventilate early.

Page 25: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2525

WATER SUPPLY,WATER SUPPLY,FIXED SYSTEMS,FIXED SYSTEMS,

SALVAGESALVAGE700 29th STREET: 700 29th STREET:

Command Sequence # 9Command Sequence # 9

Page 26: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2626

REVIEW SIZEUP REVIEW SIZEUP REPORT OF REPORT OF

FIREGROUND FIREGROUND CONDITIONS CONDITIONS

Page 27: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2727

COMMAND SEQUENCECOMMAND SEQUENCE # 9 WALK-AROUND # 9 WALK-AROUND

PLOT PLAN PLOT PLAN

Page 28: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2828

SIZEUP REPORT OF SIZEUP REPORT OF FIREGROUND CONDITIONSFIREGROUND CONDITIONS

• Initial reportInitial reportTo be given immediately upon arrival on locationTo be given immediately upon arrival on location

• Exact location and conditions as observedExact location and conditions as observed– – Nothing showingNothing showing– – Size of structure--stories and dimensions--type of Size of structure--stories and dimensions--type of construction--occupied or vacantconstruction--occupied or vacant– – Smoke/Fire--location and densitySmoke/Fire--location and density– – Status of occupants--if knownStatus of occupants--if known– – Exposures---Sides A, B, C, D, or otherExposures---Sides A, B, C, D, or other– – Engine __ is establishing ___ Street Command.Engine __ is establishing ___ Street Command.

Page 29: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-2929

SIZEUP SIZEUP REPORT OF FIREGROUND REPORT OF FIREGROUND

CONDITIONS (cont'd)CONDITIONS (cont'd)

• Subsequent reportSubsequent reportInformation not immediately reported Information not immediately reported and/or information developed upon and/or information developed upon investigation. To be given ASAP or investigation. To be given ASAP or within 5 minutes.within 5 minutes.

• Progress reportProgress reportTo be given by the IC every 10 minutes To be given by the IC every 10 minutes until fire is under control.until fire is under control.

Page 30: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3030

COMMAND SEQUENCE COMMAND SEQUENCE WATER SUPPLY, WATER SUPPLY,

FIXED SYSTEMS, SALVAGE FIXED SYSTEMS, SALVAGE ACTION PLANACTION PLAN

Command Sequence # 9Command Sequence # 9

Page 31: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3131

Side ASide A

Walk-around700 29th

StreetCommand Sequence

# 9

13-story high- 13-story high- rise building, rise building, 75' x 75',75' x 75', fire-resistive fire-resistive construction,construction,occupied as occupied as medical medical laboratory/laboratory/offices. offices. Standpipe Standpipe connections connections located in fire located in fire towers.towers.

N

Page 32: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3232

Walk-around700 29th

StreetCommand Sequence

# 9

Side ASide A

Side BSide B

Page 33: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3333

Side BSide BWalk-around

700 29th Street

Command Sequence # 9

StandpipeStandpipeConnectionConnection

Page 34: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3434

Walk-around700 29th

StreetCommand

Sequence # 9

Side CSide C

Side BSide B

Page 35: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3535

Walk-around700 29th

StreetCommand

Sequence # 9

Side CSide C

Page 36: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3636

Side DSide DWalk-around

700 29th Street

Command Sequence # 9

Page 37: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3737

COMMAND SEQUENCE # 9COMMAND SEQUENCE # 91ST ALARM RESOURCES1ST ALARM RESOURCES

• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1

– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response

Page 38: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3838

13-story high- 13-story high- rise, 75' x 75', rise, 75' x 75', fire-resistive fire-resistive construction, construction, occupied as a occupied as a medical medical laboratory/ laboratory/ office building.office building.Heavy fire, one Heavy fire, one window, sixth window, sixth floor, Side A. floor, Side A. Medium smoke Medium smoke upper floors. upper floors. All occupants All occupants have been have been removed.removed.

Activity700 29th

StreetCommand

Sequence # 9

Side BSide B Side ASide A

StandpipeStandpipeConnectionConnection

N

Page 39: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-3939

700 29th St. Medical Laboratory Tower 13 Stories: 75' x 75'

Jon

es St.

Fire Tower

Fire Tower

Elevator

NParking Lot

Parking Lot

Side A

Side B

Side C

Side D

Standpipe Connection

700 20th St.

Sixth Floor

Page 40: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4040

WHAT IS THE SITUATION?WHAT IS THE SITUATION?(SIZEUP)(SIZEUP)

Sizeup report example: Sizeup report example: • On location at 700 29th Street, 13-story highrise On location at 700 29th Street, 13-story highrise

building 75' x 75', fire-resistive construction, building 75' x 75', fire-resistive construction, occupied as medical laboratory/office building.occupied as medical laboratory/office building.

• Heavy fire and smoke from one window, sixth Heavy fire and smoke from one window, sixth floor Side A, light to medium smoke upper floor Side A, light to medium smoke upper floors. floors.

• All occupants have been removed.All occupants have been removed.• No other immediate exposures.No other immediate exposures.• Engine 1 is establishing 29th Street command.Engine 1 is establishing 29th Street command.

Page 41: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4141

WATER SUPPLY,WATER SUPPLY,FIXED SYSTEMS,FIXED SYSTEMS,

SALVAGE SALVAGE ACTION PLANACTION PLAN

Page 42: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4242

WHAT CAN BE WHAT CAN BE ACCOMPLISHED?ACCOMPLISHED?

INCIDENT OBJECTIVESINCIDENT OBJECTIVES

Contain and control fire to room/ Contain and control fire to room/ building of origin.building of origin.

Page 43: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4343

WHAT NEEDS TO BE WHAT NEEDS TO BE DONE?DONE?

INCIDENT STRATEGY(IES)INCIDENT STRATEGY(IES)

• Exposure protectionExposure protection

• Confinement/ExtinguishmentConfinement/Extinguishment

• Special equipmentSpecial equipment

• VentilationVentilation

• SalvageSalvage

Page 44: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4444

HOW ARE YOU GOING TO DO IT?HOW ARE YOU GOING TO DO IT?INCIDENT TACTICSINCIDENT TACTICS

• Exposure protectionExposure protection– – Deploy large diameter hoseline for water supplyDeploy large diameter hoseline for water supply– – Deploy one 1-3/4-inch hoseline from seventh floor Deploy one 1-3/4-inch hoseline from seventh floor standpipe to seventh floor for exposure protectionstandpipe to seventh floor for exposure protection

• Confinement/ExtinguishmentConfinement/Extinguishment– – Deploy one 2-1/2-inch hoseline from sixth floor standpipe Deploy one 2-1/2-inch hoseline from sixth floor standpipe for confinement/extinguishmentfor confinement/extinguishment– – Deploy one 1-3/4-inch hoseline from fifth floor standpipe to Deploy one 1-3/4-inch hoseline from fifth floor standpipe to sixth floor for backup line supportsixth floor for backup line support

• Special equipmentSpecial equipment– – Stretch two 2-1/2-inch hoselines to standpipe connectionStretch two 2-1/2-inch hoselines to standpipe connection– – Deploy water-absorbent materials to reduce water damage Deploy water-absorbent materials to reduce water damage on sixth flooron sixth floor

Page 45: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4545

HOW ARE YOU GOING TO DO IT?HOW ARE YOU GOING TO DO IT?INCIDENT TACTICS (cont'd)INCIDENT TACTICS (cont'd)

• VentilationVentilation– – Vent stairwells to roof.Vent stairwells to roof.– – Horizontal cross ventilation all floorsHorizontal cross ventilation all floors

• SalvageSalvage– – Provide salvage cover protection to Provide salvage cover protection to floors and equipment below firefloors and equipment below fire– – Divert runoff water to prevent Divert runoff water to prevent contaminationcontamination

Page 46: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4646

IMPLEMENT THE WATER SUPPLY IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS SALVAGE FIXED SYSTEMS SALVAGE

ACTION PLANACTION PLAN

Communicate assignments clearly to Communicate assignments clearly to all resources operating on the all resources operating on the incident.incident.

Page 47: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4747

IMPLEMENT THE WATER IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS SUPPLY FIXED SYSTEMS

SALVAGE ACTION SALVAGE ACTION PLAN (cont'd)PLAN (cont'd)

• Evaluate progress every 10 minutes.Evaluate progress every 10 minutes.

• Obtain feedback reports from Obtain feedback reports from resources operating on the incident.resources operating on the incident.

Page 48: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4848

Side ASide B 13-story high- rise, 75' x 75', fire-resistive construction, occupied as a medical laboratory/ office building.Heavy fire, one window, sixth floor, Side A. Medium smoke upper floors. All occupants have been removed.

Activity700 29th

StreetCommand

Sequence # 9

StandpipeStandpipeConnectionConnection

Page 49: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-4949

Activity 5.2Activity 5.2Scenario 1Scenario 1

SalvageSalvage122 M Street122 M Street

Page 50: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5050

Sides A and DSide A

122 M Street

Side D

Walk-around122 M StreetActivity 5.2Scenario 1

Page 51: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5151

Side B

Walk-around122 M StreetActivity 5.2Scenario 1

Page 52: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5252

Side C Walk-around122 M StreetActivity 5.2Scenario 1

Page 53: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5353

Side CSide C

Exposure C1Exposure C1Walk-around122 M StreetActivity 5.2Scenario 1

Page 54: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5454

Side DSide D

Exposure C2Exposure C2

Walk-around122 M StreetActivity 5.2Scenario 1

Page 55: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5555

ACTIVITY 5.2 SCENARIO 1 ACTIVITY 5.2 SCENARIO 1 1ST ALARM RESOURCES1ST ALARM RESOURCES

• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1

– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response

Page 56: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5656

Heavy fire and smoke third floor, Side C. All occupants have been removed. Second-floor occupancy directly below has an expensive art collection.

Side C

Walk-around122 M StreetActivity 5.2Scenario 1

Page 57: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5757

N

Exposure C1 Exposure C2

Parking

Side A

Side B

Side C

Side D

122 M St.

Page 58: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5858

LR

BR

BR

Ba K

45'

25'

Side A

Third Floor

Side B

Side C

Side D

122 M St.

Page 59: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-5959

Activity 5.2Activity 5.2Scenario 2Scenario 2

SalvageSalvage246 10th Street246 10th Street

Page 60: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6060

Sides A and B

Side B Side A

Walk-around246 10th Street

Activity 5.2Scenario 2

Page 61: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6161

Side B

Side A

Sides A and B

Walk-around246 10th Street

Activity 5.2Scenario 2

Page 62: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6262

Side C

Walk-around246 10th Street

Activity 5.2Scenario 2

Page 63: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6363

Sides A and D

Side A

Side D

Walk-around246 10th Street

Activity 5.2Scenario 2

Page 64: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6464

ACTIVITY 5.2 SCENARIO 2 ACTIVITY 5.2 SCENARIO 2 1ST ALARM RESOURCES1ST ALARM RESOURCES

• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1

– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response

Page 65: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6565

Side B Side A

Sides A and B

246 10th Street Activity 5.1Scenario 2

Medium smoke second and third floors Side A and B. All occupants have been removed. First-floor occupancy uses various acids for mixing.

Page 66: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6666

Activity 5.2Scenario 2

246 10th Street

Heavy smoke second and third floors,Sides A and D. Medium smoke Side C.All occupants have been removed.

Sides A and D

Side A

Side D

Page 67: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6767

2-storyWarehouse

1-story 1-story

E

3-storyOffice

3-storyWarehouse

E 50'

Fire onSecondFloor

N

75'

E

Side A

Side B

Side C 246 10th St.

Side D

Page 68: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6868

Activity 5.3Activity 5.3Large Exercise 3Large Exercise 3

• Three-Story Bank/Office BuildingThree-Story Bank/Office Building• 900 16th Street900 16th Street

Page 69: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-6969

Side ASide A

Walk-aroundLarge Exercise 3900 16th Street

Three-story bank building, 125' x 175', noncombustible construction, building is sprinklered and contains standpipe connections in stairways, occupied by 250 employees.

N

Page 70: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7070

Side ASide A

Walk-aroundLarge Exercise 3900 16th Street

Page 71: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7171

Sides A and BWalk-around

Large Exercise 3900 16th Street

Side ASide A

Sprinkler/Standpipe Sprinkler/Standpipe Connection Side BConnection Side B

Side B

Page 72: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7272

Side B

Walk-aroundLarge Exercise 3900 16th Street

Page 73: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7373

Side C

Sides B and C

Walk-aroundLarge Exercise 3900 16th Street

Side B

Page 74: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7474

Side C

Walk-aroundLarge Exercise 3900 16th Street

Page 75: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7575

Side C

Walk-aroundLarge Exercise 3900 16th Street

Page 76: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7676

Side C

Sides C and D

Walk-aroundLarge Exercise 3900 16th Street

Side DSide D

Page 77: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7777

Side DSide D

Walk-aroundLarge Exercise 3900 16th Street

Page 78: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7878

Side D

Sides A and D

Side ASide A

Walk-aroundLarge Exercise 3900 16th Street

Page 79: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-7979

Side A

Side D

Sides A and D

Walk-aroundLarge Exercise 3900 16th Street

Page 80: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8080

Side A

Walk-aroundLarge Exercise 3900 16th Street

Page 81: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8181

LARGE EXERCISE 3LARGE EXERCISE 31ST ALARM RESOURCES1ST ALARM RESOURCES

• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1

– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response

Page 82: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8282

Side C Side C

Large Exercise 3Large Exercise 3900 16th Street900 16th Street

Conditions upon arrival: Friday 2 p.m. Heavy fire three windows, Conditions upon arrival: Friday 2 p.m. Heavy fire three windows, third floor, Side C. Report of occupants trapped on the third third floor, Side C. Report of occupants trapped on the third floor. Second floor is the main computer floor, National Bankfloor. Second floor is the main computer floor, National Bank ..

Page 83: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8383

3rd Floor Offset

Interior Elevator Shafts

Elevator Shafts

N

Drive-Through Teller

Parking

Parking

Sprinkler/Standpipe connection

Side A

Side B Side D

Side C

900 16th St.

Covered Truckway

Stairs Stairs

Page 84: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8484

Large Exercise 3900 16th Street

Conditions 15 minutes after arrival.

Side C

Page 85: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8585

Conditions 30 minutes after arrival.

Side C

Large Exercise 3900 16th Street

Page 86: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8686

Large Exercise 3900 16th Street

Side C

Conditions 40 minutes after arrival.

Page 87: Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8

Slide 5-Slide 5-8787

TRANSFER OF COMMAND TRANSFER OF COMMAND REPORT PROCEDUREREPORT PROCEDURE

• Location and extent of fireLocation and extent of fire

• Control effortsControl efforts

• Deployment of resourcesDeployment of resources

• Need for additional resourcesNeed for additional resources

To be delivered to the next commanding To be delivered to the next commanding officer arriving at an incidentofficer arriving at an incident