MINUTES OF THE 17 th SLCMEETING HELD ON 08/11/2017 AT 03:30 PM IN THE CONFERENCE HALL OF COMMISSIONERATE OF INDUSTRIES, CHIRAG ALI LANE, ABIDS,HYDERABAD-TELANGANA STATE The list of the Members who attended the meeting is appended. Agend a Item Brief Description of the Issue Decision of the Committee 1 Confirmation of the Minutes of the previous Meeting held on 23/10/2017. The SLC has confirmed the Minutes of the previous Meeting held on 23/10/2017. 2 Follow up action on the minutes of the previous Meeting held on 23/10/2017 Noted 3 IIPP 2005-10, IIPP 2010-15 & T–IDEA Schemes – Sanction of Investment subsidy, Reimbursement of Interest Subsidy (PavalaVaddi), Reimbursement of Sales Tax and Reimbursement of Power cost – Regarding. ***** The Verification / Scrutiny Committee of Investment Subsidy in its meeting held on 08-11-2017 has verified / Scrutinized (04) claim applications of Investment Subsidy, (14) claim applications of reimbursement of PavalaVaddi, (17*) claim applications of reimbursement of Sales Tax, and (19) claim applications of reimbursement of power cost as per the Guidelines under respective schemes and recommended for sanction of eligible Incentives / Concessions The SLC has examined therecommendations of the Verification /Scrutiny Committee and decided to sanction eligible incentives / concessions to the industrial units as mentioned below under various schemes: 1. Investment Subsidy: Sanctioned investment subsidy to (04) units under IIPP 2010-15 /T-IDEA Schemes and the list is appended as Annexure I 2. Reimbursement Interest Subsidy (PAVALA VADDI SCHEME)sanctioned to (14)

Upload: others

Post on 14-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

MINUTES OF THE 17 th SLCMEETING HELD ON 08/11/2017 AT 03:30 PM IN THE CONFERENCE HALL OF COMMISSIONERATE OF INDUSTRIES,

CHIRAG ALI LANE, ABIDS,HYDERABAD-TELANGANA STATE

The list of the Members who attended the meeting is appended.

Agenda

ItemBrief Description of the Issue Decision of the Committee

1 Confirmation of the Minutes of the previous Meeting held on 23/10/2017.

The SLC has confirmed the Minutes of the previous Meeting held on 23/10/2017.

2 Follow up action on the minutes of the previous Meeting held on 23/10/2017

Noted

3 IIPP 2005-10, IIPP 2010-15 & T–IDEA Schemes – Sanction of Investment subsidy, Reimbursement of Interest Subsidy (PavalaVaddi), Reimbursement of Sales Tax and Reimbursement of Power cost – Regarding.

*****

The Verification / Scrutiny Committee of Investment Subsidy in its meeting held on 08-11-2017 has verified / Scrutinized (04) claim applications of Investment Subsidy, (14) claim applications of reimbursement of PavalaVaddi, (17*) claim applications of reimbursement of Sales Tax, and (19) claim applications of reimbursement of power cost as per the Guidelines under respective schemes and recommended for sanction of eligible Incentives / Concessions to the units. The Minutes of Verification / Scrutiny Committee of Investment Subsidy and Sales Tax are appended as Annexure –I, II, III

ABSTRACT

S No General Incentives No of

units

Amount (in Rupees )

1 A Investment subsidy 04 9994560

The SLC has examined therecommendations of the Verification /Scrutiny Committee and decided to

sanction eligible incentives /concessions to the industrial units as mentioned below under various schemes:

1. Investment Subsidy: Sanctioned investment subsidy to (04) units under IIPP 2010-15 /T-IDEA Schemes and the list is appended as Annexure – I

2. Reimbursement Interest Subsidy (PAVALA VADDI SCHEME)sanctioned to (14) units under IIPP 2010-15 /T-IDEA Schemes and the list is appended as Annexure – II.

3. Reimbursement of Sales Tax Sanctioned reimbursement of Sales Tax to (17) units IIPP

Page 2: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 2 ::

  B Stamp Duty 0 0  C Mortgage

Duty 0 0  D Land Cost 0 0  E Land

Conversion Charges

0 0

  F Sales Tax 17* 35029123  Total 4 4

Or Say Rs. 4.50 Cr2 PavalaVaddi 14 4368782

 Total 14 4368782  Or say Rs. 0.43 Cr

3 Reimbursement of Power Cost

19 4580682

Total 19 4580682  Or say Rs. 0.45 Cr

  Grand Total 54 53973147

Or say Rs. 5.39 Cr

The Verification / Scrutiny Committee of Investment Subsidy and Sales Tax have recommended for sanction of eligible Incentives/concessions to the units as mentioned below.(*SVC recommended cases at Sl.No.6, 7 and 15 of Sales Tax reimbursement to place in SLC subject to confirmation of CT Dept.)

I.A INVESTMENT SUBSIDY (ONLINE)

S. No.

Apprisal No. of SVC Meeting

Name & Address of the Unit

Scheme

Date of Receipt

Recommended Amount

Financial Institution

1 1 M/s. Sri Lakshmi Plastic, Plot No. 21/B, Cherlapally, Ghatkesar (M), Medchal-Malkajgiri District

T-IDEA 14/09/2017

Rs. 30,00,000/- (Rupees Thirty Lakhs Only)

The Cosmo Co-op Bank Limited, Nacharam

2 3 M/s. SVG Industries, Sy.No. 40, Khazipur (V), Karimna

T-IDEA 18/09/2017

Rs. 30,00,000/- (Rupees Thirty Lakhs Only)

State Bank of India, KIMS, Branch,

2010-15 /T-IDEA Schemes. The list is appended as Annexure – III.

*Sanction of Sales Tax Reimbursment to the units at Sl.No. 6, 7 and 15 of Annexure-III is subject to confirmation of the details of the Form-A by the CT department.

4. Reimbursement of Power cost: Sanctioned the reimbursement of power cost to (19) units under IIPP2010-15 /T-IDEA Schemesand the list is appended as Annexure – IV.

Page 3: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 3 ::gar (M) , Karimnagar District

Karimnagar

3 2 M/s.SaiSharanam Industries, Sy.No. 23/A, Khaazipur (V), Karimnagar (M), Karimnagar District

T-IDEA 24/10/2017

Rs. 20,00,000/- (Rupees Twenty Lakhs Only)

Indian Bank, Asif Nagar, Branch Karimnagar

4 4 M/s.Shri Himalaya Granites, Sy.No. 35/E & 36/A, Kamanpur (v), Karimnagar (V), Karimnagar (M), & District

T-IDEA 02/11/2017

Rs. 19,94,560/- (Rupees Nineteen Lakhs Ninety Four Thousand Five Hundred and Sixty Only)

Karnataka Bank Ltd, Karimnagar Branch

B. SANCTION OF REIMBURSEMENT OF PAVALA VADDI

(ONLINE PAVALA VADDI)

S. No.

Apprisal No. of SVC Meeting

Name & Address of the Unit

Scheme

Date of Receipt

Recommended Amount

1 9 M/s R.B. Industries, Sy.No. 5, Jaithpur, Wankidi, Kumurambhee, Asifabad District

T-IDEA 22/09/2017 Rs. 1,71,700/- (Rupees One Lakh Seventy One Thousand and Seven Hundred Only)

2 1 M/s. Ramalingeshwara Cotton Industries, Sy. No. 315/B, 312/A & 312A/3, Musthyala(V), Cherial(M), Siddipet District

IIPP 2010-15

 05/10/2017 Rs. 6,60,711/- (Rupees Six Lakhs Sixty Thousand Seven Hundred and Eleven Only)

3 6 M/s Suvarna Granites, Sy.No. 49/B, Khazipur (V), Karimnagar (M), Karimnagar district

IIPP 2010-15

09/10/2017 Rs. 99,389/- (Rupees Ninety Nine Thousand Three Hundred and Eighty Nine Only)

4 7 M/s S.V. Industries, Sy.No. 320, Asifnagar, Karimnagar (M) & District

IIPP 2010-15

10/10/2017 Rs. 2,21,455/- (Rupees Two Lakhs Twenty One Thousand Four Hundred and Fifty Five Only)

5 11 M/s. Govind Industries, Sy.No. 160, Handekelur (V), Madnoor (m), Kamareddy Dist.

IIPP 2010-15

11/10/2017 Rs. 4,26,020/- (Rupees Four Lakhs Twenty Six Thousand Twenty Only)

Page 4: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 4 ::6 2 M/s. SRG

Industries, Plot No. 17/A, IDA, Bhongir(V&M), Nalgonda District

IIPP 2010-15

 20/10/2017 Rs. 0/- (Rupees Zero Only)

7 14 M/s M.B. Industries, Sy. No. 358 & 359, Gundaram, Nizamabad Dist.

IIPP 2010-15

23/10/2017 Rs. 87,510/- (Rupees Eighty Seven Thousand Five Hundred and Ten Only)

8 3 M/s. SaiCharita Paper Products, Plot No. P-11/5A, Road No. 8, IDA, Nacharam, Uppal (M), Medchal-Malkajgiri District

T-IDEA 25/10/2017 Rs. 2,24,730/- (Rupees Two Lakhs Twenty Four Thousand Seven Hundred and Thirty Only)

9 4 M/s. Sri Sai Plastics, Plot No. 4B, Extension, Phase-II, IDA, Cherlapally (V), Kapra (M), Medchal-Malkajgiri District

IIPP 2010-15

25/10/2017 Rs. 81,500/- (Rupees Eighty One Thousand and Five Hundred Only)

10 5 M/s. Ganesh Rig Industries, Unit-II, Plot No. 19/B, Phase-V, IDA, Cherlapally, Kapra (M), Medchal-Malkajgiri District

IIPP 2010-15

25/10/2017 Rs. 31,198/- (Rupees Thirty One Thousand One Hundred and Ninety Eight Only)

11 10 M/s Darshan Cotton Industries, Sy.No. 213, Nirmal Road, Bhainsa (V&M), Nirmal, District

IIPP 2010-15

26/10/2017 Rs. 1,36,375/- (Rupees One Lakh Thirty Six Thousand Three Hundred and Seventy Five Only)

12 12 M/s. K.S. Cold Storage, Sy.No: Munipally (V), Jakranapally (M), Nizamabad Dist.

IIPP 2010-15

27/10/2017 Rs. 10,44,314/- (Rupees Ten Lakhs Forty Four Thousand Three Hundred and Fourteen Only)

13 13 M/s. S.L.N.S. Cold Storage, Sy.No: 180, Munpally (V), Jakranapally (M), Nizamabad Dist.

IIPP 2010-15

27/10/2017 Rs. 10,68,570/- (Rupees Ten Lakhs Sixty Eight Thousand Five Hundred and Seventy Only)

14 8 M/s Abhaya Granites, Sy.No. 78/a, B, C, D, Elgandal, (V), Karimnagar (M) and District

IIPP 2010-15

06/11/2017 Rs. 1,15,310/- (Rupees One Lakh Fifteen Thousand Three Hundred and Ten Only)

C. SANCTION OF REIMBURSEMENT OF 25% & 50 & 75% &100%SALES TAX

(*SVC recommended Sl.No.6, 7 and 15 to place in SLC subject to confirmation of CT Dept.)

(ON LINE SALES TAX)

Page 5: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 5 ::

S. No.

Apprisal No. of SVC Meeting

Name & Address of the Unit

Scheme

Date of Receipt

Recommended Amount

1 5 M/s. Maruti Industries, Sy.No. 136,137,138, Agnoor(v), Yelal(M), Vikarabad District

IIPP 2010-15

03/10/2017

Rs. 37,06,042/- (Rupees Thirty Seven Lakhs Six Thousand Forty Two Only)

2 1 M/s. Ramalingeshwara Cotton Industries, Sy. No. 315/B, 312/A & 312A/3, Musthyala(V), Cherial(M), Siddipet District

IIPP 2010-15

 05/10/2017

Rs. 34,58,686/- (Rupees Thirty Four Lakhs Fifty Eight Thousand Six Hundred and Eighty Six Only)

3 2 M/s. Surya Rice Industries, Sy. No. 312/3/A, 312/3/Aa, 313, Yadgarpalle, Miryalguda, Nalgonda District

IIPP 2010-15

 10/10/2017

Rs. 44,34,310/- (Rupees Forty Four Lakhs Thirty Four Thousand Three Hundred and Ten Only)

4 6 M/s. Amritha Tool Crafts Private Limited, Plot No. 195/6, Cherlapally, Ghatkesar (M), Medchal-Malkajgiri District

IIPP 2010-15

11/10/2017

Rs. 5,01,319/- (Rupees Five Lakhs One Thousand Three Hundred and Nineteen Only)

5 9 M/s. Unikon Paints Private Limited, Plot No. 8/1/B, Road No.9, IDA, Nacharam, Uppal (M), Medchal-Malkajgiri District

T-IDEA 11/10/2017

Rs. 5,91,690/- (Rupees Five Lakhs Ninety One Thousand Six Hundred and Ninety Only)

6 14 M/s. Sri Naarsimha Industries, Sy.No. 21, Shakkarga Road, Madnoor (V&M), Kamareddy District

IIPP 2010-15

11/10/2017

Rs. 9,97,350/- (Rupees Nine Lakhs Ninety Seven Thousand Three Hundred and Fifty Only)

7 16 M/s. Govind Industries, Sy.No. 160, Handekelur (V), Madnoor (m), Kamareddy Dist.

IIPP 2010-15

11/10/2017

Rs. 35,26,720/- (Rupees Thirty Five Lakhs Twenty Six Thousand Seven Hundred and Twenty Only)

8 17 M/s. Mangilal Gilda Industries, Sy. No. 182/1, Anantharam(V), Mahabubabad(M), Mahabubabad District

IIPP 2010-15

 16/10/2017

Rs. 4,89,605/- (Rupees Four Lakhs Eighty Nine Thousand Six Hundred and Five Only)

9 3 M/s. Jhawar Brothers, Sy.No. 26, Ghanpur (V), Medchal (M), Medchal-Malkajgiri District

T-IDEA 21/10/2017

Rs. 5,44,180/- (Rupees Five Lakhs Forty Four Thousand One Hundred and Eighty Only)

10 4 M/s. Premier Oxygen, Plot No. 6 & 7, SVCIE,

IIPP 2010-15

23/10/2017

Rs. 1,39,407/- (Rupees One Lakh Thirty Nine

Page 6: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 6 ::Balanagar (M), Medchal-Malkajgiri District

Thousand Four Hundred and Seven Only)

11 8 M/s. LorvenSai Engineers, Plot No. 36, Part, Road No. 15, Ph-I, IDA, Jeedimetla, Quthbullapur (M), Medchal-Malkajgiri District

T-IDEA 23/10/2017

Rs. 4,63,891/- (Rupees Four Lakhs Sixty Three Thousand Eight Hundred and Ninety One Only)

12 7 M/s. Ultrafil Air Systems (India) Private Limited, Plot No. 10/11, Road No. 5, IDA, Nacharam, Uppal (M), Medchal –Malkajgiri District

IIPP 2010-15

24/10/2017

Rs. 13,61,896/- (Rupees Thirteen Lakhs Sixty One Thousand Eight Hundred and Ninety Six Only)

13 10 M/s. Premier Oxygen, Plot No. 6 & 7, SVCIE, Balanagar (M), Medchal-Malkajgiri District

IIPP 2010-15

26/10/2017

Rs. 2,68,325/- (Rupees Two Lakhs Sixty Eight Thousand Three Hundred and Twenty Five Only)

14 11 M/s Darshan Cotton Industries, Sy.No. 213, Nirmal Road, Bhainsa (V&M), Nirmal, District

IIPP 2010-15

26/10/2017

Rs. 20,85,720/- (Rupees Twenty Lakhs Eighty Five Thousand Seven Hundred and Twenty Only)

15 15 M/s M.B. Industries, Sy. No. 358 & 359, Gundaram, Nizamabad Dist.

IIPP 2010-15

02/11/2017

Rs. 13,51,478/- (Rupees Thirteen Lakhs Fifty One Thousand Four Hundred and Seventy Eight Only)

16 12 M/s SaiDatta Ginning & Pressing Factory, Sainagar Main Road, Boath (Village &Mandal), Adilabd District

IIPP 2010-15

03/11/2017

Rs. 50,36,888/- (Rupees Fifty Lakhs Thirty Six Thousand Eight Hundred and Eighty Eight Only)

17 13 M/s Raghavendra Ginning & Pressing Factory, Sy.No. 163, Main Road, Boath (v&M), Adilabad District

IIPP 2010-15

03/11/2017

Rs. 60,71,616/- (Rupees Sixty Lakhs Seventy One Thousand Six Hundred and Sixteen Only)

REIMBURSEMENT OF POWER COST:

The Verification / Scrutiny Committee of Reimbursement of Power cost in its meeting held on 08/11/2017scrutinized claim applications of Reimbursement of Power cost (19 ) cases under IIPP - 2005 -10, IIPP 2010-15& T-IDEA.

The Verification / Scrutiny Committee of Reimbursement of Power cost has recommended for sanction of

Page 7: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 7 ::

Reimbursement of Power cost to the units. The Minutes of Verification / Scrutiny Committee of Reimbursement of Power cost is appended Annexure – III. The Verification / Scrutiny Committee of Reimbursement of Power cost has recommended for sanction of Reimbursement of Power cost to the units as mentioned below:

IIPP 2005-10, 2010-15& T-IDEA

(ONLINE POWER COST)

S. No.

Apprisal No. of SVC Meeting

Name & Address of the Unit

Scheme

DOR Receipt

Recommended Amount

1 13 M/s R.B. Industries, Sy.No. 5, Jaithpur, Wankidi, Kumurambhee, Asifabad District

T-IDEA 22/09/2017 Rs. 24,260/- (Rupees Twenty Four Thousand Two Hundred and Sixty Only)

2 3 M/s. Ramalingeshwara Cotton Industries, Sy. No. 315/B, 312/A & 312A/3, Musthyala(V), Cherial(M), Siddipet District

IIPP 2010-15

 05/10/2017 Rs. 1,64,412/- (Rupees One Lakh Sixty Four Thousand Four Hundred and Twelve Only)

3 9 M/s Suvarna Granites, Sy.No. 49/B, Khazipur (V), Karimnagar (M), Karimnagar District

IIPP 2010-15

06/10/2017 Rs. 1,68,830/- (Rupees One Lakh Sixty Eight Thousand Eight Hundred and Thirty Only)

4 20 M/s. Govind Industries, Sy.No. 160, Handekelur (V), Madnoor (m), Kamareddy Dist.

IIPP 2010-15

11/10/2017 Rs. 1,26,470/- (Rupees One Lakh Twenty Six Thousand Four Hundred and Seventy Only)

5 19 M/s. Sri Satyanarayana Swamy Cotex, 221/C2, 272, 272/A1, Gorrekunta(V), Geesugonda(M), Warangal Rural District.

T-IDEA 16/10/2017 Rs. 2,30,070/- (Rupees Two Lakhs Thirty Thousand and Seventy Only)

6 5 M/s. Nosch Labs Pvt. Ltd., Sy. No. 332, 333 and 335 Velimenedur(V), Chityal(M), Nalgonda District

IIPP 2010-15

 20/10/2017 Rs. 6,53,430/- (Rupees Six Lakhs Fifty Three Thousand Four Hundred and Thirty Only)

7 6 M/s. Surya Rice Industries, Sy. No. 312/3/A, 312/3/Aa, 313, Yadgarpalle, Miryalguda, Nalgonda District

IIPP 2010-15

 20/10/2017 Rs. 17,23,170/- (Rupees Seventeen Lakhs Twenty Three Thousand One

Page 8: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 8 ::Hundred Seventy Only)

8 8 M/s. Jhawar Brothers, Sy.No. 26, Ghanpur (V), Medchal (M), Medchal-Malkajgiri District

T-IDEA 21/10/2017 Rs. 49,920/- (Rupees Forty Nine Thousand Nine Hundred Twenty Only)

9 1 M/s. Sairam Food Grade Packaging Industries, Plot No. 43/D, IDA, Phase -V, Patancheru(V&M), Sanga Reddy District

IIPP 2010-15

 23/10/2017 Rs. 2,46,310/- (Rupees Two Lakhs Forty Six Thousand Three Hundred and Ten Only)

10 10 M/s Abhaya Enterprises, Sy.No. 303 & 304, Asifnagar (V), Karimnagar (M), Karimnagar District

T-IDEA 24/10/2017 Rs. 1,10,750/- (Rupees One Lakh Ten Thousand Seven Hundred and Fifty Only)

11 7 M/s. Sri Sai Plastics, Plot No. 4B, Extension, Phase-II, IDA, Cherlapally (V), Kapra (M), Medchal-Malkajgiri District

IIPP 2010-15

25/10/2017 Rs. 89,690/- (Rupees Eighty Nine Thousand Six Hundred and Ninety Only)

12 14 M/s Darshan Cotton Industries, Sy.No. 213, Nirmal Road, Bhainsa (V&M), Nirmal, District

IIPP 2010-15

26/10/2017 Rs. 91,700/- (Rupees Ninety One Thousand Seven Hundred and Only)

13 15 M/s. S.L.N.S. Cold Storage, Sy.No: 180, Munpally (V), Jakranapally (M), Nizamabad Dist.

IIPP-2010-15

27/10/2017 Rs. 96,410/- (Rupees Ninety Six Thousand Four Hundred and Ten Only)

14 16 M/s. K.S. Cold Storage, Sy.No: Munipally (V), Jakranapally (M), Nizamabad Dist.

IIPP 2010-15

27/10/2017 Rs. 1,00,760/- (Rupees One Lakh Seven Hundred and Sixty Only)

15 2 M/s. Sairam Food Grade Packaging Industries, Plot No. 43/D, IDA, Phase -V, Patancheru(V&M), Sanga Reddy District

IIPP 2010-15

 30/10/2017 Rs. 2,44,870/- (Rupees Two Lakhs Forty Four Thousand Eight Hundred and Seventy Only)

16 17 M/s. M.B. Industries, Sy. No. 358 & 359, Gundaram, Nizamabad Dist.

IIPP 2010-15

02/11/2017 Rs. 16,930/- (Rupees Sixteen Thousand Nine Hundred Thirty Only)

17 11 M/s Abhaya Granites, Sy.No. 78/A & 78/C, Elegandla (V), Karimnagar (M), Karimnagar District

IIPP 2010-15

03/11/2017 Rs. 1,60,880/- (Rupees One Lakh Sixty Thousand Eight Hundred and Eighty Only)

18 12 M/s Hari Hara Granites, Sy.No. 78/A, B,C,D, Elegandla (V), Karimnagar (M), Karimnagar

IIPP 2010-15

03/11/2017 Rs. 2,55,150/- (Rupees Two Lakhs Fifty Five Thousand One Hundred

Page 9: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 9 ::District and Fifty

Only)19 18 M/s. Sri Sai

Polymers, Sy.No. 186 & 186/1, (V), Dichpally (M), Nizamabad Dist.

T-IDEA 03/11/2017 Rs. 26,670/- (Rupees Twenty Six Thousand Six Hundred and Seventy Only)

The SLC may sanction the above amounts to the units as incentives under IIPP 2005-10, IIPP 10-15& T-IDEA Scheme.

3A SCSP / PHC / TSP under IIPP 2010-15 & T-PRIDE schemes –Sanction of Investment Subsidy& Pavala vaddi - Regarding.

*********The Verification / Scrutiny

Committee of Investment Subsidy in its 17thmeeting held on Dated: 08-11-2017has Verified / Scrutinized SCP – 30 Nos (Online), TSP – 13 Nos (Online) and PHC – 01 Nos (Online) = Total - 44 claim applications of Investment Subsidy, (07) claim applications of Pavala Vaddi SCP – 04 Nos (Online), TSP – 03 Nos (Online), (01) claim applications of Sales Tax TSP – 01 Nos (Online) and (02) claim applications of Power Cost SCP – 01 Nos (Online) & TSP – 01 Nos (Online)under respective schemes and recommended for sanction of eligible Incentives / Concessions to the units. The Minutes of Verification / Scrutiny Committee of Investment Subsidies is appended as Annexure-I. The details are as follows:

A). Incentives SCSP TSP PHC

Sl. No.

Type of Incentive

No.

of Cases

Amount in Rs.

No.

of Cases

Amount in Rs.

No.

of Cases

Amount in Rs.

1 Investment Subsidy

30 47676330

13 14515520

01 776880

2 Reimbursement of Sales of Sales Tax

0 0 01 1098000 0 0

  TOTAL: 30 47676330

14 15613520

01 776880

B). Reimbursement of Pavala Vaddi

SCSP TSPPHC

Sl.No.

Type of Incentive

No. of Cases

Amount in Rs.

No.of

Cases

Amount in

Rs.

No.of

Cases

Amount in Rs.

1 PavalaVaddi 04 19976

10 03 753933 0 0

  TOTAL: 04 1997610 03 7539

330 0

The SLC has examined the recommendations of the Verification / Scrutiny committed and decided to sanction eligible incentives / concessions to the industrial units as mentioned below under various schemes:

1. Investment Subsidy: Sanctioned investment subsidy to (SCP - 30, ST- 13& PHC - 01) units to SCSP / TSP/PHC under IIPP 2010-15 & T-PRIDE and the list is appended as Annexure – SC - V, ST- VI, PH-VII.

2. PavalaVaddi: Sanctioned interest subsidy under Pavala Vaddi to (SC-04and ST- 03) units to SCSP/TSP under IIPP 2010-15 & T-PRIDE and the list is appended as Annexure – SC-VIII, ST-IX

3. Reimbursement of Sales Tax Sanctioned reimbursement of Sales Tax to (ST - 1) units to TSP under IIPP 2010-15& T-PRIDE. The list is

Page 10: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 10 ::

C). Power SCSP TSP PHC

Sl. No.

Type of Incentive

No.of

Cases

Amount in Rs.

No.of

Cases

Amount in

Rs.

No.of

Cases

Amount in Rs.

1 Reimbursement of Power Cost

01 105200

01 85008

0 0

  TOTAL: 01 105200

01 85008

0 0

A B S T R A C T ( SCP,TSP&PHC)(Rs. In Crores)

A) Incentives (Investment Subsidy, Stamp Duty , Sales Tax& BIS/ISO)

45 6.40

B) PavalaVaddi 07 0.27

C) Reimbursement of Power Cost 02 0.01

  GRAND TOTAL: 54 6.686.68

I. INVESTMENT SUBSIDY – SCP (ONLINE)

Sl.No.

Name and Address of the unit

Date of receipt of claim

Caste

Scheme

Recommended Amount

Financing Institution

1 M/s Sri Tirumala Earth Movers, H.No. 4-36/3, Kadili (V), Dilawarpur (M), Nirmal

21/10/2017

SC (W)

T-PRIDE

Rs. 11,91,150/- (Rupees Eleven Lakhs Ninety One Thousand One Hundred and Fifty only)

Indus Ind Bank, Nizamabad

2 M/s GangadharJadi, H.No. 4-42, Thimmapur (V), Jannaram (M), Mancherial

21/10/2017

SC T-PRIDE

Rs. 6,01,120/- (Rupees Six Lakhs One Thousand One Hundred and Twenty only)

The South India Bank Ltd., Mancherial

3 M/s Prashanthi Travels, H.No. 2-6-5, Hanamkonda, Warangal Urban

23/10/2017

SC T-PRIDE

Rs. 2,37,360/- (Rupees Two Lakhs Thirty Seven Thousand Three Hundred Sixty only)

Canara Bank, Madikonda

4 M/s AnguriJanardhan, H.No. 7-79/A, Konaraopet (V &M), RajannaSircilla

24/10/2017

SC T-PRIDE

Rs. 5,90,160/- (Rupees Five Lakhs Ninety Thousand One Hundred and Sixty only)

The Kotak Mahindra Bank Ltd., Karimnagar

5 M/s SingadhasariSwathi, H.No. 15-15/63, Serilingampally, Rangareddy

24/10/2017

SC (W)

T-PRIDE

Rs. 7,78,720/- (Rupees Seven Lakhs Seventy Eight Thousand Seven Hundred Twenty only)

The KarurVysya Bank Ltd., Serilingampally

6 M/s GummadiManohar, H.No. 5-88, Mamidipalle, Konaraopeta, RajannaSircilla

24/10/2017

SC T-PRIDE

Rs. 5,90,160/- (Rupees Five Lakhs Ninety Thousand One Hundred and Sixty

HDFC Bank Ltd., Karimnagar

appended asAnnexure – X.

4.Reimbursement of Power Cost: Sanctioned reimbursement of Power Cost to (SC – 01, ST – 01)units to SCSP/TSP under IIPP 2010-15 & T-PRIDE and the list is appended as Annexure – XI& XII.

Page 11: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 11 ::only)

7 M/s Ganga Bhavani Enterprises, H.No.5-25/1, Veenavanka, Karimnagar

24/10/2017

SC (W)

T-PRIDE

Rs. 25,56,000/- (Rupees Twenty Five Lakhs Fifty Six Thousand only)

State Bank of India, Veenavanka

8 M/s Indira Ramachanrapu, H.No. 2-43, Nereducherla, Suryapet

24/10/2017

SC (W)

T-PRIDE

Rs. 11,67,830/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred Thirty only)

Indus Ind Bank, Miryalaguda

9 M/s Bhanu Earth Movers, H.No. 8-98, Cherla (Z), Cherla, BhadradriKothagudem

24/10/2017

SC T-PRIDE

Rs. 9,32,180/- (Rupees Nine Lakhs Thirty Two Thousand One Hundred and Eighty only)

Andhra Bank, Bhadrachalam

10 M/s Pole Anitha, H.No. 2-139, Kalwakuthy, Kalwakurthy, Nagarkurnool

26/10/2017

SC (W)

T-PRIDE

Rs. 26,10,000/- (Rupees Twenty Six Lakhs Ten Thousand only)

Indus Ind Bank Ltd., Secunderabad

11 M/s RyakamKanthaiah, H.No. 1-20, Chittapur, Dubbak, Siddipet

27/10/2017

SC T-PRIDE

Rs. 5,08,890/- (Rupees Five Lakhs Eight Thousand Eight Hundered Ninety only)

Indus Ind Bank Ltd., Secunderabad

12 M/s RajuGorantla, H.No. 2-14, Perur, Devarakadra (M), Mahabubnagar

28/10/2017

SC T-PRIDE

Rs. 11,19,220/- (Rupees Eleven Lakhs Nineteen Thousand Two Hundred Twenty only)

Shri Ram Commercial Vehicle Finance

13 M/s DurgamRajeshwari, H.No. 1-51, Kothapet, Velgatoor, Jagtial

28/10/2017

SC (W)

T-PRIDE

Rs. 7,56,970/- (Rupees Seven Lakhs Fifty Six Thousand Nine Hundred Seventy only)

Kotak Mahindra Bank Ltd., Karimnagar

14 M/s Yamini Earth Movers, H.No. 6-86, Mamnoor, Khila Warangal, Warangal Urban

30/10/2017

SC (W)

T-PRIDE

Rs. 18,87,230/- (Rupees Eighteen Lakhs Eighty Seven Thousand Two Hundred Thirty only)

Indian Overseas Bank, Shayampet Br

15 M/s Sai Earth Movers, H.No. 9-168, Kalluru (V), Kallur (M), Khammam

31/10/2017

SC (W)

T-PRIDE

Rs. 70,18,770/- (Rupees Seventy Lakhs Eighteen Thousand Seven Hundred Seventy only)

Andhra Bank, Kavirajnagar Br

16 M/s Manikya Travels, H.No. 57-6-116, Rampur (V), Kazipet (M), Warangal Urban

31/10/2017

SC (W)

T-PRIDE

Rs. 3,41,110/- (Rupees Three Lakhs Forty One Thousand One Hundred and Ten only)

Canara Bank, Madikonda

Page 12: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 12 ::17 M/s

GainiBhudevi, H.No. 1-24, Sanjivaraopet, Narayankhed, Sangareddy

31/10/2017

SC (W)

T-PRIDE

Rs. 11,67,810/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred and Ten only)

Indus Ind Bank Ltd., Secunderabad

18 M/s GouniRaju-Tata Hitachi, H.No. 1-71, Dharmapur, Raikode (M), Sangareddy

31/10/2017

SC T-PRIDE

Rs.24,30,400/- (Rupees Twenty Four Lakhs Thirty Thousand Four Hundred only)

ICICI Bank Ltd.,

19 M/s SujathaKodapaka, H.No. 5-17/A, Chandraiahpally, Bhanjipet, Narsampet, Warangal Rural

31/10/2017

SC (W)

T-PRIDE

Rs. 11,13,750/- (Rupees Eleven Lakhs Thirteen Thousand Seven Hundred and Fifty only)

Indus Ind Bank Ltd., Secunderabad

20 M/s Rani Travels, 25-6-221, Vidyanagar, Kazipet (M), Warangal Uraban

01/11/2017

SC (W)

T-PRIDE

Rs. 5,40,940/- (Rupees Five Lakhs Forty Thousand Nine Hundred Forty only)

Karnataka Bank Ltd., Warangal

21 Pothuganti Moulali, H.No. 1-47, Dagadapalle, Veepangandla (M), Wanaparthy

02/11/2017

SC T-PRIDE

Rs. 9,42,850/- (Rupees Nine Lakhs Forty Two Thousand Eight Hundred and Fifty only)

HDFC Bank Ltd., Ameerpet

22 Radharapu Nagajyothi, H.No. 5-40, Penchikalpet, Atmakur (M), Warangal Rural

02/11/2017

SC (W)

T-PRIDE

Rs. 46,89,820/- (Rupees Forty Six Lakhs Eighty Nine Thousand Eight Hundred Twenty only)

Indus Ind Bank Ltd., Secunderabad

23 Middhe Shymala, H.No. 5-34, Chinnagundavelly, Siddipet (M), Siddipet

02/11/2017

SC (W)

T-PRIDE

Rs. 11,67,830/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred Thirty only)

Indus Ind Bank Ltd., Secunderabad

24 Madimadugu Chendrakala, H.No. 8-1-1/1, Padmanagar Colony, Near Pochamma Devalayam, Karmanghat, Saroornagar (M), Rangareddy

02/11/2017

SC (W)

T-PRIDE

Rs. 6,87,240/- (Rupees Six Lakhs Eighty Seven Thousand Two Hundred and Forty only)

Andhra Bank, Nadergul Branch

25 M/s Laxmi Earth Movers, H.No. 5-39, Chekkapalli (V), Vemulawada Rural (M), RajannaSircilla

03/11/2017

SC (W)

T-PRIDE

Rs. 11,67,750/- (Rupees Eleven Lakhs Sixty Seven Thousand Seven Hundred and Fifty only)

Andhra Bank, Vemulawada

26 BhagyammaPulla, 5-25, Chinnagattu,

03/11/2017

SC (W)

T-PRIDE

Rs. 57,89,750/- (Rupees

ICICI Bank Ltd.,

Page 13: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 13 ::Hasanparthy (M), Warangal Urban

Fifty Seven Lakhs Eighty Nine Thousand Seven Hundred and Fifty only)

Warangal

27 Ananthamma Buggula, H.No. 3-99, Kalwal, Narva (M), Mahabubnagar

03/11/2017

SC (W)

T-PRIDE

Rs. 7,83,450/- (Rupees Seven Lakhs Eighty Three Thousand Four Hundred and Fifty only)

ICICI Bank, Mahabubnagar

28 Laxmi Kannamalla, H.No. 12-62, Choppadandi, Choppadandi (M), Karimnagar

03/11/2017

SC (W)

T-PRIDE

Rs. 14,67,930/- (Rupees Fourteen Lakhs Sixty Seven Thousand Nine Hundred Thirty only)

Punjab National Bank, Karimnagar

29 Vijaya Valuri, H.No. 14-134, Choppadandi, Choppadandi (M), Karimnagar

03/11/2017

SC (W)

T-PRIDE

Rs. 14,67,930/- (Rupees Fourteen Lakhs Sixty Seven Thousand Nine Hundred Thirty only)

Punjab National Bank, Karimnagar

30 Beulah Constructions, H.No. 3-68/D, Ballepally (V), Khammam Urban (M), Khammam

06/11/2017

SC (W)

T-PRIDE

Rs. 13,72,010/- (Rupees Thirteen Lakhs Seventy Two Thousand and Ten only)

HDFC Bank Ltd., Ameerpet

II. INVESTMENT SUBSIDY – TSP (ONLINE)

S. No.

Name & Address of the Unit

Date of Receipt

Caste

Scheme

Recommended Amount

Financial Institution

1 M/s Yerukali Anjaneyulu, C-42/8-27, Gadwal (V&M), Gadwal District

05/10/2017

ST T-PRIDE

Rs 5,95,320/- (Rupees Five Lakhs Ninety Five Thousand Three Hundred and Twenty Only

Indusind Bank, Secunderabad

2 M/s Banothu Kalpana, H. No. 6-13, Bandarupalle (V), Mulugu (M), Jayashankar Bhupalpally District

09/10/2017

ST (W)

T-PRIDE

Rs 13,00,030/- (Rupees Thirteen Lakhs and Thirty Only)

Indusind Bank, Warangal

3 M/s E.V. Naik Borewells, 3-77, Cherla Gouraram (V), Kangal (M), Nalgonda District

09/10/2017

ST T-PRIDE

Rs 35,77,620/- (Rupees Thirty Five Lakhs Seventy Seven Thousand Six Hundred Twenty Only)

Indian Overseas Bank, Lakdikapur Br.

4 M/s Lavudya Rajitha, H. No. 2-99/1, Husnabad (V&M), Siddipet District

16/10/2017

ST (W)

T-PRIDE

Rs 7,56,970/- (Rupees Seven Lakhs Fifty Six Thousand Nine Hundred and Seventy Only)

Kotak Mahindra Bank Ltd., Karimnagar Br.

5 M/s Jadav 21/10/201 ST T- Rs Syndica

Page 14: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 14 ::Kasinath, H. No. 6-67, Huggeli (V), Zaheerabad (M), Sanga Reddy District

7 PRIDE

4,72,540/- (Rupees Four Lakhs Seventy Two Thousand Five Hundred and Forty Only)

te Bank, Zaheerabad Br.

6 M/s Masru Pathuloth, H. No. 1-50, Bandalemoor, Manchal Mandal, Ranga Reddy District

26/10/2017

ST (W)

T-PRIDE

Rs 12,07,730/- (Rupees Twelve Lakhs Seven Thousand Seven Hundred Thirty Only)

HDFC Bank Ltd., Ameerpet

7 M/s Sharadha Kethavath, H. No. 8-81, Kadthal (V&m), Ranga Reddy

26/10/2017

ST (W)

T-PRIDE

Rs 9,08,310/- (Rupees Nine Lakhs Eight Thousand Three Hundred and Ten Only)

Andhra Bank

8 M/s Anjaneya Earth Movers, 9-78/34, Tanikella (V), Konijerla (M), Khammam District

28/10/2017

ST (W)

T-PRIDE

Rs 11,95,260/- (Rupees Eleven Lakhs Ninety Five Thousand Two Hundred and Sixty Only)

Karnataka Bank Ltd., Khammam

9 M/s Polam Lakshmiprasanna, 6-54, Laxmidevipeta (V), Venkatapur (M), Jayashankar Bhupalpally District

28/10/2017

ST (W)

T-PRIDE

Rs 6,94,680/- (Rupees Six Lakhs Ninety Four Thousand Six Hundred and Eighty Only)

IndusInd Bank Ltd., Warangal

10 M/s Tulasi Katravath, H. No. 1-200, Amistapur, Bhoothpur, Mahabubnagar District

28/10/2017

ST (W)

T-PRIDE

Rs 6,84,810/- (Rupees Six Lakhs Eighty Four Thousand Eight Hundred and Ten Only)

Andhra Bank, Zonal Office, Mahabubnagar

11 M/s Lavudya Suguna, H. No. 2-97/A, Narmetta (V&M), Janagaon District

30/10/2017

ST (W)

T-PRIDE

Rs 11,91,150/- (Rupees Eleven Lakhs Ninety One Thousand One Hundred and Fifty Only)

Indusind Bank Ltd., Secunderabad

12 M/s Mudavath Chandi, H. No. 5-40, Indrakal (V), Tadoor (M), Nagarkurnool Districct

01/11/2017

ST (W)

T-PRIDE

Rs 11,67,830/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred and Thirty Only

HDFC Bank Ltd., Ameerpet

13 M/s Bhukya Rajasree, H. No. 11-7-116, Warangal (V&M), Warangal Urban District

01/11/2017

ST (W)

T-PRIDE

Rs 7,63,270/- (Rupees Seven Lakhs Sixty Three Thousand Two Hundred and Seventy Only)

APGVB, Mothkur Br.

Page 15: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 15 ::

III. INVESTMENT SUBSIDY – PHC (ONLINE)

S. No.

Name & Address of the Unit

DOR in HOD

Caste

Scheme

Recommend

Amount

Financin

g Institutio

n1 M/s Sri Ram

Travels, 4-5-145, Khammam Urban Mandal, Khammam District

28/10/2017

PHC T-PRIDE

Rs 7,76,880/- (Rupees Seven Lakhs Seventy Six Thosuand Eight Hundred and Eighty Only)

State Bank of India, Khammam

IV. Sanction of Reimbursement of Pavala Vaddi (SCSP)

PAVALA VADDI -SCP (ONLINE)

Sl.No.

Name and Address of the unit

Date of receipt of claim

Caste

Scheme

Recommend Amount

1 M/s GalipallySangeetha, H.No. 6-41, KGR Nagar, Badangpet, Saroornagar (M), Rangareddy

30/10/2017

SC (W)

T-PRIDE Rs. 38,870/- (Rupees Thirty Eight Thousand Eight Hundred and Seventy only)

2 M/s Micron Engineering Enterprises, Plot No. 6/Part I, Patancheru (M), Sangareddy

06/11/2017

SC (W)

T-PRIDE Rs. 4,80,090/- (Rupees Four Lakhs Eighty Thousand and Ninety only)

3 M/s Sri Bhavani Technologies, Plot No. 5/6, Patancheru, Sangareddy

06/11/2017

SC T-PRIDE Rs. 4,85,450/- (Rupees Four Lakhs Eighty Five Thousand Four Hundred and Fifty only)

4 M/s S.B Engineers, Plot No. 6 Part I, Patancheru (M), Sangareddy

06/11/2017

SC T-PRIDE Rs. 4,96,600/- (Rupees Four Lakhs Ninety Six Thousand Six Hundred only)

V. Sanction of Reimbursement of Pavala Vaddi (TSP)

PAVALA VADDI – TSP (ONLINE)

Sl. No.

Name and Address

Date of receipt of claim

Caste

Scheme

Recommend Amount

1 M/s Lalitha Earth Movers, H. No. 6-77, Makt Akanchathanda, mankhal (V), Maheswaram (M), Ranga Reddy District

14-09-2017

ST(W)

T-PRIDE

Rs 1,34,960/- (Rupees One Lakh Thirty Four Thosuand Nine Hundred and Sixty Only)

2 M/s Ravi Travels, H. No. 11-69, Devapur (V),

27-09-2017

ST T-PRIDE

Rs 66,709/- (Rupees Sixty Six Thousand

Page 16: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 16 ::Kasipet (M), Mancherial District

Seven Hundred and Nine Only)

3 M/s Sri Srinivasam Industries, H. No. 5-2, Thaharapur (V), Shayampet (M), Warangal District

31-10-2017

ST T-PRIDE

Rs 5,52,264/- (Rupees Five Lakhs Fifty Two Thousand Two Hundred and Sixty Four Only)

VI. REIMBURSEMENT OF SALES TAX :

The Verification / Scrutiny Committee of Reimbursement of Sales Tax in its meeting held on 08/11/2017 has verified / Scrutinized the One (01) claim application of Reimbursement of Sales Tax (TSP – 1) under IIPP 2010-15 /T-PRIDE schemes and recommended for sanction of reimbursement of Sales Tax.

The Minutes of Verification / Scrutiny Committee of Reimbursement of Sales Tax are appended.SALES TAX - TSP (OFFLINE)

S. No.

Name & Address of the Unit

Date of Receipt in COI

Scheme

Amount Recommended

1 M/s Sri Srinivasam Industries, H. No. 5-2, Thaharapur (V), Shayampet (M), Warangal District

31-10-2017

T-PRIDE Rs 10,98,000/- (Rupees Ten Lakhs Ninety Eight Thousand Only)

VII. REIMBURSEMENT OF POWER COST:

The Verification / Scrutiny Committee of Reimbursement of Power Cost in its meeting held on 08-11-2017 has verified / Scrutinized the Eight (02) claim applications of ( SCP – 01 Nos (Online), TSP - 01Nos (Online) Entrepreneurs for Reimbursement of Power Costunder IIPP-2010-15& T-PRIDE scheme and recommended for sanction of reimbursement of Power cost.The Minutes of Verification / Scrutiny Committee of Reimbursement of Power Cost are appended Annexure-III.POWER COST – SCP (ONLINE)

S. No.

Name & Address of the Unit

Date of Receipt in COI

Scheme

Amount Recommended

1 M/s KBS Industries, Sy.No. 180, 21,179,

21/10/2017

T-PRIDE Rs. 1,05,200/- (Rupees One Lakh Five Thousand Two

Page 17: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 17 ::Edulapally (V), Jharasangam (M), Sangareddy

Hundred only)

POWER COST – TSP (ONLINE)

S. No.

Name & Address of the Unit

Date of Receipt in COI

Scheme

Amount Recommended

1 M/s Sri Srinivasam Industries, H. No. 5-2, Thaharapur (V), Shayampet (M), Warangal District

31-10-2017

T-PRIDE Rs 85,008/- (Rupees Eighty Five Thousand and Eight Only)

The SLC may sanction the above amounts to the units towards various Incentives under IIPP 2005-10, 2010-15 & T-PRIDE Schemes.

4 NOTE ON RELEASE OF SANCTIONED INCENTIVES / CONCESSIONS TO THE UNITS AS ON 07.11.2017

I. General Incentives

Government has sanctioned an amount of Rs. 24,05,91,000/- (Rupees twenty four crores five lakh ninety one thousand only) towards Incentives for Industrial Promotion under the General schemes plan from the BE Provision 2017-18 under the Head of accounts 2851-00-800-25-SH(08)-310-312 and 2852-80-800-25-SH(04)-310-312 vide GO Rt No. 127 dt. 31/5/2017 of Industries & Commerce (IP & INF) Department.

Government has sanctioned an amount of Rs. 24,05,91,000/- (Rupees twenty four crores five lakh ninety one thousand only) towards Incentives for Industrial Promotion under the General schemes plan from the BE Provision 2017-18 under the Head of accounts 2851-00-800-25-SH(08)-310-312 and 2852-80-800-25-SH(04)-310-312 vide GO Rt No. 189 dt. 28/8/2017 of Industries & Commerce (IP & INF) Department.

Letter of credit was received for an amount of Rs. 47,36,82,000/- is received on 7/10/2017 and the distribution of funds to the eligible units as per seriatim of sanctions is

The SLC noted the status.

Further, the Chairman, SLC instructed the Member Convener, SLC / Additional Director of Industries to address a letter to the Government requesting to allocate additional budget to meet the pending demand for relase of sanctioned incentives.

Page 18: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 18 ::

being processed.

The details of releases made and pendency as on 7.11.2017 is as follows:

SLC Cases:

Sanctions made upto 16th SLC

and pending for release

proceedings issued for

releases since last SLC

Releases pending as on

7.11.2017

Nature of Incentive Units Amt in

CroresUnit

s

Amt in

Crores

Units

Amt in Crores

Investment Subsidy 510 88.44 0 0 510 88.44

Reimbursement of Sales Tax

1122 716.63 0 0 1122 716.63

Reimbursement of Stamp Duty

140 7.90 0 0 140 7.90

Reimbursement of Land Cost

44 3.13 0 0 44 3.13

Reimbursement of Land Conversion charges

26 0.14 0 0 26 0.14

Reimbursement of Mortgage Duty

21 0.50 0 0 21 0.50

Skill Upgradation / Training

3 0.05 0 0 3 0.05

Total 1866 816.80 0 0 1866 816.80

DLC Cases:

  proceedings issued for releases since last SLC

Releases pending as on 7.11.2017

Nature of Incentive

Units Amount

Amt in Crores

Units Amount Amt in

Crores

Total

0 0 0 123 173983014 17.40

II. Reimbursement of Power Cost (General)

Government has sanctioned an amount of Rs. 27,00,00,000/- (Rupees twenty seven crores only) towards Power Subsidy for Industries under the General scheme from

Page 19: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 19 ::

the BE Provision 2017-18 under the Head of Account 2852-80-800-25-SH(13)-310-312 vide GO Rt No. 189 dt. 28/08/2017 of Industries & Commerce (IP & INF) Department;

Letter of credit was received for an amount of Rs. 27,00,00,000/- is received on 23/10/2017 and the distribution of funds to the eligible units as per seriatim of sanctions is being processed;

The details of releases made and pendency as on 7.11.2017 is as follows:

SLC Cases:

  Sanctions made upto 16th SLC

and pending for release

proceedings issued for

releases since last SLC

Releases pending as on

7.11.2017

Nature of Incentive

Units Amt in Crores

Units

Amt in

Crores

Units

Amt in Crores

Power Subsidy

2193 208.18 0 0 2193 208.18

DLC Cases:

  proceedings issued for releases since last SLC

Releases pending as on 7.11.2017

Nature of Incentive

Units

Amount

Amt in

Crores

Units

Amount Amt in

Crores

Power Subsidy

0 0 0 81 3686578 0.37

III. Pavala Vaddi (General)

Government has sanctioned an amount of Rs. 10,50,00,000/- ( Rupees ten crores and fifty lakhs only) towards Pavala Vaddi for Industries under the General scheme from the BE Provision 2017-18 under the Head of account 2852-80-800-25-SH(14)-310-312 vide GO Rt No. 127 dt. 31/5/2017 of Industries & Commerce (IP & INF) Department;

Government has sanctioned an amount of Rs. 10,50,00,000/- ( Rupees ten crores and fifty lakhs only) towards Pavala Vaddi for

Page 20: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 20 ::

Industries under the General scheme from the BE Provision 2017-18 under the Head of account 2852-80-800-25-SH(14)-310-312 vide GO Rt No. 189 dt. 28/08/2017 of Industries & Commerce (IP & INF) Department;

Letter of Credits for both the above sanctionsare awaited from DTO, Hyderabad, subsequent to which necessary action for distribution of funds will be taken up;

The details of releases made and pendency as on 7.11.2017 is as follows:

SLC Cases:

  Sanctions made upto 16th SLC

and pending for release

proceedings issued for

releases since last SLC

Releases pending as on

7.11.2017

Nature of Incentive

Units Amt in Crores

Units

Amt in

Crores

Units Amt in Crores

Pavala Vaddi

1789 131.34 0 0 1789 131.34

DLC Cases:

  proceedings issued for

releases since last SLC

Releases pending as on 07.11.2017

Nature of Incentive

Units Amoun

t

Units

Amount

Units Amount

Pavala Vaddi

0 0 0 68 3732679 0.37

SUMMARY OF PENDING RELEASES (GENERAL SCHEME)AS ON 7.11.2017

Pending for release Releases made upto

Type of incentives

Cases Amount in Rs. Crores

SLC number

Date of SLC

Power        

SLC 2193 208.18 5th SLC part

25/5/2015

DLC 81 0.37    

Total 2274 208.54    

         

Pavala Vaddi

       

SLC 1789 131.34 7th SLC 30/10/2015

DLC 68 0.37    

Page 21: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 21 ::

Total 1857 131.71    

         

General        

Investment Subsidy

510 88.44 2nd SLC 24/10/2014

Sales Tax 1122 716.63 100th SLC part

21/12/2013

Stamp Duty

140 7.90 102nd SLC

15/5/2014

Land Cost 44 3.13 102nd SLC

15/5/2014

Land Conversion

26 0.14 102nd SLC

15/5/2014

Mortgage Duty

21 0.50 102nd SLC

15/5/2014

Skill upgd / Training

3 0.05 102nd SLC

15/5/2014

DLC 123 17.40    

Total 1989 834.19    

         

Grand Total

6120 1174.45    

4A NOTE ON RELEASE OF SANCTIONED INCENTIVES / CONCESSIONS TO THE

UNITS AS ON 07/11/2017

SCSP – SLC CASES-Investment Subsidy(As on 07/11/2017 t he Government have allocated an amount of Rs. 6387.51 Lakhs towards incentives under SCSP for industrial promotion during the year 2017-18. The Government have issued BRO for Rs.4790.25 lakhs for the 1st2nd,3rdquarter of 2017-18and the same has been released.

The Government have issued BRO for the balance amount of Rs.1596.75 lakhs for the year 2017-18 vide G.O.Rt.No. 1527 Finance (EBSVII) Dept., Dt. 29/08/2017 for which LOCs are awaited.

The details of releases made and pendency as on07/11/2017is as follows:

SLC Cases: SCSP

Scheme

Sanctions made upto

16th SLC and

pending for release

proceedings issued

for releases

Releases pending as

on 07/11/2017

Units

Amt in

Crores

Units

Amt in

Crores

Units

Amt in

Crores

The SLC noted the status.

Further, the Chairman, SLC instructed the Member Convener, SLC / Additional Director of Industries to address a letter to the Government requesting to allocate additional budget to meet the pending demand for relase of sanctioned incentives.

Page 22: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 22 ::

Investment Subsidy

1346

178.73 -- --

1346

178.73

50% Reimbursement of Sales Tax 9 1.58 -- -- 9 1.58

Total: 1355

180.31 -- --

1355

180.31

DLC Cases:

  Proceedings issued for releases

Releases pending as on

07/11/2017Nature of Incentive

Units

Amoun

t

Amount in Crores

Units

Amount Amt in

Crores

Total -- -- -- 1806

539283751

53.92

II. Reimbursement of Power Cost (SCSP)

SCSP –SLC CASES –POWER- (As on 07/11/2017)

The Government have allocated an amount of Rs. 2317.50 Lakhs towards Power subsidy during the year 2017-18. The Government have not issued BRO for the 1stand 2ndquarters of 2017-18.

The details of pendency as on 07/11/2017is as follows:

SLC Cases:Sanctions made upto

16th SLC pending releases

Proceedings

issued for

releases from the available

funds

Releases pending as

on 07/11/2017

Nature of Incentive

Units Amt in

Crores

Units

Amt in

Crores

Units Amt in

Crores

Power Subsidy

08 0.11 05 0.06

03 0.05

DLC Cases:  proceedings

issued for Releases pending as on 07/11/2017

.

Page 23: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 23 ::

releases from the available

fundsNature of Incentive

Units

Amoun

t

Amount in Crores

Units Amount

Amt in

Crores

Power Subsidy

0 0 0.00 0 0 0

III. Pavala Vaddi (SCSP)

SCSP – SLC CASES – PAVALA VADDI – (As on 07/11/2017)

The Government have allocated an amount of Rs 772.50 lakhs towards Extension of Pavala Vaddi Scheme to all SSI and Food Processing units during the year 2017-18. The Government have not issued BRO for the 1stand 2ndquarters of 2017-18.

The details of releases and pendency as on 07/11/2017 is as follows:

SLC Cases:  Sanctions

made upto 16th SLC and pending for

release

proceedings

issued for

releases from the available

funds

Releases pending as

on 07/11/2017

Nature of Incentive

Units Amt in

Crores

Units

Amt in

Crores

Units Amt in

Crores

Pavala Vaddi

89 1.88 51 0.99

38 0.88

DLC Cases:

  proceedings issued for

releases from the available funds

Releases pending as on

07/11/2017

Nature of Incentive

Units

Amoun

t

Amount in Crores

Units

Amount

Amt in

Crores

Pavala Vaddi

0 0 0.00 0 0 0

NOTE ON RELEASE OF SANCTIONED

Page 24: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 24 ::

INCENTIVES / CONCESSIONS TO THE UNITS AS ON 07-11-2017

TSP – SLC CASES-Investment Subsidy

The Government has allocated an amount of Rs. 10659.39 Lakhs towards Incentives for Industrial Promotion Plan from the Provision B.E. 2017-18 under the head of account 2852-80-796-25-17-310-312 under STSDF. The Government have issued BROs for Rs. 5329.50 lakhs towards meeting the expenditure for the 1st& 2nd quarters of 2017-18 vide G.O. Rt. No. 861of Finance (EBS.III) Dept., Dt. 11-04-2017.

The details of releases made and pendency as on 07.11.2017 is as follows:

SLC Cases: TSP

Scheme

Sanctions made up to

16th SLC and

pending for release

Proceedings issued

for releases since last

SLC

Releases pending as

on 07.11.2017

Units

Amt in

Crores

Units

Amt in

Crores

Units

Amt in

Crores

Investment Subsidy

771 95.80 0 0.0 771 95.80

50% Reimbursement of Sales Tax

5 0.48 0 0.0 5 0.48

Total: 776 96.29 0 0.0 77

696.2

9

DLC Cases:

  Proceedings issued for

releases since last SLC

Releases pending as on 07.11.2017

Nature of Incentive

Units

Amount

Amount in Crores

Units

Amount Amt in

Crores

Total 0 0 0.0 1929

538625138

53.86

Page 25: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 25 ::

II. Reimbursement of Power Cost (TSP)TSP –SLC CASES – POWER-(As on 07-11-2017)

The Government has allocated an amount of Rs. 1362.00 Lakhs towards Power subsidy for Industries under the head of account 2852-80-796-25-18-310-312 under STSDF during the year 2017-18. The Government has not issued BROs & Administrative sanction for the 1st, 2nd, quarters of 2017-18.

The details of Releases and pendency as on 07.11.2017 is as follows:

SLC Cases:

  Sanctions made up to

16th SLC Pending Release

Proceedings

issued for

releases since last

SLC

Releases pending as

on 07.11.2017

Nature of Incentive

Units Amt in

Crores

Units

Amt in

Crores

Units Amt in

Crores

Power Subsidy 21 0.55 16 0.4

7 05 0.08

DLC Cases:

  Proceedings issued for

releases since last SLC

Releases pending as on

07.11.2017

Nature of Incentive

Units

Amount

Amt in

Crores

Units

Amount

Amt in

Crores

Total 0 0 0.0 0 0 0

Page 26: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 26 ::

III. Pavala Vaddi (TSP)

TSP –SLC CASES – PAVALA VADDI -(As on 07-11-2017)

The Government has allocated an amount of Rs. 454.00 Lakhs towards Extension of Pavala Vaddi Scheme all SSI and Food Processing units under the head of account 2852-80-796-25-16-310-312 under STSDF during the year 2017-18. The Government has not issued BROs & Administrative sanction for the 1st, 2nd, quarters of 2017-18.

The details of releases and pendency as on 07.11.2017 is as follows:

SLC Cases:

  Sanctions made up to

16th SLC and pending for release

Proceedings

issued for

releases since last

SLC

Releases pending as

on 07.11.2017

Nature of Incentive

Units Amt in

Crores

Units

Amt in

Crores

Units Amt in

Crores

Pavala Vaddi 65 1.65 50 1.3

9 15 0.25

DLC Cases:

  Proceedings issued for

releases since last SLC

Releases pending as on 07.11.2017

Nature of Incentive

Units

Amoun

t

Amount in Crores

Units

Amount Amt in

Crores

Page 27: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 27 ::

Pavala Vaddi

0 0 0.0 0 0 0

Summary of Pending releases under SCP as on 07.11.2017

SC Sub Plan

Pending releases Investment

Subsidy/Sales Tax up to 07/11/2017

Releases made

uptoRemarks

No. of Units sanctioned

Amount sanctioned in Rs.

Amount Rs. In Crores

SLC 1355 180320576

1

180.32

Part of 9th SLC, Dated: 22.04.2016

During the year 2017-18, the Govt. have allocated an amount of Rs. 63.87 Crores towards incentives under SCSP. The Government have issued BRO for 1st, 2nd, 3rd qtr i.e. Rs. 47.90 Crores.

Accordingly, release proceedings were issued for Rs. 47.90 Crores for the sanctioned cases covering up to a part of 9th SLC (SLC sanctioned cases) 22/04/2016 and DLC up to 10/08/2016 (DLC sanctioned cases).

The Government has issued BRO for Rs. 1596.75 Lakhs LOCs are

DLC 1806 539283751

53.93

Up to 10/08/2016

Total 3161 234248951

2

234.24

 

Page 28: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 28 ::

awaited.

The remaining pending demand will be released as soon as

 

Pending Power Cost Sanctioned

up to07/11/2017

   

SLC03

517920

0.05

15th SLC Dated: 12/09/2017

On line work is under progress. As soon as the work completed the releases will be made through online.

DLC -- -- --  No case is pending as on 07/11/2017

Total 03 517920

0.05  

 

Pavala Vaddi Sanctioned up

07/11/2017

   

SLC 38 889303

0

0.88

15th SLC Dated: 12/09/2017

On line work is under progress. As soon as the work completed the releases will be made through online.

DLC -- -- --  No case is pending as on 07/11/2017

Total 38 889303

0

0.88

 Grand Total

3202 235190046

2

235.19

SUMMARY OF PENDING RELEASES UNDER TSP AS ON 07.11.2017

 

Type Pending for release

Released upto

Date of SLC

Power UnitsIn

Crores    SLC 05 0.08  

15th SLC, Dated: 12.09.2017

  

DLC 0 0.0

Total05 0.08

     Pavala Vaddi Units

In Crores    

Page 29: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 29 ::

SLC 15 0.25  15th SLC, Dated: 12.09.2017  

DLC 0 0.0Total 15 0.25         General (SLC) Units

In Crores    

Investment Subsidy

771 95.80 SLC Cases

Industries Sector -- Released up to 13th SLC

Service Sector &Transport Sector -- Released up to 8th SLC

Dated: (30- 03-2017)

Dated :(08-01-2016)

Sales Tax

05 0.48

Stamp Duty

0 0.0

Land Cost

0 0.0

Land Conversion

0 0.0

Mortgage Duty

0 0.0

Skill upgd / Training

0 0.0

Total 776 96.28General (DLC) Units

In Crores

   

Investment Subsidy

1929 53.86 DLC Cases

Industries Sector -- Released as on date.

Service Sector &Transport Sector -- Released up to 30-08-2015

30-08-2015

Grand Total

2725 150.47

5 STATUS REPORT ON THE PROPOSALS SENT TO THE

GOVERNMENT AS ON 07/11/2017.

****

The Government have issued the orders against each item/issue and also action taken on the orders of Government are as follows:

The SLC directed the Member Convener,SLC / Additional Director of Inds. tosend a reminder request to the Govt. on all the issues and follow up for their expeditious clearance.

Page 30: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 30 ::

Sl. No.

Date of SLC

MeetingSubject & SLC

DecisionStatues of the

issue Action taken

1 21/12/13 IIPP 2005-10 & IIPP – 2010-15 – Sanctioned Investment Subsidy to the industrial units under IIPP – 2005-2010 & IIPP 2010-15 Schemes by the SLC subject to production of HMDA / DTCP approval – Release the sanctioned Investment Subsidy without insisting the HMDA / DTCP approval – Guideline proposed – Reg.

*** The issue pertaining to release of sanctioned investment subsidy to the industrial units without insisting for HMDA / DTCP approvals under IIPP 2005-10 and 2010-15 scheme has been placed before SLC in its meeting held on 31/10/2013 and the decision of SLC is as follows:

“The SLC discussed the issue in detail and decided to recommend the issue to the Government with full details and guidelines”

As per the decision taken by the SLC, the following guidelines are proposed for releasing the sanctioned incentives to the industrial units without insisting for HMDA / DTCP approvals.

The unit should obtain the building plan approval from Gram Panchayat / Municipality concerned, since they have started the construction of their unit which is prior it came under the purview of HMDA / DTCP.

The unit should have been in continuous production at least 2 years from the Date of Commencement of Commercial production to be eligible for disbursement of sanctioned investment subsidy.

However, the recovery of sanctioned and disbursed incentives will be as per the para 26 of IIPP 2010-15 operational guidelines.

The unit should obtain all statutory approvals like CFO from APCCB, approval from Factories Department etc.,

The unit should pay the property tax and

In a meeting on “SLC issues at the Government level “held on 01-09-2014 in the chambers of the Special Chief Secretary to Govt. & CIP Industries & Commerce Dept., and the decision recorded in the minutes of the above meeting is as follows;

The release of sanctioned investment subsidy can be considered if:

The unit has gone into production before Master plan of HMDA

and

Approval for change of land use is obtained from the competent authority.

The Govt. has been addressed vide Lr. No. 30/2/2013/10254/10254/ID dt: 05-09-2015 with a request to issue executive orders in the matter. The reply is awaited.

Page 31: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 31 ::sales tax regularly to the Government.

If, the above departments / organizations insist for approvals to run the unit as per their norms, the unit should obtain approvals and run the unit at least 6 years from DCP

SLC Decision

The SLC has decided to recommend the case to Government.

Accordingly,the proposals were recommended to the Government vide letter No. 0/C/13/2654/2654, dated: 07/01/2014.

2 23/12/14 Target 2000 Scheme - M/s. Marvel Weaves Ltd., Mahabubnagar District - To accord permission to pay an amount of Rs. 43,05,506/- towards Deferment of Sales Tax liability in one instalment and exemption of interest on Sales Tax Deferment payable to the Sales Tax Department - Regarding.

***

The Executive Director of APSFC has informed that the APSFC and APIDC has extended financial assistance to M/s. Marvel Weaves Ltd. To set up a unit for manufacture of canvas cloth at Inumulnarva, Mahabubnagar District. It is informed that the company has committed defaults in repayment of dues, the unit was seized and advertised for sale under section 29 of SFC Act and finally the offer received in response to 11th

advertisement was approved for sale consideration of Rs. 241.00 lakhs.

The Commercial Tax Officer, Ameerpet, Hyderabad has informed to the Corporation, the company has sales tax deferment arrears of Rs. 43,05,506/- (deferment tax for the period 2000-01 to 2002-03) and requested the Corporation to earmark the same from the sale proceeds and remit the same to the Commercial Tax Officer. The Corporation has

Accordingly, the proposal were recommended to the Government vide letter No. 20/1/14/3146/3146,dated 16/01/2015.

Government Ordersare awaited.

Page 32: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 32 ::informed the same to APIDC for their consent to keep the said amount aside for remitting the same to Commercial Taxes Department.

It is informed that the Commercial Tax Officer has requested the Corporation to pay the said amount of Rs. 43,05,506/- along with @ 21.50% p.a. amounting to Rs. 98,91,092/- totaling to Rs. 1,41,96,598/-.

In this connection, the Corporation has informed that the captioned unit has the following dues payable to both the institutions as on 31/10/2013 with interest w.e.f. 01/11/2013. APSFC -

Rs. 789.52 lakhs

APIDC-Rs. 2260.72 lakhs--------------------------Total -Rs. 3050.24 lakhs

--------------------------

Further APSFC has stated that the both the Corporations are sacrificing the huge amounts on this account. The Company has availed deferment of sales tax to the tune of Rs. 43,05,506/- and is required to pay in 14 yearly installments w.e.f. January, 2014 without paying any interest.In this regard, the Corporation has informed that the defunct unit was seized and both the Corporations are sacrificing huge amounts. The Corporation has requested to issue a letter advising the Commercial Tax Officer, MG Road Circle, Ameerpet, Hyderabad to exempt from the interest, so that the principal amount of Rs. 43,05,506/- could be paid in one installment.

In view of the above, Permission may accord to pay an amount of Rs. 43,05,506/- towards Deferment of Sales Tax liability in one installment and exemption of interest on Sales Tax Deferment payable to the Sales Tax Department.SLC may take a

view.

SLC Decision

Page 33: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 33 ::The SLC discussed the issue in detail and as the APSFC has agreed to pay the Sales Tax deferment amount of Rs.43,05,506/- will paid to Commercial Tax Officer, Ameerpet, Hyderabad and regarding the payment of interest on the amount of Rs.43,05,506 at the rate of Rs.21.50% worksout to Rs.1,41,96,598/- and the same is requested by APSFC for exemption.

The SLC recommended to Government for issuing necessary orders on the waiver of interest on the Sales Tax Deferment amount of Rs.43,05,506/-, which works out to Rs.1,41,96,598/-.

3 17/12/16 T-IDEA – Incentives – Setting up of New Textile Industry in Telangana – Request for making Dyeing and Printing eligible for Sanction reimbursement of Interest Subsidy @ 6% to their proposed Textile Industry in Telangana State - Regarding.

****

M/s VijayaAnand Textile Mills Pvt. Ltd., Hyderabad vide his letter Dt. dt: 14-09-2015 has informed that they are planning to set up a Textile Industry (Dyeing and Printing) at Pochampally (M), Nalgonda District with an Investment of Rs. 25 Crores. The industry provides employment of 200 People approx.

Further, unit holder has informed that G.O.Ms.No. 28, which provides the incentives for setting up of a new industry in G.O. Clause 4.9.0 Textile Sector, it is mentioned that the interest Subsidy of 6% on dyeing of Textiles. Therefore, the unit holder requested the Commissioner of Industries, whether their industry is eligible for the Interest Subsidy of 6% so that we can proceed with setting up of his Industry and other states like Gujarat and Maharashtra are providing incentives of 7-8% interest and 35 % subsidy on capital.

As per the decision of SLC in its meeting held on 17-12-2016 a proposal has been recommended vide 30/1/2016 /29840 dt: 03-01-2017 to the Government with a request to issue clarification on applicability of reimbursement of interest subsidy @ 6% announced to Industries involved in composite activities i.e., Spinning and weaving/ Knitting/ Dyeing/ Garmenting (excluding ginning) at para 4.9.0 (C) of operational guidelines of T-IDEA Scheme also to the units engaged in single activities like Dyeing , weaving etc. as the phrasing of the sentence composite activities i.e., Spinning and weaving/ Knitting/ Dyeing/ Garmenting with “(/)” between the activities is leading to confusion and lacking clarity to decide the eligibility of single activities such as Dyeing etc.

Government Orders are awaited.

Page 34: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 34 ::

In this connection, it is submitted that as per the G.O. Ms. No. 28 of Inds. & Comm. (IP & INF) Department, Dt. 29/11/2014 the following benefits are being offered to the Textile Sector:4.9.0 Textile Sector (A) The State will provide reimbursement of interest subsidy to spinning/textile industries in addition to theTUF Schemes.

(B) Reimbursement of interest subsidy @ 4% for spinning activity (excluding Ginning) for Period of (5) years from the Date of Commencement of Commercial Production.

(C) Reimbursement of interest subsidy @ 6% for Industries involved in composite activities i.e., Spinning and weaving/ Knitting/ Dyeing/ Garmenting (excluding ginning) for a period of (5) years from the Date of Commencement of Commercial Production.(D) The total interest subsidy including under TUF Scheme should not exceed the rate of interest levied by Financial Institutions on the sanctioned and disbursed term loan to the unit.

Since, the captioned unit’s line of activity is only “Dyeing and Printing”, but not the eligible composite activities such as i.e. “Spinning and weaving/Knitting/Dyeing/Garmenting” or “Spinning” alone to become eligible for reimbursement of Interest Subsidy.

Hence, the proposed line of activity “Dyeing and Printing” of the Captioned

Page 35: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 35 ::textile industry, is not eligible for Interest Subsidy reimbursement under T-IDEA Scheme 2014.

But, it is a fact that the following Government’s are providing reimbursement of Interest Subsidy:Government of Andhra Pradesh is offering ‘8%’ for weaving (with or without preparatory) Dyeing & Processing, Knitting, Garment/Made-ups Machine Carpeting, Machine Embroidery, technical textiles and any other activities/process like crimping, texturizing, twisting, winding, sizing etc. in Textiles & Apparel Policy 2015-20 issued vide G.O. Ms. No. 32, Industries & Commerce (IP & INF) Department, Dated: 29/04/2015. Government of Maharashtravideresolution No. 2012/CR/257/Tex-2, Dt. 21/02/2014 is offering Interest Subvention of 7% for Spinning Mill, Garmenting, Ginning, Pressing and Processing and offering 6% to technical textile units and composite units (Ginning, Spinning, Weaving and Processing) and also offering 5% to all other textile units.

In respect of the request made by M/s. Salguti Industries Ltd., to consider the line of activity “Weaving” alone for sanction of reimbursement of Interest Subsidy was submitted to Government for taking necessary action vide this Office Lr. No. 30/1/2016/29218, Dt. 23-11-2016 for issue suitable orders in the matter, which are still awaited.

In view of the

Page 36: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 36 ::receipt of the various representations from the Textile Industries which are not engaged in composite activity but in the activities like “weaving, dyeing etc.,” to extend the reimbursement of interest subsidy under T-IDEA scheme and as per para 28.0 of T-IDEA Scheme Operational guidelines any such matters which is outside the scope of SLC in regard to implementation of the Scheme such matters shall be referred to the Government, hence the matter was placed before SLC for taking a view before referring the matter to the Government.

The SLC in its meeting held on 17-12-2016 discussed the issue in detail and decided to request the Government to issue clarification on applicability of reimbursement of interest subsidy @ 6% announced to Industries involved in composite activities i.e., Spinning and weaving/ Knitting/ Dyeing/ Garmenting (excluding ginning) at para 4.9.0 (C) of operational guidelines of T-IDEA Scheme also to the units engaged in single activities like Dyeing , weaving etc. as the phrasing of the sentence composite activities i.e., Spinning and weaving/ Knitting/ Dyeing/ Garmenting with “(/)” between the activities is leading to confusion and lacking clarity to decide the eligibility of single activities such as Dyeing etc.

4 17/12/16 T-PRIDE – TSP(W) - Sanction of Investment Subsidy prior to Date of Commencement of Production (DCP) to M/s. Jayalaxmi Readymade Garments, Sy. No. 468/1/A, Maripeda Banglaw(V&M), Warangal District.

*********

The General Manager, District Industries Centre, Warangal has forwarded the proposals of M/s. Jayalaxmi

As per the decision of the SLC in its 12th

meeting held on 17-12-2016, the issue has been recommended to the Government vide letter No. 39/2/2016/29022, Dated: -01-2017 with a request to issue orders limiting the investment on land and building together to 35% of the

Government Orders are awaited.

Page 37: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 37 ::Readymade Garments, Sy.No. 468/1/A, Maripeda Banglaw(V&M), Warangal District for sanction of Investment Subsidy prior to Date of Commencement of Production for the line of activity “Readymade Garments ”

The details of the Project Cost of the unit as recommended by GM is as follows

1.

Project Cost

2.

Expected Date of Commencement of Production

3.

Proposed Project Cost as recommended by General Manager, District Industries Center, Warangal District

4.

Loan Sanctioned By Indian Over Seas Bank, Shyampet, Warangal

Therefore, the eligibility of the unit for the sanction of investment subsidy (1st installment) prior to Date of Commencement of Production(DCP) for the project cost calculated as per guidelines is as follows:

1.

Project Cost Calculated

2.

Eligible Investment Subsidy @ 35% of the Project Cost (Max. 75.00 Lakhs)

3.

Additional Subsidy @ 10% of the Project Cost for Women Entrepreneur (Max. 10.00 Lakhs)Total Eligible Subsidy

4.

1st Installment of Investment Subsidy prior to DCP (35% of Eligible Subsidy) 1st Installment

The unit has been placed before the DIPC meeting held on 23.08.2016 and the DIPC recommended for sanction of eligible Investment Subsidy prior to DCP towards 1st

installment. Copy of the DIPC meeting minutes furnished by GM.

Therefore, the proposal was placed before State Level Committee

total fixed capital investment of the project in respect of Readymade Garment units under T-PRIDE Scheme to discourage the small units going for large investment on building with an intention to claim more Subsidy there by affecting the viability of the unit.

Page 38: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 38 ::(SLC) to take a decision for sanction of 1st

installment of investment subsidy prior to DCP to the captioned unit for Rs. 18,62,700/-

The SLC in its 12th

meeting dated 17-12-2016 ,decided to recommend to the Government for limiting the investment on land and building together to 35% of the total fixed capital investment of the project in respect of Readymade Garment units under T-PRIDE Scheme to discourage the small units going for large investment on building with an intention to claim more Subsidy there by affecting the viability of the unit.

5 17/12/16 T-PRIDE – TSP(W) - Sanction of Investment Subsidy prior to Date of Commencement of Production (DCP) to M/s. K.S.V. Readymade Garments, S.No. 502/A, Near Goshala,Bhagat Nagar(V),Thorrur(M), Warangal District.

*********

The General Manager, District Industries Centre, Warangal has forwarded the proposals of M/s. K.S.V. Readymade Garments, S.No. 502/A, Near

Goshala,Bhagat Nagar(V),Thorrur(M),Warangal District for sanction of Investment Subsidy prior to Date of Commencement of Production for the line of activity “Ready Made Garments”

The details of the Project Cost of the unit as recommended by GM is as follows

1.

Project Cost

2.

Expected Date of Commencement of Production

3.

Proposed Project Cost as recommended by General Manager, District Industries Center, Warangal District

As per the decision of the SLC in its 12th

meeting held on 17-12-2016, the issue has been recommended to the Government vide letter No. 39/2/2016/23722, Dated: -01-2017 with a request to issue orders limiting the investment on land and building together to 35% of the total fixed capital investment of the project in respect of Readymade Garment units under T-PRIDE Scheme to discourage the small units going for large investment on building with an intention to claim more Subsidy there by affecting the viability of the unit.

Government Orders are awaited.

Page 39: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 39 ::4.

Loan Sanctioned By Indian Over Seas Bank, Shyampet, Warangal

Therefore, the eligibility of the unit for the sanction of investment subsidy (1st installment) prior to Date of Commencement of Production(DCP) for the project cost calculated as per guidelines is as follows:

1.

Project Cost Calculated

2.

Eligible Investment Subsidy @ 35% of the Project Cost (Max. 75.00 Lakhs)

3.

Additional Subsidy @ 10% of the Project Cost for Women Entrepreneur (Max. 10.00 Lakhs)Total Eligible Subsidy

4.

1st Installment of Investment Subsidy prior to DCP (35% of Eligible Subsidy) 1st Installment

The unit has been placed before the DIPC meeting held on 28.01.2016 and the DIPC recommended for sanction of eligible Investment Subsidy prior to DCP towards 1st

installment. Copy of the DIPC meeting minutes furnished by GM.

Therefore, the issue was placed before State Level Committee (SLC) to take a decision for sanction of 1st

installment of investment subsidy prior to DCP to the captioned unit for Rs. 22,86,026/-

The SLC in its 12th

meeting dated 17-12-2016 ,decided to recommend to the Government for limiting the investment on land and building together to 35% of the total fixed capital investment of the project in respect of Readymade Garment units under T-PRIDE Scheme to discourage the small units going for large investment on building with an intention to claim more Subsidy there by affecting the

Page 40: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 40 ::viability of the unit.

6 22/06/17 T-PRIDE – TSP - Claim proposals of Sri VadityaVenkateshwaraRao S/o. Vachya, R/o 5-145, VM Banjar(V), Penubally(M), Khammam District for sanction of Investment Subsidy– Certain clarification - Requested.

The GM, DIC, Khammam District has forwarded the (4) proposals of Sri VadityaVenkateshwaraRao S/o Vachya, R/o 5-145, VM Banjar(V), Penubally (M), Khammam District for sanction of Investment Subsidy and also forwarded the other claim application of SmtBhukyaChaithanya Devi W/o Sri VadityaVenkateshwaraRao with same address and Line of activity which are as follows:

S. No.

Name of Address of the Unit

1 M/s. Sai Hanuman Transport, H.No. 5-145, Main Road, VM Banzar(V), Penuballi(M), Khammam District.Porp: Sri. VadityaVenkateshwaraRao, S/o Vachya, R/O 5-145, VM Banjar(V), Penubally(M), Khammam District

2 M/s. SaiChaitanya Transport, H.No. 5-145, Main Road, VM Banzar(V), Penuballi(M), Khammam DistrictPorp: Sri. VadityaVenkateshwaraRao, S/o Vachya, R/O 5-145, VM Banjar(V), Penubally(M), Khammam District

3 M/s. Vadithya VenkateshwaraRao, H.No. 5-145, Main

As per the decision of the SLC in its 14th

meeting held on 22-06-2017, a letter has been addressed to the Government videLr.No.39/2/2016/28753/IDdt: 18-07-2017 with a request to issue clarification in respect of claims received in the following three situations from Service Enterprises(Transport category) under T-PRIDE Scheme, whether each unit should be treated as separate unit and or to club the investment and treat the 2nd unit onwards as expansion unit for sanction of eligible incentives .1. When a same entrepreneur sets up more than one unit in the same name and same address location.

2. When more than one unit are located in same address with different names by the same entrepreneur or his family members .

3. When the same entrepreneur sets up more than one unit in different locations

Government Orders are awaited.

Page 41: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 41 ::Road, VM Banzar(V), Penuballi(M), Khammam District

Porp: Sri. VadityaVenkateshwaraRao, S/o Vachya, R/O 5-145, VM Banjar(V), Penubally(M), Khammam District

4 M/s. Sai Siddhartha Transport, H.No. 5-145, Main Road, VM Banzar(V), Penuballi(M), Khammam DistrictPorp: Sri. VadityaVenkateshwaraRao, S/o Vachya, R/O 5-145, VM Banjar(V), Penubally(M), Khammam District

5 M/s Sai Venkata Chaitanya Transport, D.No. 5-145, MainRoad, V.M. Banjara (V), Penubally(M), Khammam DistrictPorp: SmtBhukyaChaitanya Devi, W/o Sri VadityaVenkateshwaraRao

In this regard, it is to submit that, the unit at S. No. (1) with Maximum Investment i.e., M/s. Sai Hanuman Transport, H.No. 5-145, Main Road, VM Banzar(V), Penuballi(M), Khammam District has been considered for sanction of investment subsidy for the Project Cost of Rs. 1,91,82,454/- and sanctioned Investment Subsidy for an amount of Rs. 67,13,850 in the 12th SLC Meeting held on 17-12-2016, which is 90% of the Max. subsidy (75 Lakhs) as per guidelines.

If the investment of (4) units added to the original unit, the total

Page 42: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 42 ::investment crosses “Small service sector” and comes under Medium Category which is not eligible for Investment Subsidy. Hence, the remaining (4) claims were not sanctioned Investment Subsidy.

Further, it is submitted that, in the similar case, the 12th SLC has taken a decision which is as follows

“The SLC discussed the issue in detail and decided to reject the claim for sanction of Investment Subsidy to the captioned unit as this Small Enterprises, after expansion, graduated to Medium Service Enterprise status and as per T-PRIDE guidelines Medium Enterprises are not eligible for sanction of Investment Subsidy.”

In view of the above, the issue is placed before the SLC for taking a decision for sanction of Investment subsidy for the remaining (4) proposals.

The SLC may take a view.

7 22/06/17 T-IDEA– M/s. Target Equipments and Machines Private Limited, Plot No. 10 (NP), 12 & 13, IDA, Mallapur, Uppal (M), Medchal-Malkajgiri -Sanction of Investment Subsidy Reg.

*****

The General Manager, District Industries Centre, RR-II, Ranga Reddy District has forwarded the claim application of M/s. Target Equipments and Machines Private Limited, Plot No. 10 (NP), 12 & 13, IDA, Mallapur, Uppal (M),Ranga Reddy District for sanction of Investment Subsidy under T-IDEA Scheme. He has informed that the unit is registered vide UdhyogAadhaar No. TS-09B-00-06157, dt: 10/03/2016 for the line of activity

As per the decision of the SLC in its 14th

meeting held on 22-06-2017, a letter has been addressed to the Government vide Lr.No. 20/1/2016/30764/30764/FD dt: 11-07-2017 witha request to issue clarification in respect of M/s. Target Equipments and Machines Private Limited, Plot No. 10 (NP), 12 & 13, IDA, Mallapur, Uppal (M), Medchal-Malkajgiri Dist. in detail and decided to seek clarification from the Government on the eligibility of the unit for availing incentives under T-IDEA Scheme, while

Government Orders are awaited.

Page 43: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 43 ::“Manufacturing of Heavy Engineering and Fabricated metal Products” with date of Commencement Production 22/02/2016. The unit is financed by Andhra Bank SME, Mallapur Branch for a Term Loan of Rs. 950 Lakhs. The General Manager, DIC submitted claim application together with verification report, statement of accounts and enclosed required documents for sanction of 15% of Rs. 20,00,000/- Investment Subsidy under New Policy T-IDEA.

The General Manager, District Industries Centre, Medchal District has informed that the unit holder has purchased the land along with existing buildings on “as is where is basis” consisting of Cranes fabrication and welding machines from M/s. Lurgi India International Services Private Limited ( the merged entity of Air Liquide Engineering India Private Limited). The previous unit i.e., M/s Air Liquide Engineering

Further he has informed that on verification of the proposal it is found that 4 machines worth Rs. 1,88,71,031/- (Rupees One Crore Eighty Eight Lakhs Seventy One Thousand and Thrity one only) which is 42.28% of the total value of machinery which is computed to Rs. 4,46,29,000/- (Rupees Four Crores Forty Six LakhsTwenty Nine Thousand only) is procured from M/s. Rolon Seals. The General Manager, DIC has personally visited M/s. Rolon Seals at Plot No. 9 Road No. 1 IDA Mallapur and found that the line of activity of M/s. Rlon Seals is Mfg. Of Mechanical Seals & is a Precision Engineering unit and not manufacturer or supplier of machineries, and is also a sister concern of this unit. The unit holder has furnished the bill

furnishing the complete details of the case and rule position.

Page 44: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 44 ::copies i.e. 1. M/s Rolon Seals Invoices on Target Equipment & Machinery Private Limited 2.Navadurga Trade Centre bills on M/s Rolon Seals.

The unit holder has been asked by the GM, DIC, MedchalMalkajgiri to furnish some more clarifications and information on the issue. The unit holder vide his letter dated: 25/04/2017 has furnished additional information to this office on 05/04/2017.

1. On 19.12.2014 M/s Target Equipments& Machinery Private Limited entered agreement of Sale with M/s Air Liquide to purchase land asset “as is where is basis”

2. M/s Target Equipments& Machinery Private Limited registered with Central Excise on 11/03/2015

3. M/s Target Equipments& Machinery Private Limited registered with VAT & CST on 24/01/2015 and 29/01/2015 respectively.

4. M/s Target Equipments& Machinery Private Limited applied to Andhra Bank for Term Loan for this project cost of Rs 18.50 Crs on 07/03/2015

5. M/s Target Equipments& Machinery Private Limited ordered for machines on M/s Navdurga Trade Cenre on 26/02/2015

6. The Sales Tax Department withheld M/s Target Equipments& Machinery Private Limited registration on 06/08/2015

7. The Excise Department

Page 45: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 45 ::withheld M/s Target Equipments& Machinery Private Limited registration on 26/06/2015 as Ms Air Liquide had dues pending as per departments notice.

8. Andhra Bank approved M/s Target Equipments& Machinery Private Limited application for term loan on 02/07/2015

9. M/s Navdurga Trade Centre was ready with material, but M/s Target Equipments& Machinery Private Limited registration with Excise & Sales Tax were withheld, hence to overcome the loss of forgoing the advance paid to M/s Navdurga, M/s Target Equipments&Machinery Private Limited requested M/s Navdurga to Invoice on M/s Rolon Seals, who are the promoters and Group Company of M/s Target Equipments& Machinery Private Limited. The Machines from M/s Navdurga were Invoiced on 04/09/2015 to M/s Rolon Seals and delivered at Target Equipments& Machinery Private Limited, factory as M/s Rolon Seals & Target Equipments& Machinery Private Limited are situated side by side in the same Industrial Area (IDA),Mallapur.

10. The Central Excise Department revoked

Page 46: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 46 ::Target Equipment & Machines Pvt Ltd., registration for Excise on 08/12/2015

11. The Sales Tax Department revoked Target Equipment & Machines Pvt Ltd., registration for Sale Tax on 23/12/2015

12. M/s Air Liquid final sales deed Registration of land done on 31/12/2015

13. M/s Rolon Seals, machines invoiced on M/s Target Equipment & Machines Pvt Ltd., on 28/01/2016.

The unit holder further informed that, due to unforeseen issue arised by Sales Tax & Central Excise Departments, the project was delayed by one year.

The unit holder also furnished the power bills of M/s Rolon Seals and Target Equipment and Machines Pvt Ltd., to claim that the machinery was not kept on use at M/s Rolon Seals.

The General Manager opined that it seems, the unit holder neither purchased the Machinery for M/s Rolon Seals nor kept in use in M/s Rolon Seals, Just to vercome technical problem arised due tounforeseen issued with Sales Tax and Central Excise Departments, he might have got invoiced the machinery on M/s Rolon Seals as the Managing Director, M/s Target Equipment & Machines Pvt Ltd., is one of the promoters of M/s Rolon Seals and also it is verified that with power bills of M/s Rolon Seals of the period from delivery of Machinery to M/s Rolon Seals and to errection in M/s Target Equipment & Machines Pvt Ltd., and there is no much difference in power

Page 47: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 47 ::consumption in M/s Rolon Seals for the above period which reveals that, the machinery was not kept in use at M/s Rolon Seals and also machinery was not leased by Rolon Seals to M/s Target Equipments and Machines Pvt Ltd., it is sold raising invoice at original cost and payments made to M/s Rolon Seals by M/s Target Equipment & Machines Pvt Ltd., after settlement of the Sales Tax and Central Excise Department.

The General Manger, District Industries Centre, Medchal-Malkajgiri District has requested the Commissioner of Industries to examine the issue in view of the above remarks and documents furnished by the unit holder to take further necessary action in the sanction of incentives to M/s Target Equipment & Machines Private Limited.

In view of the above, the issue is placed before the SLC for taking a view for sanction of Investment Subsidy to M/s.Target Equipment & Machines Private Limited.

The SLC may take a view.

8 23/10/2017

T-PRIDE Scheme - SCP - Sanction of Investment subsidy for the activity “Aluminum Hanger Services” to M/s Lordven Hangers, Sy.No. 91, Naergul (V), Balapur, Saroornagar (M), Rangareddy District& M/s Avens Expostition Pvt Ltd., D.No. 9-8-97, Mauthinagar, Champapet, Saroornagar (M), Rangareddy Dist - Reg.

***

The General Manager, District Industries Centre, Rangareddy District has informed that, M/s Lordven Hangers, Sy.No. 91, Naergul (V), Balapur, Saroornagar (M), Rangareddy District has been inspected and found that the line of activity of the

As per the decision of the 16th SLC the issue has been referred to Govt. vide Lr.No.39/1/2017/45683 Dated.03/11/2017 with a request to issue suitable orders.

Government Orders are awaited.

Page 48: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 48 ::unit is Aluminum Hanger Services. The unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set up in a leased premises for a period of 7 years.

M/s Avens Expostition Pvt Ltd., D.No. 9-8-97, Mauthinagar, Champapet, Saroornagar (M), Rangareddy Dist is for same line of activity and the unit is a self financed with an investment on equipment for Rs. 190.00 Lakhs set up in a leased premises for a period of 7 years.

The unit holder has informed that as per the guidelines of Special Protection Groups it has to be Fire Proof and Water Proof, the line of activity is a innovative Technology for out door events, and they will arrange services of outdoor infrastructure (Aluminum Hangers) on rental basis at the events of Exhibitions, Medical Conferences, Star shows and outdoor events like stage preparation at the venues when VVIPs like Chief Minister, Prime Minister, President of India attend the events as per guidelines of special protection groups (SPG).

The line of avtivity Aluminum Hanger Service is not included in the list of service sector enterprises eligible for availing incentives under T-PRIDE scheme. Further, as per para 5.4.23 under T-PRIDE scheme is as follows:

“Such other activity as may be approved by the State Level Committee.”

The SLC may take a view on the request of the applicants for inclusion of the line of activity “Aluminum Hangers” in Annexure B i.e List of Service activities under T-PRIDE scheme.

The SLC may take a view.

Page 49: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 49 ::

SLC Decision:The SLC discussed the issue in detail and decided to refer the request of the applicants to make the line of activity “Aluminium Hanger Services” eligible for sanction of incentives under T-PRIDE Scheme to the Government with a request to issue suitable orders.

Commissioner of Industries.

LIST OF MEMBERS ATTENDED THE 17thSTATE LEVEL COMMITTEE MEETING HELD ON 08/11/2017 AT 03:30PM IN THE CONFERENCE HALL OF THE COMMISSIONERATE OF INDUSTRIES, TELANGANA STATE,HYDERABAD(CONFERENCE HALL).

SL.NO. MEMBERS NAME & DESIGNATION OF MEMBER /__________________________________________REPRESENTATIVE________________________

Sri/Smt:

1. Chairman, Ahmad Nadeem, IAS.,State Level Committee. Chairman, SLC /

Commissioner of Industries.

2. Commissioner of Tribal Welfare, R. Laxman, I.R.S.,Hyderabad Commissioner.

3. President, Sri L. Girijapathy, FTAPCCI. Assistant Director.

4. President, A. Bhasker Reddy,

Page 50: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 50 ::

FETSIA. Vice-President

5. Managing Director, S. Kalavathi, TSIIC, Hyderabad General Manager.

6. Commissioner, T.Seshagiri Rao,Commercial Taxes, Hyderabad. Deputy Commissioner(ST), CT Dept.

7. Managing Director, C. Padma,APSFC, Telangana Unit Manager.

8. Director of SC Development C. Syam Sunder Rao,Department.Hyderabad Statistical Officer.or his nominee

9. Director (Commercial), K.Vidyadhari, T.S.TRANSCO, Hyderabad. DE/BPP/ Commercial/TSPCC.

10.Convenor. SLBC, Hyderabad. M. Ravi Kumar,Manager.

11.Nominee of SBI Babu Balaganur, SME Local Head Office Chief Manager.

12.President K. Ravi Kumar,DICCI, Telangana SVP.

13.Chairman S. Radha Krishna, TSTMA Assistant Secretary.

14.Federation of Small and P.C.Babu,Medium Enterprises Industries Secretary.

15.Chairman & Managing Director, Sreesha,TSSPDCL Assistant Divisional Engineer.

16.Additional Director of Industries R. B. Devanand, /Member Convener. Additional Director.

Page 51: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 51 ::

Page 52: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 52 ::

INVESTMENT SUBSIDY (ONLINE) ANNEXURE – I

S. No.

Name & Address of the Unit

Scheme

Date of Receipt

Recommended Amount

Financial Institution

1 M/s. Sri Lakshmi Plastic, Plot No. 21/B, Cherlapally, Ghatkesar (M), Medchal-Malkajgiri District

T-IDEA 14/09/2017

Rs. 30,00,000/- (Rupees Thirty Lakhs Only)

The Cosmo Co-op Bank Limited, Nacharam

2 M/s. SVG Industries, Sy.No. 40, Khazipur (V), Karimnagar (M) , Karimnagar District

T-IDEA 18/09/2017

Rs. 30,00,000/- (Rupees Thirty Lakhs Only)

State Bank of India, KIMS, Branch, Karimnagar

3 M/s.SaiSharanam Industries, Sy.No. 23/A, Khaazipur (V), Karimnagar (M), Karimnagar District

T-IDEA 24/10/2017

Rs. 20,00,000/- (Rupees Twenty Lakhs Only)

Indian Bank, Asif Nagar, Branch Karimnagar

4 M/s.Shri Himalaya Granites, Sy.No. 35/E & 36/A, Kamanpur (v), Karimnagar (V), Karimnagar (M), & District

T-IDEA 02/11/2017

Rs. 19,94,560/- (Rupees Nineteen Lakhs Ninety Four Thousand Five Hundred and Sixty Only)

Karnataka Bank Ltd, Karimnagar Branch

Page 53: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 53 ::

REIMBURSEMENT OF PAVALA VADDI (ONLINE) ANNEXURE – II

S. No.

Name & Address of the Unit

Scheme Date of Receipt

Recommended Amount

1 M/s R.B. Industries, Sy.No. 5, Jaithpur, Wankidi, Kumurambhee, Asifabad District

T-IDEA 22/09/2017 Rs. 1,71,700/- (Rupees One Lakh Seventy One Thousand and Seven Hundred Only)

2 M/s. Ramalingeshwara Cotton Industries, Sy. No. 315/B, 312/A & 312A/3, Musthyala(V), Cherial(M), Siddipet District

IIPP 2010-15

 05/10/2017

Rs. 6,60,711/- (Rupees Six Lakhs Sixty Thousand Seven Hundred and Eleven Only)

3 M/s Suvarna Granites, Sy.No. 49/B, Khazipur (V), Karimnagar (M), Karimnagar district

IIPP 2010-15

09/10/2017 Rs. 99,389/- (Rupees Ninety Nine Thousand Three Hundred and Eighty Nine Only)

4 M/s S.V. Industries, Sy.No. 320, Asifnagar, Karimnagar (M) & District

IIPP 2010-15

10/10/2017 Rs. 2,21,455/- (Rupees Two Lakhs Twenty One Thousand Four Hundred and Fifty Five Only)

5 M/s. Govind Industries, Sy.No. 160, Handekelur (V), Madnoor (m), Kamareddy Dist.

IIPP 2010-15

11/10/2017 Rs. 4,26,020/- (Rupees Four Lakhs Twenty Six Thousand Twenty Only)

6 M/s. SRG Industries, Plot No. 17/A, IDA, Bhongir(V&M), Nalgonda District

IIPP 2010-15

 20/10/2017

Rs. 0/- (Rupees Zero Only)

7 M/s M.B. Industries, Sy. No. 358 & 359, Gundaram, Nizamabad Dist.

IIPP 2010-15

23/10/2017 Rs. 87,510/- (Rupees Eighty Seven Thousand Five Hundred and Ten Only)

8 M/s. SaiCharita Paper Products, Plot No. P-11/5A, Road No. 8, IDA, Nacharam, Uppal (M), Medchal-Malkajgiri District

T-IDEA 25/10/2017 Rs. 2,24,730/- (Rupees Two Lakhs Twenty Four Thousand Seven Hundred and Thirty Only)

9 M/s. Sri Sai Plastics, Plot No. 4B, Extension, Phase-II, IDA, Cherlapally (V), Kapra (M), Medchal-Malkajgiri District

IIPP 2010-15

25/10/2017 Rs. 81,500/- (Rupees Eighty One Thousand and Five Hundred Only)

10 M/s. Ganesh Rig Industries, Unit-II, Plot No. 19/B, Phase-V, IDA, Cherlapally, Kapra (M), Medchal-Malkajgiri District

IIPP 2010-15

25/10/2017 Rs. 31,198/- (Rupees Thirty One Thousand One Hundred and Ninety Eight Only)

Page 54: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 54 ::

11 M/s Darshan Cotton Industries, Sy.No. 213, Nirmal Road, Bhainsa (V&M), Nirmal, District

IIPP 2010-15

26/10/2017 Rs. 1,36,375/- (Rupees One Lakh Thirty Six Thousand Three Hundred and Seventy Five Only)

12 M/s. K.S. Cold Storage, Sy.No: Munipally (V), Jakranapally (M), Nizamabad Dist.

IIPP 2010-15

27/10/2017 Rs. 10,44,314/- (Rupees Ten Lakhs Forty Four Thousand Three Hundred and Fourteen Only)

13 M/s. S.L.N.S. Cold Storage, Sy.No: 180, Munpally (V), Jakranapally (M), Nizamabad Dist.

IIPP 2010-15

27/10/2017 Rs. 10,68,570/- (Rupees Ten Lakhs Sixty Eight Thousand Five Hundred and Seventy Only)

14 M/s Abhaya Granites, Sy.No. 78/a, B, C, D, Elgandal, (V), Karimnagar (M) and District

IIPP 2010-15

06/11/2017 Rs. 1,15,310/- (Rupees One Lakh Fifteen Thousand Three Hundred and Ten Only)

Page 55: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 55 ::

REIMBURSEMENT OF SALES TAX (ONLINE) ANNEXURE -III

S. No.

Name & Address of the Unit Scheme Date of Receipt

Recommended Amount

1 M/s. Maruti Industries, Sy.No. 136,137,138, Agnoor(v), Yelal(M), Vikarabad District

IIPP 2010-15

03/10/2017 Rs. 37,06,042/- (Rupees Thirty Seven Lakhs Six Thousand Forty Two Only)

2 M/s. Ramalingeshwara Cotton Industries, Sy. No. 315/B, 312/A & 312A/3, Musthyala(V), Cherial(M), Siddipet District

IIPP 2010-15

 05/10/2017

Rs. 34,58,686/- (Rupees Thirty Four Lakhs Fifty Eight Thousand Six Hundred and Eighty Six Only)

3 M/s. Surya Rice Industries, Sy. No. 312/3/A, 312/3/Aa, 313, Yadgarpalle, Miryalguda, Nalgonda District

IIPP 2010-15

 10/10/2017

Rs. 44,34,310/- (Rupees Forty Four Lakhs Thirty Four Thousand Three Hundred and Ten Only)

4 M/s. Amritha Tool Crafts Private Limited, Plot No. 195/6, Cherlapally, Ghatkesar (M), Medchal-Malkajgiri District

IIPP 2010-15

11/10/2017 Rs. 5,01,319/- (Rupees Five Lakhs One Thousand Three Hundred and Nineteen Only)

5 M/s. Unikon Paints Private Limited, Plot No. 8/1/B, Road No.9, IDA, Nacharam, Uppal (M), Medchal-Malkajgiri District

T-IDEA 11/10/2017 Rs. 5,91,690/- (Rupees Five Lakhs Ninety One Thousand Six Hundred and Ninety Only)

6* M/s. Sri Naarsimha Industries, Sy.No. 21, Shakkarga Road, Madnoor (V&M), Kamareddy District(Subject to confirmation by CT Dept.)

IIPP 2010-15

11/10/2017 Rs. 9,97,350/- (Rupees Nine Lakhs Ninety Seven Thousand Three Hundred and Fifty Only)

7* M/s. Govind Industries, Sy.No. 160, Handekelur (V), Madnoor (m), Kamareddy Dist.(Subject to confirmation by CT Dept.)

IIPP 2010-15

11/10/2017 Rs. 35,26,720/- (Rupees Thirty Five Lakhs Twenty Six Thousand Seven Hundred and Twenty Only)

8 M/s. Mangilal Gilda Industries, Sy. No. 182/1, Anantharam(V), Mahabubabad(M), Mahabubabad District

IIPP 2010-15

 16/10/2017

Rs. 4,89,605/- (Rupees Four Lakhs Eighty Nine Thousand Six Hundred and Five Only)

9 M/s. Jhawar Brothers, Sy.No. 26, T-IDEA 21/10/2017 Rs. 5,44,180/-

Page 56: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 56 ::

Ghanpur (V), Medchal (M), Medchal-Malkajgiri District

(Rupees Five Lakhs Forty Four Thousand One Hundred and Eighty Only)

10 M/s. Premier Oxygen, Plot No. 6 & 7, SVCIE, Balanagar (M), Medchal-Malkajgiri District

IIPP 2010-15

23/10/2017 Rs. 1,39,407/- (Rupees One Lakh Thirty Nine Thousand Four Hundred and Seven Only)

11 M/s. LorvenSai Engineers, Plot No. 36, Part, Road No. 15, Ph-I, IDA, Jeedimetla, Quthbullapur (M), Medchal-Malkajgiri District

T-IDEA 23/10/2017 Rs. 4,63,891/- (Rupees Four Lakhs Sixty Three Thousand Eight Hundred and Ninety One Only)

12 M/s. Ultrafil Air Systems (India) Private Limited, Plot No. 10/11, Road No. 5, IDA, Nacharam, Uppal (M), Medchal –Malkajgiri District

IIPP 2010-15

24/10/2017 Rs. 13,61,896/- (Rupees Thirteen Lakhs Sixty One Thousand Eight Hundred and Ninety Six Only)

13 M/s. Premier Oxygen, Plot No. 6 & 7, SVCIE, Balanagar (M), Medchal-Malkajgiri District

IIPP 2010-15

26/10/2017 Rs. 2,68,325/- (Rupees Two Lakhs Sixty Eight Thousand Three Hundred and Twenty Five Only)

14 M/s Darshan Cotton Industries, Sy.No. 213, Nirmal Road, Bhainsa (V&M), Nirmal, District

IIPP 2010-15

26/10/2017 Rs. 20,85,720/- (Rupees Twenty Lakhs Eighty Five Thousand Seven Hundred and Twenty Only)

15*

M/s M.B. Industries, Sy. No. 358 & 359, Gundaram, Nizamabad Dist.(Subject to confirmation by CT Dept.)

IIPP 2010-15

02/11/2017 Rs. 13,51,478/- (Rupees Thirteen Lakhs Fifty One Thousand Four Hundred and Seventy Eight Only)

16 M/s SaiDatta Ginning & Pressing Factory, Sainagar Main Road, Boath (Village &Mandal), Adilabd District

IIPP 2010-15

03/11/2017 Rs. 50,36,888/- (Rupees Fifty Lakhs Thirty Six Thousand Eight Hundred and Eighty Eight Only)

17 M/s Raghavendra Ginning & Pressing Factory, Sy.No. 163, Main Road, Boath (v&M), Adilabad District

IIPP 2010-15

03/11/2017 Rs. 60,71,616/- (Rupees Sixty Lakhs Seventy One Thousand Six Hundred and Sixteen Only)

Page 57: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 57 ::

REIMBURSEMENT OF POWER COST (ONLINE) ANNEXURE – IV

S. No.

Name & Address of the Unit Scheme DOR Receipt

Recommended Amount

1 M/s R.B. Industries, Sy.No. 5, Jaithpur, Wankidi, Kumurambhee, Asifabad District

T-IDEA 22/09/2017 Rs. 24,260/- (Rupees Twenty Four Thousand Two Hundred and Sixty Only)

2 M/s. Ramalingeshwara Cotton Industries, Sy. No. 315/B, 312/A & 312A/3, Musthyala(V), Cherial(M), Siddipet District

IIPP 2010-15

 05/10/2017

Rs. 1,64,412/- (Rupees One Lakh Sixty Four Thousand Four Hundred and Twelve Only)

3 M/s Suvarna Granites, Sy.No. 49/B, Khazipur (V), Karimnagar (M), Karimnagar District

IIPP 2010-15

06/10/2017 Rs. 1,68,830/- (Rupees One Lakh Sixty Eight Thousand Eight Hundred and Thirty Only)

4 M/s. Govind Industries, Sy.No. 160, Handekelur (V), Madnoor (m), Kamareddy Dist.

IIPP 2010-15

11/10/2017 Rs. 1,26,470/- (Rupees One Lakh Twenty Six Thousand Four Hundred and Seventy Only)

5 M/s. Sri SatyanarayanaSwamyCotex, 221/C2, 272, 272/A1, Gorrekunta(V), Geesugonda(M), Warangal Rural District.

T-IDEA 16/10/2017 Rs. 2,30,070/- (Rupees Two Lakhs Thirty Thousand and Seventy Only)

6 M/s. Nosch Labs Pvt. Ltd., Sy. No. 332, 333 and 335 Velimenedur(V), Chityal(M), Nalgonda District

IIPP 2010-15

 20/10/2017

Rs. 6,53,430/- (Rupees Six Lakhs Fifty Three Thousand Four Hundred and Thirty Only)

7 M/s. Surya Rice Industries, Sy. No. 312/3/A, 312/3/Aa, 313, Yadgarpalle, Miryalguda, Nalgonda District

IIPP 2010-15

 20/10/2017

Rs. 17,23,170/- (Rupees Seventeen Lakhs Twenty Three Thousand One Hundred Seventy Only)

8 M/s. Jhawar Brothers, Sy.No. 26, Ghanpur (V), Medchal (M), Medchal-Malkajgiri District

T-IDEA 21/10/2017 Rs. 49,920/- (Rupees Forty Nine Thousand Nine Hundred Twenty Only)

9 M/s. Sairam Food Grade Packaging Industries, Plot No. 43/D, IDA, Phase -V, Patancheru(V&M), Sanga Reddy District

IIPP 2010-15

 23/10/2017

Rs. 2,46,310/- (Rupees Two Lakhs Forty Six Thousand Three Hundred and Ten Only)

10 M/s Abhaya Enterprises, Sy.No. 303 & 304, Asifnagar (V), Karimnagar (M), Karimnagar

T-IDEA 24/10/2017 Rs. 1,10,750/- (Rupees One Lakh Ten Thousand Seven

Page 58: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 58 ::

District Hundred and Fifty Only)

11 M/s. Sri Sai Plastics, Plot No. 4B, Extension, Phase-II, IDA, Cherlapally (V), Kapra (M), Medchal-Malkajgiri District

IIPP 2010-15

25/10/2017 Rs. 89,690/- (Rupees Eighty Nine Thousand Six Hundred and Ninety Only)

12 M/s Darshan Cotton Industries, Sy.No. 213, Nirmal Road, Bhainsa (V&M), Nirmal, District

IIPP 2010-15

26/10/2017 Rs. 91,700/- (Rupees Ninety One Thousand Seven Hundred and Only)

13 M/s. S.L.N.S. Cold Storage, Sy.No: 180, Munpally (V), Jakranapally (M), Nizamabad Dist.

IIPP-2010-15

27/10/2017 Rs. 96,410/- (Rupees Ninety Six Thousand Four Hundred and Ten Only)

14 M/s. K.S. Cold Storage, Sy.No: Munipally (V), Jakranapally (M), Nizamabad Dist.

IIPP 2010-15

27/10/2017 Rs. 1,00,760/- (Rupees One Lakh Seven Hundred and Sixty Only)

15 M/s. Sairam Food Grade Packaging Industries, Plot No. 43/D, IDA, Phase -V, Patancheru(V&M), Sanga Reddy District

IIPP 2010-15

 30/10/2017

Rs. 2,44,870/- (Rupees Two Lakhs Forty Four Thousand Eight Hundred and Seventy Only)

16 M/s. M.B. Industries, Sy. No. 358 & 359, Gundaram, Nizamabad Dist.

IIPP 2010-15

02/11/2017 Rs. 16,930/- (Rupees Sixteen Thousand Nine Hundred Thirty Only)

17 M/s Abhaya Granites, Sy.No. 78/A & 78/C, Elegandla (V), Karimnagar (M), Karimnagar District

IIPP 2010-15

03/11/2017 Rs. 1,60,880/- (Rupees One Lakh Sixty Thousand Eight Hundred and Eighty Only)

18 M/s Hari Hara Granites, Sy.No. 78/A, B,C,D, Elegandla (V), Karimnagar (M), Karimnagar District

IIPP 2010-15

03/11/2017 Rs. 2,55,150/- (Rupees Two Lakhs Fifty Five Thousand One Hundred and Fifty Only)

19 M/s. Sri Sai Polymers, Sy.No. 186 & 186/1, (V), Dichpally (M), Nizamabad Dist.

T-IDEA 03/11/2017 Rs. 26,670/- (Rupees Twenty Six Thousand Six Hundred and Seventy Only)

Page 59: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 59 ::

INVESTMENT SUBSIDY – SCP (ONLINE) ANNEXURE – V

Sl.No.

Name and Address Date of receipt of claim

Caste Scheme Recommended Amount

Financing Institution

1 M/s Sri Tirumala Earth Movers, H.No. 4-36/3, Kadili (V), Dilawarpur (M), Nirmal

21/10/2017

SC (W) T-PRIDE Rs. 11,91,150/- (Rupees Eleven Lakhs Ninety One Thousand One Hundred and Fifty only)

Indus Ind Bank, Nizamabad

2 M/s GangadharJadi, H.No. 4-42, Thimmapur (V), Jannaram (M), Mancherial

21/10/2017

SC T-PRIDE Rs. 6,01,120/- (Rupees Six Lakhs One Thousand One Hundred and Twenty only)

The South India Bank Ltd., Mancherial

3 M/s Prashanthi Travels, H.No. 2-6-5, Hanamkonda, Warangal Urban

23/10/2017

SC T-PRIDE Rs. 2,37,360/- (Rupees Two Lakhs Thirty Seven Thousand Three Hundred Sixty only)

Canara Bank, Madikonda

4 M/s AnguriJanardhan, H.No. 7-79/A, Konaraopet (V &M), RajannaSircilla

24/10/2017

SC T-PRIDE Rs. 5,90,160/- (Rupees Five Lakhs Ninety Thousand One Hundred and Sixty only)

The Kotak Mahindra Bank Ltd., Karimnagar

5 M/s SingadhasariSwathi, H.No. 15-15/63, Serilingampally, Rangareddy

24/10/2017

SC (W) T-PRIDE Rs. 7,78,720/- (Rupees Seven Lakhs Seventy Eight Thousand Seven Hundred Twenty only)

The KarurVysya Bank Ltd., Serilingampally

6 M/s GummadiManohar, H.No. 5-88, Mamidipalle, Konaraopeta, RajannaSircilla

24/10/2017

SC T-PRIDE Rs. 5,90,160/- (Rupees Five Lakhs Ninety Thousand One Hundred and Sixty only)

HDFC Bank Ltd., Karimnagar

7 M/s Ganga Bhavani Enterprises, H.No.5-25/1, Veenavanka, Karimnagar

24/10/2017

SC (W) T-PRIDE Rs. 25,56,000/- (Rupees Twenty Five Lakhs Fifty Six Thousand only)

State Bank of India, Veenavanka

8 M/s Indira Ramachanrapu, H.No. 2-43, Nereducherla, Suryapet

24/10/2017

SC (W) T-PRIDE Rs. 11,67,830/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred Thirty only)

Indus Ind Bank, Miryalaguda

9 M/s Bhanu Earth Movers, H.No. 8-98, Cherla (Z), Cherla, BhadradriKothagudem

24/10/2017

SC T-PRIDE Rs. 9,32,180/- (Rupees Nine Lakhs Thirty Two Thousand One Hundred and Eighty only)

Andhra Bank, Bhadrachalam

10 M/s Pole Anitha, H.No. 2-139, Kalwakuthy,

26/10/2017

SC (W) T-PRIDE Rs. 26,10,000/- (Rupees Twenty Six

Indus Ind Bank Ltd.,

Page 60: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 60 ::

Kalwakurthy, Nagarkurnool Lakhs Ten Thousand only)

Secunderabad

11 M/s RyakamKanthaiah, H.No. 1-20, Chittapur, Dubbak, Siddipet

27/10/2017

SC T-PRIDE Rs. 5,08,890/- (Rupees Five Lakhs Eight Thousand Eight Hundered Ninety only)

Indus Ind Bank Ltd., Secunderabad

12 M/s RajuGorantla, H.No. 2-14, Perur, Devarakadra (M), Mahabubnagar

28/10/2017

SC T-PRIDE Rs. 11,19,220/- (Rupees Eleven Lakhs Nineteen Thousand Two Hundred Twenty only)

Shri Ram Commercial Vehicle Finance

13 M/s DurgamRajeshwari, H.No. 1-51, Kothapet, Velgatoor, Jagtial

28/10/2017

SC (W) T-PRIDE Rs. 7,56,970/- (Rupees Seven Lakhs Fifty Six Thousand Nine Hundred Seventy only)

Kotak Mahindra Bank Ltd., Karimnagar

14 M/s Yamini Earth Movers, H.No. 6-86, Mamnoor, Khila Warangal, Warangal Urban

30/10/2017

SC (W) T-PRIDE Rs. 18,87,230/- (Rupees Eighteen Lakhs Eighty Seven Thousand Two Hundred Thirty only)

Indian Overseas Bank, Shayampet Br

15 M/s Sai Earth Movers, H.No. 9-168, Kalluru (V), Kallur (M), Khammam

31/10/2017

SC (W) T-PRIDE Rs. 70,18,770/- (Rupees Seventy Lakhs Eighteen Thousand Seven Hundred Seventy only)

Andhra Bank, Kavirajnagar Br

16 M/s Manikya Travels, H.No. 57-6-116, Rampur (V), Kazipet (M), Warangal Urban

31/10/2017

SC (W) T-PRIDE Rs. 3,41,110/- (Rupees Three Lakhs Forty One Thousand One Hundred and Ten only)

Canara Bank, Madikonda

17 M/s GainiBhudevi, H.No. 1-24, Sanjivaraopet, Narayankhed, Sangareddy

31/10/2017

SC (W) T-PRIDE Rs. 11,67,810/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred and Ten only)

Indus Ind Bank Ltd., Secunderabad

18 M/s GouniRaju-Tata Hitachi, H.No. 1-71, Dharmapur, Raikode (M), Sangareddy

31/10/2017

SC T-PRIDE Rs.24,30,400/- (Rupees Twenty Four Lakhs Thirty Thousand Four Hundred only)

ICICI Bank Ltd.,

19 M/s SujathaKodapaka, H.No. 5-17/A, Chandraiahpally, Bhanjipet, Narsampet, Warangal Rural

31/10/2017

SC (W) T-PRIDE Rs. 11,13,750/- (Rupees Eleven Lakhs Thirteen Thousand Seven Hundred and Fifty only)

Indus Ind Bank Ltd., Secunderabad

20 M/s Rani Travels, 25-6-221, Vidyanagar, Kazipet (M), Warangal Uraban

01/11/2017

SC (W) T-PRIDE Rs. 5,40,940/- (Rupees Five Lakhs Forty Thousand Nine Hundred Forty only)

Karnataka Bank Ltd., Warangal

21 Pothuganti Moulali, H.No. 1-47, Dagadapalle, Veepangandla (M), Wanaparthy

02/11/2017

SC T-PRIDE Rs. 9,42,850/- (Rupees Nine Lakhs Forty Two Thousand Eight Hundred and

HDFC Bank Ltd., Ameerpet

Page 61: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 61 ::

Fifty only)22 Radharapu Nagajyothi,

H.No. 5-40, Penchikalpet, Atmakur (M), Warangal Rural

02/11/2017

SC (W) T-PRIDE Rs. 46,89,820/- (Rupees Forty Six Lakhs Eighty Nine Thousand Eight Hundred Twenty only)

Indus Ind Bank Ltd., Secunderabad

23 Middhe Shymala, H.No. 5-34, Chinnagundavelly, Siddipet (M), Siddipet

02/11/2017

SC (W) T-PRIDE Rs. 11,67,830/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred Thirty only)

Indus Ind Bank Ltd., Secunderabad

24 Madimadugu Chendrakala, H.No. 8-1-1/1, Padmanagar Colony, Near Pochamma Devalayam, Karmanghat, Saroornagar (M), Rangareddy

02/11/2017

SC (W) T-PRIDE Rs. 6,87,240/- (Rupees Six Lakhs Eighty Seven Thousand Two Hundred and Forty only)

Andhra Bank, Nadergul Branch

25 M/s Laxmi Earth Movers, H.No. 5-39, Chekkapalli (V), Vemulawada Rural (M), RajannaSircilla

03/11/2017

SC (W) T-PRIDE Rs. 11,67,750/- (Rupees Eleven Lakhs Sixty Seven Thousand Seven Hundred and Fifty only)

Andhra Bank, Vemulawada

26 BhagyammaPulla, 5-25, Chinnagattu, Hasanparthy (M), Warangal Urban

03/11/2017

SC (W) T-PRIDE Rs. 57,89,750/- (Rupees Fifty Seven Lakhs Eighty Nine Thousand Seven Hundred and Fifty only)

ICICI Bank Ltd., Warangal

27 Ananthamma Buggula, H.No. 3-99, Kalwal, Narva (M), Mahabubnagar

03/11/2017

SC (W) T-PRIDE Rs. 7,83,450/- (Rupees Seven Lakhs Eighty Three Thousand Four Hundred and Fifty only)

ICICI Bank, Mahabubnagar

28 Laxmi Kannamalla, H.No. 12-62, Choppadandi, Choppadandi (M), Karimnagar

03/11/2017

SC (W) T-PRIDE Rs. 14,67,930/- (Rupees Fourteen Lakhs Sixty Seven Thousand Nine Hundred Thirty only)

Punjab National Bank, Karimnagar

29 Vijaya Valuri, H.No. 14-134, Choppadandi, Choppadandi (M), Karimnagar

03/11/2017

SC (W) T-PRIDE Rs. 14,67,930/- (Rupees Fourteen Lakhs Sixty Seven Thousand Nine Hundred Thirty only)

Punjab National Bank, Karimnagar

30 Beulah Constructions, H.No. 3-68/D, Ballepally (V), Khammam Urban (M), Khammam

06/11/2017

SC (W) T-PRIDE Rs. 13,72,010/- (Rupees Thirteen Lakhs Seventy Two Thousand and Ten only)

HDFC Bank Ltd., Ameerpet

Page 62: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 62 ::

INVESTMENT SUBSIDY – TSP (ONLINE) ANNEXURE – VI

S. No.

Name & Address of the Unit

Date of Receipt

Caste Scheme Recommended Amount

Financial Institution

1 M/s Yerukali Anjaneyulu, C-42/8-27, Gadwal (V&M), Gadwal District

05/10/2017

ST T-PRIDE Rs 5,95,320/- (Rupees Five Lakhs Ninety Five Thousand Three Hundred and Twenty Only

Indusind Bank, Secunderabad

2 M/s Banothu Kalpana, H. No. 6-13, Bandarupalle (V), Mulugu (M), Jayashankar Bhupalpally District

09/10/2017

ST (W) T-PRIDE Rs 13,00,030/- (Rupees Thirteen Lakhs and Thirty Only)

Indusind Bank, Warangal

3 M/s E.V. Naik Borewells, 3-77, Cherla Gouraram (V), Kangal (M), Nalgonda District

09/10/2017

ST T-PRIDE Rs 35,77,620/- (Rupees Thirty Five Lakhs Seventy Seven Thousand Six Hundred Twenty Only)

Indian Overseas Bank, Lakdikapur Br.

4 M/s Lavudya Rajitha, H. No. 2-99/1, Husnabad (V&M), Siddipet District

16/10/2017

ST (W) T-PRIDE Rs 7,56,970/- (Rupees Seven Lakhs Fifty Six Thousand Nine Hundred and Seventy Only)

Kotak Mahindra Bank Ltd., Karimnagar Br.

5 M/s Jadav Kasinath, H. No. 6-67, Huggeli (V), Zaheerabad (M), Sanga Reddy District

21/10/2017

ST T-PRIDE Rs 4,72,540/- (Rupees Four Lakhs Seventy Two Thousand Five Hundred and Forty Only)

Syndicate Bank, Zaheerabad Br.

6 M/s Masru Pathuloth, H. No. 1-50, Bandalemoor, Manchal Mandal, Ranga Reddy District

26/10/2017

ST (W) T-PRIDE Rs 12,07,730/- (Rupees Twelve Lakhs Seven Thousand Seven Hundred Thirty Only)

HDFC Bank Ltd., Ameerpet

7 M/s Sharadha Kethavath, H. No. 8-81, Kadthal (V&m), Ranga Reddy

26/10/2017

ST (W) T-PRIDE Rs 9,08,310/- (Rupees Nine Lakhs Eight Thousand Three Hundred and Ten Only)

Andhra Bank

8 M/s Anjaneya Earth Movers, 9-78/34, Tanikella (V), Konijerla (M), Khammam District

28/10/2017

ST (W) T-PRIDE Rs 11,95,260/- (Rupees Eleven Lakhs Ninety Five Thousand Two Hundred and Sixty Only)

Karnataka Bank Ltd., Khammam

9 M/s Polam Lakshmiprasanna, 6-54, Laxmidevipeta (V), Venkatapur (M), Jayashankar Bhupalpally District

28/10/2017

ST (W) T-PRIDE Rs 6,94,680/- (Rupees Six Lakhs Ninety Four Thousand Six Hundred and Eighty Only)

IndusInd Bank Ltd., Warangal

10 M/s Tulasi Katravath, H. No. 1-200, Amistapur, Bhoothpur, Mahabubnagar District

28/10/2017

ST (W) T-PRIDE Rs 6,84,810/- (Rupees Six Lakhs Eighty Four Thousand Eight Hundred and Ten

Andhra Bank, Zonal Office, Mahabubnagar

Page 63: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 63 ::

Only)11 M/s Lavudya Suguna, H.

No. 2-97/A, Narmetta (V&M), Janagaon District

30/10/2017

ST (W) T-PRIDE Rs 11,91,150/- (Rupees Eleven Lakhs Ninety One Thousand One Hundred and Fifty Only)

Indusind Bank Ltd., Secunderabad

12 M/s Mudavath Chandi, H. No. 5-40, Indrakal (V), Tadoor (M), Nagarkurnool Districct

01/11/2017

ST (W) T-PRIDE Rs 11,67,830/- (Rupees Eleven Lakhs Sixty Seven Thousand Eight Hundred and Thirty Only

HDFC Bank Ltd., Ameerpet

13 M/s Bhukya Rajasree, H. No. 11-7-116, Warangal (V&M), Warangal Urban District

01/11/2017

ST (W) T-PRIDE Rs 7,63,270/- (Rupees Seven Lakhs Sixty Three Thousand Two Hundred and Seventy Only)

APGVB, Mothkur Br.

INVESTMENT SUBSIDY – PHC (ONLINE) ANNEXURE – VII

S. No.

Name & Address of the Unit

DOR in HOD

Caste Scheme

Recommend Amount Financing Institution

1 M/s Sri Ram Travels, 4-5-145, Khammam Urban Mandal, Khammam District

28/10/2017

PHC T-PRIDE Rs 7,76,880/- (Rupees Seven Lakhs Seventy Six Thosuand Eight Hundred and Eighty Only)

State Bank of India, Khammam

Page 64: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 64 ::

PAVALA VADDI -SCP (ONLINE) ANNEXURE – VIII

Sl.No.

Name and Address Date of receipt of claim

Caste Scheme

Recommend Amount

1 M/s GalipallySangeetha, H.No. 6-41, KGR Nagar, Badangpet, Saroornagar (M), Rangareddy

30/10/2017

SC (W) T-PRIDE Rs. 38,870/- (Rupees Thirty Eight Thousand Eight Hundred and Seventy only)

2 M/s Micron Engineering Enterprises, Plot No. 6/Part I, Patancheru (M), Sangareddy

06/11/2017

SC (W) T-PRIDE Rs. 4,80,090/- (Rupees Four Lakhs Eighty Thousand and Ninety only)

3 M/s Sri Bhavani Technologies, Plot No. 5/6, Patancheru, Sangareddy

06/11/2017

SC T-PRIDE Rs. 4,85,450/- (Rupees Four Lakhs Eighty Five Thousand Four Hundred and Fifty only)

4 M/s S.B Engineers, Plot No. 6 Part I, Patancheru (M), Sangareddy

06/11/2017

SC T-PRIDE Rs. 4,96,600/- (Rupees Four Lakhs Ninety Six Thousand Six Hundred only)

PAVALA VADDI - TSP (ONLINE) ANNEXURE – IX

Sl.No.

Name and Address Date of receipt of claim

Caste Scheme

Recommend Amount

1 M/s Lalitha Earth Movers, H. No. 6-77, Makt Akanchathanda, mankhal (V), Maheswaram (M), Ranga Reddy District

14-09-2017

ST(W) T-PRIDE Rs 1,34,960/- (Rupees One Lakh Thirty Four Thosuand Nine Hundred and Sixty Only)

2 M/s Ravi Travels, H. No. 11-69, Devapur (V), Kasipet (M), Mancherial District

27-09-2017

ST T-PRIDE Rs 66,709/- (Rupees Sixty Six Thousand Seven Hundred and Nine Only)

3 M/s Sri Srinivasam Industries, H. No. 5-2, Thaharapur (V), Shayampet (M), Warangal District

31-10-2017

ST T-PRIDE Rs 5,52,264/- (Rupees Five Lakhs Fifty Two Thousand Two Hundred and Sixty Four Only)

Page 65: SLC minutes... · Web viewThe unit is financed by Bank of India, SR Nagar branch for an amount of Rs. 99,00,000/- and approved project cost of the unit is Rs. 1,1833,825/- to set

:: 65 ::

SALES TAX –TSP(ONLINE) ANNEXURE – X

S. No.

Name & Address of the Unit

DOR in HOD

Caste Scheme Recommended Amount

1 M/s Sri Srinivasam Industries, H. No. 5-2, Thaharapur (V), Shayampet (M), Warangal District

31-10-2017 ST T-PRIDE Rs 10,98,000/- (Rupees Ten Lakhs Ninety Eight Thousand Only)

POWER COST – SCP (ONLINE) ANNEXURE – XI

S. No.

Name & Address of the Unit

Date of Receipt

Caste Scheme Recommended Amount

1 M/s KBS Industries, Sy.No. 180, 21,179, Edulapally (V), Jharasangam (M), Sangareddy

21/10/2017 SC T-PRIDE Rs. 1,05,200/- (Rupees One Lakh Five Thousand Two Hundred only)

POWER COST – TSP (ONLINE) ANNEXURE – XII

S. No.

Name & Address of the Unit

Date of Receipt

Caste Scheme Recommended Amount

1 M/s Sri Srinivasam Industries, H. No. 5-2, Thaharapur (V), Shayampet (M), Warangal District

31-10-2017 ST T-PRIDE Rs 85,008/- (Rupees Eighty Five Thousand and Eight Only)