SYSTEM INSTALLATION & CONSTRUCTION DETAIL MANUAL
SKYLINE TECHNICAL DOCUMENT 13.06.2013
ARCHITECTURAL‘CAP-LESS’ SOLUTIONSFOR PARAPET WALLS & BALCONY HEADS
2 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.20162 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.
SKYL
INE
OVE
R M
AST
ERW
ALL
SYS
TEM
.
SKYL
INE
MEM
BRA
NE:
Adva
nced
wat
erpr
oof m
embr
ane
to b
eap
plie
d as
per
Sky
line
Syst
em S
peci
�cat
ion.
STU
D F
RAM
E
FIXI
NG
S:75
mm
�xi
ng a
nd 4
0mm
but
ton
set
REN
DER
PRO
CESS
MA
STER
WA
LL B
REAT
HER
WRA
P:A
supe
rior t
rans
luce
nt b
reat
her f
ram
e w
rap
whi
ch
prov
ides
hig
h pe
rform
ance
vap
or p
erm
eabi
lity.
FIB
REG
LASS
REI
NFO
RCIN
G M
ESH
:Em
bedd
ed in
�rs
t lay
er o
f pol
ymer
rend
er.
MES
HED
& P
RIM
ED M
AST
ERW
ALL
PA
NEL
S:
Thic
knes
ses:
50/
75/1
00/1
25m
m R
1.8
/2.5
/3.2
/3.9
.**
Incl
udes
R 0
.5 a
llow
ance
for 9
0mm
fram
e, 1
0mm
pla
ster
boar
d.
Suita
ble
for B
AL 2
9 - s
ee M
aste
rWal
l Spe
ci�c
atio
ns.
ALL
OY
EXTE
RNA
L CO
RNER
S:
With
inte
grat
ed m
esh
retu
rns.
POLY
STYR
ENE
H-G
RAD
E W
EDG
E:(R
efer
to M
aste
rWal
l K-S
erie
s Sy
stem
In
stal
latio
n an
d Co
nstru
ctio
n De
tail
man
ual f
or B
AL40
det
ail).
NOT
E:
For B
ox G
utte
r det
ail,
retu
rn d
own
with
F/C
she
et (R
efer
to C
onst
ruct
ion
Deta
il in
Sky
line
Broc
hure
)
4 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016
INTRODUCTION
Description
The Skyline membrane may be installed over substrates that have a smooth surface for a strong bond, such as polystyrene, fibre cement, plywood, MasterWall panel, smooth render, concrete or smooth masonry. The Skyline membrane will adhere to rough surfaces when parged with Skyline compatible adhesive (consult Practica MMC). Adhesion test may be required.
Polystyrene Wedge
H Grade polystyrene wedges are recommended to parapet designs and should have a fall of 7° minimum back into the box gutter to avoid water run off the front edge of the building. Wedges should be screwed to parapet frame at 300mm centres using MasterWall fixings with 40mm red washers. Mitre all external/internal corners and tightly butt all joints together, no adhesive is required to wedge joints. Apply MasterWall Joint Foam between wedge/ MasterWall panel junction to seal joint on vertical face.
Fibre Cement (F/C)
When using F/C sheet as a surface for Skyline to bond to, a minimum of 4.5mm thick material should be used, such as with the drop down component into a box gutter on a parapet. Use only 6mm F/C sheet or greater on all horizontal surfaces such as balcony balustrades or cavity brick parapet when used as a cap. Use ‘cement tile adhesive’ to bond F/C to brick or masonry substrates.
Brick / Masonry
Bonding Skyline membrane to rough brick will require parging with a Skyline compatible adhesive or alternatively the surface can be coated with a smooth render finish which Skyline membrane will bond to as with brick veneer. A test patch should be performed to ensure good adhesion will result. Note: any smooth render should be dry prior to applying Skyline. Cavity brick will require a 6mm minimum F/C cap bonded with tile adhesive, and brick veneer a polystyrene cap to the rear (See details on page 13).
Detail Tape
Skyline compatible detail tape is to be applied to all ‘3 surface junctions’ to ensure complete water-tightness is achieved at the point of junction. (See detail on page 17 Detail tape should be 50x50mm square and pressed firmly onto all adjacent surface planes at the junction point. Avoid touching raw detail tape with hands, by using plastic film backing once removed from tape. (See Skyline installation video for correct technique)
Layout
Skyline membrane is to terminate minimum of 35mm onto all vertical surfaces to form a ‘cap’ for water runoff. All joins in the membrane shall overlap 75mm minimum. Vertical returns onto MasterWall cladding to be rendered shall be 75mm. Vertical returns behind alternative cladding shall be 100mm.
Cutting
Use sharp clean knife only to cut Skyline membrane.
Health and Safety
Skyline membrane poses no issues when coming in contact with skin; however avoid contact with eyes. Dispose all waste off cut material according local refuse regulations.
Method
Ensure all substrates are clean of dirt & dust and free of organic matter and solvents. Peel paper from back of Skyline membrane, smoothing out over applied area while working from one direction to ensure no air pockets exist. Apply strong pressure either by hand or roller to activate the adhesive bond of the butyl to the substrate.
5COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.
Joint Tape
Lap all membrane joins by 75mm minimum. Apply Skyline compatible adhesive to area to be bonded only, by laying two beads of adhesive, and smearing over entire bonded area with a scraper to a thin film of around 1mm. (See Skyline installation video for correct technique) None of the polyester fibre should be visible once adhesive is spread. Press top layer of Skyline onto the adhesive and apply hand pressure to firmly bond. (Note: avoid spreading adhesive on exposed face of Skyline that is to be rendered)
Adhesive Parging
To parge Skyline to substrate, apply 8mm beads of adhesive to substrate 40mm apart, and smear over entire bonded area with a scraper to a thin film of around 1mm. None of the substrate should be visible. Press Skyline onto the adhesive and apply hand pressure to firmly bond. (Note: avoid spreading adhesive on exposed face of Skyline that is to be rendered)
Penetrations
Ensure that no nails/screws or other fixings penetrate through the final Skyline membrane as it is a total waterproofing solution. This would void all warranties.
Warranty - 7 Years
Practica MMC Pty Ltd warrants that its products are free from defects in materials and workmanship for a period of 7 years from the date of purchase. For a full description of the Warranty refer to the Practica MMC website (http://www.practicammc.com.au).
Render
A minimum thickness of 5mm polymer modified render should be applied in two coats over entire Skyline system. A single layer of alkali resistant mesh (145–160 g/m2) must be embedded into the first coat of render.
Render trims should be pre-meshed alloy and should be either glued or embedded into first coat of render. Do not fix with nails or any fixing methods that entail the piercing of the Skyline membrane.
A texture finish to the coating manufacturer’s specification may be applied. It is highly recommended that in a parapet design the render system be over coated with an acrylic membrane for added protection and long term durability of the system.
6 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Box
gu
tter
4.5
mm
F/C
sh
eet
wit
h
50m
m w
idth
ret
urn
ed in
to
box
gu
tter
Min
7°
fall
Poly
styr
ene
H-G
rad
e w
edg
e
Raf
ter
Fib
reg
lass
rei
nfo
rcin
g m
esh
to
cov
er g
ap
bet
wee
n a
lloy
ang
le m
esh
ret
urn
s
Mas
terW
all®
pan
el
Sky
line
mem
bra
ne
(to
be
app
lied
as
per
S
kylin
e S
yste
m S
pec
i�ca
tio
n)
Min
imu
m 5
mm
ap
pro
ved
acr
ylic
re
nd
er s
yste
m
Mas
terW
all B
reat
her
Fra
me
Wra
p
Not
e: D
o no
t pea
rce
Skyl
ine
mem
bran
e w
ith m
echa
nica
l fas
tner
s th
roug
h th
e ho
rizo
ntal
pla
ne
All
exte
rnal
co
rner
s re
info
rced
wit
h a
lloy
ren
der
b
ead
wit
h in
teg
ral �
ber
gla
ss
mes
h r
ein
forc
ing
str
ip
SKYLINE SYSTEM / MASTERWALL® PANEL:
RENDERED PARAPET WALL
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
SUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.
Ad
equ
ate
bea
d o
f ex
pan
dab
le f
oam
co
nst
ruct
ion
ure
than
e at
mid
po
int
of
pan
el t
hic
knes
s
Mas
terW
all a
pp
rove
d 7
5mm
�
xin
g &
40m
m b
utt
on
set
Mas
terW
all a
pp
rove
d �
xin
g
& 4
0mm
bu
tto
n s
et
7COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
SKYLINE SYSTEM / MASTERWALL® PANEL:
RENDERED PARAPET WALL (CLOSE UP DETAIL)
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Not
e: D
o no
t pea
rce
Skyl
ine
mem
bran
e w
ith m
echa
nica
l fas
tner
s th
roug
h th
e ho
rizo
ntal
pla
nel
Mas
terW
all B
reat
her
Fra
me
Wra
p
Box
gu
tter
4.5m
m F
/C s
hee
t M
in. 5
0mm
in w
idth
Sky
line
Mem
bra
ne
(to
be
app
lied
as
per
S
kylin
e S
yste
m S
pec
i�ca
tio
n)
Min
imu
m 5
mm
ap
pro
ved
mes
h
rein
forc
ed p
oly
mer
ren
der
sys
tem
Poly
styr
ene
H G
rad
e w
edg
e
Fib
reg
lass
rei
nfo
rcin
g m
esh
to
cov
er g
ap
bet
wee
n a
lloy
ang
le m
esh
ret
urn
s
All
exte
rnal
co
rner
s re
info
rced
wit
h a
lloy
ren
der
b
ead
wit
h in
teg
ral �
ber
gla
ss
mes
h r
ein
forc
ing
str
ip
SUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.
Mas
terW
all a
pp
rove
d �
xin
g
& 4
0mm
bu
tto
n s
et
Mas
terW
all a
pp
rove
d 7
5mm
�xi
ng
&
40m
m b
utt
on
set
Ad
equ
ate
bea
d o
f ex
pan
dab
le f
oam
co
nst
ruct
ion
ure
than
e at
mid
po
int
of
pan
el t
hic
knes
s
8 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Box
gu
tter
F/C
sh
eet
4.5m
m w
ith
50
mm
wid
th r
etu
rned
in
to b
ox g
utt
er
Min
7°
fall
Rafte
r
Poly
styr
ene
H-G
rad
e w
edg
e
Koolt
her
m® p
anel
Not
e: D
o no
t pea
rce
Skyl
ine
mem
bran
e w
ith m
echa
nica
l fas
tner
s th
roug
h th
e ho
rizo
ntal
pla
nel
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Sky
line
mem
bra
ne
(to
be
app
lied
as
per
S
kylin
e S
yste
m S
pec
i�ca
tio
n)
Fib
reg
lass
rei
nfo
rcin
g m
esh
ove
r en
tire
Koolt
her
m® p
anel
sys
tem
Min
imu
m 5
mm
ap
pro
ved
mes
h r
ein
forc
ed
po
lym
er r
end
er s
yste
m
Mas
terW
all B
reat
her
Fra
me
Wra
p
All
exte
rnal
co
rner
s re
info
rced
wit
h a
lloy
ren
der
b
ead
wit
h in
teg
ral �
ber
gla
ss
mes
h r
ein
forc
ing
str
ip
SKYLINE SYSTEM / Kooltherm® PANEL:
RENDERED PARAPET WALLSUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.
Fib
reg
lass
rei
nfo
rcin
g m
esh
to
cov
er g
ap
bet
wee
n a
lloy
ang
le m
esh
ret
urn
s
Ad
equ
ate
bea
d o
f ex
pan
dab
le f
oam
co
nst
ruct
ion
ure
than
e at
mid
po
int
of
pan
el t
hic
knes
s
Mas
terW
all a
pp
rove
d 7
5mm
�
xin
g &
50m
m b
utt
on
set
Mas
terW
all a
pp
rove
d �
xin
g
& 5
0mm
bu
tto
n s
et
9COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Not
e: D
o no
t pea
rce
Skyl
ine
mem
bran
e w
ith m
echa
nica
l fas
tner
s th
roug
h th
e ho
rizo
ntal
pla
nel
Mas
terW
all B
reat
her
Fra
me
Wra
p
Box
gu
tter
Mas
terW
all a
pp
rove
d 7
5mm
�xi
ng
&
50m
m b
utt
on
set
4.5m
m F
/C s
hee
t -
50m
m w
idth
Sky
line
Mem
bra
ne
(to
be
app
lied
as
per
S
kylin
e S
yste
m S
pec
i�ca
tio
n)
Fib
reg
lass
rei
nfo
rcin
g m
esh
Min
imu
m 5
mm
ap
pro
ved
mes
h
rein
forc
ed p
oly
mer
ren
der
sys
tem
All
exte
rnal
co
rner
s re
info
rced
wit
h a
lloy
ren
der
b
ead
wit
h in
teg
ral �
ber
gla
ss
mes
h r
ein
forc
ing
str
ip
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
SKYLINE SYSTEM / Kooltherm® PANEL:
RENDERED PARAPET WALLSUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.
Poly
styr
ene
H G
rad
e w
edg
e
Fib
reg
lass
rei
nfo
rcin
g m
esh
to
cov
er g
ap
bet
wee
n a
lloy
ang
le m
esh
ret
urn
s
Mas
terW
all a
pp
rove
d 7
5mm
�xi
ng
&
50m
m b
utt
on
set
Ad
equ
ate
bea
d o
f ex
pan
dab
le f
oam
co
nst
ruct
ion
ure
than
e at
mid
po
int
of
pan
el t
hic
knes
s
10 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Box
gu
tter
F/C
sh
eet
4.5m
m w
ith
50m
m
wid
th r
etu
rned
into
box
gu
tter
Raf
ter
Min
imu
m 5
mm
ap
pro
ved
mes
h r
ein
forc
ed
po
lym
er m
od
i�ed
ren
der
sys
tem
Koolt
her
m® p
anel
Mas
terW
all B
reat
her
Fra
me
Wra
p
Not
e: D
o no
t pea
rce
Skyl
ine
mem
bran
e w
ith m
echa
nica
l fas
tner
s th
roug
h th
e ho
rizo
ntal
pla
nel
Sky
line
mem
bra
ne
(to
be
app
lied
as
per
S
kylin
e S
yste
m S
pec
i�ca
tio
n)
Mas
terW
all a
pp
rove
d a
dh
esiv
e
F/C
sh
eet
4.5m
m
Min
7°
fall
Poly
styr
ene
H-G
rad
e w
edg
e
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
All
exte
rnal
co
rner
s re
info
rced
wit
h a
lloy
ren
der
b
ead
wit
h in
teg
ral �
ber
gla
ss
mes
h r
ein
forc
ing
str
ip
SKYLINE SYSTEM / Kooltherm® PANEL:
BAL 40 RENDERED PARAPET WALL
Fib
reg
lass
rei
nfo
rcin
g m
esh
to
cov
er g
ap
bet
wee
n a
lloy
ang
le m
esh
ret
urn
s
Mas
terW
all a
pp
rove
d 7
5mm
�
xin
g &
50m
m b
utt
on
set
Mas
terW
all a
pp
rove
d �
xin
g
& 5
0mm
bu
tto
n s
et
11COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Not
e: D
o no
t pea
rce
Skyl
ine
mem
bran
e w
ith
mec
hani
cal f
astn
ers
thro
ugh
the
hori
zont
al p
lane
Mas
terW
all B
reat
her
Fra
me
Wra
p
Koolt
her
m® p
anel
Box
gu
tter
4.5m
m F
/C s
hee
t w
ith
50m
m w
idth
Sky
line
Mem
bra
ne
(to
be
app
lied
as
per
S
kylin
e S
yste
m S
pec
i�ca
tio
n)
Fib
reg
lass
rei
nfo
rcin
g m
esh
Min
imu
m 5
mm
ap
pro
ved
mes
h r
ein
forc
ed
po
lym
er m
od
i�ed
ren
der
sys
tem
Poly
styr
ene
H-G
rad
e w
edg
e
4.5m
m F
/C s
hee
t w
ith
50m
m w
idth
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
All
exte
rnal
co
rner
s re
info
rced
wit
h a
lloy
ren
der
b
ead
wit
h in
teg
ral �
ber
gla
ss
mes
h r
ein
forc
ing
str
ip
SKYLINE SYSTEM / Kooltherm® PANEL:
BAL 40 RENDERED PARAPET WALL (CLOSE UP)
Fib
reg
lass
rei
nfo
rcin
g m
esh
to
cov
er g
ap
bet
wee
n a
lloy
ang
le m
esh
ret
urn
s
Mas
terW
all a
pp
rove
d 7
5mm
�xi
ng
&
50m
m b
utt
on
set
Mas
terW
all a
pp
rove
d �
xin
g
& 5
0mm
bu
tto
n s
et
Mas
terW
all a
pp
rove
d a
dh
esiv
e
16 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
Note: Do not pearce Skyline membrane with mechanical fastners through the horizontal planel
Render note: Render system is to be polymer modi�ed render, fully �breglass mesh reinforced with alkali resistant render mesh, completed with desired texture �nish. It is recommended that a durable roll-on membrane / paint be applied to keep the surface clean.
These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.
MasterWall® Breather Frame Wrap
MasterWall® Breather Frame Wrap
Timber stud
Skyline membrane (to be applied as per Skyline System speci�cation)
Alternative claddinge.g. weatherboard, �bre cement sheeting, aluminium panel, metal sheeting, plywood etc. (as per manufacturers speci�cations)
Timber stud
Timber stud
Waling plate
F/C sheet 4.5mm
Polystyrene wedge or framed with F/C sheet
MasterWall approved adhesive
SKYLINE SYSTEM:
CONCEALED FLASHING DETAILWATERPROOF LEDGE OR SIMILAR
Min. 35mm Skyline membrane drop down
18 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016
SYSTEM CHECKLIST:
NOTES:
PRODUCT
Skyline membrane
MasterWall Panel
MasterWall Fixings
MasterWall Breather Frame Wrap
MasterWall Flashing Tape
Premium Quality Modified Liquid Sealant / Adhesive
Expandable Elastic Foam
Ableflex
DESCRIPTION
Waterproof Renderable Membrane
Precoated Polystyrene Panel (ready to render)
Screw Button Sets 100 p/box
Vapour Permeable Sarking
Self Adhesive Aluminium Tape (flashing windows & doors etc)
Premium Quality Modified Liquid Sealant
Expandable Urethane Flexible Foam (joint sealant)
Foam strip for rebated slab detail & expansion joints
SIZES
Width by request
50mm, 75mm, 100mm & 125mm
75mm
1350mm or 2700mm
75mm width
600ml sausage
700ml can
75mm width
COVERAGE
Job specification
1.2m x 2.4m (2.88m²)
300 Centres
82m² per roll
25m roll
2 per roll of flashing tape
65m² of MasterWall Panel
25m roll