skyline parking - mobilis · cycle time: 30–60 seconds short construction periods thanks to...
TRANSCRIPT
![Page 1: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/1.jpg)
Skyline Parking®
High Yield Parking Conceptsfor Prime Real Estate Locations
Swiss Engineering Excellence
Skyline Parking provides solutions for high density parking installations with Skyline T-Park, L-Park, S-Park and C-Park.
![Page 2: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/2.jpg)
Skyline-Parking SolutionsIncreasing mobility and traffic density lead to a high demandfor high density parking solutions.
Whether overground, underground, stand-alone or within buildings, Skyline Parking has the solution.
– highly profitable– highest parking density– reliable and fast.
32
![Page 3: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/3.jpg)
For the user:– no searching for parking spaces– no damages– no theft and crime– no maneuvering– time saving and comfortable– car protected against weather and vandalism
For the environment:– energy efficient– reduced CO2 emissions– creation of green spaces– ensures optimum utilization of space– energy generation through solar power– promotes small and electric cars
Benefits of Skyline Parking SolutionsFor the investor:– high yield investment opportunities in parking real estate– low risk due to ease of dismantling and relocating– high resistance to financial market fluctuations– short pay-back period– low and predictable operating costs– secure investment with high value retention– revenue from advertising and solar electricity
54
For urban planning:– aesthetic urban architecture– creation of traffic-free areas– fast and cost-efficient solutions for limited spaces– environmentally friendly and ecologically sustainable– ideal for temporary utilization of vacant property– simplified underground construction, less excavation work, short construction time
![Page 4: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/4.jpg)
– standard modules that can be assembled to a parking solution– that optimally meets the local requirements
The Skyline Parking Systems– Compact Multiple quantities of cars in a given construction volume
– Fast Cycle time: 30–60 seconds Short construction periods thanks to modular system technology
– Reliable High availability thanks to cutting-edge technology and use of redundant systems
– Profitable Return on Equity of over 25 %
76
![Page 5: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/5.jpg)
– free-standing parking towers with up to 8 entry/exit boxes above and below ground– 160-320 parking spaces on a area of 20x20 m
Skyline T-Park – The Most Compact and Profitable 98
![Page 6: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/6.jpg)
– in basements– in and between historical buildings worthy of preservation– in empty lots
Skyline L-Park – Parking within buildings 1110
![Page 7: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/7.jpg)
Skyline C-Park – The flexible solution for Park & Ride 1312
Park & Ride | Park & Fly | Park & Rail | Park & Pool– at train stations, subway stations and bus stops– at car reloading points such as ports and industrial plants– at highway service areas, junctions and meeting points
![Page 8: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/8.jpg)
– under inner-city intersections and buildings– in small city parks– along coastal promenades
Skyline S-Park – Parking in vertical shafts with 16m diameter 1514
![Page 9: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/9.jpg)
– with a diameter of 16m through all rock and ground water– continuous advance while simultaneously shuttering and sealing– low emissions by using an automated drilling process
Shaft excavation with most efficient manufacturing technology 1716
![Page 10: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/10.jpg)
Skyline Parking AG Skyline Sales Organization 1918
Builds where:– there is a great need for parking facilities– space is limited– there is a need to get the most out of a given space– solutions to traffic problems are required
– in large cities– on small surfaces– in existing buildings– for hospitals, hotels and office buildings– at traffic hubs such as airports, railway stations, etc.– for staff and customers– for car industry and automotive retail– for housing estates– at excursion destinations, ports, mountain railways, etc.
![Page 11: Skyline Parking - Mobilis · Cycle time: 30–60 seconds Short construction periods thanks to modular system technology – Reliable High availability thanks to cutting-edge technology](https://reader035.vdocuments.site/reader035/viewer/2022063003/5f5618da8e429366cf386bf5/html5/thumbnails/11.jpg)
Skyline Parking® at a glanceSkyline Parking® Market:• Citycenters • ParkandRide• HospitalsandHotels • Residentialareas• Airports • Amusementparks• Corporate,commercialand • Commercialfleet-management
shopping centers
Skyline Parking® Services:• Planning&Development • Financing• Turnkeycontracting • Scoutingofpromisinglocations• Maintenance • Completedismantlingandrelocation• Operating • Opportunityforadvertisementspace
MajorAdvantages• Strategic business with • Multiplepaymentpossibilities
significant growth potential • Additionalservicesavailablesuch• Profitableusageofvaluableplots aspre-ordersystem,integratedcarwash,• Availabilityofparkingspace entertainmentsystem,etc.• Proximitytothepointofinterest • Highperformanceandefficiency• Safeandeasytooperate • Creativeleeway•
Skyline Parking® Contact
SKYLINEPARKING®AG Phone: +41522030003Lagerhausstrasse3 Fax: +41522027521CH-8400 Winterthur Email: [email protected] Web: www.skyline-parking.com
© e
n-09
.201
2, S
kylin
e Pa
rkin
g®A
G,p
rodu
ced
bym
apro
.ch