ZIPPER “TAIL” Note: 11’ Ring Model shown as example. A B C D Skyline 8’ x 45” Ring Banner Assembly Instructions 1. Connect six 46” radius curved tubes together to create the top circle (connecting pins should be down). 2. Connect six 46” radius curved bottom tubes together to create the bottom circle (connecting pins should be up). 3. Vertical tubes will attach to the bottom circle at the joint where two tubes meet using the ey e bolt . Note: Eye bolts must face the inside of the structure for proper hanging. 4. Connect the top circle to the curved vertical tubes (already in place) using the supplied hex tool to secure the hex bolt of the clamp. 5. Remove banner from storage bag. Spread the banner out on a clean area on the floor. Separate the inside and outside sections of the banner to expose the bottom seam. Lift the finished frame and place it on the banner aligning the bottom circle and the seam. Match the holes with the ties in the inside section of the banner with the eye bolts of the vertical connectors. Fit the eye bolt through the hole and loosely tie the strings to the eye bolt (ILLUSTRATION A). Pull the inside section up and attach the hook and loop tabs to the upper tubes to hold it in place while zipping (ILLUS- TRATION B). Start the zipper at the “tail” and pull the outer section up while working the zipper around the frame. Unfasten the hook and loop tabs before zippering over them. Work to keep the zipper evenly aligned along the top of the tube (ILLUSTRATION C). To finish the zipper, tuck the “tail” of the zipper inside the banner before closing (ILLUS- TRATION D). Note: Banner is under tension – work carefully. 6 Attach the ends of the cable harness to the eye bolts in preparation for hanging. Part List: 12 Curved horizontal tubes 6 Curved vertical tubes 1 Cable assembly 1 Fabric banner 1 Hex key tool Skyline Displays, Inc. 3355 Discovery Road, Eagan, MN 55121 • 1-800-328-2725 • www.skylinedisplays.com ©2001 Skyline Displays, Inc. PN22956-A Finished Banner Eye bolt Hex Bolt

Upload: others

Post on 26-Sep-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Skyline 8’ x 45” Ring Bannermarketing.skylinefiles.com/website/Fabric-Structure-8-Foot-Ring.pdf · Skyline 8’ x 45” Ring Banner Assembly Instructions 1. Connect six 46”

ZIPPER “TAIL”

Note: 11’ Ring Modelshown as example.

A

B

C

D

Skyline 8’ x 45” Ring Banner

Assembly Instructions1. Connect six 46” radius curved tubes together to createthe top circle (connecting pins should be down).

2. Connect six 46” radius curved bottom tubes togetherto create the bottom circle (connecting pins should beup).

3. Vertical tubes will attach to the bottom circle at thejoint where two tubes meet using the eye bolt.Note: Eye bolts must face the inside of the structurefor proper hanging.

4. Connect the top circle to the curved vertical tubes(already in place) using the supplied hex tool to securethe hex bolt of the clamp.

5. Remove banner from storage bag. Spread the bannerout on a clean area on the floor. Separate the inside andoutside sections of the banner to expose the bottom seam.Lift the finished frame and place it on the banner aligningthe bottom circle and the seam. Match the holes with theties in the inside section of the banner with the eye bolts ofthe vertical connectors. Fit the eye bolt through the holeand loosely tie the strings to the eye bolt (ILLUSTRATION A).Pull the inside section up and attach the hook and loop tabsto the upper tubes to hold it in place while zipping (ILLUS-TRATION B). Start the zipper at the “tail” and pull the outersection up while working the zipper around the frame.Unfasten the hook and loop tabs before zippering overthem. Work to keep the zipper evenly aligned along the topof the tube (ILLUSTRATION C). To finish the zipper, tuck the“tail” of the zipper inside the banner before closing (ILLUS-TRATION D).Note: Banner is under tension – work carefully.

6 Attach the ends of the cable harness to the eye bolts inpreparation for hanging.

Part List:12 Curved horizontal tubes6 Curved vertical tubes1 Cable assembly1 Fabric banner1 Hex key tool

Skyline Displays, Inc. 3355 Discovery Road, Eagan, MN 55121 • 1-800-328-2725 • www.skylinedisplays.com ©2001 Skyline Displays, Inc. PN22956-A