skybus

19
SKYBUS METRO .

Upload: yajurvendra-tomar

Post on 13-Apr-2017

2.676 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: Skybus

SKYBUS METRO

.

Page 2: Skybus

CONTENTSintroduction.Skybus technology.Components of Skybus.

sky waysky bogiessky coachessky stationswitching arrangements

Working principle.Salient features.Safety measures.Advantages.Conclusion.

Page 3: Skybus

INTRODUCTION

This type of system has been successfully implemented in certain countries, where road has been added along with introduction of metro type transport system.

What is Skybus?

This concept was first presented in Bologna university Italy by MR.B Rajaram.

Sky Bus Technology Launched 15th Oct.2003,at Madgaon, Goa.

Page 4: Skybus

It is similar to the Wuppertal Suspension Railway or H-Bahn systems in Germany.

Page 5: Skybus

SKYBUS TECHNOLOGY

schematic arrangement

Page 6: Skybus

COMPONENTS OF SKYBUS

The components used in this are:

Sky way

Page 7: Skybus

SKY BOGIES

Page 8: Skybus

SKY COACHES

Page 9: Skybus

SKY STATION

Page 10: Skybus

SWITCHING ARRANGEMENT

Page 11: Skybus

WORKING PRINCIPLEStandard railway coach running on railway track.

The railways wheels remains same, they run on same track, the coach is firmly attached.

Page 12: Skybus
Page 13: Skybus

SALIENT FEATURES

Braking.Capacity of 20m long train unit.Route capacity.Security and safety (Raksha kavach)Easy access.Power requirements.

Page 14: Skybus

SAFETY MEASURESDynamic safety is improved.In Skybus wind cannot topple.Derailment arresters which prevents the wheel from jumping of the rails.Safety air bags are provided with each coaches.

Raksha Kavach will be there in each sky bogie.

Page 15: Skybus

ADVANTAGESFast transportation.Minimal land acquisition problems.No vandalism.No capsizing.Construction is fast compared to other railwaysAffordable chargesNo interference with road traffic.No pollution.No traffic jams .

Page 16: Skybus
Page 17: Skybus

WHY IT WAS NEVER BUILD IN INDIA A 1.6 km (1 mi) test track in Margao, Goa

started trials in 2004, but on 25 September, one employee was killed and three injured in an accident when the coaches hit the concrete track pillars. The test track was supposed to be extended to 10.5 km, but no progress has been made since the accident, and the system has not been adopted anywhere else in India.

Page 18: Skybus

SKYBUS METRO IN GOA

Page 19: Skybus

THANK YOU