skybim - accelerate project roll-out with integrated bim prototyping

38
ACCELERATE Virtual Construction & BIM Prototyping Collab www.skybim.com Banking Food Service Warehouses Healthcare Commercial Franchises PROJECT ROLL-OUT

Upload: skybim

Post on 23-Jan-2015

298 views

Category:

Technology


4 download

DESCRIPTION

SkyBIM (www.skybim.com) has developed a powerful 'Design-Cost-Build-Manage' BIM platform that can significantly accelerate the roll-out of similar projects by using multidisciplinary, fully costed BIM prototypes. The beauty of SkyBIM is that all important building data is cloud hosted and can be accessed and queried by all project stakeholders - anywhere, anytime - even across multiple projects. - Cost estimates are real-time and generated at the click of a button. - Owner receives 'digital doubles' of projects for asset tracking & facilities management. - Collab, our real-time collaboration tool, allow users to attach real-time information (messages, scheduled reminders, barcoding, status updates, checklists, files, photos, markups, etc) to BIM objects in any context. - SkyBIM incorporates classification standards such as UniFormat, MasterFormat & OmniClass. As simple as Lego Many Revit users tend to overmodel. SkyBIM's approach is to treat BIM elements as PLACEHOLDERS for REAL-WORLD PRODUCT RECIPES. This is much easier and way more flexible. Furthermore recipes are learnt across projects which means costing becomes progressively quicker with each successive project.

TRANSCRIPT

Page 1: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

ACCELERATE

Virtual Construction & BIM Prototyping

Collab www.skybim.com

Banking Food Service

Warehouses Healthcare Commercial

Franchises

PROJECT ROLL-OUT

Page 2: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

CAD versus BIM

• Primarily 2D

Computer Aided Design Building Information Modeling

• Dumb graphics (lines, arcs, circles, polylines)

• 3D, 4D, 5D, 6D, 7D & beyond

• Intelligent objects (walls, floors, doors, windows, columns)

time cost lifecycle green

Collab

• Basic measuring • ‘One-click’ bill of quantities

• Electronic drafting • Virtual construction

• AutoCAD • Revit

Page 3: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

BIM is a Steamroller

Collab

UK government has mandated their requirement for fully collaborative 3D BIM as a minimum by 2016

Worldwide, the foundations for a digital construction future are now being put in place

*UK Government Construction Strategy 2011

Page 4: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Traditional Design ‘Over the wall’ workflow

Work is sequential & slow

Silo mentality

Collab

Page 5: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

CONSTRUCTABILITY

Benefits of BIM

& Virtual Construction

Collab www.skybim.com

Page 6: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Integrated across Disciplines

Architecture

Structure

Mechanical

Electrical

Plumbing

HVAC

Fire

Speciality trades

Fixtures

Cost Estimating

Quantity surveying

Collab

Model includes major and minor disciplines

MOSAIC BIM

Cost Estimate

Page 7: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Collisions between Trades Architecture

Structure

Mechanical

Electrical

Plumbing

HVAC

Fire

Speciality trades

Fixtures

Quantity surveying

Collab

Up to 10 percent of the cost of a project is lost because of rework and avoidable collisions between trades

Page 8: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Complete Design Virtually Build entire project virtually before entering the physical space

Identify cost optimisations

Detect clashes

Collab

Page 9: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Shift Effort Curve left

Collab

Cost of design changes increases over time

Effort

BIM Traditional

Time

Page 10: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

360 Panoramic Visualisations Architecture

Structure

Mechanical

Electrical

Plumbing

HVAC

Fire

Speciality trades

Fixtures

Quantity surveying

Collab

View online or offline with iPad, iPhone, Android

Page 11: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Think of BIM as Intelligent BIM elements are fully parametric

Lego blocks

Lego blocks are simply [PLACEHOLDERS] for real-world products

Collab

Page 12: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Imagine Lego blocks… • with built-in real-world product recipes & costs

Collab

Azure BIM

Page 13: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Revit wall is simply a

[PLACEHOLDER]

for real-world products

Example real-world WALL recipe

Real-world products

Construction methods

Estimated Costs

Actual Costs

Manufacturer warranties

Maintenance records

Specifications

Documents

Photos

Radio Frequency IDs

Collab

Page 14: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Revit door is simply a

[PLACEHOLDER]

for real-world products

Real-world products

Construction methods

Estimated Costs

Actual Costs

Manufacturer warranties

Maintenance records

Specifications

Documents

Photos

Radio Frequency IDs

Example real-world DOOR recipe

Collab

Page 15: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Procurement, Material Tracking, Construction Status, Checklists

Manage Data in the Field

In DWF file, pick a door in plan, section, elevation or 3D

View SkyBIM recipe with ingredients

Specify Project Status for each ingredient

Back order

In transit

On site

Percentage complete

Installed

Tablet PC worker

Cost Reports

Planned vs Actual

(Use Checklists to flag any issues)

Collab

Page 16: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Example Shelving recipe

Simple rectangle

can be a

[PLACEHOLDER]

for real-world

products

Collab

Page 17: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Room/Area/Department recipe

Cold Room

29.78m2

Simple room area can be a [PLACEHOLDER] for real-world products

Collab

Page 18: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

• Cost quicker with each successive project

Projects learn from each other

Wall Recipe

Door Recipe

Wall Recipe

Door Recipe

Collab

Page 19: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Case Study:

100 Bed Hospital

Collab www.skybim.com

Tracking Silicone Sealant

Page 20: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Tracking Silicone Sealant In a 100-Bed Hospital

Silicone consumption:

6.70 m

Bath

Silicone consumption:

1.62 m

Basin

Silicone consumption:

1.96 m

Sink

Collab

Page 21: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Result = One-click Bill of Quantities Silicone sealant in 100-bed hospital: 918.62m

Model

Bill of Quantities

We know how much there is. We know where it is.

Collab

Page 22: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Track Quantities in the Field Reconcile Planned versus Actual

Planned 918.62 m R13 503.71

Actual 292.12 m R 4 294.18

Remaining 626.50 m R 9209.53

31.8%

(2) (112) (17)

• STATUS • Back order • In transit • On site • % Complete • Installed

• STATUS • Back order • In transit • On site • % Complete • Installed

Page 23: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

REUSABILITY

BIM Prototyping

Collab www.skybim.com

Page 24: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

HVAC

Equipment

Steel

Plant

Concrete

Walls

Doors/Windows

Rebar

Slabs Roofs

Floors

Bill of Quantities

BIM Prototype [KFC] fully integrated, fully specified, fully costed

Collab

Page 25: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Kitchen Equipment Library

Collab

Page 26: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Collab

Quicker turnaround versus traditional

Traditional Consultants

Integrated BIM Prototyping

“70% Complete Rule” By working

Parallel versus Sequential

BIM Prototyping is Fast

Page 27: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Collab

Optimised for Reusability & Rollout Do prototype properly, automate the rest

Page 28: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

HVAC

Equipment

Steel

Plant

Concrete

Walls

Doors/Windows

Rebar

Slabs Ceilings

Floors

Master BIM Prototype fully integrated, fully specified, fully costed Bill of Quantities

Page 29: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

COLLAB

Real-time Collaboration

Collab www.skybim.com

Page 30: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Select anything anywhere… plan, section, elevation, detail, 3D

PDF on steroids

Collab

Intelligent DWF Deliverables

Page 31: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Attach anything to anything

Real-time messaging

Reminders

Markups

Status Back order | In Transit | On site | % Complete | Installed

Discussions

Scheduled Maintenance | SMS/Email reminders

Intelligent contextual Markups | Smartpins

Photos

Product images, site photos, snags, progress

Files Attach documents - pdf, doc, xls | Warranties

Specifications Integrate specifications

Barcode RFID | Traceability

Mini BOQ Real-world building products | Rates

Collab

Page 32: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Scheduled Maintenance

How COLLAB works Real-time engine keeps everyone in sync

Project Manager

Engineer

Estimator

Contactor

Quantity Surveyor

Collab

Page 33: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

MANAGEABILITY

FM / Asset Management

Collab www.skybim.com

Page 34: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Supply Chain Visibility

Collab

Project 1 Silicone sealant around fittings

Project Product Qty Rate Amount

A Silicone sealant around fittings 55.623m R 14.70 R 817.66

B Silicone sealant around fittings 61.328m R 14.88 R 911.22

C Silicone sealant around fittings 92.549m R 15.20 R 1408.41

Silicone consumption:

6.70 m

Bath

Silicone consumption:

1.62 m

Basin

Silicone consumption:

1.96 m

Sink

Search and report across multiple projects

Project A Project B Project C

Page 35: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Owner receives Digital Double

Collab

for FM / Asset Management

Bill of Quantities

3D Model

Product Recipes

Collab

Digital Double of Project

2D Drawings*

*Traditional deliverables

Azure BIM

Page 36: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

SkyBIM is an extendible platform

Revit

Wall Recipe

Door Recipe

DWF (3D) DWF (2D) Your App

Room Recipe

• Technology is SQL / .NET Based

• Other apps can interface with SkyBIM-Collab

Collab

Page 37: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Compare the Deliverables

Collab

Integrated BIM Prototyping Traditional

Mostly paper based

Manual takeoff

Scheduled Reminders Maintenance

Real-time messaging

Checklists, Snaglists

Attach Files, Photos

Barcodes, RFID

Page 38: SkyBIM - Accelerate Project Roll-out with Integrated BIM Prototyping

Collab www.skybim.com

CONSTRUCTABILITY

COSTABILITY

REUSABILITY

MANAGEABILITY

KEY BENEFITS

Marek Brandstatter [email protected]

For more information contact: