skripsi - eprints.umk.ac.ideprints.umk.ac.id/5009/1/halaman_judul.pdf · vii abstract the bridge is...

18
i SKRIPSI SISTEM PENDUKUNG KEPUTUSAN PENENTUAN KELAYAKAN PEMBANGUNAN JEMBATAN BERDASARKAN STRUKTUR TANAH Oleh : Moh Khoirudin 2011-51-262 PROGRAM STUDI TEKNIK INFORMATIKA FAKULTAS TEKNIK UNIVERSITAS MURIA KUDUS 2015

Upload: nguyendat

Post on 23-Mar-2019

212 views

Category:

Documents


0 download

TRANSCRIPT

i

SKRIPSI

SISTEM PENDUKUNG KEPUTUSAN PENENTUAN

KELAYAKAN PEMBANGUNAN JEMBATAN BERDASARKAN

STRUKTUR TANAH

Oleh :

Moh Khoirudin

2011-51-262

PROGRAM STUDI TEKNIK INFORMATIKA

FAKULTAS TEKNIK

UNIVERSITAS MURIA KUDUS

2015

ii

SKRIPSI

SISTEM PENDUKUNG KEPUTUSAN PENENTUAN

KELAYAKAN PEMBANGUNAN JEMBATAN BERDASARKAN

STRUKTUR TANAH

Oleh :

Moh Khoirudin

2011-51-262

PROGRAM STUDI TEKNIK INFORMATIKA

FAKULTAS TEKNIK

UNIVERSITAS MURIA KUDUS

2015

iii

iv

v

vi

vii

ABSTRACT

The bridge is a means of connecting between places separated by the river, the

bridge construction project aims to mmemperlancar path of the economy,

development and connecting lines between the place or region .. In this paper the

authors designed sustu system capable of supporting decisions that determine the

structure of the soil to membangu bridge. Applications built a web-based

applications using the programming language PHP and using MySQL databse. The

method used in this application is Analytichal Hierarchy Process (AHP). This

method is a method known as weighted summation method used to find the optimal

alternative of a number of alternatives with the following criteria: soil structure,

layout area, bridge type, soil type, the type of foundation. then also requires the

decision matrix normalization process to a scale which can be compared with all the

ratings of existing alternatives so as to determine the feasibility of building a bridge

that is based on the structure of the soil.

Keywords: bridge, project, site, Systems, Analytical Hierarchy Process (AHP), Php,

MySQL

viii

ABSTRAK

Jembatan adalah suatu sarana penghubung antar tempat yang terpisah oleh

sungai, proyek pembangunan jembatan bertujuan untuk mmemperlancar jalur

perekonomian, pembangunan dan jalur penghubung antar tempat atau wilayah.. Pada

skripsi ini penulis merancang sustu sistem Pendukung keputusan yang mampu

menentukan struktur tanah untuk membangu jembatan. Aplikasi yang dibangun

merupakan aplikasi berbasis web dengan menggunakan bahasa pemrograman php

dan menggunakan databse MySQL. Metode yang digunakan dalam aplikasi ini adalah

Analytichal Hierarchy Process(AHP). Metode ini merupakan metode yang dikenal

dengan metode penjumlahan berbobot yang digunakan untuk mencari alternatif

optimal dari sejumlah alternatif dengan kriteria-kriteria sebagai berikut: struktur

tanah, letak daerah, jenis jembatan, jenis tanah, jenis pondasi. kemudian juga

membutuhkan proses normalisasi matriks keputusan ke suatu skala yang dapat

diperbandingkan dengan semua rating alternatif yang ada sehingga dapat

menentukan kelayakan bangunan jembatan yang berdasarkan struktur tanah.

Kata kunci :jembatan, proyek, Web, Sistem, Analytichal Hierarchy Process(AHP),

Php, MySQL

ix

KATA PENGANTAR

Puji syukur kehadirat Allah SWT karena atas Rahmat dan Hidayah-Nya

penulis mampu menyelesaikan penyusunan skripsi ini dengan judul “sistem

pendukung keputusan penentuan kelayakan pembangunan jembatan berdasarkan

struktur tanah dengan menggunakan metode analitychal hierarchy process (AHP).

Skripsi ini disusun guna melengkapi salah satu persyaratan untuk

memperoleh Gelar Kesarjanaan Progam Studi Teknik Informatika Fakultas Teknik

Universitas Muria Kudus. Pada kesempatan ini, penulis ingin menyampaikan rasa

terima kasih yang sebesar-besarnya kepada :

1. Allah SWT yang telah memberikan Rahmat dan Hidayah-Nya.

2. Bapak Dr. Soeparnyo, selaku Rektor Universitas Muria Kudus.

3. Bapak Rochmad Winarso, ST., MT., selaku Dekan Fakultas Teknik Universitas

Muria Kudus.

4. Bapak Ahmad Jazuli, M.Kom, selaku Ketua Program Studi Teknik Informatika

Universitas Muria Kudus.

5. Ibu Rina Fiati, S.T,M.Cs selaku pembimbing I yang telah banyak memberikan

masukan selama penyusunan skripsi ini.

6. Bapak Arief Susanto, S.T, M.Kom, selaku pembimbing II yang telah banyak

memberikan masukan selama penyusunan skripsi ini.

7. Teman-Teman Teknik Informatika Angkatan 2011, yang sudah memberikan

masukan dan nasehat untuk menyelesaikan skripsi ini dan proses akhir laporan

skripsi, serta semua pihak yang telah membantu penyusunan skripsi ini yang tidak

bisa penulis sebutkan satu persatu, yang telah memberikan semangat dan

motivasi.

Penulis menyadari sepenuhnya bahwa dalam penyusunan skripsi ini masih

terdapat banyak kekurangan. Selain itu penulis juga berharap semoga karya tulis ini

dapat memberikan manfaat bagi semua.

Kudus, 22 Desember 2015

Penulis

x

DAFTAR ISI

Halaman

HALAMAN SAMPUL ......................................................................................................... i

HALAMAN JUDUL ............................................................................................................. ii

PENGESAHAN STATUS SKRIPSI ................................................................................... iii

PERNYATAAN PENULIS ................................................................................................. iv

PERSETUJJUAN SKRIPSI ................................................................................................. v

PENGESAHAN SKRIPSI ................................................................................................... vi

ABTRACT ............................................................................................................................ vii

ABSTRAK ............................................................................................................................ viii

KATA PENGANTAR .......................................................................................................... ix

DAFTAR ISI ......................................................................................................................... x

DAFTAR TABEL ................................................................................................................. xiv

DAFTAR GAMBAR ............................................................................................................ xvi

DAFTAR LAMPIRAN ......................................................................................................... xix

BAB 1 PENDAHULUAN .................................................................................................... 1

1.1 Latar Belakang .................................................................................................... 2

1.2 Rumusan Masalah ............................................................................................... 2

1.3 Batasan Masalah.................................................................................................. 2

1.4 Tujuan Penelitian ................................................................................................ 3

1.5 Manfaat Penelitian .............................................................................................. 3

BAB II TINJAUAN PUSTAKA ........................................................................................... 4

2.1 Penelitian Terkait ................................................................................................ 4

2.2 Landasn Teori...................................................................................................... 8

2.2.1 Pengertian Sistem Pendukung

Keputusan…..................................... ................................................................... 8

xi

2.2.2 Tujuan Sistem Pendukung Keputusan ....................................................... 8

2.2.3 Fase Pengambilan Keputusan .................................................................... 9

2.2.4 Arsitektur Sistem Pendukung Keputusan................................................... 10

2.2.5 Karateristik Sisitem Pendukung Keputusan ............................................... 11

2.2.6 Metode Analitychal hierarchy process ....................................................... 12

2.2.6.1 Prinsip dasar Metode Analitychal hierarchy process .................... 12

2.2.7 Database Sistem Pendukung Keputusan .................................................... 14

2.2.8 Analisa Sistem ............................................................................................ 14

2.2.9 Perancangan Sistem ................................................................................... 15

2.2.9.1 Bagan Alir (Flowchart) .................................................................. 15

2.2.9.2 Entity Relationship Diagram (ERD) .............................................. 17

2.2.9.3 Data Flow Diagram (DFD) ............................................................ 18

2.2.9.4 Perangkat Lunak yang Digunakan ................................................. 19

2.2.9.4.1 PHP ....................................................................................... 19

2.2.9.4.2 MySQL................................................................................... 21

2.2.9.4.3 HTML .................................................................................... 21

2.2.9.4.4 CSS ........................................................................................ 22

2.2.9.4.5 Jquery .................................................................................... 22

2.2.9.4.6 Macromedia Dreamweaver CS5 ........................................... 22

2.3 Kerangka pemikiran ............................................................................................ 23

BAB III METODE PENELITIAN........................................................................................ 24

3.1 Metode Pengumpulan Data ................................................................................. 24

3.2 Metodologi Pengembangan Sistem Pendukung Keputusan ................................ 24

xii

BAB IV PERANCANGAN SISTEM ................................................................................... 26

4.1 Deskripsi Masalah ............................................................................................... 26

4.2 Tujuan Sistem Pendukung Keputusan ................................................................ 26

4.3 Pengguna Sistem Pendukung Keputusan ............................................................ 26

4.4 Variabel-variabel Keputusan / Kriteria-kriteria .................................................. 26

4.5 Diagram / Arsitektur Sistem Pendukung Keputusan .......................................... 29

4.6 Metode Analitycal Hierarchy Process(AHP) digunakan untuk

menghitung kelayakan pembangunan jembatan berdasarkan struktur

tanah .................................................................................................................... 30

4.7 Perhitungan Metode Analitycal Hierarchy Process(AHP) ................................. 31

4.7.1 Pemberian Bobot Kriteria ......................................................................... 31

4.7.2 Pemberian Bobot Subkriteria .................................................................... 32

4.7.3 Penilaian Subkriteria ................................................................................. 34

4.7.4 Perkalian kriteria ....................................................................................... 36

4.8 Desain .................................................................................................................. 37

4.8.1 Pemodelan Data ........................................................................................ 37

4.8.1.1 ERD (Entity Relational Diagram) ................................................... 37

4.8.1.2 Tabel-tabel........................................................................................ 38

4.8.1.3 Relasi antar tabel .............................................................................. 45

4.8.2 Pemodelan Proses...................................................................................... 46

4.8.2.1 Bagan Air (Flowchart) ..................................................................... 46

4.8.2.2 Context Diagram .............................................................................. 49

4.8.2.3 Dekomposisi Sistem Pendukung Keputusan kelayakan

pembangunan jembatan ............................................................................... 51

4.8.2.4 DFD (Data Flow Diagram) ............................................................. 52

4.8.3 Desain Antarmuka (Interface)................................................................... 60

4.8.3.1 Halaman User ................................................................................... 60

xiii

4.8.3.2 Desain Input dan Output .................................................................. 64

BAB V IMPLEMENTASI SISTEM .................................................................................... 70

5.1 Kebutuhan Sistem ............................................................................................... 70

5.2 Imtplementasi Aplikasi ....................................................................................... 71

5.3 pengujian ............................................................................................................. 80

5.3.1 Hasil Pengujian Sistem Menggunakan Black box ...................................... 80

5.3.2 Kesimpulan Hasil Pengujian Black box ..................................................... 82

BAB VI PENUTUP ............................................................................................................. 83

6.1 Kesimpulan ......................................................................................................... 83

6.2 Saran .................................................................................................................... 83

DAFTAR PUSTAKA

LAMPIRAN-LAMPIRAN

xiv

DAFTAR TABEL

Halaman

Tabel 2.1 Perbandingan Penelitian Terkait ......................................................................... 5

Tabel 2.2 Penilaian kriteria dan alternatif ........................................................................... 13

Tabel 2.3 Simbol-simbol Flowchart ................................................................................... 16

Tabel 2.4 Komponen- komponen ERD ............................................................................... 17

Tabel 4.1 Matrix perbandingan kriteria .............................................................................. 31

Tabel 4.2 Matrix perbandingan kriteria struktur tanah ....................................................... 32

Tabel 4.3 Matrix perbandingan kriteria letak daerah .......................................................... 33

Tabel 4.4 Matrix perbandingan kriteria jenis jembatan ...................................................... 33

Tabel 4.5 Matrix perbandingan kriteria jenis tanah ............................................................ 33

Tabel 4.6 Matrix perbandingan kriteria jenis pondasi ........................................................ 34

Tabel 4.7 Matrix penilaian kriteria struktur tanah .............................................................. 34

Tabel 4.8 Matrix penilaian kriteria letak daerah ................................................................ 34

Tabel 4.9 Matrix penilaian kriteria jenis jembatan ............................................................. 35

Tabel 4.10 Matrix penilaian kriteria jenis tanah ................................................................. 35

Tabel 4.11 Matrix penilaian kriteria jenis pondasi.............................................................. 35

Tabel 4.12 Petugas .............................................................................................................. 39

Tabel 4.13 Data jembatan ................................................................................................... 40

Tabel 4.14 Kriteria .............................................................................................................. 40

Tabel 4.15 Subkriteria ......................................................................................................... 41

Tabel 4.16 Penilaian ............................................................................................................ 42

Tabel 4.17 Batas keputusan................................................................................................. 43

Tabel 4.18 Tipe Jembatan ................................................................................................... 43

Tabel 4.17 Lokasi Jembatan ................................................................................................ 43

Tabel 4.17 Detail Penilaian ................................................................................................. 44

xv

Tabel 5.1 Hasil Pengujian Halaman Kriteria ...................................................................... 81

Tabel 5.2 Hasil Pengujian data kriteria ............................................................................... 81

Tabel 5.3 Hasil Pengujian Halaman penilaian .................................................................... 82

xvi

DAFTAR GAMBAR

Halaman

Gambar 2.1 Proses pengambilan keputusan.......................................................................... 9

Gambar 2.2 Arsitektur Decision Support System .................................................................. 11

Gambar 2.2 Kerangka Pemikiran .......................................................................................... 23

Gambar 4.1 Diagram Arsitektur Sistem pendukung keputusan penentuan kelayakan

pembangunan jembatan metode AHP ............................................................... 29

Gambar 4.2 Struktur hierarki sistem pendukung keputusan penentuan kelayakan

pembangunan jemabatan ................................................................................... 30

Gambar 4.3 ERD ................................................................................................................... 38

Gambar 4.4 Relasi Antar Tabel ............................................................................................. 46

Gambar 4.5 Bagan Alir (Flowchart) yang sedang berjalan .................................................. 47

Gambar 4.6 Bagan Alir (Flowchart) Sistem Yang diusulkan ............................................... 48

Gambar 4.7 Context Diagram ............................................................................................... 50

Gambar 4.8 Analysis Report-Rule Check Context Diagram ................................................. 50

Gambar 4.9 Analysis Report-Level Balance Context Diagram ............................................ 51

Gambar 4.10 Dekomposisi Sistem Pendukung Keputusan kelayakan pembangunan

jembatan ................................................................................................................................ 51

Gambar 4.11 DFD level 0 ..................................................................................................... 52

Gambar 4.12 Analysis Report-Rule Check DFD level 0 ....................................................... 53

Gambar 4.13 Analysis Report-Level Balace DFD Level 0 ................................................... 54

Gambar 4.14 DFD level 1 Pendataan Kriteria ...................................................................... 54

Gambar 4.15 Analysis Report-Rule Check DFD level 1 Pendataan Kriteria ........................ 55

Gambar 4.16 Analysis Report-Level Balance DFD level 1 Pendataan Kriteria .................... 55

Gambar 4.17 DFD level 1 Pendataan SubKriteria ................................................................ 56

Gambar 4.18 Analysis Report-Rule Check DFD level 1 Pendataan SubKriteria .................. 56

xvii

Gambar 4.19 Analysis Report-Level Balance DFD level 1 Pendataan SubKriteria ............. 57

Gambar 4.20 DFD level 1 Proses perhitungan Keputusan .................................................... 58

Gambar 4.21 Analysis Report-Rule Check DFD level 1 Perhitungan Keputusan................. 59

Gambar 4.22 Analysis Report-Level Balance DFD level 1 Perhitungan Keputusan ............ 59

Gambar 4.23 Layout Halaman .............................................................................................. 60

Gambar 4.24 Struktur Menu Petugas .................................................................................... 61

Gambar 4.25 Halaman Menu Utama Petugas ....................................................................... 62

Gambar 4.26 Struktur Menu kontraktor ................................................................................ 63

Gambar 4.27 Halaman Menu Utama kontraktor ................................................................... 63

Gambar 4.28 Desain Halaman Login .................................................................................... 64

Gambar 4.29 Desain Peringatan Login gagal ....................................................................... 64

Gambar 4.30 Desain Halaman menu kriteria ........................................................................ 64

Gambar 4.31 Desain Halaman subkriteria ............................................................................ 65

Gambar 4.32 Desain Halaman batas keputusan .................................................................... 66

Gambar 4.33 Desain Halaman menu data jembatan ............................................................. 66

Gambar 4.34 Desain Halaman output data jembatan ............................................................ 67

Gambar 4.35 Desain Halaman data penilaian ....................................................................... 68

Gambar 4.36 Desain Halaman output daftar hasil penilaian................................................. 69

Gambar 5.1 Tampilan Utama Pada sistem ............................................................................ 71

Gambar 5.2 Tampilan script menu utama ............................................................................. 71

Gambar 5.3 Tampilan Menu kriteria ..................................................................................... 73

Gambar 5.4 Tampilan script menu kriteria ........................................................................... 74

Gambar 5.5 Tampilan halaman penilaian ............................................................................. 75

Gambar 5.6 Tampilan script inputan penilaian ..................................................................... 77

Gambar 5.7 Tampilan Menu cetak data ................................................................................ 78

Gambar 5.8 Tampilan script cetak data................................................................................. 79

xviii

DAFTAR LAMPIRAN

Lampiran 1 Data penilaian jembatan

Lampiran 2 Buku Konsultasi Skripsi

Lampiran 3 Lembar Revisi Sidang Skripsi