Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

SSIX MONTHLY COMPLIANCE REPORT

DECEMBER- 2016

“GROUP HOUSING COMPLEX”

MAHAGUN MANTRA - II

AT

GH-01, Sector-10, Greater Noida, U.P.

Being developed by

M/s Hebe Infrastructure Pvt. Ltd.

The Corenthum Tower-B, Office no. B-44,

Plot no.-A-41, Sector-62,

Noida, U.P-201301

Prepared by

M/s Perfact Services

(ISO9001:2008& ISO14001:2004 Certified)

501-507, 5th Floor, NN Mall,

Mangalam Palace, Sector 3 Rohini, New Delhi

Page 3: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

LIST OF ANNEXURE

ANNEXURE DETAILS

ANNEXURE -I COPY OF GRANTED ENVIRONMENTAL CLEARANCE

ANNEXURE – II COPY OF RECEIPT OF CTE APPLIED

ANNEXURE – III MONITORING REPORTS OF AIR, WATER, SOIL, NOISE

& STACK

ANNEXURE - IV HEALTH CERTIFICATES OF FEW WORKERS ENGAGED

DURING CONSTRUCTION WORK

ANNEXURE – V PUC CERTIFICATES OF FEW VEHICLES HIRED FOR

CONSTRUCTION

ANNEXURE - VI COPY OF HEIGHT CLEARANCE FROM AAI

ANNEXURE-VII COPY OF ELECTRICITY BILL

ANNEXURE-VIII COPY OF FIRE APPROVAL

ANNEXURE-IX COPY OF FLY ASH PURCHASE BILL

ANNEXURE-X COPY OF WATER SUPPLY BILL

Page 4: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

1. Introduction:

The “Group Housing” Project is located at Plot no. GH-01A, Sector-10, Greater Noida, U.P being

developed by M/s Hebe Infrastructure Pvt. Ltd.

Name of the project Group Housing “Mahagun Mantra II”

Site address Plot no. GH-01A, Sector-10, Greater Noida,

U.P.

Developed By M/s Hebe Infrastructure Pvt. Ltd.

Environment Clearance Letter No 1522/Praya/SEAC/2481/2013-14/AD(S)

Dated 8 December, 2015

Period of Compliance Six monthly compliance: Period April-2016

to September-2016, Submission due in

December-2016

Project Description Project involves the construction of Group

Housing on a plot area of 23657.31 Sqm.

Built up area of the project is 135,405.18

Sqm.

Construction Status Construction under progress

Proposed Year of Commencement 2014

Proposed year of completion 2018

Page 5: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

2. Project Description

The Group Housing Project will have the following salient features: -

Particulars Details

Total Plot Area 23657.31 m2

Built up Area 135405.18 m2

Green Area 9540.27 m2

No. of Towers 3

No. of RWH pits 6

Power requirement 4820 KVA

Height of Building 87.1 m

Parking space proposed 1322ECS

Total water requirement 428 KLD

Total no. of D.G sets 4 D.G sets of capacity of 600 KVA

Estimated Solid waste generation

2426 Kg per day

Page 6: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

3. Construction Progress Status:

S. No. Component Construction status as per December-16

1 Civil construction

(Structural work, Brick work & Plaster work)

35% Completed

2 Plumbing 12% Completed

3 Electrical work 15% Completed

4 Fire Fighting Not yet Started

5 Sewage Treatment Plant Not yet Started

6 Rain Water Harvesting Not yet Started

7 Sewerage, Drainage etc. Not yet Started

8. D.G Room, AC Plant Room Not yet Started

9. Landscape work Not yet Started

10. Finishing work Not yet Started

Page 7: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

Site Photographs

Page 8: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

Page 9: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – June-2016 M/s Hebe Infrastructure Pvt. Ltd

Green Area Present at the site

December-2016

Page 10: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

4. Current Status of point – wise compliance of the stipulated environmental conditions/safeguards.

S. No General Conditions: Reply

1. It shall be ensured that all standards related to

ambient environmental quality and the

emission/ effluent standards as prescribed by

the MOEF are strictly compiled with.

Standards related to ambient environmental

quality & emission / effluent standards

prescribed by the MoEF are being complied.

Test reports are enclosed as Annexure-III.

2. It shall be ensured that obtain the no

objection certificate from the U.P. Pollution

Control Board before start of construction.

Noted

3. It shall be ensured that no construction work

or preparation of land by the project

management except for securing the land is

started on the project or the activity without

the prior environmental clearance.

We have obtained Environmental Clearance

vide letter no. 1522/Praya/SEAC/2481/2013-

14/AD(S) Dated 8 December, 2015

Construction was started after getting

Environmental Clearance. Copy for the EC is

enclosed as Annexure-I.

4. The proposed land use shall be in accordance

to the prescribed land use. A land use

certificate issued by the competent authority

shall be obtained in this regards.

The site is earmarked for development of

Group Housing Complex and hence no land

use change is anticipated.

5. All trees felling in the project area shall be as

permitted by the forest department under the

prescribed rules. Suitable clearance in this

regard shall be obtained from the competent

Authority.

Not applicable as no tree exists at the project

site.

6. Impact of drainage pattern on environment

should be provided.

No impact of drainage pattern on

environment.

Page 11: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

7. Surface hydrology and water regime of

Project area within 10 Km. should be

provided.

10 km radius Topographical map has already

been submitted.

8. A suitable plan for providing shelter, light

and fuel, water and waste disposal for

construction labor during the construction

phase shall be provided along with the

number of proposed workers.

Local workers have been engaged in

construction work. No workers are allowed to

stay in the night at project site. Necessary

basic facilities like temporary toilets, and

wash area have been provided for the

construction workers.

9. Measures shall be undertaken to recycle and

reuse treated effluents for the horticulture and

plantation. A suitable plan for waste water

recycling should be submitted.

The waste water generated during operation

phase shall be treated in In-house Sewage

Treatment Plant & treated effluent will be

reused for horticulture & Plantation within

the complex.

10. Obtain proper permission from competent

authorities regarding enhanced traffic during

and due to construction and operation of

project.

Necessary permission from competent

authorities shall be taken regarding enhanced

traffic during and due to construction and

operation of project, if required.

Traffic circulation Plan in this regard has

already submitted.

11. Obtain necessary clearances from the

competent authority on the abstraction and

use of ground water during the construction

and operation phases.

We are not using ground water during

construction phase, hence clearance is not

required. Tanker supply water is being used

for construction work purpose.

12. Hazardous/inflammable/ Explosive materials

likely to be stored during the construction and

operation phases shall be as per standard

procedure as prescribed under law, Necessary

Only hazardous waste generated during

construction/operation phase is used oil from

D.G sets which is being stored in leak proof

containers and shall be given to approve

Page 12: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

clearances in this regards shall be obtained. recycler.

13. Solid waste shall be suitably segregated and

disposed. A separated and isolated municipal

waste collection center should be provided.

Necessary plans should be submitted in this

regards.

Solid waste generated during Operation

phase shall be suitably segregated and

disposed-off at isolated municipal waste

collection Centre.

14. Suitable rainwater harvesting systems as per

designs of groundwater department shall be

installed. Complete proposals in this regard

should be submitted.

Rainwater harvesting & Ground water

recharging shall be done as per our

submittals. Oil & Grease trap to remove oil &

Grease from the surface runoff shall been

provided.

Complete details had been submitted.

15. The emissions and effluents etc. from

machines, Instruments and transport during

construction and operation phases should be

according to the prescribed standards.

Necessary plans in this regard shall be

submitted.

Necessary care is being taken to control

emissions & effluents etc. from machines

instruments & transport during construction

phase & will be taken during operation phase

also.

Covered transportation of material is being

practiced.

16. Water sprinklers and other dust control

measures should be undertaken to take care

of dust generated during the construction and

operation phases. Necessary plans in this

regard shall be submitted.

Dust control measures are being adopted to

take care of dust generated during the

construction phase.

Water sprinkling is being done on regular

basis.

Construction material stored at site is being

covered with the cloth/plastic sheet to avoid

the dust emission.

Page 13: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

17. Suitable noise abatement measures shall be

adopted during the construction and operation

phases in order to ensure that the noise

emissions do not violate the prescribed

ambient noise standards. Necessary plans in

this regard shall be submitted.

All suitable noise abatement measures are

being adopted. The DG sets used during

construction/Operation phase are acoustically

enclosed as per the Central Pollution Control

Board norms. All D.G sets during operation

phase will be also kept acoustically enclosed.

18. Separate stockpiles shall be maintained for

excavated topsoil and the topsoil should be

utilized for preparation of green belt.

Soil excavated during construction phase has

been stored separately under tarpaulin cover.

Excavated soil is being used in the backfilling

and top fertile soil shall be used for

development of the horticulture/landscape at

site.

19. Sewage effluents shall be kept separate from

rainwater collection and storage system and

separately disposed. Other effluents should

not be allowed to mix with domestic

effluents.

Separate lines are being laying down for

sewage effluents & carrying storm water. No

other effluent shall be allowed to mix with

Domestic effluent.

20. Hazardous/ Solid wastes generated during

construction and operation phases should be

disposed-off as prescribed under law.

Necessary clearances in this regard shall be

obtained.

No hazardous waste is being generated during

construction phase except used oil generated

from DG set. Only lesser amount of used oil

from D.G Sets is generated and shall be

disposed-off through approved recycler.

21. Alternate technologies for the solid waste

disposals (like vermin-culture etc.) should be

used in consultation with expert organization.

For disposal of solid waste, biodegradable

waste shall be treated in Organic waste

converter.

22. No wetland should be infringed during

construction and operational phases. Any

wetland coming in the project area should be

No wetland exists at the site.

Page 14: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

suitably rejuvenated and conserved.

23. Pavements shall be so constructed as to allow

infiltration of surface run-off of rain water.

Fully impermeable pavements shall not be

constructed. Construction of pavements

around trees shall be as per scientifically

accepted principles in order to provide

suitable watering, aeration and nutrition to

the tree.

Pavements are being constructed so as to

allow infiltration of surface run off of

rainwater. All necessary cares shall be taken.

24. The Green Building Concept suggested by

Indian Green Building Council, which is a

part of CII-Godrej GBC, shall be studied and

followed as far as possible.

The project is registered and pre-certified

under IGBC Green Homes, Green Building

rating system.

25. Compliance with the safety procedures,

norms and guidelines as outlined in National

Building Code 2005 shall be compulsorily

ensured.

We are complying with all safety procedures

norms & and guidelines as per National

Building Code 2005.

Safety slogans and hoardings have been

provided at the site.

26. Ensure usage of dual flush system for flush

cisterns and explore option to use sensor

We will use dual flush systems for flush

cisterns. Use of sensor based fixtures, sensor

Page 15: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

based fixates, waterless urinals and other

water saving techniques.

based urinals & other water saving

techniques at our project site will be followed

as far as possible.

27. Explore options for the use of dual pipe

plumbing for use of water with different

qualities such as municipal supply, recycled

water, ground water etc.

Dual pipe plumbing is being laid down for use

of water with different qualities.

28. It is to ensure use of measures for reducing

water demand for landscaping and using

xeriscaping, efficient irrigation equipments &

controlled watering systems.

Necessary measures shall be taken to reduce

the water demand for landscaping .

We will try to improve irrigation efficiency.

29. Make suitable provisions for using solar

energy as alternative source of energy. Solar

energy application should be incorporated for

illumination of common areas, lighting for

the gardens and street lighting in addition to

provision for the solar water heating. Present

a detailed report showing how much

percentage of backup power for institution

can be provided through solar energy so that

use and polluting effects of DG sets can be

minimized.

Suitable provisions for using solar energy as

alternative source of energy shall be provided

during the operational phase.

30. Make separate provision for the segregation,

collection, transport and disposal of E-waste.

Separate provisions for segregation,

collection, transport & disposal of e-waste

shall be done through approved vendors.

31. Educate citizens and other stake-holders by

putting up hoardings at different places to

create environmental awareness.

Necessary hoardings shall be provided at

different places to create environmental

awareness.

Page 16: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

32. Traffic congestion near the entry and exit

points from the roads adjoining the proposed

project site must be avoided. Parking should

be fully internalized and no public space

should be utilized.

Proper measure like road width, entry width

etc. has been taken care, so that there is no

Traffic congestion near the entry and exit

points from the roads adjoining the project

site.

Parking shall be fully internalized and no

public space shall be utilized. Movement of

vehicles is being carried out during non-peak

hour.

33. Prepare and present disaster management

plan.

Disaster management plan has already been

submitted.

34. A report on the energy conservation measures

confirming to energy conservation norms

finalize by Bureau of Energy efficiency

should be prepared incorporating details

about building materials and technology, R &

U Factors etc.

Energy conservation report has been already

submitted.

35. Fly ash should be used as building material in

the construction as per the provision of fly

ash notification of September, 1999 and

amended as on August, 2003 (The above

condition is applicable only if the project lies

within 100 km of Thermal Power Station).

We are using fly ash bricks in the

construction and fly ash blocks shall be used

in the construction of pathways and boundary

walls as per the provisions of Fly Ash

Notification of September, 1999 and amended

as on 27th August, 2003.

36. The DG sets to be used during construction

phase should use low Sulphur diesel type and

should conform to E.P. rules prescribed for

air and noise emission standards.

Acoustically enclosed DG sets have been

installed during construction phase which

uses low Sulphur diesel and conform to E.P.

rules prescribed for air and noise emission

standards.

Page 17: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

37. Alternate technologies to chlorination (for

disinfection of water) including methods like

ultra-violate radiation, ozonation, etc. shall be

examined and a report submitted with

justification for selected technology.

We shall install UV Treatment system for

disinfection of the treated waste water.

38. The green belt design along the periphery of

the plot shall achieve attenuation factor

conforming to the day and night noise

standards prescribed for residential land use.

The open spaces inside the plot should be

suitably landscaped and covered with

vegetation of indigenous variety.

Green area of 9540.27 m2 shall be developed

in and around the project. The open spaces

inside the plot shall be suitably landscaped

and covered with vegetation of indigenous

variety.

Landscape plan in this regard has already

submitted.

39. The construction of the building and the

consequent increased traffic load should be

such that the microclimate of the area is not

adversely affected.

Adequate measures are being taken to ensure

that microclimate of the area is not adversely

affected.

40. The building should be designed so as to take

sufficient safeguards regarding seismic zone

sensitivity.

Adequate measures have been taken for

structural stability of the building for seismic

zone sensitivity.

41. High rise buildings should obtain clearance

from aviation department or concerned

authority.

Building height approval has been obtained.

Copy of Approval from AAI is enclosed as

Annexure –VI.

42. Suitable measures shall be taken to restrain

the development of small commercial

activities or slums in the vicinity of the

complex. All commercial activities should be

restricted to special areas earmarked for the

purpose.

We are ensuring that slums will not develop

in the vicinity of the complex due to the

construction of the project. All commercial

activities shall be restricted to special areas

earmarked for the purpose.

Page 18: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

43. It is suggested that literacy program for

weaker sections of society/ women/ adults

(including domestic help) and under

privileged children could be provided in a

formal way.

Noted.

44. The use of compact fluorescent lamps should

be encouraged, a management for the safe

disposal of used /damaged CFLs should be

submitted.

We will use CFL’s in the complex. Proper

disposal method shall be designed.

45. It shall be ensured that all street and park

lighting is solar powered. 50% of the same

may be provided with dual (solar/electrical)

alternatives.

Noted.

46. Solar water heater shall be installed to

maximum possible capacity. Plans may be

drawn up accordingly and submitted with

justification.

Solar water heater shall be provided.

Plans in this regard have been already

submitted.

47. Treated effluents shall be maximally reused

to aim for Zero discharge. Whenever no

possible a detailed management plan for

disposal should be provided with quantities

and quality of waste water.

Treated effluent from the STP shall be

maximally reused to aim for zero discharge

for flushing, Gardening and Miscellaneous

purposes.

48. The treated effluents should normally not be

discharged into public sewers with terminal

treatment facilities as they adversely affect

the hydraulic capacity of STP. If unable,

necessary permission from authorities should

be taken.

The treated water from STP will be

maximally utilized in the project. If required

permission from concerned authority will be

taken.

Page 19: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

49. Construction activities including movements

of vehicles should be so managed so that no

disturbance is caused to nearby residents.

Necessary care is being taken to ensure that,

no disturbance is caused to nearby residents

due to construction activity.

Construction Vehicles movement is being

done during non-peak hours.

50. All necessary statutory clearance should be

obtained and submitted before start of any

construction activity and if this condition is

violated the clearance, if and when given,

shall be automatically deemed to have been

cancelled.

All necessary statutory clearances shall be

obtained whichever applicable.

51. Parking areas should be in accordance with

the norms of MOEF, Government of India.

Plans may be drawn up accordingly and

submitted.

Parking area has been provided as per the

details submitted and in accordance with the

norms of MOEF, GOI. Parking plan in this

regard has already submitted.

52. The location of the STP should be such that it

is away from human habilitation and does not

cause problem of odor. Odorless technology

options should be examined and a report

submitted.

STP shall be located away from the human

habilitation; hence no odor problem is

expected.

53. The Environment Management plan should

also include the break up costs on various

activities and the management issues also so

that the residents also participate in the

implementation of the environment

management plan.

Environment Management plan including

break up costs on various activities has

already been submitted.

54. Detailed plans for safe disposal of STP

sludge shall be provided along with ultimate

disposal location, quantitative estimates and

STP Sludge after drying shall be used as

manure and rest of unused manure shall be

given to nursery/farmers.

Page 20: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

measures proposed.

55. Status of the project as on date shall be

submitted along with photographs from

North, South, West and East side facing

camera and adjoining areas should be

provided.

Photographs showing construction status of

the project is enclosed.

56. Specific location along with dimension with

reference to STP, parking, open areas and

green should be provided on the layout plan.

Layout Plan has been already submitted.

57. The DG sets shall be so installed so as to

conform to prescribed stack heights and

regulations and also to the noise standards as

prescribed. Details should be submitted.

Acoustically enclosed D.G sets will be

installed for the operational towers with

adequate stack height as per norms.

58. E-waste management should be done as per

MoEF guidelines

E-waste Management shall be as per MOEF

guidelines.

59. Electrical waste should be segregated and

disposed suitably as not to impose

Environmental risk.

There shall be provision for segregation of

electrical waste & disposal of the same

through approved recyclers.

60. The use of suitably processed plastic waste in

the construction of roads should be

considered.

Processed plastic waste in construction shall

be used where feasible.

61. Displaced persons shall be suitably

rehabilitated as per prescribed norms.

No displacements of person have been

involved.

62. Dispensary for first aid shall be provided. First aid facility has been provided during

construction phase and also shall be provided

for operational phase.

Regular Health Checkup of construction

Page 21: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

labours is being done.

Medical Certificates of few workers are

enclosed as Annexure – IV.

63. Safe disposal arrangement of used toiletries

items in Hotels should be ensured. Toiletries

items could be given complementary to

guests, adopting suitable measures.

Safe disposal arrangement of used toiletries

items shall be ensured in the Group Housing

complex.

64. Diesel generating set attacks should be

monitored for CO and HC.

D.G. set monitoring is being regularly done.

65. Ground Water downstream of Rain Water

Harvesting pit nearest to STP should be

monitored for bacterial contamination.

Necessary Hand Pumps should be provided

for sampling. The monitoring is to be done in

pre-and post-monsoon, seasons.

STP shall be installed away from Rain water

Harvesting pits. So, that ground water

contamination does not occur.

66. The green belt shall consist of 50% trees,

25% shrubs and 25% grass as per MOEF

norms.

Proper Green belt shall be maintained as per

MOEF norms.

67. A separate electric meter shall be provided to A separate electric meter has been provided

Page 22: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

monitor consumption of energy for the

operation of sewage/effluent treatment in

tanks.

for the STP.

68. An energy audit should be annually carried

out during the operational phase and

submitted to the authority.

Noted.

69. Project proponents shall endeavor to obtain

ISO:14001 certifications. All general and

specific conditions mention under this

environmental clearance should be included

in the environment manual to be prepared for

the certification purposes and compliances.

Noted.

70. Appropriate safety measures should be made

for Accidental fire.

Appropriate safety measures shall be taken.

71. Smoke meters should be installed as warning

measures for accidental fire.

Smoke meters shall be installed as warning

measures for accidental fire.

72. Plan for safe disposal of R.O reject is to be

submitted.

As it is a Group Housing project. No RO shall

be proposed. So, there is no RO reject.

73. Project falling within 10 K.M. area of Wild

Life Sanctuary should obtain a clearance

from National Board for Wild Life (NBWL)

even if the eco-sensitive zone is not

earmarked.

No Eco sensitive zone falls within 10 km

radius of the project. Hence it is not

applicable.

Page 23: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

SPECIFIC CONDITIONS

1. Provision of setback on all sides should be

made as per G.B. Nagar bye -laws.

Set back of all the side shall be made as per

G.B. Nagar bye-laws.

2. Municipal solid waste shall be disposed

/managed as per Municipal Solid Waste

(Management and Handling) Rules, 2000 (as

amended).

Noted.

3. 03m peripheral green belt shall be provided

around the project inside the project

boundary. Add Astonia in list of trees.

Noted.

4. 15% area of the total plot area shall be

compulsorily made available for the green

belt development including the peripheral

green belt.

It shall be followed.

5. Project falling within 10 Km. area of Wild

Life Sanctuary is to obtain a clearance from

National Board Wild Life (NBWL) even if

the eco- sensitive zone is not earmarked.

Not Applicable.

6. Criteria/ norms provided by competent

Authority regarding the seismic zone be

followed for construction work. Provision of

alarm system, to timely notify the residents, in

case of occurrence of earthquake/other natural

disasters/fire should be provided. A well-

defined evacuation plan should also be

prepared and regular mock drills should be

arranged for the residents. Rise of stairs

should be constructed in a way, so that it

The project is located at seismic zone-IV

There are no chances of floods and landslides.

An onsite emergency plan and evacuation

plan shall be made.

Page 24: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

should provide smooth movement.

7. For the treatment for total sewage, a full-

fledged STP is to be provided with 20% more

capacity than waste water generated during

operation phase. 100% waste water is to be

treated in captive STP conforming to

prescribed standards of receiving body for

designated use. Monitoring of STP to be done

daily till its stabilization.

Sewage treatment plant of full-fledged

capacity shall be installed.

Regular monitoring shall be done during

operation phase.

8. Dual plumbing should be adopted. Recycling

of water as proposed shall be undertaken with

regular testing and monitoring of treated

water.

Dual Plumbing line shall be provided in the

complex for reuse of treated water.

9. Dedicated power supply for STPs is to be

ensured during operation. Sludge of STP is to

be used in-house as manure and surplus

manure should be managed by giving it to end

users. STP shall be suitably located nearest to

back side boundary with shortest out let.

Operation and the maintenance cost of the

STP shall also be informed along with the

compliance of the E-waste and municipal

solid waste disposal.

Dedicated power supply for STPs shall be

provided during operation period. Dried

sludge generated from STP within complex

during operation phase shall be dewatered/

dried to form a cake and then will be used as

manure in green areas.

10. Environmental Corporate Responsibility

(ECR) plan along with budgetary provision

on amounting to 2% of total project cost shall

be prepared and approved by Board of

Directors of the company. A copy of

resolution as above shall be submitted to the

Environmental Corporate Responsibility

(ECR) plan along with budgetary provision

amounting to 2% of total project cost is

already submitted.

Page 25: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

authority. A list of beneficiaries with their

mobile nos./address should be submitted

along with six monthly compliance reports.

11. LEDs should be used in all common areas and

corridors. 100% solar lighting is to be

provided in the open areas/ stairs cases.

Energy conservation measures shall be taken

and LEDs will be used for lighting systems.

Solar lights shall be provided in open area.

12. Parking guideline as per G.B. Nagar

Development Authority should be followed.

Parking for disabled persons should be

explored.

Parking guidelines shall be followed.

13. All of them entry/exit point should be bell

mouth shaped.

Noted.

14. To discharge excess treated waste water into

public drainage system, permission from the

competent authority to be taken prior to any

discharge.

Permission for discharge of waste water into

sewer line shall be taken.

15. I00% provision of Rain Water Harvesting is

to be made. RWH shall be initially done only

from the roof-top. RWH from green and other

open areas shall be done only after permission

from CGWB.

Noted. Rainwater Harvesting System shall be

provided as per CGWB designs.

16. An underground Pucca tank for

collection/reuse of rain water may be

constructed.

Noted.

17. Height of the stack should be provided based

on combined DG sets capacity and be 6mt

higher than the tallest building.

Adequate stack height of 6 m above roof level

of DG sets shall be maintained.

Page 26: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

18. Post project monitoring for air, water (surface

+ ground), Stack noise of D.G. sets, STP to be

carried out as CPCB Guidelines.

Air, water, noise & STP Monitoring during

operational phase of the project shall be

carried out.

19. Crèche to be provided during the

construction/operation phase.

Noted.

20. Provision of separate room for senior citizen

with proper amenities shall be made.

Noted and will be complied.

21. Protection shall be provided on the windows

of the high-rise flats for security of residents

Noted.

22. Unless and until all the environmental issues

are sorted out the occupancy will be restricted

and would be only allowed after achieving the

Permission from the competent authority.

We will ensure Occupancy certificate from

competent authority shall be obtained before

giving any occupancy.

23. The project proponent shall ensure that the

project site does not attract/infringe any

buffer zone of no activity identified/declared

under law.

We shall ensure that the project site does not

attract/infringe any buffer zone of no activity

identified/declared under law.

24. For any extraction of ground water, prior

permission from CGWB shall be taken.

Noted.

25. Sprinkler to be listed for curing and

quenching and ready mix concrete may be

used for construction.

Sprinkler is being used for curing and

quenching during construction phase. We are

in use of Ready Mix Concrete for

construction purpose.

26. Possibilities of use of treated waste water for

irrigation purposes should be explored. Drip

irrigation should be tried up to extent

possible. No fresh water will be used for

Treated water from STP will be used for

irrigation purpose.

Page 27: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

irrigation purpose.

27. Mobile toilets, safe drinking water facility,

sanitation facility and eco -friendly fuels etc.

Shall be made available to the temporary

residents/workers at the project site including

the proper treatment and the disposal of the

wastes.

Mobile toilets, safe drinking water facility,

sanitation facility shall be made available to

the temporary workers at the project site. We

have also made arrangement of proper

treatment and the disposal of the wastes.

28. Revised NOC from fire department &.

Airport Authority of India is to be Submitted.

Already submitted.

Page 28: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE-I

COPY OF ENVIRONMENTAL CLEARANCE

Page 29: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 30: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 31: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 32: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 33: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 34: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 35: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 36: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 37: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 38: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE – II

COPY OF RECEIPT OF CTE APPLIED

Page 39: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 40: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE – III

MONITORING REPORTS OF AIR, WATER, SOIL, NOISE & STACK

Page 41: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 42: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 43: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 44: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 45: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 46: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 47: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE-IV

HEALTH CERTIFICATES OF FEW WORKERS ENGAGED FOR CONSTRUCTION

Page 48: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 49: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 50: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 51: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 52: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 53: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 54: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 55: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE-V

PUC CERTIFICATES OF FEW VEHICLES HIRED FOR CONSTRUCTION

Page 56: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 57: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 58: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE-VI

COPY OF HEIGHT CLEARANCE FROM AAI

Page 59: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 60: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 61: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE-VII

COPY OF ELECTRICITY BILL

Page 62: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 63: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE-VIII

COPY OF FIRE APPROVAL

Page 64: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 65: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 66: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE – IX

COPY OF FLY ASH PURCHASE BILL

Page 67: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 68: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National

Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd

ANNEXURE – X

COPY OF WATER SUPPLY BILL

Page 69: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National
Page 70: SIX MONTHLY COMPLANCEenvironmentclearance.nic.in/writereaddata/online/MinistryEAC/18032… · 25. Compliance with the safety procedures, norms and guidelines as outlined in National