siting optimization surveys for edgartown ferc permit area

30
Siting Optimization Surveys for Edgartown FERC Permit Area 0 3 4 1 2 6 5 7 8 9 NOAA Station SMAST Tide Recorder SMAST Current Meters Ebb Tide Current Direction Permit Boundary Velocity Transects

Upload: others

Post on 24-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Siting Optimization Surveys for Edgartown FERC Permit Area

Siting Optimization Surveys for Edgartown FERC Permit Area

03

4

12

6 578

9NOAA Station

SMAST Tide RecorderSMAST Current Meters

Ebb Tide Current Direction

Permit BoundaryVelocity Transects

Page 2: Siting Optimization Surveys for Edgartown FERC Permit Area

Launch of Barge for 2011 Technology Test

Page 3: Siting Optimization Surveys for Edgartown FERC Permit Area

Test Barge on station in Muskeget Channel

Page 4: Siting Optimization Surveys for Edgartown FERC Permit Area

Barge mounted Free Flow Turbine for 2011 Muskeget Channel Technology TestEnergy Generation Pilot August 2011 FreeFlow Turbine Muskeget Channel

Page 5: Siting Optimization Surveys for Edgartown FERC Permit Area

Barge mounted Free Flow Turbine for 2011 Muskeget Channel Technology Test

Page 6: Siting Optimization Surveys for Edgartown FERC Permit Area
Page 7: Siting Optimization Surveys for Edgartown FERC Permit Area

Test Barge on station in Muskeget Channel

Page 8: Siting Optimization Surveys for Edgartown FERC Permit Area

Energy Generation Pilot August 2011 FastCap Power Electronics for Muskeget Channel

Page 9: Siting Optimization Surveys for Edgartown FERC Permit Area

Technology Related Environmental Impacts: As the marine renewable energy developers move into permitting

and implementation, need assessment of potential environmental effects.

Scouring Studiespresently underway

in Muskeget Channelto understand effectson sediment transport

Bio-fouling Effects fromTechnology Deployment in

Muskeget Channel

Page 10: Siting Optimization Surveys for Edgartown FERC Permit Area

Environmental Evaluations – Muskeget ChannelMooring Structures

Test Mooring Structure to evaluate sediment movement in high velocity zone. Instrumented with velocity sensors and tilt gauges.

Page 11: Siting Optimization Surveys for Edgartown FERC Permit Area

Pre-deployment of Scour Block with Velocity Sensorsas Presently Deployed in Muskeget Channel

Environmental Evaluations – Muskeget ChannelMooring Structures

Deployed for 1 year

Page 12: Siting Optimization Surveys for Edgartown FERC Permit Area

Scouring Study in Muskeget Channel

Current meter

Page 13: Siting Optimization Surveys for Edgartown FERC Permit Area

Scouring Study in Muskeget Channel

Page 14: Siting Optimization Surveys for Edgartown FERC Permit Area

Environmental Evaluations – Muskeget ChannelBottom Sediment Sampling

Page 15: Siting Optimization Surveys for Edgartown FERC Permit Area

Trawl resistant bottom mooring

Current Meter

Environmental Evaluations – Muskeget ChannelCurrent Profiling in High Velocity Site

Page 16: Siting Optimization Surveys for Edgartown FERC Permit Area

Environmental Evaluations – Muskeget ChannelCurrent Profiling in High Velocity Site

Mooring Recovery

Page 17: Siting Optimization Surveys for Edgartown FERC Permit Area

Coastal Systems Programweather buoy deployed in

Muskeget Channel

Page 18: Siting Optimization Surveys for Edgartown FERC Permit Area

Deployment of CSP Weather Buoy

Page 19: Siting Optimization Surveys for Edgartown FERC Permit Area

Proposed Cable Routes

Environmental Evaluations –Routes for Power Cables (generator to grid)

Page 20: Siting Optimization Surveys for Edgartown FERC Permit Area

Environmental Evaluations Muskeget Channel Bio-fouling Tests on Generator Components

Page 21: Siting Optimization Surveys for Edgartown FERC Permit Area

Bio-fouling ArrayReady for Deployment Muskeget Channel

Page 22: Siting Optimization Surveys for Edgartown FERC Permit Area

With and Without Anti-Fouling Protection

Bio-fouling ArrayBeing Deployed Muskeget Channel May 2011

Page 23: Siting Optimization Surveys for Edgartown FERC Permit Area

Bio-fouling ArrayDeployed Muskeget Channel - 2011

Page 24: Siting Optimization Surveys for Edgartown FERC Permit Area

Siting Surveys for Edgartown FERC Permit Area

03

4

12

6 578

9

NOAA Station

SMAST Tide RecorderSMAST Current Meters

Ebb Tide Current Direction

Permit BoundaryVelocity Transects

Page 25: Siting Optimization Surveys for Edgartown FERC Permit Area

34

12

6 57 89

0

CSP-SMAST Siting Surveys Muskeget Muskeget Channel Max Velocity

Transect 6

FLOODEBB 4 kts 5 kts

Shipboard and Bottom Mounted ADCP Capabilities

Page 26: Siting Optimization Surveys for Edgartown FERC Permit Area

3

4

12

6 57 89

0 Long-Term Bottomwater Velocity

Current Velocity Plotted as a Function of Magnetic Heading

0.0m/s 0.5m/s 1.0m/s 1.5m/s 2.0m/s

0.0m/s0.5m/s1.0m/s1.5m/s2.0m/s

N

330

300

W

240

210

S

150

120

E

60

30

60 day records of water flow and direction

3 knots

Page 27: Siting Optimization Surveys for Edgartown FERC Permit Area

Maximum Ebb Tide Velocities

7.1

7.0

7.2

6.0

6.1

6.2

8.0

Page 28: Siting Optimization Surveys for Edgartown FERC Permit Area

~ 260 yards

Proposed Tidal Turbine Array

CSP-SMAST Siting Surveys Muskeget Channel Locating Max Velocity

Page 29: Siting Optimization Surveys for Edgartown FERC Permit Area

Transect 6

Transect 7

Bottom Mounted Current Profiler

N 41 20.069

W 070 25.428

N 41 20.078

W 070 25.677

Location of bottommounted ADCP inMuskeget Channel

Page 30: Siting Optimization Surveys for Edgartown FERC Permit Area

Velocity Ensemble

Dep

th (m

eter

s)Bottom Mounted ADCP Current Velocity Profile for 24 Hour Period in Muskeget Channel

4080 4090 4100 4110 4120 4130 4140 4150 4160 4170 4180

2

4

6

8

10

12

14

16

18

20

22

0

500

1000

1500

2000

2500

Velocity(mm/sec)