SITECH (WA) PTY LTD

Construction Services

Connected Community

2-Way data

Page 2: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Full Suite of Solutions for the Heavy and Highway Contractor

Grade Control Systems

Site Positioning Systems Supervisor Systems

Office Software

Asset Management Solutions

Page 3: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Trimble Construction Services

Equipment and Mobile Asset Management

Page 4: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Construction Asset Management

How well are my assets utilized? What is their productivity? Where are they? How can I manage my assets better?

Page 5: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

How it works

GPS Hardware installed in machine or truck.

Position and event data is sent to central server using cell network (GPRS).

Data held on server is accessed via Trimble Construction Manager from any internet connected PC.

Page 6: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Benefit Summary

Centralize management

Improve asset productivity

Improve site safety

Reduce maintenance and fuel costs

Manage asset usage Assist with theft recovery

Page 7: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Trimble Construction Manager

Page 8: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Trimble Construction Manager

Page 9: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Product Focus

Productivity Utilization and under utilization Understanding equipment costs and project

costs Understanding equipment operations from

your office Drilling down into project specific details eg –

cycle and load counts Monitoring planned maintenance Exception reporting (alerts) in real time

Page 10: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Utilization

Trimble Construction Manager provides three utilization calculations (all percentages):

All three values are presented in a “Utilization” report.

“Working Utilization” is used in a number of charts.

Running utilization = Run time / Expected hoursWorking utilization = Work time / Expected hours

Efficiency = Work time / Run time

1

2

3

Page 11: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Accurate “Work” and “Idle” Time

Trimble Construction Manager can calculate accurate “work time” and “idle time”:

1. GPS movement – mobile assets where movement is a good indicator of productivity, such as trucks and graders.

2. Sensor switch – assets where movement is not indicative of productivity, such as excavators, cranes.

3. Combination of both.

Page 12: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Daily Activity ReportDaily Activity Summary ReportReport Period: 4/16/2007 12:00:00 AM to 4/19/2007 11:59:59 PM GMT Standard Time

Asset: 1201

DateFirst

Start TimeLast

Stop TimeDrive

DurationRun

DurationEnd Runtime

CounterDistanceDriven

EndOdometer

StopEvents

StopDuration

hr:min:sec hr:min:sec hrs miles miles hr:min:sec

4/16/2007 5:38:43 AM 5:54:43 PM 6:30:13 11:27:30 6449 113.6 9041.7 109 17:29:474/17/2007 5:17:23 AM 5:21:50 PM 5:32:02 11:05:40 6460 87.6 9129.3 111 18:27:584/18/2007 5:20:12 AM 6:04:26 PM 6:11:01 11:47:39 6472 97.7 9227.0 118 17:48:594/19/2007 7:01:30 AM 5:53:43 PM 5:14:06 10:08:02 6482 92.0 9319.0 104 18:45:53

Asset: 1210

DateFirst

Start TimeLast

Stop TimeDrive

DurationRun

DurationEnd Runtime

CounterDistanceDriven

EndOdometer

StopEvents

StopDuration

hr:min:sec hr:min:sec hrs miles miles hr:min:sec

4/16/2007 5:36:59 AM 7:18:12 PM 3:08:15 5:04:57 4892 49.5 8174.3 62 20:51:454/17/2007 5:45:31 AM 6:29:35 PM 5:14:20 11:14:24 4904 82.3 8256.7 117 18:45:404/18/2007 5:47:17 AM 5:57:16 PM 5:09:38 10:23:11 4914 83.2 8339.9 102 18:50:224/19/2007 5:44:27 AM 6:47:31 PM 4:42:34 9:04:21 4923 78.0 8417.8 99 19:17:25

Asset: 1213

DateFirst

Start TimeLast

Stop TimeDrive

DurationRun

DurationEnd Runtime

CounterDistanceDriven

EndOdometer

StopEvents

StopDuration

hr:min:sec hr:min:sec hrs miles miles hr:min:sec

4/16/2007 5:47:43 AM 5:57:27 PM 4:23:24 7:52:54 4549 71.6 8800.0 77 19:36:364/17/2007 5:33:44 AM 5:58:00 PM 5:39:08 11:32:43 4560 84.9 8884.9 108 18:20:524/18/2007 5:52:37 AM 5:56:56 PM 5:40:25 11:38:01 4572 90.0 8975.0 108 18:19:354/19/2007 5:39:03 AM 6:01:48 PM 6:12:13 11:38:28 4584 101.5 9076.5 119 17:47:46

Page 13: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Work versus Idle Time

Page 14: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Utilization

Page 15: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Maintenance Report

Page 16: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Cycle Monitoring

Could be fixed location “Load” or “Dump” site:

Could be sensor or switch to indicate “Dump Up/Down” or “Ejector Out”:

Page 17: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Cycle Count / Load Reports

Date Time Asset Load Count Cycle Time(Mn) Cycle Dist(Kilometres) Site 10/02/2009 06:51:02 AM TIP14 1 0 0.00 K7110/02/2009 07:22:45 AM TIP14 2 32 3.70 K7110/02/2009 07:35:24 AM TIP14 3 13 1.80 K7110/02/2009 07:50:00 AM TIP14 4 15 1.70 K7110/02/2009 08:05:47 AM TIP14 5 16 1.70 K7110/02/2009 08:18:41 AM TIP14 6 13 1.70 K7110/02/2009 08:33:58 AM TIP14 7 15 1.40 K7110/02/2009 08:46:30 AM TIP14 8 13 1.40 K7110/02/2009 09:02:06 AM TIP14 9 16 1.30 K7110/02/2009 09:18:01 AM TIP14 10 16 1.30 K7110/02/2009 09:30:37 AM TIP14 11 13 1.40 K7110/02/2009 09:44:51 AM TIP14 12 14 1.20 K7110/02/2009 11:28:11 AM TIP14 13 103 12.60 K7110/02/2009 11:41:41 AM TIP14 14 14 1.00 K7110/02/2009 12:22:09 PM TIP14 15 40 2.10 K7110/02/2009 12:34:56 PM TIP14 16 13 1.20 K7110/02/2009 12:49:27 PM TIP14 17 15 1.70 K7110/02/2009 01:01:51 PM TIP14 18 12 1.60 K7110/02/2009 01:16:36 PM TIP14 19 15 1.70 K7110/02/2009 01:29:45 PM TIP14 20 13 1.70 K7110/02/2009 01:42:38 PM TIP14 21 13 1.80 K7110/02/2009 01:56:22 PM TIP14 22 14 1.70 K7110/02/2009 02:06:50 PM TIP14 23 10 1.80 K71

Page 18: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Real-time Alerts

Management byexception.– Notification of specific

asset activity– Variety of alert types:

Idle Sensor switches

(e.g. low fuel light). Ignition on/off. Started/Stopped moving. Site activity. Asset nearing

maintenance.

– Configurable time periods

Asset 'Dump Truck #2' triggered TCM alert 'Dump Truck leaves Depot' on Tuesday, May 02, 2006 7:44:49 AM.

At address: Sandhill Close, Millbrook, BEDS

Triggered by ‘Leave Site' event in 'Depot' site.

Page 19: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

2-Way Messaging and Operator ID

Real-time “2-way messaging” service

– Use the terminal in machines and trucks to communicate directly with operators within TCM

Operator ID

– Monitors who is using what equipment and when

Page 20: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Asset History

Page 21: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Enabling Hardware

Hardware to meet your requirements

Page 22: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Trimble MTS400 Machine Telematics System Ruggedized asset

management device– Built Trimble tough to survive

harsh installation environments

Incorporates GPS location with wireless cellular-based telematics and optional two-way messaging

Rugged design makes it ideal for installation in a more permanent, discrete location outside of the heavy equipment machine cab

Page 23: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Trimble CrossCheck Global

Powerful asset management device

Incorporates GPS location with wireless cellular-based telematics and optional two-way messaging

The low profile, compact design makes it simple to install on a construction asset

Page 24: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Trimble TrimTrac Pro Locator

Cost-effective asset management device

Incorporates GPS location with wireless cellular-based telematics

The low cost design and simple, non-technical installation makes it ideal for the installation on a broad range of light construction assets

Page 25: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Trimble Connected Site

Connecting your Community

Page 26: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

A Contractor Once Said …

“I want everyone who ventures onto any one of our jobsites at any stage of the process to be able to provide information to the rest of the organization so that we can all learn from their experience and understand what is going on”

“Through that process my organization will grow and develop new and advanced processes to better tackle issues before or as they arise”

Page 27: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

The Trimble Connected Site

Workflows to meet the needs of the different customer groups within the contractor’s organization

Connecting the components within the workflow, streamlining data flows and providing data management and reporting capabilities

Integrating the workflows to provide management information– Asset and fleet utilization– Progress and volumetric analysis– Grade checks and performance to specification

Page 28: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Site Positioning

Synch

Synch

Page 29: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Grade and Compaction Control

Page 30: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Fleet Management

Asset 'Dump Truck #2' triggered TCM alert 'Dump Truck leaves Depot' on Tuesday, May 02, 2006 7:44:49 AM.

At address: 10 Main St, Denver, CO, 80305

Triggered by ‘Enter Site' event in 'Depot' site.

Asset 'Dump Truck #2' triggered TCM alert 'Dump Truck leaves Depot' on Tuesday, May 02, 2006 7:44:49 AM.

At address: 10 Main St, Denver, CO, 80305

Triggered by ‘Enter Site' event in 'Depot' site.

Page 31: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

The Connected Site

Page 32: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

The Connected Community

An Example Community Site

Page 33: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Trimble Connected Community

All of your site information in one place www.MyConnectedSite.com brings your entire project

together Secure webserver with different levels of access and

permissions Track and exchange real-time data View historical project information for accurate

evaluation Keep all players informed with the latest information

– Field crews, site supervisors, engineers, site managers, head office, subcontractors, suppliers, owner of the project etc…

The complete view of the project to share with the team – from a single source

Page 34: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Trimble Connected Community

Page 35: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example Project Home Page

Page 36: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example Site Equipment Page

Page 37: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example Site / Project Calendar

Page 38: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example Supervisors Journal

Page 39: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example RFI Inbox

Page 40: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example Site Web Cameras

Page 41: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example File Repository

Page 42: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Example 3D Site Viewer

Page 43: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

In Summary A Single Connected Workflow

– Infrastructure GPS e.g. VRS and Rebroadcast Radio on Site– SPS Workflow for Intelligent data tracking, QA, QC, Reporting– GCS Workflow for Grade Control, 2 way data and productivity

analysis– CCS Workflow for Compaction Control and analysis– TCM Workflow for Fleet and Asset Management

The Connected Site– Combining and integrating the workflows– Providing additional value– Centralizing information, providing feedback and management data

The Connected Community– Connecting the sites– Connecting the offices (HQ, Region, Site …)– Connecting the personnel (Managers, Surveyors, Supervisors …)– Connecting Partners (Suppliers, Sub Contractors, Engineers,

Owners)

Page 44: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Two-Way Data

Daniel Brosh

Trimble Navigation LTD.PTY.

Page 45: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Two-Way Data Topics

What is two-way data? Why two-way data? Project management Data management As-built information Support Training Questions & Answers

Page 46: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

What is Two-Way Data?

A technology that enables the bi-directional transfer of data between an office and machines over a series of data links– Data files– Machine specific files– Machine diagnostic– Screen snaps/text message

Page 47: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

What is Two-Way Data?

GPS Base Station

IP Machine Radio

Access Point/ IP Base Radio

IP Repeater Radio

Wired BackboneOffice Network

SiteVision OfficeComputer

CMR

CMR

CMR

Data

Data

DataData

Data

Page 48: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Why Two-Way Data?

1. Does your site have frequent design changes?2. Do you need to get design changes to the machine immediately?3. Does it take you too long to update files on a machine (including drive

time)?4. Have you ever wondered if a machine has a specific design on their

card?5. Have you ever struggled with troubleshooting machine control

problems over the phone?6. Do you need to know if your machines are up and running?7. Have you ever wanted to ask a question to a machine operator who

does not have a cell phone?8. Have you ever needed a DTM to verify project progress?9. Do you want to be more productive with your time?

Page 49: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Project Management

Page 50: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Verify Machine Locations On Site Putting grade in the office Two-way data allows the

supervisor to view the same information as the operator, including – machine location – Real-time status on site

This facilitates real-time decisions and allows them to know at all times that their machine is being productive

Page 51: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Send a Text Message to Machines

Two-way data allows safe and fast text-based communication between the office and the machine– Ideal for YES / NO questions

Eliminates time delays from phone calls

Allows direction of machines from within the office

Page 52: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Data Management

Page 53: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Verify Data on a Machine

Confirm design files on a machine’s data card at any time

Upload new or revised design to all machines in one export

Eliminate cost– Machine downtime

– Drive time to the field

– Manpower

Page 54: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Verify Design in the Machine Troubleshoot designs in the

office Take a screen snap to see

problem area and locate on design

Locate problems faster

Page 55: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

As-built Data Maintain daily progress

– Turn on terrain map recording

– Download recorded terrain (*.st) file from card

– Import into SiteVision Office

– Export to Excel CSV or Terramodel file

– Perform volume calculations

– Calculate area

Page 56: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Support and Training

Page 57: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Confirm What Is on the Operator’s Screen Request a screen snap of the

Trimble display

Page 58: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Remote Diagnostics

View a screen snap of the operator’s display and the diagnostics– Version numbers– Serial numbers– Enabled options– Machine details– GPS status– Current offsets– Loaded design

Page 59: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Remote Diagnostics Retrieve radio diagnostic information

– IP statistics– CMR reception– Error logs– Temperature logs

Page 60: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

Update Machine

Firmware updates can be uploaded to machine– Upload firmware to machine– Send a text message to operator to restart display– Display is flashed, machine comes back on-line

Restore machine settings– Machine settings lost– Copy MCH file to card– Send a text message to operator to restore machine settings

Retrieve program log.txt file for Trimble support

Page 61: SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data

SITECH (WA) PTY LTD

Questions?