site work instruction

2
5/17/2018 SiteWorkInstruction-slidepdf.com http://slidepdf.com/reader/full/site-work-instruction 1/2  State of Kuwait Ministry of Defence Military Engineering Projects Project : Contract No: Date : Contractor : SWI No. : __________________________ ________________________ ______________________ for Resident Engineer for the Engineer for Owner Date : ____________________ Date : _________________ Date : ________________ THIS SITE WORKS INSTRUCTION (S.W.I.) IS A NOTICE TO PROCEED AND MAY INVOLVE A CHANGE IN COST OR TIME. YOU ARE REQUIRED TO ADVISE THE OWNER WITHIN ONE MONTH OF ANY ADDITIONAL COST OR TIME REQUIRED TO COMPLY WITH THIS INSTRUCTION. RECEIVED FOR : CONTRACTOR : ___________________________________ DATE : ____________________ DISTRIBUTION OWNER’S REPRENTATIVE GULF CONSULT Site Work Instruction 

Upload: fred-anthony-a-uera

Post on 05-Nov-2015

223 views

Category:

Documents


0 download

DESCRIPTION

swi

TRANSCRIPT

  • State of Kuwait Ministry of Defence

    Military Engineering Projects

    Project :

    Contract No: Date :

    Contractor : SWI No. :

    __________________________ ________________________ ______________________ for Resident Engineer for the Engineer for Owner

    Date : ____________________ Date : _________________ Date : ________________

    THIS SITE WORKS INSTRUCTION (S.W.I.) IS A NOTICE TO PROCEED AND MAY INVOLVE A CHANGE IN COST OR TIME. YOU ARE REQUIRED TO ADVISE THE OWNER WITHIN ONE MONTH OF ANY ADDITIONAL COST OR TIME REQUIRED TO COMPLY WITH THIS INSTRUCTION.

    RECEIVED FOR :

    CONTRACTOR : ___________________________________ DATE : ____________________

    DISTRIBUTION OWNERS REPRENTATIVE GULF CONSULT

    Site Work Instruction