site survey waste storage ( santan terminal )
DESCRIPTION
Site Survey Waste StorageTRANSCRIPT
![Page 1: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/1.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
STANDAR OPERATING PROCEDURESite Survey Waste Storage
Area/Dept.:
NORTH ONSHORE OPERATION
Facility/Section:
Santan TerminalNo. Rev. Tgl. Rev Uraian Disiapkan
SurowoBukaka
Disetujui Oleh
Iman Sudirman/ Hendrik AWTM Santan Terminal
New Issue Whole Document Partial
Chevron Kalimantan Operation
Operational Excellence
Management System
Document ID
008/BTU/SOP-Q/SANTAN/2013
Page 1 of 8
1. GENERAL DISCRIPTION ( URAIAN UMUM)SOP ini dibuat bertujuan untuk menerangkan langkah – langkah site visit pembuatan waste storage di Santan Terminal untuk memenuhi penataan terhadap limbah sesuai peraturan penataan limbah terhadap Peraturan Lingkungan UU no. 23 Tahun 1997 tentang Pengolahan Lingkungan Hidup dan Peraturan Pemerintah no. 18 Tahun 1999 tentang Pengolahan Limbah Bahan Berbahaya Beracun ( Limbah B3 ).
2. HES NOTICE
Most significant hazard:
● HEALTH :
1. Temperatur: Dehidrasi Pencegahan Istirahat yang cukup Banyak mengkonsumsi air mineral Gunakan PPE yang sesuai dan standar
2. Radiation : Paparan sinar matahari yang terlalu lamaPencegahan : Gunakan pakaian kerja berlengan panjang Hindari paparan sinar matahari yang terlalu lama dan lakukan istirahat berkala
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 1 of 8North Area Onshore
![Page 2: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/2.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
● SAFETY :
1. Motion: Terpeleset, tergelincir, tersandung, terjepit dan terkena material & peralatanPencegahan : Lakukan ergonomic position pada saat melakukan pekerjaan Hindari pinch point untuk menghindari terjepit, Hindari lintasan bahaya (line of fire) Mata dan gerakan focus pada pekerjaan Lakukan komunikasi yang baik antar rekan kerja.
2. Gravity : Perkakas atau tubuh jatuh dari ketinggian, tertimpaPencegahan: Perhatikan Posisi dan langkah pada saat berjalan hindari posisi terjepit “pitch point” Hindari Line off Fire
● ENVIROMENTAL :
1. Biologi : Gigitan nyamuk, serangga, tersengat lebah, digigit ular, dll.Pencegahan :
Lakukan inspeksi potensi bahaya binatang di area lokasi kerja
URUTAN AKTIVITAS / LANGKAH KERJA
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 2 of 8North Area Onshore
![Page 3: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/3.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
No UrutanPekerjaan Drawing No.
Dilakukan oleh Note
A Pre Work PreperationI.1 Mempersiapkan SOP Qualified dan mengkomunikasikan
kepada semua pekerja yang terlibat dalam pekerjaan tersebut dan memastikan SOP Qualified sudah ditandatangani oleh Authorized Team
Supervisor Pastikan SOP Qualified dikomunikasikan dengan baik
I.2 Melapor kekontrol room untuk pelaksanaan pekerjaan ini. Supervisor Pastikan SOP Qualified dikomunikasikan dengan baik dan membuat list of SOP
I.3 Mempersiapkan Work Permit sesuai dengan lokasi kerja, khusus untuk pekerjaan di area proses harus dengan persetujuan dari TL area, TM Santan: Gunakan Permit General dan hot work untuk site
survei waste storage Jika pekerjaan untuk dokumentasi, menggunakan
peralatan berupa kamera, tambahkan permit form Hot Work
Supervisor Pastikan pembuatan work permit sudah sesuai dengan prosedur dengan melampirkan SOP Qualified
I.4 Melaksanakan Safety talk sebelum aktivitas pekerjaan dimulai membahas masalah keselamatan dan pekerjaan yang akan dilakukan.
Supervisor,pekerja
I.5 Mempersiapkan material dan peralatan yang akan digunakan dalam melakukan pekerjaan
- PPE ( Helemet, FRC, Sagety shoes, Safety glasses, Hand glove )
- Measurement Tape 8 m- Peralatan tulis- Kamera- T nol
Potensi bahaya:1. Motion : Terpeleset, tergelincir, tersandung ,
terjepit terkena material dan peralatan.Pencegahan : Hindari lintasan bahaya di lokasi kerja (line of
fire) Lakukan ergonomic position
padasaatmelakukan pekerjaan Hindari pinch point untuk menghindari terjepit, Mata dan gerakan focus pada pekerjaan Lakukan komunikasi yang baik antar rekan
kerja.
2. Gravity : Kejatuhan material / benda disekitar lokasi kerja, terjatuh
Pencegahan: Focus pada saat melakukan pekerjaan
Supervisor,pekerja Pastikan peralatan yang dipakai dalam kondisi baik dan layak pada saat digunakan.
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 3 of 8North Area Onshore
![Page 4: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/4.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
Lakukan komunikasi yang baik antar rekan kerja saat proses persiapan pekerjaan berlangsung
Pemasangan police line/barikade pada area pekerjaan
3. Temperatur: Dehidrasi Pencegahan: Istirahat yang cukup Banyak mengkonsumsi air mineral Gunakan PPE yang sesuai dan standart
4. Radiation : Paparan sinar matahari yang terlalu lamaPencegahan :
Gunakan pakaian kerja berlengan panjang Hindari paparan sinar matahari yang terlalu
lama dan lakukan istirahat berkala
Station Bill dalam kondisi Emergency: Emergency : 123 / 0800 1900 123
FS : 68113
Clinic : 68922 – AOH: 68940
Security (SANTAN): 68110
B NORMAL, ABNORMAL , EMERGENCY CONDITIONII.1 Pekerjaan ini akan dilakukan jika dalam kondisi :
a. Dilakukan dalam waktu siang harib. Penerangan diruangan cukup.c. Peralatan kerja dalam kondisi bagus dan
standartd. Cuaca dalam kondisi cerah dan tidak hujan
All TeamMedicFERT
II.2 EMERGENCY RESPONSEa. Jika terjadi kebakaran hubungi operator yang
sedang bertugasb. Jika terjadi emergency muster point ditiap
lokasi kerja.c. Jika ada yang luka lapor ke medic
Rencana pencegahan:a. Stop pekerjaan dan segera melapor pada Spv
dan Operatorb. Semua Pekerja di evakuasi ketempat yang
amanc. Pekerja yang terluka di evakuasi untuk
mendapatkan pertolongan pengobatanNote:
Station Bill dalam kondisi Emergency:
Emergency : 123 / 0800 1900 123
All TeamMedicFERT
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 4 of 8North Area Onshore
![Page 5: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/5.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
FS : 68113
Clinic : 68922 – AOH: 68940
Security (SANTAN): 68110
D Job ExecutionIII. 1 Site Survei letak didirikan bangunan waste storage
Potensi Bahaya :1. Motion: Terpeleset, tergelincir, tersandung,
terjepit dan terkena material & peralatanPencegahan : Lakukan ergonomic position pada saat
melakukan pekerjaan Hindari pinch point untuk menghindari
terjepit, Hindari lintasan bahaya (line of fire) Mata dan gerakan focus pada pekerjaan Lakukan komunikasi yang baik antar rekan
kerja.2. Biologi : Gigitan nyamuk, serangga, tersengat
lebah, digigit ular, dll.Pencegahan : Lakukan inspeksi potensi bahaya binatang di
area lokasi kerja 3. Temperatur: Dehidrasi
Pencegahan : Istirahat yang cukup Banyak mengkonsumsi air mineral Gunakan PPE yang sesuai dan standar
4. Radiation : Paparan sinar matahari yang terlalu lamaPencegahan : Gunakan pakaian kerja berlengan panjang Hindari paparan sinar matahari yang terlalu
lama dan lakukan istirahat berkala
Station Bill dalam kondisi Emergency:
Emergency : 123 / 0800 1900 123
FS : 68113
Clinic : 68922 – AOH: 68940
Security (SANTAN): 68110
Pekerja Pastikan pekerjaan dilakukan oleh pekerja yang berpengalaman dan pekerja faham akan adanya potensi bahaya di masing-masing lokasi kerja
III. 2 Pengukuran tanah yang akan didirikan bangunan Waste Storage - Panjang tanah - Lebar tanah - Tingi elevasi tanah - Rendah elevasi tanah
Pekerja Pastikan pekerjaan dilakukan oleh pekerja yang berpengalaman dan pekerja faham akan adanya potensi bahaya di masing-masing lokasi kerja
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 5 of 8North Area Onshore
![Page 6: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/6.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
Potensi Bahaya :1. Motion: Terpeleset, tergelincir, tersandung,
terjepit dan terkena material & peralatanPencegahan : Lakukan ergonomic position pada saat
melakukan pekerjaan Hindari pinch point untuk menghindari
terjepit, Hindari lintasan bahaya (line of fire) Mata dan gerakan focus pada pekerjaan Lakukan komunikasi yang baik antar rekan
kerja.2. Gravity : Perkakas atau tubuh jatuh dari
ketinggian, tertimpaPencegahan: Perhatikan Posisi dan langkah pada saat
berjalan hindari posisi terjepit “pitch point” Hindari Line off Fire
3. Biologi : Gigitan nyamuk, serangga, tersengat lebah, digigit ular, dll.Pencegahan : Lakukan inspeksi potensi bahaya binatang di
area lokasi kerja 4. Temperatur: Dehidrasi
Pencegahan : Istirahat yang cukup Banyak mengkonsumsi air mineral Gunakan PPE yang sesuai dan standar
5. Radiation : Paparan sinar matahari yang terlalu lamaPencegahan : Gunakan pakaian kerja berlengan panjang Hindari paparan sinar matahari yang terlalu
lama dan lakukan istirahat berkala
Station Bill dalam kondisi Emergency:
Emergency : 123 / 0800 1900 123
FS : 68113
Clinic : 68922 – AOH: 68940
Security (SANTAN): 68110
IV CLOSE JOBIV.1 House Keeping
Potensi bahaya:1. Motion : Terpeleset, tergelincir, tersandung ,
Pencegahan : Hindari lintasan bahaya di lokasikerja
Pekerja Apabila pekerjaan berlanjut,buat work permit baru.Pekerjaan continue buat permit baru dengan status continue.
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 6 of 8North Area Onshore
![Page 7: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/7.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
Lakukan ergonomic position pada saat melakukan pekerjaan
Hindari pinch point untuk menghindari terjepit, Hindaril intasan bahaya (line of fire) Mata dan gerakan focus pada pekerjaan Lakukan komunikasi yang baik antar rekan
kerja2. Gravity : Kejatuhan material / benda disekitar lokasi
kerja, terjatuhPencegahan: Focus padasaat melakukan pekerjaan Lakukan komunikasi yang baik antar rekan
kerja saat proses persiapan pekerjaan berlangsung
3. Biologi : Gigitan nyamuk, serangga, tersengat lebah, digigit ular, dll.Pencegahan : Lakukan inspeksi potensi bahaya binatang di
area lokasi kerja 4. Temperatur : Dehidrasi
Pencegahan: Istirahat yang cukup Banyak mengkonsumsi air mineral Gunakan PPE yang sesuai
5. Radiation : Paparan sinar matahari yang terlalu lamaPencegahan : Gunakan pakaian kerja berlengan panjang Hindari paparan sinar matahari yang terlalu
lama dan lakukan istirahat berkala
Pekerjaan completed tutup status completed.
VI.2 Melapor kepada TL area setiap selesai melakukan pekerjaan mengenai update pekerjaan apakah sudah selesai atau masih berlanjut
Pekerja Apabila pekerjaan berlanjut, buat work permit baru & status pekerjaan Continue &apabila sudah selesai status Completed
IV.3 Khusus untuk pekerjaan di area Process, Supervisor pekerja harus melapor kepada senior operator control room apabila pekerjaan masih berlanjut atau sudah selesai
Pekerja Apabila pekerjaan berlanjut, buat work permit baru & status pekerjaan Continue &apabila sudah selesai status Completed
E. AttachmentsDIAGRAM ALIR / GAMBARN/ADATA TEKNISN/AINFORMASI PENGENDALIAN DOCUMENT
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 7 of 8North Area Onshore
![Page 8: Site Survey Waste Storage ( Santan Terminal )](https://reader036.vdocuments.site/reader036/viewer/2022071705/563db8d2550346aa9a974235/html5/thumbnails/8.jpg)
STANDART OPERATING PROCEDURE
QUALIFIED
Site Survey Waste Storage
SOP Number
008/BTU/SOP-Q/SANTAN/2013North Area Onshore
Chevron Kalimantan
Operation
Rev. Number Issued
December 2013
Effective
December 2016
Description
Approval Date
Reviewed by :
Description Legend:
New Issue : This SOP is newly issued and/or introduced to area/dept, facility/section in each OPG/SSG/ODG in IBU. Whole Document : All part of this SOP is modified especially changes in procedural steps and/or transferred from previous SOP format. Partial : Minor changes such as inserting additional procedural steps, flow diagram or technical data.
ROLE & RESPONSIBILITY- Operator adalah orang yang mempunyai dedikasi untuk mengoperasikan produksi dan di tunjuk oleh
leader.
- Pekerja adalah Personel Bukaka yang bertugas mengerjakan pekerjaan
- TL atau / orang ditunjuk : seorang team leader operation / atau yang ditunjuk untuk memimpin suatu pekerjaan
Revision: 0 Date: 4/18/2023 Chevron Indonesia Company Page 8 of 8North Area Onshore