SINDH INDUSTRIAL TRADING ESTATES LIMITED

“Every step towards, Industry is a steptowards progress” Quaid-e-Azam

1

Page 2: Site presentation 18 11-2013

INDEX

Organization

Board of Directors

General Body

Functions

Objectives

Operating Trades

Estates

Development Schemes

Employees Statistics

Development Projects 2

Page 3: Site presentation 18 11-2013

ORGANIZATION

Established in 1947 under the Indian Companies Act, 1913 (Now Companies Ordinance 1984)

Company functions under the Memorandum of Articles of Association

Governed by Board of Directors consisting of 15 Members (8 from Government representatives and 7 from Tenants of SITE)

General Body consisting of 60 Members out of which 35 from Government representatives and 25 from Tenants of SITE 3

Page 4: Site presentation 18 11-2013

BOARD OF DIRECTORS

Government Representatives (9) 1. Secretary Industries & Commerce Department 2. Secretary, Planning & Development Department 3. Secretary, Excise & Taxation Department 4. Managing Director, Sui Southern Gas Co. Ltd. 5. Chief Executive Officer, Karachi Electric Supply Company Ltd. 6. Managing Director, KW&SB 7. Chairman, Area Electricity Board, Hyderabad 8. Managing Director, S.I.T.E. Limited 9. Deputy Managing Director (Co-opted Officer)

4

Cont…..

Page 5: Site presentation 18 11-2013

BOARD OF DIRECTORS

Tenant Representatives (7)

1. Chairman, SITE Association of Industry, Karachi2. Tenant Directors from SITE Karachi.3. Tenant Directors from SITE Karachi.4. Tenant Director from SITE Super Highway Karachi5. Tenant Director from SITE Nooriabad6. Tenant Director from SITE Hyderabad/Kotri7. Tenant Director from SITE Sukkur

5

Page 6: Site presentation 18 11-2013

GENERAL BODY

35 government representative out of which a number of them have been retired

Final list will be presented after the approval of Board of Directors

6

Cont…..

Page 7: Site presentation 18 11-2013

FUNCTIONS

Promote industrialization

Create attractive conditions for the industrialists

7

Page 8: Site presentation 18 11-2013

OBJECTIVES

To Establish planned industrial areas where industrialists can have all the facilities

land, roads, water supply, electricity, gas, telephone, godowns, sanitation, drainage, labour colonies and other necessary public amenities

8

Page 9: Site presentation 18 11-2013

OPERATING TRADES

Textile

Chemicals

Food and Beverages

Confectionaries

Soaps and Detergents

Steel and Re-Rolling

Pharmaceutical

Paints 9

Cotton and Garments

Light and Engineering

Electronics

Cold Storage

Wood Works

Ghee and Oil

Flour Mills

Page 10: Site presentation 18 11-2013

ESTATESName of Estates Established Area (Acres)

Karachi 1947 4460

Superhighway Phase I 1983 349

Superhighway Phase II 1992 1000

Nooriabad 1983 5342

Kotri 1962 1875

Hyderabad Phase-I 1950 1264

Hyderabad Phase II 2008 300

Tando Adam 1952 150

Nawabshah 1994 239

Larkana 2009 500

Sukkur 1963 1066 10

Page 11: Site presentation 18 11-2013

OCCUPANCY OF PLOTS

11

Industrial EstateNo. of Allotted

Industrial Plots

Units in Operation

Sick /ClosedUnits

Under Construction

Open Plots

Vacant Plots

Karachi 2648 2220 248 100 80 -

Superhighway Phase I

410 208 30 96 76 -

Superhighway Phase II

1285 10 --- 120 1155 -

Nooriabad 1172 79 39 17 1037 -

Kotri 337 99 39 18 181 -

Hyderabad Phase-I 462 366 35 18 43 -

Hyderabad Phase II 192 --- --- --- 192 -

Tando Adam 56 21 7 24 4 -

Nawabshah 36 --- 1 2 33 -

Sukkur 237 75 35 16 111 -

Larkana Planning work in progress

6835 3078 434 411 2912 -

Page 12: Site presentation 18 11-2013

SITE LARKANA

On the directive of the President, Islamic Republic of Pakistan,

Larkana Industrial Estate is being establish at 14 Km from Larkana

City near Arija Village on Larkana- Moenjodaro Road, where 500

acres of forest land has been allotted and possession handed over to

SITE limited. PC-I for the development of infrastructure facilities of

Rs. 2404.489 million has been cleared by PDWP, Planning and

Development Department, Government of Sindh, for onward

submission to Federal Government for approval of CDWP and

ECNEC12

Page 13: Site presentation 18 11-2013

EMPLOYEES STATISTIC

13

Estates

No. of Employees

BPS-20 BPS-19 BPS-18 BPS-17 BPS-16Others

(BPS-5 to 15) Total

Karachi 2 8 33 47 41 953 1086

Super Highway

- - 3 4 7 121 135

Nooriabad - - 1 2 2 106 111

Kotri - - 2 3 2 146 154

Hyderabad - - 2 6 3 155 166

Tando Adam - - 1 3 - 30 34

Nawabshah - - - 3 - 34 37

Sukkur - - 1 3 2 152 158

Total 3 13 43 71 57 1697 1881

Page 14: Site presentation 18 11-2013

Development Works

14

Improvement of Infrastructure Facilities in Five Estate of SITE Limited (Karachi, Nooriabad, Kotri, Hyderabad and Sukkur.)

Development of Infrastructure for SITE Nawabshah (District Shaheed Banazirabad).

Supply of Water Pipeline from Keenjhar Lake of SITE Nooriabad

Cont ….

Page 15: Site presentation 18 11-2013

Development Works

15

Construction of 5.0 MGD Filter Plant at SITE Kotri

Construction of 2.5 MGD Combine Effluent Treatment Plant at Kotri

Water Supply Pipeline From Keenjhar Lake to SITE Nooriabad

Construction of Flyover (Afza Altaf) at Habib Bank roundabout at SITE Karachi.

Page 16: Site presentation 18 11-2013

ISSUES AND PROBLEMS

16

Infrastructure up gradation

Encroachment and Security of SITE areas

Budget deficit of SITE

Non-payment of salaries and other dues since last 4 month