SITE PLAN REVIEW COMMITTEE
June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street
1) 420 E. Horseshoe Drive – Clasen Quality Chocolate – Proposed Building Expansion 2) 1901 Market Way – TNT Fireworks – Fireworks Sales Request 3) Site Plan Review Minutes – May 29, 2018
![Page 2: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/2.jpg)
MAUSTON
23MONTELLO
36
12
151
MILWAUKEEMADISON
51
94
94
94
43
90
90
90
94
43
41
GREEN BAY
APPLETON
RACINE
KENOSHA
SHEBOYGAN
MANITOWOC
FOND DU LAC
OSHKOSH
SUPERIOR
WAUSAU
LA CROSSE
EAU CLAIRE
53
2
ASHLAND
STEVENS POINT
141
8
RHINELANDER
WISCONSIN
PARK
FALLS
13
RAPIDS
TOMAH
11
LAKE
RICE
WATERTOWN
PROJECT
LOCATION
N
CIVIL
C-001 INDEX SHEET
C-200A DEMOLITION AND EROSION CONTROL PLAN
(NORTH BUILDING ADDITION)
C-200B DEMOLITION AND EROSION CONTROL PLAN
(MAINTENANCE BUILDING ADDITION)
C-300 OVERALL SITE PLAN
C-300A SITE PLAN (NORTH BUILDING ADDITION)C-300B SITE PLAN (MAINTENANCE BUILDING ADDITION)
C-400A GRADING PLAN (NORTH BUILDING ADDITION)
C-400B GRADING PLAN (MAINTENANCE BUILDING ADDITION)
C-500A UTILITY PLAN (NORTH BUILDING ADDITION)
C-500B UTILITY PLAN (MAINTENANCE BUILDING ADDITION)
C-900 CIVIL DETAILS
C-901 CIVIL DETAILS
LANDSCAPE
L-100 LANDSCAPE PLAN (NORTH BUILDING ADDITION)
L-101 LANDSCAPE PLAN (INTERSECTION PLANTINGS)
CLASEN QUALITY CHOCOLATE
420 E. HORSESHOE RD.WATERTOWN, WI 53094
CQC WT PROJECT FIELDHOUSE
ARCHITECTURAL
A-201 ELEVATIONS
A-202 ELEVATIONS
TITLE SHEET
G-001 TITLE SHEET
SHEET INDEX
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER:
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
AS NOTED
1010 East Washington Ave.,Suite 202Madison, WI 53703-3130608 / 242 1550608 / 242 0787 fax
www.graef-usa.com
1 2 3 4 5 6
D
C
B
A
D
C
B
A
1 2 3 4 5 6C
:\Use
rs\1
472\
Doc
umen
ts\2
017-
5026
.01_
A18
_cur
t.hof
fman
n@gr
aef-
usa.
com
.rvt
6/6/
2018
12:
11:0
2 P
M
CQC WT PROJECT FIELDHOUSE
TITLE SHEET
06/06/2018
G-001
2017-5026.01
RMG
CWH
BMS
420 E. HORSESHOE RD.WATERTOWN, WI 53094
CLASEN QUALITY CHOCOLATE
![Page 3: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/3.jpg)
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C0
01_G
ener
alEng
ineer
ingNo
tes_5
026
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 11
:15 A
M
KEY PLANN
C-001
CIVIL ENGINEERING LEGENDSAND INDEX SHEET
SURVEY LEGEND
UTILITY LEGEND SITE IMPROVEMENTS LEGEND
Sheet List TableSheet Number Sheet Title
EROSION CONTROL LEGEND
![Page 4: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/4.jpg)
X X X X
X X X X X X X X
XXXX
XXXXX
XX
XXX X X X X X
X
X
XXX
XXXXX X X X
EAST HORSESHOE ROAD
EA
ST
HO
RS
ES
HO
E R
OA
DE
ND
ER
S L
AN
E
X
X
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C2
00A_
Demo
-EC_
5026
_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 9:
46 A
M
KEY PLANN
DEMOLITION AND EROSIONCONTROL PLAN (NORTH BUILDINGADDITION)
C200A
![Page 5: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/5.jpg)
DEMOLITION AND EROSIONCONTROL PLAN (MAINTENANCEBUILDING ADDITION)
C200B
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C2
00B_
Demo
-EC_
5026
_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
09 P
M
KEY PLANN
![Page 6: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/6.jpg)
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C3
00_O
vera
ll-Site
-Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
13 P
M
KEY PLANN
OVERALL SITE PLAN
C300
![Page 7: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/7.jpg)
EAST HORSESHOE ROAD
EN
DE
RS
LA
NE
EA
ST
HO
RS
ES
HO
E R
OA
D
NORTH BUILDINGADDITION CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C3
00A_
Site-
Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
15 P
M
KEY PLANN
SITE PLAN (NORTH BUILDINGADDITION)
C300A
![Page 8: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/8.jpg)
SOUTH BUILDINGADDITION
SITE PLAN (MAINTENANCE BUILDINGADDITION)
C300B
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C3
00B_
Site-
Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
18 P
M
KEY PLANN
![Page 9: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/9.jpg)
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C4
00A_
Grad
ing-P
lan_5
026_
01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 9:
54 A
M
KEY PLANN
GRADING PLAN (NORTH BUILDINGADDITION)
C400A
![Page 10: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/10.jpg)
GRADING PLAN (MAINTENANCEBUILDING ADDITION)
C400B
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C4
00B_
Grad
ing-P
lan_5
026_
01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
29 P
M
KEY PLANN
![Page 11: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/11.jpg)
NORTH BUILDINGADDITION CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C5
00A_
Utilit
y-Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 10
:01 A
M
KEY PLANN
UTILITY PLAN (NORTH BUILDINGADDITION)
C500A
![Page 12: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/12.jpg)
SOUTH BUILDINGADDITION
UTILITY PLAN (MAINTENANCEBUILDING ADDITION)
C500B
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C5
00B_
Utilit
y-Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
48 P
M
KEY PLANN
![Page 13: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/13.jpg)
MT
MT
MT
MTMT
MTMTMT
MT
MT
MT
SM
ESM
SM
MT
ESM
SM SM
SM SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
5-JCP
3-JCA
2-CTA
3-JCA
5-SNS
2-CTA
3-DSL
1-SNS
4-CTA
3-JCO
4-DSL
3-JCO
1-HKA
8-JSA
2-DSL
2-HKA
4-JCA
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_L1
00_L
ands
cape
-Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 11
:50 A
M
KEY PLANN
LANDSCAPE PLAN(NORTH BUILDING ADDITION)
L100
LANDSCAPE LEGEND
MT
EXISTING SHADE TREE TO REMAIN
EVERGREEN SHRUB
MANICURED TURF - SOD or SEED
PROPOSED ALUMINUM EDGER
LIMIT OF LANDSCAPE CONSTRUCTION
EXISTING SHRUB TO REMAIN
DECIDUOUS SHRUB
ESM EXISTING STONE MULCH
SM PROPOSED STONE MULCH
EXISTING ORNAMENTAL TREE TO REMAIN
![Page 14: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/14.jpg)
MT
MT
NOTE: LANDSCAPING TO BEADJUSTED BASED ON FINALLOCATION OF SIGN AND BERM
4-PGL
3-MRJ
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_L1
00_L
ands
cape
-Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 11
:50 A
M
KEY PLANN
LANDSCAPE PLAN(INTERSECTION PLANTINGS)
L101
LANDSCAPE LEGEND
ORNAMENTAL TREE
EVERGREEN TREE
MT MANICURED TURF - SOD or SEED
![Page 15: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/15.jpg)
CIVIL DETAILS
C900
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C9
00_D
etails
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
54 P
M
KEY PLANN
30" CONCRETE GUTTER30" VERTICAL FACE HIGHSIDECONCRETE CURB & GUTTER
30" VERTICAL FACE CONCRETE CURB & GUTTER
TRAFFIC CLASS I ASPHALTPAVING SECTIOND1
TYPICAL CONCRETEPAVING SECTION
18" VERTICAL FACE CONCRETE CURB & GUTTER
18" VERTICAL FACE HIGHSIDECONCRETE CURB & GUTTER 18" CONCRETE GUTTER
TYPICAL CONCRETESIDEWALK SECTION
TRAFFIC CLASS II ASPHALTPAVING SECTIOND2 D3 D4
C1 C2
B1
C3 C4 C5 C6
B4
TYPE E DOWELEDCONSTRUCTION JOINT
A2
A1 A2 A3 A4 A5 A6CONSTRUCTION JOINT FILLERTYPE C DOWELED
CONTRACTION JOINT
A4
CONTRACTION JOINT FILLERTYPE A THICKENED EDGE
ISOLATION JOINT
A6
ISOLATION JOINT FILLER
TYPICAL DOWEL AND TIE BAR BASKET
TYPICAL AGGREGATEPAVEMENT SECTIOND5
CONCRETE PAVEMENTTHICKENED EDGEB3
6' CURB TAPER SECTIONB2
30" ROLLED FACE CONCRETE CURB & GUTTER
D6STONE STRIP
![Page 16: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/16.jpg)
CIVIL DETAILS
C901
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_C9
00_D
etails
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/5/20
18 5:
55 P
M
KEY PLANN
D5 UTILITY TRENCH PAVEMENT RESTORATION
GENERAL NOTES
OPTIONAL FLAT-TOP SECTION
OPTIONAL POURED BASE
D1 CLASS "B" BEDING DETAIL FOR SANITARY SEWER D3 CLASS "C" BEDDING FOR STORM SEWER
A1 PRECAST MANHOLE RECTANGULAR CATCH BASINA3
CATCH BASIN UNDERDRAINB4
UTILITY CLEANOUTC3 C5 FIRE ACCESS ROAD GATE
B5 B6
TYPE B BUILDINGISOLATION JOINT
B6
BUILDING ISOLATION JOINT FILLER
INLINE DRAINC4
A5 TRAILER LANDING GEAR CONCRETE PAD
![Page 17: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/17.jpg)
MT
MT
MT
MTMT
MTMTMT
MT
MT
MT
SM
ESM
SM
MT
ESM
SM SM
SM SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
5-JCP
3-JCA
2-CTA
3-JCA
5-SNS
2-CTA
3-DSL
1-SNS
4-CTA
3-JCO
4-DSL
3-JCO
1-HKA
8-JSA
2-DSL
2-HKA
4-JCA
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_L1
00_L
ands
cape
-Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 11
:50 A
M
KEY PLANN
LANDSCAPE PLAN(NORTH BUILDING ADDITION)
L100
LANDSCAPE LEGEND
MT
EXISTING SHADE TREE TO REMAIN
EVERGREEN SHRUB
MANICURED TURF - SOD or SEED
PROPOSED ALUMINUM EDGER
LIMIT OF LANDSCAPE CONSTRUCTION
EXISTING SHRUB TO REMAIN
DECIDUOUS SHRUB
ESM EXISTING STONE MULCH
SM PROPOSED STONE MULCH
EXISTING ORNAMENTAL TREE TO REMAIN
![Page 18: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/18.jpg)
MT
MT
NOTE: LANDSCAPING TO BEADJUSTED BASED ON FINALLOCATION OF SIGN AND BERM
4-PGL
3-MRJ
CQC WT PROJECT FIELDHOUSE
06/06/2018
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER: 2017-5026.01
FKO
LRK
BMS
AS NOTED
X:\M
D\20
17\20
1750
26-0
1\CAD
\Site
\dwg\0
0\C_0
0_L1
00_L
ands
cape
-Plan
_502
6_01
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
NO. DATE REVISIONS BY
420 E. HORSESHOE RD.WATERTOWN, WI 53094
1 2 3 4 5 6
D
C
B
A
654321
A
B
C
D
www.graef-usa.com
5126 West Terrace Drive,Suite 111Madison, WI 53718-8346608 / 242 1550608 / 242 0787 fax
6/6/20
18 11
:50 A
M
KEY PLANN
LANDSCAPE PLAN(INTERSECTION PLANTINGS)
L101
LANDSCAPE LEGEND
ORNAMENTAL TREE
EVERGREEN TREE
MT MANICURED TURF - SOD or SEED
![Page 19: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/19.jpg)
FIRST FLOOR
100' - 0"
T / WALL
114' - 8"
EXISTING WALL BEYOND
B
EXISTING HOLLOW METAL DOORS
FIRST FLOOR
100' - 0"
T / WALL
114' - 8"
AA
B
B B
B
2222 2
1 1 1 1 1
EXTERIORINTERIOR
METAL MECHANICAL SCREEN, TYPICAL
CMETAL SHADE AWNING, TYPICAL
FIRST FLOOR
100' - 0"
T / WALL (S)
129' - 1"
T / WALL
114' - 8"
T / HIGH ROOF PARAPET
122' - 6"
22
11
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
2
1 1 1
2
2
A
BBBB
BA
A
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2 2 2
C
AAA
A
EXISTING WALL BEYOND
INTERIOREXTERIOR
FIRST FLOOR
100' - 0"
T / WALL
114' - 8"
T / IMP WALL (NB)
128' - 5"
T / HIGH ROOF PARAPET
122' - 6"
EXISTING PRECAST WALL PANEL
AA A A
BBBB
BB
EXISTING WALL BEYOND
C
DD
3 3 3 3 3 3 3 3 3 3
2222222
1111111
2
1
2
1
2
1
2
1
2
1
EXISTING STOREFRONT FRAMING AND GLASS
2
1
2
2
2
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER:
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
AS NOTED
1010 East Washington Ave.,Suite 202Madison, WI 53703-3130608 / 242 1550608 / 242 0787 fax
www.graef-usa.com
1 2 3 4 5 6
D
C
B
A
D
C
B
A
1 2 3 4 5 6
A
R
E
A
A
A
R
E
A
B
EXI
ST I
NGB
UI
C:\U
sers
\147
2\D
ocum
ents
\201
7-50
26.0
1_A18
_cur
t.hof
fman
n@gr
aef-us
a.co
m.rvt
6/6/
2018
12:
09:4
7 PM
CQC WT PROJECT FIELDHOUSE
ELEVATIONS
06/06/2018
A-201
2017-5026.01
RMG
CWH
BMS
420 E. HORSESHOE RD.WATERTOWN, WI 53094
CLASEN QUALITY CHOCOLATE
1/8" = 1'-0"B5OFFICE ADDITION - COURTYARD - EAST ELEVATION
1/8" = 1'-0"A5
OFFICE ADDITION -COURTYARD - WEST ELEVATION
1/8" = 1'-0"B1OFFICE ADDITION - EAST ELEVATION
1/8" = 1'-0"A1OFFICE ADDITION - SOUTH ELEVATION
KEY
1
2
3
A
B
C
D
METAL SPANDREL GLASS PANEL WITH METAL STUD AND GYPSUM BEHIND
TINTED VISION GLASS - 1/4" CLEAR GLASS, 1" HERMETIC AIR SPACE, 1/4" LIGHTLY TINTED GLASS WITH LOW-E COATING ON INSIDE SURFACE
REFLECTIVE VISION GLASS - 1/4" CLEAR GLASS, 1" HERMETIC AIR SPACE, 1/4" REFLECTIVE TINTED GLASS WITH LOW-E COATING ON INSIDE SURFACE
FIBER CEMENT PANEL, MATTE FINISH WITH SURFACE TEXTURE
FIBER CEMENT PANEL, METALLIC SEMI-GLOSS FINISH WITH SMOOTH SURFACE. ALTERNATE: SMOOTH COMPOSITE METAL PANEL
METAL SCREEN PANEL AND POSTS AT MECHANICAL EQUIPMENT
INSULATED METAL SANDWICH PANEL
![Page 20: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/20.jpg)
FIRST FLOOR
100' - 0"
FIRST FLOOR
100' - 0"
T / WALL (S)
129' - 1"
T / WALL (S)
129' - 1"
2
IMP SANDWICH PANEL COLOR AND SURFACE TO MATCH EXISTING WALL PANELS, TYPICAL
OVERHEAD SECTIONAL DOOR COLOR AND TYPE TO MATCH EXISTING OVERHEAD DOORS
HOLLOW METAL DOOR AND FRAME, COLOR TO MATCH EXISTING
METAL EDGE COPING, COLOR AND TYPE TO MATCH EXISTING, TYPICAL
D
FIRST FLOOR
100' - 0"
FIRST FLOOR
100' - 0"
T / WALL (S)
129' - 1"
T / WALL (S)
129' - 1"
IMP SANDWICH PANEL COLOR AND SURFACE TO MATCH EXISTING WALL PANELS, TYPICAL
METAL EDGE COPING, COLOR AND TYPE TO MATCH EXISTING, TYPICAL
D
FIRST FLOOR
100' - 0"
FIRST FLOOR
100' - 0"
T / WALL (S)
129' - 1"
T / WALL (S)
129' - 1"
IMP SANDWICH PANEL, COLOR AND SURFACE TO MATCH EXISTING WALL PANELS, TYPICAL
HOLLOW METAL DOOR AND FRAME, COLOR TO MATCH EXISTING
METAL EDGE COPING, COLOR AND TYPE TO MATCH EXISTING, TYPICAL
D
CLIENT:
DRAWN BY:
APPROVED BY:
SCALE:
CHECKED BY:
DATE:
PROJECT NUMBER:
PROJECT TITLE:
ISSUE:
PROJECT INFORMATION:
SHEET TITLE:
SHEET NUMBER:
AS NOTED
1010 East Washington Ave.,Suite 202Madison, WI 53703-3130608 / 242 1550608 / 242 0787 fax
www.graef-usa.com
1 2 3 4 5 6
D
C
B
A
D
C
B
A
1 2 3 4 5 6
A
R
E
A
A
A
R
E
A
B
EXI
ST I
NGB
UI
C:\Users\1472\Docum
ents\2017-5026.01_A18_curt.hoffmann@
graef-usa.com.rvt
6/6/2018 12:06:56 PM
CQC WT PROJECT FIELDHOUSE
ELEVATIONS
06/06/2018
A-202
2017-5026.01
RMG
CWH
BMS
420 E. HORSESHOE RD.WATERTOWN, WI 53094
CLASEN QUALITY CHOCOLATE
1/8" = 1'-0"A1MAINTENANCE ADDITION - SOUTH ELEVATION
1/8" = 1'-0"B1MAINTENANCE ADDITION - NORTH ELEVATION
1/8" = 1'-0"A3MAINENTANCE ADDITION - WEST ELEVATION
KEY
1
2
3
A
B
C
D
METAL SPANDREL PANEL WITH METAL STUD, GYPSUM, AND INSULATION KNEEWALL BEHIND
TINTED VISION GLASS - 1/4" CLEAR GLASS, 1" HERMETIC AIR SPACE, 1/4" LIGHTLY TINTED GLASS WITH LOW-E COATING ON INSIDE SURFACE
REFLECTIVE VISION GLASS - 1/4" CLEAR GLASS, 1" HERMETIC AIR SPACE, 1/4" REFLECTIVE TINTED GLASS WITH LOW-E COATING ON INSIDE SURFACE
FIBER CEMENT PANEL, MATTE FINISH WITH SURFACE TEXTURE
FIBER CEMENT PANEL, METALLIC SEMI-GLOSS FINISH WITH SMOOTH SURFACE. ALTERNATE: SMOOTH COMPOSITE METAL PANEL
METAL SCREEN PANEL AND POSTS AT MECHANICAL EQUIPMENT
IMP SANDWICH PANEL
![Page 21: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/21.jpg)
![Page 22: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/22.jpg)
![Page 23: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/23.jpg)
![Page 24: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/24.jpg)
![Page 25: SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM … Plan Review...SITE PLAN REVIEW COMMITTEE June 11, 2018 1:30 PM Room 2044, 2nd Floor, 106 Jones Street 1) 420 E. Horseshoe Drive](https://reader030.vdocuments.site/reader030/viewer/2022040908/5e7f0d07103b027b540b26f1/html5/thumbnails/25.jpg)
SITE PLAN REVIEW COMMITTEE May 29, 2018
The Site Plan Review Committee met on the above date at 1:30 P.M. in Room 2044 of the Municipal Building. The following members were present: Jacob Maas, Doug Zwieg, Jaynellen Holloway, Andrew Beyer, Robert Schwerer, Curt Kleppin, and Randy Wojtasiak. Also in attendance were Nikki Zimmerman, Dan Shea of Maas Brothers, Kyle Bergdoll of Temp Air, and Joel Van Ess of Abacus Architects. Chairperson Jacob Maas called the meeting to order. 1. 500 E. Horseshoe Road – Temp Pair – Review Industrial Development This item appeared before the Plan Commission on May 14, 2018 where it was approved for a conditional use permit for
Outdoor Storage or Wholesaling in conjunction with proposed development. This was approved at Plan Commission as submitted but still requires Site Plan Review approval. It has been determined that there are no wetlands on the site. The existing pond will be used for storm water. The north side parking will be for trucks and trailers whereas the parking on the east side will be for employees and visitors. A Notice of Intent (NOI) has been submitted to the DNR. A fence will surround the majority of the property. An roughly 3,400 square foot office area will be in the front of the building and the remainder of the building will be factory area. The departments were asked to voice any comments or concerns. The Building Inspection Department stated the plans must be reviewed by the state before submitting the building permit to the City. In addition, they requested clarification of what size meter will be used for impact fee purposes. At this time, the plan is for a ¾” meter to be installed. The Engineering Department stated the Fire Department, whose representative was not present, would likely need to speak with the developer to discuss the FDC location as well as the lock box location. In addition it was determined that proposed parking spaces are adequate. Also, there is an easement on the property. Should the City of Watertown require access to the sewer line in that easement, the City has the right to remove the fence to access the easement but does not have a requirement to replace the fence. In regards to Ruekert Mielke review, all review fees for this project shall be charged back to the applicant. The Water Department mentioned that the backflow prevention must be completed to code. The Zoning Department stated the photometric plan and landscape plan are sufficient. A motion was made by Andrew Beyer and seconded by Jaynellen Holloway to recommend approval of the project as submitted subject to Ruekert Mielke approval of the storm water management plan. Unanimously approved.
2. Site Plan Review Minutes – April 23, 2018
Motion was made by Curt Kleppin and seconded by Randy Wojtasiak to approve the minutes as submitted. Unanimously approved.
There being no further business to come before this committee, motion was made by Andrew Beyer and seconded by Robert Schwerer to adjourn. So ordered.
Respectfully submitted,
Nikki Zimmerman, Secretary
NOTE: These minutes are uncorrected and any corrections made thereto will be noted in the proceedings at which these minutes are approved.