Page 1: Site Feasibility Report

S U P E R I O R C O U R T O F C A L I F O R N I A , C O U N T Y O F L O S A N G E L E S

N E W G L E N D A L E C O U R T H O U S ESITE FEASIBILITY REPORT

truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
NOVEMBER 2011
truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
truano
Typewritten Text
Page 2: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

1 INTRODUCTION

Beginning in September 2010, a series of meetings were held to discuss the Court’s need for a new courthouse building in Glendale. During these meetings, members of the Los Angeles Superior Court, Los Angeles Sheriff’s Department, Administrative Office of the Courts and ZGF discussed priorities and established goals for the new approximately 99,552 gross square foot building. ZGF was asked to do a series of studies to establish the feasibility of building on the existing courthouse site.

From these initial studies, two options were selected for further study and to obtain a conceptual budget. The first option-labeled Site Strategy 1 in this report- retains much of the existing courthouse and places the new facility to the south in the existing parking lot. A new parking garage would occupy the Honda site across South Glendale Avenue. The second option was developed in two variations labeled Site Strategy 2A and Site Strategy 2B in this report. Both propose demolishing much of the existing courthouse, although certain historic elements of the Broadway façade would be evaluated to determine if they could be incorporated into the new building.

Both also propose acquisition of the Board of Realtors site for construction of an adjacent parking structure. Strategy 2A proposes a separate structure to accommodate County Justice Partners while Strategy 2B would accommodate the Justice Partners within the secure environment of the new courthouse itself.

The following report shows the regional location of the site in downtown Glendale, and then places the site in a neighborhood context in relationship to other structures that comprise the Glendale Civic Center.This is followed by a working program prepared by the AOC staff in consultation with the Court.

Next the two options, with two variations of the second, are presented. Each consists of conceptual plans to indicate how the program might be accommodated on the proposed site. Both vehicular and pedestrian entrances are indicated. For each option the plans are accompanied by a summary of opportunities and constraints in a brief evaluation.

Finally, the three are compared through a list of criteria that includes overall functionality, urban and civic response, and work environment. This comparison describes why Strategy 2B emerged as the preferred option in the study.

INTRODUCTION

Strategy 1 Strategy 2A Strategy 2B

Page 3: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

2

The aerial photo of central Glendale portrays the location of the proposed site in relationship to regional highway networks. From the north and the 134 Freeway the site is approached on Glendale Avenue. From the 5 Freeway to the west and the 2 Freeway to the east, the site is approached

via Colorado Street, while from the south it may be approached from the 5 Freeway via South Brand Boulevard and Broadway. This central location is thus highly visible and approachable for all potential users of the new courthouse.

REGIONAL SITE ACCESS

COLORADO STREET

BROADWAY

NORTH GLENDALE AVENUE

SOUTH BRAND BOULEVARD

134

2

5

PROPOSED COURTHOUSE SITE

Page 4: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

3

1. Board of Realtors Site

2. Honda Site (Parking Garage)

3. Honda Site (Surface Parking)

4. Municipal Services Building

5. City Hall

6. Police Headquarters

7. Perkins Building

This enlarged aerial photo locates the proposed site for the new courthouse in the context of the existing Civic Center in downtown Glendale. The project site, at the prominent intersection of East Broadway and Glendale Avenue, is at the eastern gateway to the downtown district. Adjacent Civic Center

buildings are indicated as are the site acquisition opportunities with the Board of Realtors and Honda parcels indicated in green.

SITE LOCATION IN THE CIVIC CENTER

PROJECT SITE

EAST BROADWAY

SOU

TH J

AC

KSO

N S

TREE

T

SOU

TH K

ENW

OO

D S

TREE

T

SOU

TH IS

AB

EL S

TREE

T

SOU

TH E

VER

ETT

STR

EET

EAST HARVARD STREET

ORANGE GROVE AVENUE

COLORADO STREET

EAST ELK AVENUE

EAST CALIFORNIA AVENUE

EAST WILSON AVENUE

SOUT

H G

LEND

ALE

AVEN

UE

6

45

1

2

3

7

Page 5: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

4

Page 1 of 1

LIST OF SPACESDEPARTMENTCOURT FUNCTIONS

1.0 Court Administration 10 1,516 1,895 2,653

2.0 Courtsets 8 16 21,562 28,031 39,243

3.0 Judicial Chambers & Courtroom Support 9 3,264 4,080 5,712

4.0 Criminal/Traffic Division 21 3,216 4,342 6,078

5.0 Civil/Small Claims Division 13 2,490 3,362 4,706

6.0 Self-Help Center 2 566 708 991

7.0 Jury Services 2 3,341 4,176 5,847

8.0 Public Area: Entry Lobby & Security - 2,034 2,441 3,417

9.0 Court Operations 24 1,791 2,239 3,134

10.0 Sheriff Operations 7 1,134 1,418 1,985

11.0 Central In-Custody Holding - 4,632 6,485 9,079

12.0 Building Support 4 9,920 11,934 16,708Grossing Factor

GRAND TOTAL 8 108 55,466 71,108 99,552 1.4

GSF per Courtroom 12,444

COUNTY FUNCTION

20.0 County Administration - 10,000 - -

TOTAL GSFCourt-rooms

Court Staff ASF DNSF

SUMMARY SPACE PROGRAM

This is a conceptual program for both court facilities and the associated functions of the County Justice Partners. While the number of courtrooms and the proposed square footage as such are fixed for purposes of this study, each of the court functions to be accommodated will be subject to further

evaluation in a Program Verification exercise with the AOC and the Court, prior to the commencement of detailed Schematic Design. This working program has facilitated the site evaluation phase of the process that is detailed in the report, as well as provided support for conceptual budget studies.

Page 6: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

5 SITE STRATEGY - 1

This strategy tests the possibility of adding a new, three-story courthouse on the existing courthouse site without demolishing most of the existing facility.

In this study, all court functions are located within the new courthouse, while county functions could use the vacated space in the existing courthouse. This strategy does require the demolition of the existing courthouse annex and proposes parking be accommodated in a structure across Glendale Avenue, at the current site of the Honda dealership. A signalized mid-block crossing would be necessary to connect the parking garage with the new courthouse.

Public access to the new courthouse is provided through an entry pavilion located in a courtyard between the new and existing facilities. This pavilion leads to a central atrium that acts as a hinge between two wings of courtrooms.

The drive-through sally port is accessed from a combination of South Isabel Street and the alley at the south edge of the site. Detainees are transferred from the sally port to the basement level holding via an adjacent ramp.

By placing the new courthouse on the same block as the existing facility, this strategy reinforces the city’s civic center, but its mid-block street frontage reduces the opportunity for an iconic presence.

SITE STRATEGY 1

S IS

ABEL

STR

EET

E HARVARD STREET

ACQUISITION OF HONDA SITE FOR PARKING GARAGE

ACQUISITION OF HONDA SITE FOR SURFACE

PARKING LOT

EXISTING COURTHOUSE

E BROADWAY

S GL

ENDA

LE A

VENU

ECOURTHOUSE WING TO BE DEMOLISHED

Page 7: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

6 SITE STRATEGY - 1

NE Aerial

SOUTH GLENDALE AVENUE

EAST BROADWAY

SOUT

H IS

ABEL

STR

EET

SOUT

H GL

ENDA

LE A

VENU

E

EAST BROADWAY

AOC390SF

WAITING

SERVICE

COURT2100SF

PRE-SCREEN.QUEUING

SECURE PUBLICLOBBY/ATRIUM

EXISTING BOWLING ALLEY

EXISTING COURTHOUSE

20’ BUILDING SETBACK

40’ BUILDING SETBACKSECURE UNDERGROUND

PARKING

BUSROUTE

ALLEY

JUS.AGEN.

390SF

CHAMBERS400SF

CIVIL / SMALL CLAIMS

3362 SFBUILDING

OPERATIONS1692 SF

STAFF SUPP.80 0F 1901SF

CRIMINAL / TRAFFIC DIV

4342 SF

SELFHELP708 SF

CHILDWAITING

631

COURTOPS510 OF2239 SF

EX.STOR.

480SF

RAMPDOWN

TOHOLDING

SALLY PORT

(HOLDING)

PROPERTY LINE

W

M

Ground

Page 8: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

7 SITE STRATEGY - 1

PROPERTY LINE

20’ BUILDING SETBACK

W

M COURT1750SF

W

W

M

M

STAFFSUPP.1821 OF1901SF

JURYSERVICES

4176SF

COURTOPS868 OF4176SF

JURYDELIB.

410SF

CHAMBERS400SF

CHAMBERS400SF

CHAMBERS400SF

COURT1750SF

COURT1750SF

WAITING

WAITINGROOF

ROOF

ROOF

OPEN TO BELOW

EXISTING COURTHOUSE

Floor 2

Basement

15 SECUREPARKING SPACES

6300 SF

MECHANICAL

SHERIFF1418 SF

CENTRAL IN-CUSTODY HOLDING

6485 SF

PROPERTY LINE

20’ BUILDING SETBACK

Page 9: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

8

PROPERTY LINE

20’ BUILDING SETBACK

W

M COURT1750SF

COURT1750SF

W

W

M

M COURTOPS868 OF4176SF

JURYDELIB.

410SF

CHAMBERS400SF

CHAMBERS400SF

COURTADMINISTRATION

1895SF

CHAMBERS400SF

CHAMBERS400SF

COURT1750SF

COURT1750SF

WAITING

WAITINGOPEN TO BELOW

Floor 3

Page 10: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

9

SUMMARY OF OPPORTUNITIES AND CONSTRAINTS

SITE STRATEGY - 1

Maintains the existing courthouse structure while constructing a new courthouse on the site immediately to the south. Parking for the new courthouse is accommodated in a parking structure on a site south east of the new courthouse on the Honda dealership site, which is seen by the city as a historic structure.

LAND ACQUISITION

• Strategy is dependent on the acquisition of the Honda site and partial demolition of historic building for parking garage.

DISPOSITION OF EXISTING COURT BUILDING• AOC ownership of the existing building. County will occupy only 25% of building. Other occupants and uses for building

unknown. • Requires Court to move during construction due to building and inmate security.

PEDESTRIAN / VEHICULAR ACCESS

• Remote staff and visitor parking requires crossing South Glendale Avenue. • Access to the sally port is compromised due to access from alley.

INTEGRATION WITH COMMUNITY / CONTEXT

• Limited visibility and image of Court to the community. OPERATIONAL COURT OPTIONS DURING CONSTRUCTION

• Requires court to move during construction due to building and inmate security. SHORT AND LONG TERM FINANCIAL BENEFITS

• Low initial cost approach to Court building as only limited demolition (annex only) is required. • Does not require construction cost associated with replacing county justice partners space • Unknown cost to provide temporary space for Court during construction. Not in AOC funding appropriation. • Unknown cost associated with upgrading existing building for county justice partners. Not in AOC funding appropriation.• Most costly parking structure option as it will require seismically upgrading and integrating into the existing historic structure.

Existing building will have impact on garage efficiency as well. • Ongoing maintenance and operations costs will be higher in the existing building due to age and inefficiencies.

Page 11: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

10

This strategy tests the feasibility of building both a new courthouse building and parking structure on the current site, if it is expanded to include the site currently occupied by the Board of Realtors. This strategy also proposes the demolition of portions of the existing courthouse, while retaining the façade along Broadway.

In this scheme, paired courtrooms are stacked in a four-story volume along Glendale Avenue with an adjacent four story entry tower. This entry tower provides public access off the corner of Broadway and Glendale Avenue and creates the opportunity for an iconic presence at this prominent intersection.

County functions are accommodated in a separate building, abutting the existing bowling alley. The space between the courthouse and county building entries affords the opportunity for a public plaza along Glendale Avenue that connects back to the parking structure at the southwest corner of the site.

The drive-through sally port is accessed from South Isabel Street. Detainees are transferred from the sally port to the basement level holding via an adjacent ramp.

SITE STRATEGY 2A

SITE STRATEGY - 2A

SOUT

H IS

ABEL

STR

EET

EAST HARVARD STREET

EXISTING COURTHOUSE

EAST BROADWAY

SOUT

H GL

ENDA

LE A

VENU

E

EXISTING COURTHOUSE TO BE DEMOLISHED

BOARD OF REALTORS SITE

Page 12: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

11

NE Aerial

SOUTH GLENDALE AVENUE

EAST BROADWAY

SOUT

H IS

ABEL

STR

EET

BUILDINGOPERATIONS

1692 SF

WAITING

LOADING

COURT2100 SF

COURT1750 SF

PRE-SCREEN.QUEUING

EXISTING BOWLING ALLEY

EXISTING COURTHOUSE FACADE

20’ BUILDING SETBACK

SECURE UNDERGROUND

PARKING

PUBLICPARKING

BUSROUTE

SOUT

H GL

ENDA

LE A

VENU

E

EAST BROADWAY

ALLE

Y

CHMBR400SF

CHMBR400SF

CRIMINAL / TRAFFIC DIV

4342 SF

JURY410 SF

CIVIL / SMALLCLAIMS

3362 SF

CHILD WAIT631 SF

RAMP DOWN TO HOLDING

PEDESTRIAN ACCESSTO PARKING GARAGE

SALLY PORT

(HOLDING)

PROPERTY LINE

W

W

M

M

A/C

A/C

SECURE PUBLICLOBBY/ATRIUM

SELF HELP708 SF

PARKINGGARAGE

(4 LEVELS)

EX.STOR.480 SF

COUNTY5000 of

10,000 SF

SITE STRATEGY - 2A

Ground

Page 13: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

12

POTENTIALFOR ADDITIONAL SECURE PARKING

15 + 4 SECUREPARKING SPACES

6300 SF

HOLDING6485 SF

SHERIFF1418 SF

MECHANICAL

BUILDINGOUTLINE

ABOVE

PARKING GARAGEOUTLINE

ABOVE

RAMP UP TO SALLY PORT

Basement

Page 14: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

13

ROOF

JURY SERVICES4176 SF

COURTADMIN1895 SF

COURTOPERATIONS

2239 SF

COUNTY5000 of

10,000 SF

WAITINGCOURT1750 SF

COURT1750 SF

CHMBR400SF

CHMBR400SF

JURY410 SF

PROPERTY LINE

W

W

M

M

A/C

A/C

A/C

A/C

EXISTING COURTHOUSE FACADE

STAFF SUPPORT1901 SF

JUS.360 SF

AOC390 SF

OPEN TO

BELOW

PARKINGGARAGE

(4 LEVELS)

Floor 2

OPEN TO

BELOW

ROOF

ROOF

WAITINGCOURT1750 SF

COURT1750 SF

CHMBR400SF

CHMBR400SF

JURY410 SF

PROPERTY LINE

WM

A/C

A/C

A/C

A/C

PARKINGGARAGE

(4 LEVELS)

Floors 3 and 4

SITE STRATEGY - 2A

Page 15: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

14

SUMMARY OF OPPORTUNITIES AND CONSTRAINTS

SITE STRATEGY - 2A

Maintains the historic facade of the existing courthouse and constructs a new courthouse on the site of theexisting court. A new 10,000 gsf county building to accommodate the justice partners is proposed as a stand alone building. Parking is accommodated in a parking structure on the south west corner of an expanded site. LAND ACQUISITION

• Strategy is dependent on the acquisition of the Board of Realtors site. DISPOSITION OF EXISTING COURT BUILDING

• Preserves part of the historic fabric of the existing courthouse. • Eliminates costly renovation and maintenance of existing building.

PEDESTRIAN / VEHICULAR ACCESS

• Staff and visitor parking is located immediately adjacent to the courthouse. • Allows for drive thru sally port off of South Isabel Street. • Strategy is dependent on the acquisition of the Board of Realtors site. • Requires the justice partners to pass through weapons screening several times per day.

INTEGRATION WITH COMMUNITY / CONTEXT

• Entrance location provides the opportunity for high level of visibility to the community. • Opportunity to create a landmark image for the courts within the city civic center. • Retains courthouse image along Broadway, access and historic features.

OPERATIONAL COURT OPTIONS DURING CONSTRUCTION

• Requires Court to move during construction. SHORT AND LONG TERM FINANCIAL BENEFITS

• Minimizes cost for county justice partners space as compared to other strategies. • Unknown cost to provide temporary space for Court during construction. Not in AOC funding appropriation. • Provides appropriate work space for both Court and County in new building. New building designed using

trial court facilities standards, sustainable design and technology.

Page 16: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

15

Like Strategy 2A, this strategy tests the feasibil-ity of building both a new courthouse building and parking structure on the current site, if it is expanded to include the site currently occupied by the Board of Realtors. However, this strategy accommodates county functions within the courthouse instead of in a separate building.

Paired courtrooms are, again, located efficiently around a single core of secure elevators and stacked in a four story volume with an adjacent, four story, public atrium facing onto the prominent intersection of Broadway and Glendale Avenue.

The drive-through sally port is accessed from South Isabel Street. Detainees are transferred from the sally port to the basement level holding via an adjacent ramp.

SOUT

H IS

ABEL

STR

EET

EAST HARVARD STREET

EXISTING COURTHOUSE

EAST BROADWAY

SOUT

H GL

ENDA

LE A

VENU

E

EXISTING COURTHOUSE TO BE DEMOLISHED

SITE STRATEGY - 2B

SITE STRATEGY 2B

BOARD OF REALTORS SITE

Page 17: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

16

SOUTH GLENDALE AVENUE

EAST BROADWAY

NE Aerial

SOUT

H IS

ABEL

STR

EET

BUILDINGOPERATIONS

1692 SF

WAITING

COURT2100 SF

COURT1750 SF

PRE-SCREEN.QUEUING

EXISTING BOWLING ALLEY

EXISTING COURTHOUSE FACADE

20’ BUILDING SETBACK

SECURE UNDERGROUND

PARKING

PUBLICPARKING

BUSROUTE

SOUT

H GL

ENDA

LE A

VENU

E

EAST BROADWAYAL

LEY

CHMBR400SF

CHMBR400SF

CRIMINAL / TRAFFIC DIV

4342 SF

JURY410 SF

CIVIL / SMALLCLAIMS

3362 SF

CHILD WAIT631 SF

RAMPDOWN

TOHOLDING

SALLY PORT

(HOLDING)

PROPERTY LINE

WM

A/C

A/C

SECURE PUBLICLOBBY /ATRIUM

SELF HELP708 SF

PARKINGGARAGE

(4 LEVELS)

PEDESTRIAN ACCESSTO PARKING GARAGE

SITE STRATEGY - 2B

Ground

Page 18: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

17

PARKING GARAGEOUTLINE

ABOVE

POTENTIALFOR ADDITIONAL SECURE PARKING

15 + 4 SECUREPARKING SPACES

6300 SF

HOLDING6485 SF

SHERIFF1418 SF

MECH

BUILDINGOUTLINE

ABOVERAMP UP TO SALLY PORT

Basement

SITE STRATEGY - 2B

Page 19: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

18

OPEN TO

BELOW

ROOF

WM

COURT1750 SF

COURT1750 SF

JURY410 SF

A/C

A/C

A/C

A/C

WAITING

PROPERTY LINE

STAFFSUPPORT

1901 SF

EX.STOR.480 SF

JUS.AGEN.360 SF

AOC390 SFCOUNTY

10,000 SF

CHMBR400SF

CHMBR400SF

PARKINGGARAGE

(4 LEVELS)

Floor 3

OPEN TO

BELOW

OPEN TO

BELOW

ROOF

ROOF

JURY SERVICES4176 SF

EXISTING COURTHOUSE FACADE

W

W

W

M

M

M

COURT1750 SF

COURT1750 SF

JURY410 SF

A/C

A/C

A/C

A/C

WAITING

PROPERTY LINE

COURTADMIN1895 SFSTF.

SUP.

COURTOPERATIONS

2239 SF

CHMBR400SF

CHMBR400SF

PARKINGGARAGE

(4 LEVELS)

Floor 2

SITE STRATEGY - 2B

Page 20: Site Feasibility Report

0´ 80´ 160´

1”= 80’-0”

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

19

OPEN TO

BELOWROOF

WM

CHMBR400 SF

CHMBR400 SF

COURT1750 SF

COURT1750 SF

JURY410 SF

A/C

A/C

A/C

A/C

WAITING

PROPERTY LINE

MECHANICAL

CHMBR400SF

CHMBR400SF

Floor 4

SITE STRATEGY - 2B

Page 21: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

20

SUMMARY OF OPPORTUNITIES AND CONSTRAINTS

SITE STRATEGY - 2B

Maintains the historic facade of the existing courthouse and constructs a new courthouse on the site of the existing court which includes 10,000 gsf for the county justice partners. Parking is accommodated in a parking structure on the south west corner of an expanded site. LAND ACQUISITION

• Strategy is dependent on the acquisition of the Board of Realtors site.

DISPOSITION OF EXISTING COURT BUILDING • Preserves part of the historic fabric of the existing courthouse.• Eliminates costly renovation and maintenance of existing building.

PEDESTRIAN / VEHICULAR ACCESS

• Staff and visitor parking is located immediately adjacent to the courthouse. • Allows for drive thru sally port off of South Isabel Street. • County office space is integrated into the Court and maximizes the efficiency and interaction with the justice partners.

INTEGRATION WITH COMMUNITY / CONTEXT

• Entrance location provides the opportunity for high level of visibility to the community. • Opportunity to create a landmark image for the city. • Retains courthouse image along Broadway, access and historic features.

OPERATIONAL COURT OPTIONS DURING CONSTRUCTION

• Requires Court to move during construction.

SHORT AND LONG TERM FINANCIAL BENEFITS • Long term operational costs are reduced. • Unknown cost to provide temporary space for Court during construction. Not in AOC funding appropriation. • Provides appropriate work space for both Court and County in new building. New building designed using trial court

facilities standards, sustainable design and technology.

Page 22: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

21

The team developed a series of more detailed criteria with which to evaluate the feasibility of the two Site Options. While all were deemed possible solutions to accommodate the new courthouse on the site of the existing building, Strategy 2B emerged as the clearly preferred alternative in these siting studies, primarily for three reasons. It offers great visibility and civic presence for the new courthouse

MATRIX OF CRITERIA FOR STRATEGIES 1 2A 2B YesFUNCTIONALITY NoMulti-level County Building MaybeCourts on Ground Level

Separate Entrance for County Building

Separate Building for County Offices

Sally Port Operates Strictly Off of Isabel

Loading Operates Strictly Off of Isabel

Safe / Convenient Access to / from Parking

Adaptability for Future Expansion

Full Utilization of Occupiable Space

URBAN AND CIVIC RESPONSECorner Presence - "Lantern"

Courts/Iconic Massing on Glendale

Reinforcement of Civic Center

Consideration of Historical Importance

Park-like Setting

ENVIRONMENT / SUSTAINABILITYPrivate Outdoor Space for Judges and Staff

Daylit Courts

Support Space Lit from Two Sides

in the Glendale community. Second, it provides for direct access from this parking structure to the new courtroom without crossing a busy street. And third, it accommodates the County Justice Partners within the secure perimeter of the new courthouse, which will provide both increased efficiency and accessibility in the working relationship with the Court.

COMPARISON OF SITE OPTIONS

Page 23: Site Feasibility Report

NEW GLENDALE COURTHOUSESUPERIOR COURT OF CALIFORNIA, COUNTY OF LOS ANGELES

11.29.10

SITE FEASIBILITY REPORT

22

PRELIMINARY PROJECT COSTS

Preliminary Cost Item Strategy 1 Strategy 2A Strategy 2B RemarksBasic program areas, construction cost from Davis Langdon

Strategy 1 is more costly due to re-working an existing structure.

Strategy 1 seems less costly while Strategies 2A & 2B have higher historic demolition / preservation costs.

TBD by AOC appraisals

$694 / sf

$81 / sf

$661 / sf

$81 / sf

Existing Courthouse and Board of Realtors

Board of Realtors

Existing Courthouse and Board of Realtors

Board of Realtors

$627 / sf

$101 / sf

Annex and Honda Dealership

Most expensive due to greatest area developed

Least expensive due to least areadeveloped

Slightly more expensive than 2A

Honda Dealership

Building Construction Cost

Parking

Site Development

Demolition of Existing Structures

Land Acquisition

In addition to the costs noted above, there are standard costs that will be typical to all schemes. These include costs for the Court to relocate during construction, costs for CEQA, FF & E, and costs for a historic evaluation of the existing court building. At this time, there are no discernible differences among strategies in terms of schedule.