singapore bim roadmap 2012-rev.ppt - bimmepaus › wp-content › uploads...workshop for industry...
TRANSCRIPT
Singapore Singapore
BIMBIM
RoadmapRoadmap
Singapore Building and Construction AuthoritySingapore Building and Construction Authority
by Cheng Tai Fattby Cheng Tai Fatt
Building & Construction IndustryBuilding & Construction Industry
TARGET
WHY?
Singapore Building and Construction AuthoritySingapore Building and Construction Authority
WHY?
CHALLENGES & STRATEGIES
TARGET
Singapore Building and Construction Authority
PRODUCTIVITY
Singapore Building and Construction Authority
Singapore Building and Construction Authority
BIM ROADMAP
Entrenched in the current Entrenched in the current 2D drafting practices2D drafting practices
Lack of demand for BIMLack of demand for BIM
Promoting success storiesPromoting success stories
Public sector taking the leadPublic sector taking the lead
Removing impedimentsRemoving impediments
Ch
alle
ng
es
Ch
alle
ng
es S
trate
gie
sS
trate
gie
s
Singapore Building and Construction Authority
2D drafting practices2D drafting practices
Steep learning curve to Steep learning curve to build up BIM expertisebuild up BIM expertise
Lack of ready pool of Lack of ready pool of skilled BIM manpowerskilled BIM manpower
Removing impedimentsRemoving impediments
Building BIM capability & Building BIM capability & capacitycapacity
Incentivising BIM adoptersIncentivising BIM adopters
Ch
alle
ng
es
Ch
alle
ng
es S
trate
gie
sS
trate
gie
s
Singapore Building and Construction Authority
PUBLIC SECTOR TAKING THE LEAD
U.S. GSAU.S. Army Corp of Engineers2008 : Mandatory BIM
Statsbygg, Norway2010: Requires IFC/BIM for new buildings
Norwegian Defence Estates Agency Is running 3 BIM pilots
Senate Properties (property services
UK2016: Mandatory BIM for government
GLOBAL PERSPECTIVE…
Korea 2012: Public Procurement Service will fully adopt IFC-based open BIM
Hong KongHKHA and MTR remodelled existing projects for sustainability and FM
Singapore Building and Construction Authority
2008 : Mandatory BIM for government projects
SingaporeSingapore2013: BIM Submission for Regulatory Approval
2012: BIM as part of public sector building project procurement
(property services agency), Finland 2007: Requires IFC/BIM in its projects and intends to have integrated model-based operation in future
BIM for government projects > £5 million
Establish Centre for Construction IT help key agencies and construction firms to kick start BIM
PUBLIC SECTOR PROJECTS
Singapore Building and Construction Authority
Work with key agencies on pilot projects
Work with key agencies to prepare consultants and contractors who undertake the public sector projects to be BIM ready
PHASED MANDATORY BIM E-SUBMISSION
Mandatory Architecture BIM e-Submissions for all new building projects > 20,000 m2
Mandatory Engineering BIM e-Submissions for all new
Singapore Building and Construction Authority
Mandatory Engineering BIM e-Submissions for all new building projects > 20,000 m2
Mandatory Architecture & Engineering BIM e-Submissions for all new building projects > 5,000 m2
CORENET ECORENET E--SSUBMISSIONUBMISSION SSYSTEMYSTEM
Submission via
Internet
Round-the-Clock
Submission
Singapore Building and Construction Authority
A Government-to-Business (G2B) internet-based portal for industry professionals to submit project
related plans and documents to regulatory authorities for approval
https://www.corenethttps://www.corenet--ess.gov.sg ess.gov.sg
Submission
Digital Signature
& Encryption
16 Participating
Agencies
RRIDINGIDING THETHE NNEXTEXT WWAVEAVE OFOF TTECHNOLOGYECHNOLOGY
AADVANCEMENTDVANCEMENT
Singapore Building and Construction Authority
25 JANUARY 2010
BIM E-SUBMISSION
1 APRIL 2011
Singapore Building and Construction Authority
Singapore Building and Construction Authority
PROMOTING SUCCESS STORIES
PAST OUTREACH & AWARENESS ACTIVITIES
Singapore Building and Construction Authority
Seminars Workshops Roundtable Roadshows Awards Competition
NationNation--Wide BIM Wide BIM NationNation--Wide BIM Wide BIM CompetitionCompetition8 & 9 May 2012 (Online)
8 & 9 September 2011
International International BIM Competition in BIM Competition in SingaporeSingapore8 & 9 September 2011
OUTREACH & AWARENESSInternational & Nationwide BIM Competitions
>40 teams
35 teams
>226 participants
Singapore Building and Construction Authority
26 & 26 April 2011
(Online)
15 & 16 May 2012 (Judging +
Presentation)
26 & 26 April 2011
Singapore Poly Singapore Poly BIM CompetitionBIM Competition15 March 201216 March 2011
10 judges
key leaders
teams
>300 participants
11stst BIM Visionary BIM Visionary Workshop for Workshop for Industry LeadersIndustry Leaders
SCPW BIM SCPW BIM
27 April 2011
SCPW BIM SCPW BIM ConferenceConference17 May 201227 April 2011
OUTREACH & AWARENESS International &
Local Conferences/Workshops
>400 pax
30 key leaders
Singapore Building and Construction Authority
Industry LeadersIndustry Leaders28 April 2011
11stst International International BIM Conference in BIM Conference in SingaporeSingapore21 September 2011
IPEIPE--BIM SeminarBIM Seminar3 November 2011
leaders
220 pax
320 pax
Singapore Building and Construction Authority
REMOVING IMPEDIMENTS
Outreach ProgramsOutreach Programs
Chaperon/HandholdingChaperon/Handholding
CENTRE FOR CONSTRUCTION IT (CCIT)
Singapore Building and Construction Authority
TrainingsTrainings
StandardsStandards
TemplatesTemplatesfor BIM submissionsfor BIM submissions
Step-by-Step
GuidelinesGuidelinesfor BIM submissionsfor BIM submissions
SUBMISSION TEMPLATE & GUIDELINES
Singapore Building and Construction Authority
Step-by-Step Guides
Add-On Modules
Templatesfor BIM submissions
StepStep--byby--Step Step
Guidelinesfor BIM submissions
CHAPTER 1: CUSTOMISATION
CHAPTER 2: GETTING STARTED
CHAPTER 3: PROJECT
ELEVATION/DATUM LEVEL
E-learning
Singapore Building and Construction Authority
StepStep--byby--Step Step GuidesGuides
Add-On Modules
ELEVATION/DATUM LEVEL
CHAPTER 4: SITE CONFIGURATION
CHAPTER 5: GFA TABULATION
CHAPTER 6: SITE & SITE COVERAGE
TABULATION (ONLY AFFECTING SITE
PLAN)
CHAPTER 7: ANNOTATION & SYMBOLS
CHAPTER 8: A&A WIRKS/RE-
SUBMISSION/AMENDMENTS
CHAPTER 9: ENDORSEMENT & DATA
INFORMATION
CHAPTER 10: EXPORT/PUBLISH TO
DWF
Templatesfor BIM submissions
Guidelinesfor BIM submissions
Singapore Building and Construction Authority
Step-by-Step Guides
AddAdd--On ModulesOn Modules �Buildability Score�GM Score
�CUI
�Constructability
Score
BIM STEERING COMMITTEE
� To provide strategic direction and guidance on the development of local BIM standards and supporting resources
� To seek appropriate funding support for development of
Singapore Building and Construction Authority
� To seek appropriate funding support for development of these standards and supporting resources
� To oversee implementation of these standards and address any issue that may impede the adoption of BIM
� To advise on any area that would lead to more effective BIM implementation in the industry
BIM STEERING COMMITTEEBIM STEERING COMMITTEE
BIM Steering Committee
BIM Guide Workgroup
Legal & Contract Workgroup
Discipline-Specific Workgroup
To define a industry- To define a legal & To study workflow &
Singapore Building and Construction Authority
�To define a industry-
wide BIM GuideBIM Guide�To define a legal &
contractual framework –
BIMBIM ParticularParticular ConditionsConditions�To study BIM modeling
effort and review payment
schedule to remunerate the
effort and identified a list of
value-added services
� To study workflow &
interaction btw design
consultants & their
interaction with
contractors
� To study feasibility of
newer interaction
methods such as early
contractor involvement
(ECI) and integrated
project delivery (IPD)
NNATIONALATIONAL BIM LBIM LEADERSHIPEADERSHIP
BIM Manager Forum
Policy Policy AdvisoryAdvisory
BIM Steering BIM Steering CommitteeCommittee
Singapore Building and Construction Authority
Forum
Engaging Private
Developers
National National BenchmarkingBenchmarking
NNATIONALATIONAL BIM LBIM LEADERSHIPEADERSHIP
BIM Manager BIM Manager ForumForum
Policy Policy AdvisoryAdvisory
BIM Steering Committee
�Forum for BIM managers and experienced BIM users
� To share BIM implementation
experience;
� To identify users needs in terms of
training, content and software add-
on;
� To solicit software technical and
Singapore Building and Construction Authority
ForumForum
Engaging Private
Developers
� To solicit software technical and
interoperability issues faced by BIM
users and to provide consolidated
feedback and wish-list to the BIM
vendors for resolution; and
� To establish online means to reach
out to user group
BIM Innovation BIM Innovation AwardAward
National National BenchmarkingBenchmarking
NNATIONALATIONAL BIM LBIM LEADERSHIPEADERSHIP
BIM Manager Forum
Policy Policy AdvisoryAdvisory
BIM Steering Committee
�REDAS�Design Object Library
�BIM Masterclass
�Leading developers in BIM�Capitaland
�CDL
�Changi Airport Group
�Emerald Land
Singapore Building and Construction Authority
Forum
Engaging Engaging Private Private
DevelopersDevelopers
National National BenchmarkingBenchmarking
�Emerald Land
�GuocoLand
�Keppel Land
�Land Lease
�MOH Holdings
�Wing Tai
BIM BIM BenchmarkingBenchmarking
AADVISORYDVISORY NNOTESOTES
� To draw on collective effort of all Government Procurement Entities (GPEs) to work towards stipulating BIM for new public sector building new public sector building projectsprojects with estimated contract value > $10 estimated contract value > $10 million million
phased approach phased approach
August 2011August 2011
Singapore Building and Construction Authority
� A phased approach phased approach for GPEs to stipulate BIM as early as July 2012July 2012
June 2012June 2012
�Provides clarity and certainty in stipulating BIM
delivery
1)1) BIM Requirements BIM Requirements
2)2) BIM Particular Condition BIM Particular Condition
Singapore Building and Construction Authority
BUILDING CAPABILITY AND CAPACITY
HandholdingHandholding
BIM Modeling Skill BIM Modeling Skill
33--6 months 6 months OJTOJT Existing
CAD Managers
BUILDING CAPABILITY & CAPACITY
Singapore Building and Construction Authority
Students
BIM Modeling Skill BIM Modeling Skill CertificationCertification
Managers
Existing Draftspersons
CCIT
CCIT + IHLs
Software
ATCs
Project Collaboration Project Collaboration Project Collaboration Project Collaboration
Company Deployment & Company Deployment & Company Deployment & Company Deployment & Specialist Diploma in BIM (3Specialist Diploma in BIM (3rdrd run)run)Specialist Diploma in BIM (3Specialist Diploma in BIM (3rdrd run)run)
Certificate Course:Certificate Course:Team Based Reengineering Team Based Reengineering
Certificate Course:Certificate Course:Team Based Reengineering Team Based Reengineering
EEQUIPPINGQUIPPING EXISTINGEXISTING PRACTITIONERSPRACTITIONERS
Roles of BIM SponsorsRoles of BIM SponsorsCritical Success FactorsCritical Success Factors
Senior Management Awareness Senior Management Awareness CourseCourse
Senior Management Awareness Senior Management Awareness CourseCourse
140 140 paxpax
Singapore Building and Construction Authority
Company Deployment & Company Deployment & Project Execution Project Execution
Company Deployment & Company Deployment & Project Execution Project Execution
Certificate Course (21 run):Certificate Course (21 run):BIM BIM ModellingModelling
Certificate Course (21 run):Certificate Course (21 run):BIM BIM ModellingModelling
Certificate Course (21 run):Certificate Course (21 run):BIM ManagementBIM Management
BIM eBIM e--Submission TrainingSubmission Training
Certificate Course (21 run):Certificate Course (21 run):BIM ManagementBIM Management
BIM eBIM e--Submission TrainingSubmission TrainingRegulatory Submission Regulatory Submission Regulatory Submission Regulatory Submission
Creating & Maintaining Creating & Maintaining Models + eModels + e--learning learning
Creating & Maintaining Creating & Maintaining Models + eModels + e--learning learning
300 300 paxpax
600 600 paxpax
500 500 paxpax
BUILDING CAPABILITY & CAPACITY
Competition Expert Programs Handholding
Singapore Building and Construction Authority
Competition Expert Programs Handholding
Training Skills Certification Graduation Workshop
MMOREORE BIM WBIM WORKSHOPSORKSHOPS
Q1 Q2 Q3 Q42012
ACES-Autodesk BIM Workshop
SIA-BCAA- Autodesk Architecture
BIM Workshop
Autodesk BIM Workshop
Leadership in Green Building
- Green BIM
Nemetschek
Workshop for Pre-
casters
SIA-BCAA- Autodesk
Architecture BIM
Workshop
Singapore Building and Construction Authority
Q1 Q2 Q3 Q42012
SCAL - Telka Workshop
for Contractors
SIA-BCAA- Autodesk
Architecture BIM
Workshop
CSC (Orion) Workshop
for Structural Engineers
SIA-BCAA- Autodesk
Architecture BIM
Workshop
Awareness SeminarsAwareness SeminarsAwareness SeminarsAwareness Seminars
Graduation WorkshopsGraduation WorkshopsGraduation WorkshopsGraduation Workshops
BIM CurriculumBIM CurriculumBIM CurriculumBIM Curriculum
EEQUIPPINGQUIPPING FFUTUREUTURE GGENERATIONSENERATIONS
Singapore Building and Construction Authority
CompetitionsCompetitionsCompetitionsCompetitions
Students’ Expert Students’ Expert ProgramProgram
Students’ Expert Students’ Expert ProgramProgram
Internship ProgramInternship ProgramInternship ProgramInternship Program
BIM Centre of BIM Centre of ExcellenceExcellence
BIM Centre of BIM Centre of ExcellenceExcellence
Applied BIM R&DApplied BIM R&DApplied BIM R&DApplied BIM R&D
EEQUIPPINGQUIPPING FFUTUREUTURE GGENERATIONSENERATIONSCourses BIM Modules
Bachelor of Building and Project Management
Construction IT & BIM (core
module)
BSc in Facilities and Events Management
BIM (elective)
Dip in Design (Interior & Landscape) BIM for Architecture (Year 2)
Dip in Construction Engineering BIM for Structure (Year 2)
Dip in Mechanical Engineering (Green Building Technology)
BIM for M&E (Year 2)
Dip in Electrical Engineering and Clean BIM for M&E (Year 2)
Awareness SeminarsAwareness Seminars
Graduation WorkshopsGraduation Workshops
BIM CurriculumBIM CurriculumBIM CurriculumBIM Curriculum
Singapore Building and Construction Authority
Dip in Electrical Engineering and Clean Engineering
BIM for M&E (Year 2)
Dip in Strategic Facilities Management BIM for Architecture (Year 1),
BIM for FM (Year 3)
Dip in Construction Information Technology
BIM for Architecture (Year 2),
BIM for M&E (Year 2),
Sustainable Building with BIM
(Year 3), BIM Customisation
(Year 3), Advance BIM for
Architecture (Year 3), BIM
Construction & Coordination
(Year 3), BIM for FM (Year 3),
BIM Design & Coordination
(Year 3)
Dip in Geo-Spatial Information & Technology
BIM for Surveying (Year 2)
CompetitionsCompetitions
Students’ Expert Program
Students’ Expert Program
Internship ProgramInternship Program
BIM Centre of Excellence
BIM Centre of Excellence
Applied BIM R&DApplied BIM R&D
Singapore Building and Construction Authority
INCENTIVISING BIM ADOPTERS
Building Information Model (BIM) FundBuilding Information Model (BIM) Fund
Firm Level SchemeProject Collaboration
Scheme
Construction Productivity & Construction Productivity & Capability Fund (CPCF) Capability Fund (CPCF) ––
$250mil$250mil
Singapore Building and Construction Authority
50%50% of supported items
capped at $20k $20k per
application
Scheme
50%50% of supported items
capped at $210k$210kper project, or
$35k $35k per discipline
Help defray cost of software, hardware, training & consultancy
Singapore Building and Construction Authority
BIM Project SubmittedBIM Project Funded
PRODUCTIVITY GAIN – CASE 1 PROJECT
COLLABORATION SCHEME
39%
75%
30%
22%
41%
6%
2D
BIM
Request for Information (RFI)
Singapore Building and Construction Authority
SAFRASAFRA CLUBHOUSECLUBHOUSEGFA = 840 mGFA = 840 m22
� Improved Presentation/ Visualisation� Faster Documentation� Reduced Errors in Construction
Documents
6%
Architecture Structural M&E
PRODUCTIVITY GAIN – CASE 2PROJECT COLLABORATION SCHEME
0
10
20
30
40
Co
nce
ptu
al D
esi
gn
De
tail D
esi
gn
Au
tho
rity
Su
bm
issi
on
s
Co
nce
ptu
al D
esi
gn
De
tail D
esi
gn
Au
tho
rity
Su
bm
issi
on
s
Co
nce
ptu
al D
esi
gn
De
tail D
esi
gn
Au
tho
rity
Su
bm
issi
on
s
Architecture Structure MEP
Ma
n-d
ay
s
Current 2D CAD
BIM
62
Singapore Building and Construction Authority
ANIMAL BREEDING FACILITY @ ANIMAL BREEDING FACILITY @ PERAHUPERAHU
ROADROADGFA = 840 mGFA = 840 m22
48
50
52
54
56
58
60
62
Architecture Structure MEP
Ma
n-d
ay
s
Current 2D CAD
BIM
PRODUCTIVITY GAIN – CASE 3FIRM LEVEL SCHEME
90
270
Clash Detection (hours)
Using BIM
Conventional 2D
36
170
BQ (hours)
Using BIM
Conventional 2D
� Faster Changes� Faster
Documentation� Higher Accuracy &
Fewer Site
572
710
Singapore Building and Construction Authority
VERMONT @ VERMONT @ CAIRNHILLCAIRNHILL RISERISEGFA = GFA = 18,963m18,963m22
Fewer Site Coordination Problems
� Improved Visualisation
� Clash Detection� Positive Impact on
Winning Tenders
Total time spent (hours)
Using BIM
Conventional 2D
Singapore Building and Construction Authority
THANK YOU