www.nyseg.com 2
Table of Contents
Municipal Officials’ Meeting
Topic Slide
System Overview 3
NYSEG Reliability Targets 4
Major Contributing Causes 5-6
Vegetation Management 7-8
5 Year Trim Cycle 9-10
Worst Performing Circuits 11
Routine Maintenance Programs 12-17
2018 Automation Planned Work 18
2018 Resiliency Plan 19
Capital Improvements 20-24
Future Initiatives 25
www.nyseg.com 3
System Overview
Municipal Officials’ Meeting
New York State Electric & Gas serves 890,000 electric and 264,000 natural gas customers across
New York State
Brewster Region is 531 square miles and serves approximately 86,379 electric customers
The electrical system is comprised of; • 32 substations; 15 Transmission lines;
• 95 distribution circuits - 2,399 circuit miles,
(1,630 overhead miles, 769 underground miles)
www.nyseg.com 4
NYSEG Reliability Targets
Municipal Officials’ Meeting
2017 Customer Average Interruption Duration Index (CAIDI) target
• CAIDI is the average outage duration that a customer would experience. • CAIDI is calculated by taking the sum of all customer interruption durations and dividing it
by the total number of customer interruptions. • Brewster Division had a goal of 2.25 and ended the year at 1.86
2017 System Average Interruption Frequency Index (SAIFI) target
• SAIFI is the average number of sustained interruptions per consumer during the year. • SAIFI is calculated by taking the total number of customer interruptions and dividing it by
the total number of customers served. • Brewster Division had a goal of 1.70 and ended the year at 1.80
www.nyseg.com 5
Major Contributing Causes - Motor Vehicle Accidents
Municipal Officials’ Meeting
A major contributing cause of outages in 2017 is Motor Vehicle Accidents (3rd Party)—23.1 % of all interruptions
www.nyseg.com 6 Municipal Officials’ Meeting
Trees are one of the leading causes of power interruptions and power quality issues. NYSEG routinely prunes and removes trees under and adjacent to
power lines for both safety and reliability.
Vegetation Management
www.nyseg.com 7
• Brewster Division is on a 5 year trim cycle, and trees remain a leading cause of outages
49.1% Trees - 38% Out ROW / 11% In ROW
• Continued focus on specification enforcement and individual customer outreach
• Develop new partnership strategies with the communities to strengthen the Right Tree Right Place philosophy
Municipal Officials’ Meeting
Vegetation Management
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
Westchester Putnam Dutchess
Customers Served
Customers Served
0
50
100
150
200
250
300
350
400
450
Westchester Putnam Dutchess
Total Refusal Customers Per County
Total RefusalCustomers
www.nyseg.com 8 Municipal Officials’ Meeting
Vegetation Management
• Right Tree Right Place philosophy sharing
• Tree planting guidance and awareness • NYDEC- Cost Share Grants for New
Plantings: • http://www.dec.ny.gov/lands/49
57.html • USDA Natural Resources Conservation
Service • Tree City USA
Why are trees the top cause of outages and interruptions if we’re on cycle?
One refusal has an impact on numerous customers and potentially causing impact to several towns at the same time Improper clearance leads to vegetative growth contact prior to the next scheduled maintenance year Overly mature tree population coupled with granite bedrock leads to more tree failure and uprooting Emerald Ash Borer is here and will continue to have a significant impact on safety and reliability in years to come.
Refusal to trim or cut trees affects customers impacted: 49.1% of outages are caused by trees
www.nyseg.com 9 Municipal Officials’ Meeting
5 Year Trim Cycle – Substation, Circuits
2016 2017 2018 2019 2020
Total Trim Mileage=1630 271.02 277.7 364.5 369.5 347.54
Adams Corners 411 Cantitoe 282 Amenia 153 Adams Corner 412 Amawalk 449/451/454
Adams Corners 413 CHU-Long MT Rd Bedford Hills 462 Amenia 154 Bedford Hills 227
Amawalk 453
CHU-Pleasant Ridge Rd Crafts 424 Bedford Hills 225 Cantitoe 283
Cantitoe 497 CHU-Separate Rd Cross River 469 Bedford Hills 463 Cantitoe 498
Carmel 501 CHU-White Pond Rd Cross River 470 Dingle Ridge 277 CHU-Chapman Rd
Carmel 502 Crafts 422 Goldens Bridge 417 Goldens Bridge 418 CHU-Long Hill Rd
Carmel 503 Crafts 423 Goldens Bridge 420 Haviland Hollow 426 CHU-Sylvan Beach Rd
CHU-RT 301 Croton Falls 446 Goldens Bridge 421 Mohansic 404 CHU-Tower Hill Rd
Croton Falls 514 Dover Plains 494 Kent 176 Mohansic 405 Cross River 468
Pawling 166 Pawling 509 Kent 526 Mohansic 406 Croton Falls 515/516
Pawling 508 Pound Ridge 456 Peach Lake 249 Peach Lake 250 Dingle Ridge 278
Pound Ridge 457 Putnam Lake 485 Putnam Lake 486 Sylvan Lake 478 Golden Bridge 414
Tilly Foster 439 Tilly Foster 437 Sylvan Lake 481 Sylvan Lake 480 Harlem Valley 105
Tilly Foster 438 Teakettle Spout 489 Ten Mile River 443 Haviland Hollow 427
Tilly Foster 441 Union Valley 431 Ten Mile River 444 Katonah 448/450/452
Tilly Foster 442 Union Valley 432 West Patterson 474 Kent 175
Union Valley 433 Kent Cliffs 291/292
West Patterson 475 Monhansic 403
Pawling 165
Pound Ridge 455/458
Putnam Lake 484
Streetlight_11 STI Teakettle Spout 490/491
www.nyseg.com 10
2016 2017 2018 2019 2020
Dutchess County
Dover Dover Amenia Amenia Beekman
Pawling Pawling Beekman Beekman Dover
Dover Dover Pawling
Putnam County
Brewster Brewster Carmel Brewster Kent
Carmel Carmel Kent Patterson Mahopac
Mahopac Mahopac Mahopac Putnam Valley Patterson
Putnam Valley Putnam Valley Patterson Southeast Putnam Valley
Southeast
Westchester County
Bedford Bedford Bedford Bedford Bedford
North Salem Somers Lewisboro North Salem Lewisboro
Pound Ridge North Salem Yorktown North Salem
Somers Pound Ridge Pound Ridge
Somers Somers
Yorktown
5 Year Trim Cycle – County, Town
Municipal Officials’ Meeting
www.nyseg.com 11
Worst performing circuits 2016 and 2017
Municipal Officials’ Meeting
2016 Substation - Circuit Major Cause(s) Solution
Cantitoe 497 Tree Outside of ROW, Tree Inside of ROW Trimmed late 2016
Carmel 501 MVA's/ Carmel substation fire Breakers replaced post fire
Crafts 423 Tree Outside of ROW, Tree Inside of ROW Trimmed late 2017
Pound Ridge 455 Tree Outside of ROW, Tree Inside of ROW Extensive trim post storm Riley/Quinn
Union Valley 433 Operational Errors Review relay settings and implement upgrades
2017 Substation - Circuit Major Cause(s) Solution
Adams Corners 411 Tree Outside ROW, Equipment Failure (substation breaker failure)
Station Breaker replaced 2017, 4 new reclosers to be installed, 3 communication upgrades to reclosers 2018
Crafts 423 Tree Outside ROW, Tree Inside of ROW
Trimmed late 2017 with invasive vine focus, 2 new reclosers to be installed, 1 communication upgrade to reclosers, settings changes to reclosers 2018
Crafts 424 Tree Outside ROW, Tree Inside of ROW
New fusing to truncate outage zone in tree prone area 2017, 2 new reclosers to be installed, 2 communication upgrades to reclosers 2018
Goldens Bridge 414 MVA's/ Tree Outside ROW 2 new reclosers to be installed 2018
Sylvan Lake 478 Tree Outside ROW, Lightning Substation Breaker replacement (new communication) 2018, 7 new reclosers to be installed 2018
www.nyseg.com 12
Routine Maintenance Programs
Distribution Infrared Program Stray Voltage Transmission Infrared Inspection via
Helicopter
Year/Units # Circuits (% of Total Circuits) Units # Circuits (% of Total Lines)
2016 50 (53%) 21,888 15 (100%)
2017 50 (53%) 16,995 15 (100%)
2018 50 (53%) 19,625 15 (100%)
Distribution and Transmission Inspection Programs: • Transmission Wood Pole and Above Ground Inspections on a 10 yr cycle based on industry best practice for this type of wood
pole maintenance. • Distribution and Transmission line inspections on equipment are on a 5 yr cycle based on industry best practice
Distribution and Transmission Substation Programs (Annually): • Substation Battery Maintenance • Transformer Oil Analysis • Infrared Substation Equipment Testing • Comprehensive Substation Inspection (bi-monthly) • Vegetation Abatement
Additional Substation Programs (Doble Testing) • Distribution Type Transformers on a 12 year cycle based on industry best practice- 2 this year • Substation Circuit Breakers on a 6 year cycle based on industry best practice - 27 this year • Transmission Type Transformers on a 6 year cycle based on industry best practice – 6 this year
Municipal Officials’ Meeting
www.nyseg.com 13 Municipal Officials’ Meeting
Routine Maintenance Programs and Immediate Impact
2017 Brewster Avoided Outages
www.nyseg.com 14
2018 Transmission Maintenance Work - Replacements
Towns Crossarms Insulators Poles
Amenia 12
16
Bedford 40
Carmel 13 10 20
Dover 10
6
Kent 2
Lewisboro 58
3
North Salem 20 1 9
Patterson 20 9 2
Pawling 9 16 1
Pound Ridge 27
2
Putnam Valley 4
Somers
2
Southeast 17 2 13
Total 232 40 72
Municipal Officials’ Meeting
813L South Rd. Pawling
803L Magnetic Mine Rd. Southeast
www.nyseg.com 15
2018 Distribution Maintenance Work – Repair/Replace
Municipal Officials’ Meeting
TOWNS CONDUCTOR CUT OUT GROUNDS GUY WIRE
HAND HOLE INSULATOR LA POLE PRI RISER
SECONDARY/SERVICE TRANSFORMER XARM
BEDFORD 3 2 1 5 8 1
BEEKMAN 1
CARMEL 2 5 6 1 25 51 1 2 5 6
DOVER 40 4 1 7 1 1 2 5
KENT 3 6 11 8 36 3 5
LEWISBORO 8 3 11 21 6 2 19 15 1 3 6 6
NORTH SALEM 1 2 3 6 2 1 2
PATTERSON 3 3 3 1 2 2
PAWLING 2 1 49 16 2 15 1 1 1
POUNDRIDGE 2 12 10 1 22 10 2 2 3 3
PUTNAM VALLLEY 1 9 2 21 2
SOMERS 1 4 4 1 4 22 2 6 4
SOUTHEAST 1 4 3 3
YORKTOWN 1 7 7 4 26 3 9
Total 22 9 142 99 6 13 117 198 7 13 24 46
www.nyseg.com 16
2018 Substation Distribution Maintenance Work
Municipal Officials’ Meeting
Substation Name Circuit Breaker Carmel CARMEL-99202
Croton Falls CROTON FALLS-2B-52
Croton Falls CROTON FALLS-44652
Croton Falls CROTON FALLS-51452
Croton Falls CROTON FALLS-51552
Croton Falls CROTON FALLS-51652
Croton Falls CROTON FALLS-80252
Croton Falls CROTON FALLS-80352
Croton Falls CROTON FALLS-81052
Croton Falls CROTON FALLS-81252
Croton Falls CROTON FALLS-81352
Croton Falls CROTON FALLS-T5-52
Croton Falls CROTON FALLS-T6-52
Golden Bridge GOLDEN BRIDGE-1B-42
Golden Bridge GOLDEN BRIDGE-2B-42
Golden Bridge GOLDEN BRIDGE-41642
Golden Bridge GOLDEN BRIDGE-41742
Golden Bridge GOLDEN BRIDGE-41842
Golden Bridge GOLDEN BRIDGE-41942
Golden Bridge GOLDEN BRIDGE-42042
Golden Bridge GOLDEN BRIDGE-42142
Golden Bridge GOLDEN BRIDGE-T2-42
Kent Cliffs KENT CLIFFS-29182
Kent Cliffs KENT CLIFFS-29282
Sylvan Lake SYLVAN LAKE-47812
Sylvan Lake SYLVAN LAKE-48012
Sylvan Lake SYLVAN LAKE-48112
•Substation Automation
We are performing upgrades in the automation system of the following substations. These upgrades will provide more visibility of the stations to the SCADA system. The following substation upgrades will be completed in 2018.
a.Kent Cliffs b.Putnam Lake c.Cantitoe
d.Amawalk
•Breaker Replacement
The followings breakers in the table to the right are scheduled to be replaced in the Brewster division.
• Amenia - substation rebuild
1. Install a new substation transformer 2. Low-side medium voltage GIS 3. Low-side capacitor bank and accompanying
equipment 4. Convert 10 miles of 4.8kV circuits 153 & 154 to
13.2kV.
www.nyseg.com 17
2018 Transmission Substation Maintenance Work
Municipal Officials’ Meeting
• Pawling – 115 kV Capacitor Bank Installation • Dover – 46 kV Capacitor Bank Installation • Croton Falls - Oil Breaker Replacement of all 46 kV and one 115 kV • Carmel – 115 kV Oil Breaker Replacement • Carmel – Finish the transmission line 807 Project – Upgrade from 46 kV to 115 kV • Ten Mille River – New breakers installation for MTA
www.nyseg.com 18
2018 Automation Planned Work
Municipal Officials’ Meeting
Towns Capacitors Regulators Reclosers
Amenia 4
Bedford 1 4
Beekman 1 11
Brewster Village
Carmel 12
Dover 1 2
Katonah 1
Kent 2 3
Lewisboro 2 4
North Salem 3 5
Patterson 6
Pawling 2 7
Poundridge 7
Putnam Valley 3 14
Somers 7
Southeast 3
Yorktown 3 1 1
TOTAL 8 15 87
Automation of capacitors and regulators provide better voltage regulation.
Automation of reclosers provide reduced outage durations, through remote
switching capabilities.
www.nyseg.com 19
2018 Resiliency Plan
Municipal Officials’ Meeting
Distribution System: Four areas of Focus
• Poles - Install class 3 poles
• Conductor – Install Poly Coated Conductor/ Spacer Cable/Aerial Bundled Cable • • Hardware – Install 3/8” guy wire, Vise top insulators
• System protection - Install fuses or cutouts on all transformer installations
Note: Poles, Conductor and System Protection focus areas have been implemented
in the Brewster division for several years. Poly coated wire and 3/8” guy wire has been used for years.
www.nyseg.com 20
Underground Capital Improvements
Municipal Officials’ Meeting
2018 2019 2020 2021 2022
Replace 30 Junction cabinets
Replace 2 Junction cabinets
Replace 8 Single Phase Transformers
Replace .5 Miles of primary underground on Golden Bridge 420
Replace 1.7 Miles of primary underground on Croton Falls 516
Replace 20 Single Phase Transformers
Replace 20 Single Phase Transformers
Inject .75 Miles of 3 Phase Primary on the Teakettle 490
Replace .6 Miles of primary underground on Croton Falls 514
Replace 2 Switch Gears
Replace 1 Mile of primary underground on Croton Falls 514
Replace 1 Mile of primary underground on Golden Bridge 420
Subdivisions with Underground Improvement Plan • Heritage Hills • Wild Oaks • Dalton Farms • Oakridge • The Willows • Chelsea Cove • Greenbriar • Primrose Farms • Fox Run • Indian Hill
www.nyseg.com 21
Capital 5 Year Plan
Municipal Officials’ Meeting
NYSEG
Project Title: Dingle Ridge – 2nd Bank and 13.2kV Conversion
Line of Business: Electric
Responsible Group: Projects
Investment Classification: System Capacity
Project Sponsor: Distribution Planning
Total Project Cost: $12,712,918
Project Description: Dingle Ridge – Upgrade the current 5MVA bank substation to a new Greenfield substation with 2 –
transformer banks. Convert 9.6 miles of 4.8KV circuits 277 and 278 to 13.2kV.
2013 2014 2015 2016 2017
$0 $37,710 $157,876 $273,408 $569,812
2018 2019 2020 2021 2022
$1,311,963 $10,362,149 $0 $0 $0
www.nyseg.com 22
Capital 5 Year Plan
Municipal Officials’ Meeting
NYSEG
Project Title: Line 807 115kV Conversion Project
Line of Business: Electric
Responsible Group: Projects
Investment Classification: Reliability Risk
Project Sponsor: System Planning
Total Project Cost: $22,605,775
Project Description: Convert the existing Carmel to Wood Street to Katonah Line #807 from 46kV to 115kV operation. This line
is already constructed to 115kV standards; therefore, the project is primarily substation modifications. A
new 115kV line terminal and two new 115kV breakers will be added at Carmel Substation, two new 115kV
line terminals will be added at Wood Street Substation, and a new 115kV line terminal and three new 115kV
breakers will be added at Katonah Substation.
2013 2014 2015 2016 2017
$6,760,174 $2,646,423 $4,413,869 $1,845,198 $2,903,847
2018 2019 2020 2021 2022
$3,571,721 $464,543 $0 $0 $0
www.nyseg.com 23
Capital 5 Year Plan
Municipal Officials’ Meeting
NYSEG
Project Title: North Brewster Reinforcement
Line of Business: Electric
Responsible Group: Projects
Investment Classification: Mandatory
Project Sponsor: Business Development
Total Project Cost: $18,575,007
Project Description: At Amenia Substation, the project will install 1 – 46/13.2kV, transformer & accompanying equipment and
convert 10 miles of the existing 4.8 kV circuits 153 and 154 to 13.2 kV. At Dover Plains Substation, the
project will install 2 – 46kV capacitor banks and accompanying equipment. At Pawling Substation, the
project will install 2 – 115kV capacitor banks and accompanying equipment.
2013 2014 2015 2016 2017
$0 $0 $0 $44,107 $2,505,050
2018 2019 2020 2021 2022
$11,440,658 $4,585,191 $0 $0 $0
www.nyseg.com 24
Capital 5 Year Plan
Municipal Officials’ Meeting
NYSEG
Project Title: Pawling-Ten Mile River New 115kV Line (Line 825 Rebuild)
Line of Business: Electric
Responsible Group: Projects
Investment Classification: Reliability Risk
Project Sponsor: System Planning
Total Project Cost: $31,605,000
Project Description: Build a 115kV line from Pawling to the vicinity of Ten Mile River Sub.
2013 2014 2015 2016 2017
$0 $0 $0 $0 $0
2018 2019 2020 2021 2022 Beyond 2022
$0 $0 $3,160,500 $3,160,500 $6,321,000 $18,963,000
www.nyseg.com 25
Future Initiatives
Municipal Officials’ Meeting
LED Street lighting
• Municipalities have been notified of the PSC approval of our tariffs for implementation of converting cobra head style streetlights to LEDs
• NYSEG filed specific LED street lights for approval by the PSC. Approval expected 7/2018
• Pending PSC approval of specific LEDs, lights will be ordered and conversions will be scheduled with participating municipalities.
• Municipalities are being scheduled based upon when they committed to the conversion and geographical considerations.
• Installation of lights will start in 7/2018
• 4 responses from the Brewster area: Lewisboro, Southeast, Patterson and North Salem.
NY Advanced Metering Infrastructure (AMI) (Smart Meters)
• Maine (100%) • CT (64%) • NY (Pending approval from NYPSC)
‾NYSEG & RG&E submitted a filing with the NYPSC for AMI deployment in 2018-2022 of 1.8 million electric and gas meter installations in NY ‾~$500M investment