simatic it historian pres

Upload: do-van-tu

Post on 14-Apr-2018

226 views

Category:

Documents


1 download

TRANSCRIPT

  • 7/27/2019 SIMATIC IT Historian Pres

    1/59

    siemens.com/simatic-it

    SIMATIC IT Historian

    Siemens AG 2013 All rights reserved. siemens.com/answers

  • 7/27/2019 SIMATIC IT Historian Pres

    2/59

  • 7/27/2019 SIMATIC IT Historian Pres

    3/59

    -

    ro uc on pera on ar ua y pera on ar

    Production Production

    Siemens AG 2013 All rights reserved.

    Page 3 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    4/59

    ompe ve pressure s orc ng manu ac urers o n a e us ness per ormance

    improvement strategies

    Each role in the enterprise must be empowered with accessible, meaningful and

    consistent information which improves the decision making process

    Improvements strategies cannot be effective without putting data into a business

    The goal is to transform data into information, and information into insight.

    Carly Fiorina (1954)

    Siemens AG 2013 All rights reserved.

    Page 4 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    5/59

    SIMATIC IT Historian:

    rov es a e oo s o an e an ana yze s op oor a a

    KPI calculation and validation

    Long Term Archive concept

    Data analysis tools

    Reporting

    Web based data distribution, analysis and reporting

    Integrated with SIMATIC IT Production Suite

    KPI management

    Siemens AG 2013 All rights reserved.

    Page 5 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    6/59

    Integrated with SIMATIC BATCH:

    rov es a e oo s o an e an ana yze s op oor a a

    Batch Archive

    Electronic Batch Reporting

    Integrated with SIMATIC WinCC/PCS7:

    Scalable Plant Intelligence Solution

    Product Options

    OEE-DTM (Overall Equipment Effectiveness and Downtime Management)

    Siemens AG 2013 All rights reserved.

    Page 6 Author / Department

    -

  • 7/27/2019 SIMATIC IT Historian Pres

    7/59

    Real-time dataSIMATIC IT RTDS

    transforms them into valuable information

    OPC Server WinCC Data Manager

    ( Data compression

    with optional Plant Data

    Archive module )

    SIMATIC IT PlantPerformance Analyzer

    OPC Server WinCC Archive Relational Database

    s or ca a a sources

    RDB

    Alarms events

    Long-term archive

    Batch data

    n rc ve r ar y app ca ons

    Siemens AG 2013 All rights reserved.

    Page 7 Author / Department

    SIMATIC BATCHCustom data

  • 7/27/2019 SIMATIC IT Historian Pres

    8/59

    Applicable on data from historical data

    sources

    Pre-defined aggregations available(Average, Min, Max, Sum, )

    Validation functions

    Set the ualit code GOOD or BAD INPUT PARAMETERS

    of the samples Can be applied on raw data or on

    calculated data

    Custom algorithms with PPA scripting

    environment

    Siemens AG 2013 All rights reserved.

    Page 8 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    9/59

    Trend Viewer Bargraph Viewer

    -

    Production Viewer X-Y chart

    Siemens AG 2013 All rights reserved.

    Page 9 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    10/59

    Message analyser

    -

    Message Viewer

    Siemens AG 2013 All rights reserved.

    Page 10 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    11/59

    PPA automatically stores Batch information from SIMATIC

    BATCH:

    Batch stepping sequence

    Batch-related messages

    Batch-related measures (trends)

    Analyze Batch events and related data (trends, alarms, KPIs)

    A Query Tool is available in order to

    select batches

    Search criteria can be applied to any

    Batch characteristic

    Batch reporting

    Siemens AG 2013 All rights reserved.

    Page 11 Author / Department

    Pre-defined batch reports

  • 7/27/2019 SIMATIC IT Historian Pres

    12/59

    - -

    A Formula Editor inte rated in HDD controls allows on-the-fl anal sis based

    on archived data

    It is possible to save and reuse formula templates

    Siemens AG 2013 All rights reserved.

    Page 12 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    13/59

    epor ng ramewor ex en s e unc ona y o

    Production Suite by providing:

    , ,

    exposed according to the ISA 95 standard

    ea y- o-use n us ry spec c repor

    templates and report parts integrated inMicrosoft Report Builder

    Access to reports through SIMATIC IT

    Portal, controlled by SIMATIC IT User

    Siemens AG 2013 All rights reserved.

    Page 13 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    14/59

    abstraction model that better works for him

    Business Model

    Business information

    Consolidated data

    SIMATIC IT terminology

    Business reports

    Data Model Production data

    Real time data

    O erational re orts

    Physical Model

    Siemens AG 2013 All rights reserved.

    Page 14 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    15/59

    -

    understand the complexity of database logic or to be familiar with the tool where

    the physical data is stored.

    The following MES relevant information are

    available for reporting purposes

    S95 entit iese.g. Equipment model, Orders, Materials, PPRs, Shift

    , , .

    Historical tags

    OEE SPC and EBR data

    Compliance Services and Logbook info

    Siemens AG 2013 All rights reserved.

    Page 15 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    16/59

    The Business Model is built around the standard business terminolo of ISA 95

    and provides the end-user the ability to autonomously query and retrieve

    information using common business terms.

    Siemens AG 2013 All rights reserved.

    Page 16 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    17/59

    -

    to the right users through a web-based client interface at Zero Administration Cost

    Embed pre-defined viewers in CAB screens

    Display data by means of dedicated interfaces

    Graphically build queries using Smart Query Builder(SQB)

    Siemens AG 2013 All rights reserved.

    Page 17 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    18/59

    Assign KPI to Equipment Classes (site, area, cell, unit) in the Plant Model

    Schedule KPI calculation directly from Production Modeler rules

    PPA automatically contextualizes KPIs against manufacturing events or elements

    (production runs, batches, production orders, equipments, )

    Activate KPI 1Activate KPI 1 Calculate KPI 2Calculate KPI 2 Calculate KPI 3Calculate KPI 3 Deactivate KPI 1Deactivate KPI 1

    Trace Trace

    Production Operation Production Step Production Step

    Production Viewer allows analyzing KPIs relevant to a specific production event

    Siemens AG 2013 All rights reserved.

    Page 18 Author / Department

    Comparison of KPIs can be done using Bargraph Viewer or Trend Viewer

  • 7/27/2019 SIMATIC IT Historian Pres

    19/59

    and Compliance Services

    Audit Trail and/or Electronic Signature can be applied to any modification of archived data

    u cus om za on o ec ron c gna ure scenar os s suppor e

    Siemens AG 2013 All rights reserved.

    Page 19 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    20/59

    User specific, up-to-date and comprehensive information offers crucial

    business advantages

    each corporate level

    Faster and better understanding and solving problems

    Reduce downtimes and idle-times

    Optimization of production processes

    Quality performance improvements

    Reduction of paper based activities

    Reduction of production costs

    Support compliance to regulations and normative practices

    Siemens AG 2013 All rights reserved.

    Page 20 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    21/59

    Product Options:

    OEE-DTM

    (Overall Equipment Effectivenness and Downtime Management)

    SPC-SQC

    (Statistical Process Control and Statistical Quality Control)

    Siemens AG 2013 All rights reserved.

    Page 21 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    22/59

  • 7/27/2019 SIMATIC IT Historian Pres

    23/59

    -

    ro uc on pera on ar ua y pera on ar

    Production Production

    Siemens AG 2013 All rights reserved.

    Page 23 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    24/59

    Hi h Performance, hi h Qualit , hi h Availabilit

    the everyday targets in the plant

    need to improve maintenance and operational performances

    Which is the actual performance against my performance targets?

    How effectively is the organization using its assets?

    Wh m ca acit is idle or non- roductive?

    Are resources being used efficiently for the products currently

    produced?

    What is the economic impact of the inefficiency?

    inefficiencies?

    Why two teams, that appear to be equal, produce products that are

    so different?

    Does your process create waste when stopped?

    Siemens AG 2013 All rights reserved.

    Page 24 Author / Department

    All necessary data must be available to make informed decisions

  • 7/27/2019 SIMATIC IT Historian Pres

    25/59

    identified and

    classified as the Six Big Losses

    Six Big Losses Category Comment

    Breakdowns

    Setup / Adjustments

    Downtime Loss

    Downtime Loss

    Difference between Breakdown and Small Stop

    Includes tool changeovers

    Small Stops / Idling

    Reduced Speed

    Speed Loss

    Speed Loss

    Only stops under (5) minutes and no maintenance

    Process not running at its theoretical speed

    Startup Rejects

    Production Rejects

    Quality Loss

    Quality Loss

    Scraps in warm-up, startup or other early product ion

    Scraps during steady-state production

    Siemens AG 2013 All rights reserved.

    Page 25 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    26/59

    -

    OEE is a total measure of erformance that relates the availabilit of rocess to

    OEE controls and reduces the Six Big Losses

    productivity and quality

    OEE-Category OEE-Calculation

    Standby Not part of OEE calculation

    own me oss va a y: s e ra o o opera ng me o p anne pro uc on me.

    100% availability means the process has been running with no recorded

    stops

    Speed Loss Performance: is the ratio of ideal cycle time to actual cyc le time, or

    alternatively the ratio of actual run rate to ideal run rate.

    100% performance means the process has been consistently running at its

    Quality Loss

    Quality: is the ratio of good parts to total parts.

    100% quality means there have been no reject or failure in parts

    Siemens AG 2013 All rights reserved.

    Page 26 Author / Department

    OEE = Availability * Performance * Quality

  • 7/27/2019 SIMATIC IT Historian Pres

    27/59

    World Class OEE is considered to be 85% or more

    verage o ra e n manu ac ur ng p an s s

    OEE FACTOR World Class

    Six Sigma is not enough!Availability 90,0 %

    Performance 95,0 %

    doesnt mean

    OEE >= 85% !

    Quality 99,0 %

    OVERALL OEE 84,6 %

    Big Room for Improvements

    Siemens AG 2013 All rights reserved.

    Page 27 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    28/59

    -

    ep oyment o equ pment e c enc es an ownt me management so ut on

    Time model Define general time categories as a basis for Key Performance

    definition

    Modeler

    configuration Indicators (KPI) calculation

    Reason tree Define all the possible equipment status conditions (failures,

    , , ,

    Data collection

    configuration Configure data collection in SIMATIC IT Historian

    KPI configuration Customize and personalize KPI algorithms

    Siemens AG 2013 All rights reserved.

    Page 28 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    29/59

    SIMATIC IT OEE-DTM is a product option of SIMATIC IT Historian, and it is wholly

    and seamlessly integrated within the entire MES solution

    SIMATIC IT for OEE, through integration with the entire SIMATIC IT environment,

    allows:

    the calculation of all standard and custom KPIs to fully support the Downtime Management

    to perform active and corrective actions to react to efficiency decreases

    to improve economic Return on Investments (ROI)

    to maximize the plant performance

    Siemens AG 2013 All rights reserved.

    Page 29 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    30/59

    - - -

    Pre-defined standard KPIs algorithms:

    Availability rate, Performance rate, Quality rate, OEE,

    MTTA, MTBF, MTTR, MTBA, and more

    Possibility to create new custom KPIs algorithms,

    combining the existing ones or implementing brandnew ones

    ese n ca ors, manage y - , are ava a e e er :

    for executives (who, having an extended vision of the overall plant, manage indicators and charts)

    for operators (who mainly monitor run-time views, customizing downtime parameters, and have a restricted view of a

    Siemens AG 2013 All rights reserved.

    Page 30 Author / Department

    spec c un

  • 7/27/2019 SIMATIC IT Historian Pres

    31/59

    Downtime Management:

    detailed information about equipment states

    , ,by equipment, status, product, or any other

    context data

    Downtime Analysis:

    enables exploring the causes that have

    enerated a roduction breakdown

    Siemens AG 2013 All rights reserved.

    Page 31 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    32/59

    or prov es a num er o pre e ne grap cs screens spec ca y u n

    order to provide out-of-the-box analysis OEE-related KPIs and equipment downtimes

    re- e ne grap c o ec s are ava a e o u a ona grap cs

    -

    the user interface, since the user interface is built on top of standard technology (namely .Net

    from Microsoft) a wide range of third-party graphic objects can be embedded in any GUI

    interface for OEE anal sis

    Siemens AG 2013 All rights reserved.

    Page 32 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    33/59

    Time Model:

    through its graphical representation, it provides an easy way to create

    the complex model

    Reason Tree:it defines in details the hierarchy of all the possible machine states within

    the defined time categories for individual or for groups of equipments

    Shift Calendar (SHC) Management:

    strong integration between equipments and calendars are defined in the

    SHC component

    Siemens AG 2013 All rights reserved.

    Page 33 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    34/59

    Produced units, scraps, reworked units and any other

    production counter can be displayed and summarized,

    according to the different grouping criteria

    Current production can be compared with theoretical

    SIMATIC IT for OEE makes use of SIMATIC IT Report Manager in

    order to provide flexible and effective performance reporting(customized according to the user needs)

    Reports can be launched directly from the web

    Siemens AG 2013 All rights reserved.

    Page 34 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    35/59

    .

    Planned / Induced Downtime Management

    MES Context Support

    On Value Change Design Speed Acquisition

    GUI Enhancements

    Predefined Reports

    Documentation enhancements

    Note: SIMATIC IT OEE V1.2 SP2 is compatible with SIMATIC IT Production Suite V6.3 SP2

    Siemens AG 2013 All rights reserved.

    Page 35 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    36/59

    ,

    Web Client page, or programmatically through COM or GSI methods:

    anne own mes

    which cause OEE to disregard the status information retrieved from the field

    for the specified time span, are used when an equipment have predefined

    planned time where it is off-line.

    Induced Downtimes

    used to model a bottleneck situation, where the machine state of a piece of

    e ui ment de ends on the state of another iece of e ui ment. The areused to put in Downtime status an equipment on real-time.

    Siemens AG 2013 All rights reserved.

    Page 36 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    37/59

    anne own me s a per o o own me con gure o occur n e u ure.

    e o ow ng parame ers e ne a p anne own me:

    A start-time and an end-time

    o n e u ure

    A machine state

    The piece(s) of equipment involved

    Siemens AG 2013 All rights reserved.

    Page 37 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    38/59

    n n uce own me s a per o o own me w c was cause y ano er

    downtime occurring on a different piece of equipment.

    A start time set when the record is opened

    A machine state

    The piece(s) of equipment involved

    Siemens AG 2013 All rights reserved.

    Page 38 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    39/59

    ,

    counter and design speed records:

    GroupName

    UserName

    LotID

    r er

    BatchID

    Shift

    manually (by a programmatic interface)

    automatically (by either a screen or a Production Modeler rule)

    Siemens AG 2013 All rights reserved.

    Page 39 Author / Department

    On Value Change Design Speed

  • 7/27/2019 SIMATIC IT Historian Pres

    40/59

    g g p

    n . . ere s e poss y o acqu re es gn spee va ues on a a

    change:

    the user must define two RTDS points (one to trigger the design speed reading

    and one to retrieve the design speed value)

    Now, the user can easily define all

    the parameters of design speed

    acquisition, beyond product id

    and context ac uisition

    Siemens AG 2013 All rights reserved.

    Page 40 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    41/59

    The followin redefined a es are rovided full -inte rated in SIMATIC IT CAB

    Portal:

    Counters Graphic

    Counters Grouped

    KPI Viewer

    Counters Viewer

    Design Speed Viewer

    DTM Viewer

    Gantt Viewer

    Runtime Operator Panel

    Equipment Comparison

    Context Management

    Siemens AG 2013 All rights reserved.

    Page 41 Author / Department

    anne own me

  • 7/27/2019 SIMATIC IT Historian Pres

    42/59

    e o ow ng repor s are prov e :

    Actual &Target

    Downtime

    DTM Detail

    Availability details

    Counter values

    DTM values

    Siemens AG 2013 All rights reserved.

    Page 43 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    43/59

    This version includes the following new documents:

    OEE Developer Guide:

    a comprehensive guide on how to use OEE programmatic interfaces to develop custom applications

    OEE Installation Manual:a dedicated installation manual for SIMATIC IT OEE

    OEE Web Client Documentation:new contextual documentation accessible directly from OEE Web Client pages

    Additionally, the following existing documents have been substantially updated:

    OEE Functional Overview

    Siemens AG 2013 All rights reserved.

    Page 44 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    44/59

    -

    Through integration with

    SIMATIC IT Product ion Modeler:

    SIMATIC IT OEE-DTM

    key benefits:

    Increase acquisition performances using high speed

    acquisition rules

    Customization of the application through the user-

    -information

    Preventing unscheduled downtimes

    exits capabilities, inside the Production Modeler (PM)

    rules

    S eedin -u ac uisition erformances b bufferin

    Improving of data synchronization and safety with data

    recovery system

    Maximization of production equipment utilization

    mechanisms

    Improvement of the acquired data contextualization

    Reducing maintenance costs by optimizing planning

    activities

    Improving assessment and business process

    Definition of high-level contexts Easy Import / Export configuration data from Excel

    worksheets

    Siemens AG 2013 All rights reserved.

    Page 45 Author / Department

    p m z ng pro uc qua y gra ng process

  • 7/27/2019 SIMATIC IT Historian Pres

    45/59

    a piece of equipment in a trend graph

    Additionally, it is also possible

    to display the equipment units

    design speed in the trend,

    if it was configured during the

    .

    Siemens AG 2013 All rights reserved.

    Page 46 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    46/59

    user-defined filters on contexts

    Such filters can be set if

    counter values where acquired with

    phase.

    Siemens AG 2013 All rights reserved.

    Page 47 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    47/59

    KPI Viewerdisplays KPIs associated to a particular piece of equipment using

    one of the following graphs:

    Bargraph

    Trend

    Stacked bargraph Pareto chart

    Siemens AG 2013 All rights reserved.

    Page 48 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    48/59

    oun ers ewer sp ays coun er recor s n a u ar orm

    Siemens AG 2013 All rights reserved.

    Page 49 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    49/59

    ,

    gives the user the possibility to edit them and export them to a CSV file

    Siemens AG 2013 All rights reserved.

    Page 50 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    50/59

    Siemens AG 2013 All rights reserved.

    Page 51 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    51/59

    equipment in a Gantt chart

    The user can perform the following actions:

    Filter data by

    e ui ment

    context

    time interval

    Zoom in and out the chart

    Export and print data

    Siemens AG 2013 All rights reserved.

    Page 52 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    52/59

    piece of equipment

    Two types of trend charts can be displayed:

    to view the values of all the counters

    associated to the piece of equipment

    OEE Chart

    to view all OEE indicators associated

    to the piece of equipment.

    Siemens AG 2013 All rights reserved.

    Page 53 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    53/59

    qu pmen ompar son g ves e user e oppor un y o compare wo

    or more pieces of equipment

    For each piece of equipment, the following

    KPIs are displayed (if available):

    OEE

    Availability

    Performance

    Quality

    Current counter values

    Siemens AG 2013 All rights reserved.

    Page 54 Author / Department

    Note: This page provides only real-time data and can be configured to refresh itself automatically or manually.

  • 7/27/2019 SIMATIC IT Historian Pres

    54/59

    Context Management can be used to set the current values for one or more

    contexts which were defined during the engineering phase

    By doing so, it is possible to modify

    contextualization of:

    design speed, counter

    Siemens AG 2013 All rights reserved.

    Page 55 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    55/59

    anne own me a ows e user o se a anne own me or one

    or more equipment

    Siemens AG 2013 All rights reserved.

    Page 56 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    56/59

    -

  • 7/27/2019 SIMATIC IT Historian Pres

    57/59

    ro uc on pera on ar ua y pera on ar

    Production Production

    Siemens AG 2013 All rights reserved.

    Page 58 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    58/59

    SPC project opportunities are still under evaluation on behalf of

    SIMATIC IT Product Management

    For further information lease contact:

    [email protected]

    Siemens AG 2013 All rights reserved.

    Page 59 Author / Department

  • 7/27/2019 SIMATIC IT Historian Pres

    59/59

    For further information please contact:

    [email protected]

    siemens.com/answers

    Siemens AG 2013 All rights reserved.

    Page 60 Author / Department