silverwood stone installation guide

17
Installation Manual

Upload: nicholasjr

Post on 06-Apr-2016

221 views

Category:

Documents


0 download

DESCRIPTION

Install Manual

TRANSCRIPT

Page 1: Silverwood Stone Installation guide

                                                       

 

 

 

 

 

 

 

 

 

 

 

 

                 

                                 

 

 

 

 

 

 

 

 

 

Installation  Manual                                        

Page 2: Silverwood Stone Installation guide

  2  

   

1 Warranty,  Storage  &  Maintenance    To  maintain  the  performance  and  look  of  your  SilverWood  Stone  cultured  stone  product,  and  to  benefit  from  the  advantages  of  our  industry  leading  warranty,  this  product  must  be  installed  with  care.  To  insure  warranty  compliance,  be  sure  to  carefully  read  and  understand  this  manual  prior  to  installation.    

IMPORTANT:    Compliance  with  SilverWood  Stone’s  preparation,  installation,  storage,  maintenance  and  care  requirements,  and  with  applicable  local/regional  building  codes  is  mandatory.  Failure  to  comply  with  these  requirements  and  codes  may  void  applicable  warranties,  affect  product  performance  and  lead  to  personal  injury.  

WARNING:    Do  not  install  products  you  believe  to  be  conflicting  with  local/regional  building  codes.  Before  you  begin,  refer  to  your  local/  provincial/  state  and  national  building  codes  for  requirements  regarding  the  installation  of  interior  feature  walls,  interior  decorative  stone,  manufactured  stone  siding,  breather  membrane,  house  wrap,  caulking,  fastening,  etc.  Follow  the  manufacturers’  instructions  for  installing  the  breather  membrane  (MortairVent),  and  house  wrap.  For  more  information  regarding  building  codes,  consult  the  Government  of  Canada’s  National  Model  Construction  Codes  at  www.nationalcodes.nrc.gc.ca  and  The  International  Code  Council  (ICC)  at  www.iccsafe.org  

Storage  

Store  flat  and  keep  dry  prior  to  installation.  Installing  wet  panels  may  result  in  something  happening?!  Do  not  place  product  directly  on  the  ground.  Protect  edges  and  corners  from  breakage.  Product  should  not  come  into  contact  with  other  stone  product;  use  wood  strapping  or  cardboard  to  prevent  interaction.  To  further  prevent  breakage,  when  working  with  panels,  carry  product  on  edge.  SilverWood  Stone  is  not  responsible  for  damage  caused  by  improper  storage  and  handling  of  the  product.  

Maintenance  

Our  manufactured  stone  surfaces  require  very  little  maintenance  and  should  be  cleaned  using  water,  or  warm  water  and  mild  soap.  Water  pressure  from  a  garden  hose  and  the  use  of  a  soft  bristle  brush  will  be  sufficient.  Do  not  use  a  pressure  washer,  particulate  or  sand  blasting  device,  or  harsh  chemicals  (i.e.  bleach,  acid,  detergents).  Staining,  sealing  or  treating  is  not  required  or  recommended.  Failure  to  follow  recommended  maintenance  and  care  may  affect  the  product  warranty.  

 

 

 

 

Page 3: Silverwood Stone Installation guide

  3  

 

2 General  Requirements    

• SilverWood  Stone  can  be  installed  over  steel  studs  or  braced  wood  with  a  maximum  spacing  of  16”.  When  installing  SilverLine  Atlantic  Drystack  cultured  stone  over  foam  insulated  OSB  or  sheathing  install-­‐furring  strips  similar  to  vinyl  siding  installation  16”  apart,  mortared  panels  do  not  require  this.  

• In  extreme  cases  irregularities  in  framing  and  sheathing  can  mirror  through  the  finished  application    

• Avoid  over-­‐driving  fasteners,  which  can  result  in  non-­‐adhesion  of  product  or  breaking  of  the  panels.  

• A  water-­‐resistive  barrier  as  recommended  in  this  guide  must  be  used  to  maintain  warranty  and  is  required  in  accordance  with  local  building  code  requirements.  

• The  water-­‐resistive  barrier  must  be  appropriately  installed  with  penetration  and  junction  flashing  in  accordance  with  local  building  code  requirements.  SilverWood  Stone  will  assume  no  responsibility  for  water  infiltration.  

• Adjacent  finished  grade  must  slope  away  from  the  building  in  accordance  with  local  building  codes  typically  a  6”  minimum  over  10’  or  2%.  

• Do  not  install  SilverWood  Stone  products  on  a  horizontal  plane  or  ceiling.  Vertical  wall  applications  only.    

• Maintain  a  2”  minimum  clearance  between  SilverWood  Stone  products  and  driveways,  paths  and  steps.  Do  not  caulk  gap.  

• Proper  flashing,  counter-­‐flashing  and  kick-­‐out  flashing  is  to  be  installed,  as  per  roofing  manufacturers  instructions,  wherever  SilverWood  Stone  product  is  used.  

• Products  finish  may  lighten  slightly  in  the  first  two  years  due  to  elemental  curing-­‐  this  is  normal  and  within  the  products  parameters.    

• Do  not  install  SilverWood  Stone  products,  such  that  they  may  remain  in  contact  with  standing  water.  

• Minimize exposure to salt    

Cutting  Instructions-­‐  Outdoors    1. Position  cutting/trimming  station  so  that  dust  will  not  blow  in  the  direction  

of  the  user  or  others  in  the  working  area.  2. The  following  methods  may  be  used:  A)  Handheld  grinder  with  high-­‐speed  

diamond  cutting  wheel  designed  for  masonry  and  stone.  B)  Dust  reducing  circular  saw  with  high-­‐speed  diamond  blade  designed  for  masonry/stone.    

3. Use  eye  and  respiratory  protection  when  cutting  or  trimming  product.  4. When  working  with  stone  products  a  hardhat,  toe  protection  and  a  face  

shield  is  recommended.  5. Do  not  cut  or  trim  SilverWood  Stone  products  indoors.  6. Never  use  a  toothed  blade  or  wheel  not  designed  to  cut  stone  or  masonry.  7. Panels  may  be  cut  with  a  wet  saw.  Ensure  product  is  rinsed  immediately  

following  the  cut.  Failure  to  do  so  will  cause  dust  to  adhere  permanently.  

If  concerns  exist  about  cement  dust  exposure  levels  or  you  do  not  comply  with  the  above,  practices  you  should  consult  a  qualified  industrial  hygienist  for  further  information.  

 

 

 

Page 4: Silverwood Stone Installation guide

  4  

 

 

3 Installation      Note:    This  panel  symbol  represents  a  modification  in  the  instruction  guidelines  for  installing  SilverWood  Stones  mortared  veneer  panel  products  only.  Ignore  these  guidelines  if  installing  SilverLine  Drystack.  For  mortared  installation  it  is  recommended  you  read  the  entire  manual  and  take  special  note  of  these  symbols.    Wall  Preparation    

Inspect  the  exterior  wall  prior  to  installation  to  ensure  framing  is  a  minimum  16”  ODC  spacing  and  that  sheathing  is  a  minimum  of  either  7/16”  OSB  or  ½”  plywood.  Verify  that  appropriate  flashing,  J-­‐channel,  caulking  and  water  resistive  barrier  have  been  installed  or  are  part  of  your  installation  materials.  Interior  wall  boarding  and  roofing  should  be  installed  prior  to  SilverWood  Stone  products’.  Corners  should  be  sheathed  to  meet  building  codes  and  prevent  racking.  Consult  a  professional  civil/engineer  for  applications  over  30’.  Drystack  products  use  an  8”  anchor  spacing  specifically  designed  to  accommodate  most  ICF  foundation  installations.  When  installing  panels  over  concrete  block  or  poured  foundation  pressure  treated  furring  strips  should  be  installed  and  fastened  to  the  wall  with  both  a  foundation  fastener  and  polyurethane  adhesive.    Check  wall  for  defects  or  irregularities  and  contact  the  builder  or  contractor  to  correct  any  deficiencies  before  you  proceed.    Water  Resistive  Barrier  Installation  (WRB)    SilverWood  Stone  products  were  designed  to  be  installed  in  conjunction  with  a  vented  water  resistive  barrier.  This  barrier  is  mandatory  to  maintain  warranty  eligibility.  MortairVent™  is  the  recommended  WRB  and  can  be  found  through  your  local  SilverWood  Stone  distributor.  If  using  a  different  WRB  product  contact  your  distributor  for  information  regarding  warranty  protection.    Following  installation  instructions  provided  by  the  manufacturer,  install  a  minimum  of  one  layer  of  WRB  (MortairVent™)  to  the  structures  sheathing.  Ensure  its  installation  meets  building  code  requirements,  terminates  at  least  16”  past  all  outside  and  inside  corners  and  integrates  with  flashing  materials.  In  order  to  prevent  insect  intrusion  fold  the  bottom  portion  of  the  barrier  behind  itself  to  create  a  “lip”  where  it  meets  the  base  of  the  starter                                strip.      

     

Page 5: Silverwood Stone Installation guide

  5  

 

 

 

 Fastener  type  and  use      Only  stainless  steel  screws  are  approved  for  installing  SilverWood  Stone  products  on  exterior  surfaces.  Galvanized  and  electro-­‐galvanized  fasteners  will  corrode  prematurely  and  void  product  warranty.  Grip  Rite  PrimeGuard  MAX  screws  are  recommended  and  are  available  through  your  local  SilverWood  Stone  dealer.    Screw  size  and  thread  type  chart:  

 

 

 

 

   *When  installing  over  1”  exterior  rigid  foam  insulation  add  1”  to  fastener  length.    Use  caution  when  driving  fasteners  through  attachment  points.  Use  only  enough  pressure  until  there  is  resistance.  Applying  too  much  force  will  result  in  faulty  attachment  and  broken  panels.  Silverstone  Drystack  product  should  be  fastened  so  the  screw  head  is  driven  just  below  the  surface  of  the  silicone  plug  and  fastening  stops  when  further  resistance  is  felt.  (On  a  Dewalt  XRP  drill  this  is  a  9-­‐10  setting  on  the  chuck  torque  setting)      Before  you  begin:  Planning  the  installation  

Carefully  plan  the  distribution  of  panels  on  the  walls.  Position  product  over  the  wall  area  so  as  to  limit  the  number  of  cuts.  Ensure  corners  alternate  to  avoid  joint  alignment.  In  some  instances,  height  of  ledge  may  be  pre-­‐determined  by  a  feature  such  as  the  bottom  of  a  window,  it  is  our  recommendation  to  pick  a  starting  position  that  minimizes  waste  and  cutting  of  panels.  SilverWood  Stone  ledges  are  3”  high.  Atlantic  Drystack  panels  are  9”  high.  Mortared  Panels  are  18”  high.  An  example  of  an  easy  height  that  is  aesthetically  pleasing  and  minimizes  waste  would  be  39”.  This  is  achieved  with  one  row  of  ledge  and  two  rows  of  mortared  panels  (3”+18”+18”  =  39”)  If  using  our  SilverLine  products,  this  same  dimension  is  achieved  by  using  one  row  of  ledge  and  four  rows  of  panels  (3”+9”+9”+9”+9”=39”).    

 

 

 

 

Product   Screw  Thread  Size   Screw  Length  Drystack  Panels     #7  trim  head   2  ¼”-­‐3”  Drystack  Corners   #7  trim  head   2  ¼”-­‐3”  Mortared  Panels   #8   2  ½”  Mortared  Corners   #8   2  ½”  

Trim  Pieces   #10   3”  Ledge  Pieces   #10   3”  Galv.  Trim  securing  strip   #8   1  ¼”  

Page 6: Silverwood Stone Installation guide

  6  

 

 

   Installing  the  starter  strip/row      SilverWood  Stone  starter  strip  consists  of  the  first  row  of  installed  product.  Depending  on  the  aesthetic  or  functional  application  this  can  be  ledger  piece,  molding  or  accent  trim,  or  standard  panels.  Use  a  laser  level  and  chalk  line  to  ensure  a  perfect  level.  Panels  are  designed  to  interlock  and  maintain  a  straight  line,  however  checking  level  and  alignment  of  the  panels  regularly  is  recommended.  When  using  trim  or  ledge  pieces  to  start  a  project  flash  the  top  before  starting  panels  to  prevent  water  intrusion.  Do  not  caulk  bottom  gap.  See  trim  installation  for  more  detail  when  using  trim  as  starter  course.    Installers’  Tip:  Use  a  straight  piece  of  dimensional  lumber  fastened  to  the  exterior  wall  to  mark  the  top  line  of  product  to  be  installed.  Butt  the  positive  lip  or  topside  of  first  row  of  corner  and  panels  to  this  edge.      Installing  Panels    Atlantic  Drystack  panels  are  engineered  with  an  interlocking  lip  system  to  prevent  water  intrusion  and  facilitate  ease  of  installation.  Ensure  that  each  panel  has  its  positive  tongue  edge  facing  up  and  that  panels  are  adequately  staggered  throughout  installation  to  prevent  lining-­‐up  of  vertical  seams.  (See  corner  installation  below  to  see  how  this  is  accomplished)    Drystack  installation  is  done  from  right  to  left  of  the  building  surface.  If  using  corner  pieces  begin  from  right  corner  piece.  If  panels  do  not  sit  correctly  in  their  grooves,  or  mold  castings  prevent  a  snug  fit  a  handheld  grinder  is  used  to  trim  the  excess.  An  approved  stainless  screw  must  be  used  at  each  of  the  8  fastening  points  on  each  panel,  these  fastening  points  are  easily  found  below  the  indicator  arrow  markings  on  the  top  lip  of  the  panel.  They  appear  as  a  small  “burr”  or  silicone  nub  in  the  concrete  between  the  mortar  lines  of  stacked  stone.  Be  sure  to  not  drive  the  fastener  through  the  anchor  points.  To  ensure  even  color  and  tone  distribution  mix  products  from  different  pallets.                

 

 Mortared  panels  are  also  designed  to  be  installed  between  fastened  corners.  Begin  by  attaching  Corner  pieces  to  the  wall  using  the  appropriate  length  #8  screws  starting  at  the  bottom  of  the  panel.  Tighten  screw  so  screw  head  is  snug  against  the  panel.  Ensure  that  a  fastener  is  driven  into  each  attachment  hole  in  the  panel  (7-­‐8  per  panel).  Stagger  panels  and  mix  products  from  different  pallets  to  ensure  an  even  color  distribution.      

Page 7: Silverwood Stone Installation guide

  7  

 

       Trimming  and  Cutting  Panels    Trimming  and  cutting  of  panels  can  happen  between  a  finished  panel  and  a  corner  piece,  in  the  middle  of  a  row,  at  the  end  of  a  wall  or  an  inside  corner  where  to  walls  meet.  When  cutting  a  panel  at  the  end  of  a  wall  where  a  finished  corner  piece  is  absent,  it  is  recommended  that  the  cut  end  be  caulked  with  a  color  matching  seal  and  finished  with  a  decorative  flashing  or  trim.  When  a  horizontal  cut  is  required  simply  mark  a  level  line  across  the  panel,  and  using  a  size  appropriate  handheld  grinder,  cut  along  the  mark.  Follow  the  guidelines  below  for  cutting-­‐in  a  Drystack  panel  in  a  corner  piece  wall.  The  same  guidelines  may  be  used  for  cutting  mortared  panels  without  the  concern  of  the  lip.    1. Measure  cut  gap  between  the  two  panels,  to  ensure  accuracy  use  2  screws  

to  temporarily  fasten  the  finished  corner  end  (Fig  A).  Ensure  you  select  a  panel  whose  side  lining  up  with  the  cut  end  has  similar  stone  properties  (e.g.  stones  line  up,  color).  Using  angle  grinder  with  a  7”  blade  (recommended)  cut  away  the  left  lip  on  the  side  of  the  panel  (Fig  B)  preceding  the  panel  to  be  cut  and  fit.  Cut  this  panel  before  installation  as  to  not  damage  water  barrier.  Install  this  panel.  (Fig  C)  

 

 

 

 

                                           

A    

B    

C    

Page 8: Silverwood Stone Installation guide

  8  

       

   

Trimming  and  Cutting  Panels  (cont.)    2. Using  the  top  ledge  of  the  installed  right  panel  mark  and  cut  your  first  

vertical  cut  of  the  cut  to  fit  panel.  Ensure  the  left  lip  is  in  line  with  the  female  joint  on  the  corner  piece.  (Fig  D)  Line  the  cut  to  fit  panel  with  the  lip  of  the  temporarily  installed  corner  piece  and  mark  your  second  vertical  cut  line,  this  line  should  be  4  ½”high  (Fig  E).  This  will  align  with  the  lower  tab  and  be  cut  to  mirror  the  ledge  feature  on  the  adjoining  right  panel.  Do  not  cut  the  grout  line  portion  of  the  cut  to  fit  panel  this  will  allow  alignment  in  the  cut  attached  panel.  Measure  and  mark  the  position  of  the  cut  to  trim  the  remaining  top  tab  of  the  panel  to  be  installed  to  align  with  the  top  cut  tab  of  the  installed  panel  on  the  right  (Fig  F).        

 

 

                                                       

D    

E    

F    

Page 9: Silverwood Stone Installation guide

  9  

 

     Trimming  and  Cutting  Panels  (cont.)      3. After  panels  have  been  trimmed  remove  temporary  anchors  from  the  corner  

or  adjoining  left-­‐most  piece  and  dry-­‐fit  the  two  pieces  to  ensure  proper  fit  and  seating  (Fig  G).    Caulk  all  cut  sides  of  panels  before  fastening  to  wall.  Caulk  top  channel  of  adjoining  cut  panel  and  smooth  with  finder  to  seal  the  vertical  seam.  Finish  installing  cut  panel  and  corner  (Fig  H).    

IMPORTANT:  Before  installing  the  cut  panel  use  a  color  matched  caulk  and  seal  the  cut  side  of  the  product,  ensure  that  there  are  no  caulk  gaps  and  that  entire  ledge  is  sealed  to  prevent  water  intrusion.    

                                                                         

G    

H    

Cutting  with  7”  wheel  

 

Page 10: Silverwood Stone Installation guide

  10  

 

 

 

Installing  Trim  and  Ledge    

 

SilverWood  Stone  ledge  pieces  (Fig  I)  can  be  used  interchangeably  depending  on  the  desired  aesthetic.  Trim  and  ledge  pieces  come  in  a  wide  variety  of  shapes  and  sizes,  consult  your  distributor  or  the  SilverWood  Stone  catalogue  for  the  best  options  for  your  application.  Trim  and  ledge  can  be  used  in  horizontal  or  vertical  applications  to  frame  windows,  doors  and  other  architectural  features.  A  typical  trim  or  ledge  installation  occurs  where  a  “wainscot”  application  of  stone  is  applied  to  the  lower  portion  of  the  building  face.  This  transition  is  required  from  SilverWood  Stone  siding  to  conventional  siding  products.  Pick  the  horizontal  position  of  your  ledges  to  maximize  the  length  of  each  piece  and  eliminate  “stubs”  of  ledge.  As  a  general  rule,  starting  with  a  precut  ledge  on  a  miter  from  outside  corner  is  best  practice.    

1. Determine  the  position  of  the  ledge/trim  piece  (Fig  J).  Carefully  mark  a  level  line  with  a  chalk  line  and  carpenters  level  or  laser  level  (Fig  K).    Align  top  of  bracket  with  level  line  and  fasten  with  stainless  steel  #8  x  1  ¼”  screws  (Fig  L).  It  is  recommended  that  the  J  and  corresponding  ledges  align  so  that  8”  spacing  on  fastener  holes  allows  for  screws  to  penetrate  studs  spaced  at  16”  centers.    

 

 

 

 

                 

 

 

 

 

   

 

I    

J    

K    

L    

Page 11: Silverwood Stone Installation guide

  11  

 

 

 

Installing  Trim  and  Ledge    (cont.)    

 

2. Fit  the  ledge  into  the  galvanized  J  (Fig  M),  attach  with  #10  x  3”  Stainless  Screws  (Fig  N).  Position  the  tip  of  the  screw  as  high  as  possible  within  the  keyhole.  This  will  prevent  any  downward  movement  of  the  ledge  out  of  the  galvanized  J.  Drive  screw  until  the  head  is  seated  against  the  cast,  concave  seat  (Fig  O).  Prior  to  fitting  of  ledges,  Use  a  straight  edge  to  determine  how  in-­‐plane  your  wall  is  and  note  any  imperfections:  Bows  in  wall  combined  with  over-­‐tightening  of  screws  may  cause  ledge  to  fracture  during  installation.  

 

   

 

 

 

 

 

 

 

 

 

 

3. Ensure  that  flashing  is  installed  in  accordance  with  building  codes  to  prevent  water  intrusion  along  the  galvanized  bracket  top  channel.  “L”  Flash  from  wall  (Fig  P),  a  minimum  of  1  ½”  from  supporting  wall.  Install  flexible  weather  resistant  membrane  in  accordance  with  local  and  national  building  code  when  transitioning  to  or  from  a  different  siding  material  (Fig  Q).    

 

 

 

 

 

 

M    

O    

M    

O    

P    

Q    

Page 12: Silverwood Stone Installation guide

  12  

 

 

 

Installing  SilverLine  Drystack  Corners  

 

SilverLine  Drystack  corners  are  installed  in  the  same  way  as  Drystack  panels;  from  left  to  right  and  begin  the  starter  strip  and  installation  when  they  are  used.  Follow  Drystack  panel  fastening  and  Fastener  use  sections  for  further  details.  

 There  are  two  variations  of  SilverLine  corners,  which  are  designed  to  alternate  up  the  wall  corner  to  stagger  vertical  seams  throughout  the  installation.  If  you  are  starting  with  a  corner  that  has  a  longer  right  “leg”  then  the  corner  installed  above  it  will  have  a  longer  left  “leg”  (See  image  below).      

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alternating  Corner  Pieces  

 

Page 13: Silverwood Stone Installation guide

  13  

 

 

 

 Installing  SilverWood  Stone  Mortared  Corners  

   

Mortared  corner  panels  are  installed  in  the  same  fashion  as  mortared  panels.  Begin  by  attaching  Corner  pieces  to  the  wall  using  the  appropriate  length  #8  screws  starting  at  the  bottom  of  the  panel.  Tighten  screw  so  screw  head  is  snug  against  the  panel.  Ensure  that  a  fastener  is  driven  into  each  attachment  hole  in  the  panel  (7-­‐8  per  panel).    

The  shape  of  each  corner  allows  for  it  to  be  inverted  180  degrees  with  the  “long  leg”  oriented  to  the  left  or  right  (Fig  R).  Alternate  the  position  of  each  corner  unit  as  illustrated  as  you  work  up  the  outside  corner  of  your  structure  (Fig  S).  This  will  serve  to  stagger  the  position  of  joints  between  panels.  Measure  and  mark  corner  to  ensure  that  18”  center-­‐to-­‐center  spacing  is  maintained  between  corner  units.  Panels  can  then  be  added,  working  away  from  outside  corners        (Fig  T).  

   

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R    

S    

T    

T    

Page 14: Silverwood Stone Installation guide

  14  

 

 

 Installing  Inside  Corners      There  are  3  available  methods  to  finish  inside  corners.    

1) Coping  is  the  recommended  method  and  yields  the  best  results.  Join  the  panels  and  use  coping  method  similar  to  coping  interior  baseboards.  Apply  caulk  in  the  joint  prior  to  pressing  the  coped  joints  together.  A  flexible  adhesive  weatherproofing  flashing  behind  the  corner  piece  is  recommended.  

         

 

 

 

 

 

 

2) Install  a  vinyl  trim  piece,  weatherproof  2”X2”  trim  piece  or  a  90°  corner  flashing  piece  where  the  two  walls  meet  and  butt  the  joining  panels  against  it.  Caulk  the  space  between  the  flashing  and  the  cut  panel.  A  flexible  adhesive  weatherproofing  flashing  behind  the  corner  piece  is  recommended.    

               

 

 

 

 

 

3)    Thirdly,  the  corners  can  be  mitered  to  fit  the  corner.  Follow  caulking  and  weatherproofing  instruction  from  the  first  two  methods.  This  is  the  least  effective  method  for  adjoining  inside  corner  panels  and  should  be  avoided.  

 

Page 15: Silverwood Stone Installation guide

  15  

 

 

 Installing  Accessory  Pieces    

   

SilverWood  Stone  accessory  pieces  are  designed  to  complement  both  Drystack  and  mortared  applications  and  put  the  finishing  touch  on  your  project.  Consult  your  authorized  dealer  for  endless  trim  and  accessory  options  with  SilverWood  Stone.  When  working  with  electrical  and  plumbing  accents  consult  a  qualified  electrician  or  plumber  to  ensure  safe  practices.  When  using  an  accessory  option  to  surround  an  electrical  component,  identify  electrical  box  locations  and  ensure  power  has  been  disconnected.  

It  is  recommended  that  a  flexible  weather  resistant  membrane  be  installed  around  fixtures  to  prevent  water  infiltration.  Outlet  and  lighting  accessory  pieces  can  be  installed  before  or  after  stone  panels  so  long  as  the  guidelines  below  are  met.  Refer  to  the  Trimming  and  Cutting  Panels  section  for  cutting  instructions.  

To  attach  an  accessory  piece  to  the  wall:    

Dry  fit  the  accessory  piece  for  cut  in  installations.  Apply  a  liberal  bead  of  caulking  around  the  back  edge  of  the  piece.  Attach  with  #10  x  3”  Stainless  Screws.  Position  the  tip  of  the  screw  as  high  as  possible  within  the  keyhole.  It  is  recommended  that  a  strip  of  flashing  be  installed  on  the  top  edge  to  prevent  water  intrusion.  Apply  color  matched  caulk  between  the  cut  sides  of  the  panel  and  the  accessory  piece.  

 

 Finishing  a  Drystack  Installation    

 

No  mortaring  or  finish  work  is  required  for  Drystack  installation.  Complete  the  job  with  a  visual  inspection  to  ensure  all  fastener  heads  have  been  secured  through  the  attachment  points  and  that  screw  heads  are  not  visible.    Exterior  electrical  and  plumbing  accessories  can  now  be  installed  through  accessory  pieces.  If  any  visible  joints  exist  they  may  now  be  sealed  with  a  color  matching  caulk  mixed  with  some  cement  dust  to  maintain  the  texture  of  the  stone.  

 

 

 

 

 

 

 

Page 16: Silverwood Stone Installation guide

  16  

 

 

   Grouting  a  Mortared  Panel  Installation  

 This  step  is  what  most  new  installers  find  most  challenging,  but  it  is  important  to  remember  that  this  is  the  critical  step  that  provides  the  durability  and  authentic  look  of  traditional  stone  installation.  With  a  little  patience  and  attention  to  detail,  you  can  easily  achieve  a  “better  than  professional”  installation.  Once  you  have  become  proficient  at  applying  mortar  you  can  typically  expect  to  spend  one  hour  mortaring  for  every  two  hours  spent  installing  panels.  a)  Measure  Masonry  Cement  and  Masonry  Sand  in  1:2  Ratio.  (One  shovel-­‐full  of  cement  to  two  of  sand  is  a  good  batch  size  to  start  with.  This  will  result  in  a  little  less  than  half  a  five-­‐gallon  bucket  of  mixed  mortar.  Once  you  have  become  quicker  at  applying  mortar,  a  batch  size  of  four-­‐gallons  can  be  easily  placed  before  the  mortar  sets.  b)  Add  Water  and  Bonding  Agent  in  proper  proportions  and  mix  for  at  least  one  minute  until  mixing  paddle  leaves  1-­‐2″₺  deep  impression  in  mortar  when  removed  from  mixing  bucket.  If  the  impression  is  any  deeper  you  will  have  a  hard  time  squeezing  mortar  from  the  bag.  If  impression  is  less,  then  water  content  is  too  high  and  you  will  have  poor  quality  mortar  that  will  have  poor  adhesion  and  be  less  resistant  to  water  penetration.  c)  Fill  grout  bag.  d)  Squeeze  into  all  joints,  both  on  the  panels  and  between  the  panels.  As  you  work,  try  to  ensure  that  you  are  filling  the  joints  back  to  front  and  not  simply  “bridging”  the  surface.  To  ensure  you  do  not  miss  any  joints  try  to  work  in  one  direction  and  fill  only  one  panel  high  at  a  time.  e)  When  mortar  has  cured  to  “putty  like”  consistency  (You  can  move  it  with  your  finger,  but  it  does  not  stick).  Flatten  the  mortar  in  the  joints  with  narrow  trowel  or  brick  joiner.  This  step  ensures  mortar  adhesion  with  the  panel  joint  and  provides  a  traditional,  neat  finish.  f)  When  margins  of  troweled  joints  “crumble”  to  the  touch,  use  a  stiff  bristle  brush  to  remove  excess  grout  and  trowel  marks.  If  you  notice  brush  becoming  wet  from  mortar  then  you  are  brushing  too  early.  This  will  result  in  mortar  residue  on  the  face  of  the  stone  that  will  have  to  be  cleaned-­‐off  later  to  achieve  a  neat  appearance.  If  you  brush  too  late  you  will  not  be  able  to  easily  remove  rough  edges  and  trowel  marks.  *  It  is  not  recommended  that  this  step  be  performed  in  direct  sunlight  or  temperatures  exceeding  27  degrees  C.  Moisture  will  be  drawn  from  mortar  before  it  has  cured  and  cracking  of  the  mortar  will  result.  

 

 

 

 

 

 

 

Page 17: Silverwood Stone Installation guide

  17  

367 Main St Suite 1 Fredericton, N.B. Canada, E3a 1E6

Ph#506.457.4649 Fax#506.459.3395

[email protected]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exclusive Distributor

 

 

 

 

 

 

 

 

 

 

   

SilverWood  Stone  does  not  make  any  representations,  warranties  or  guarantees,  express  or  implied,  as  to  the  accuracy  or  completeness  of  the  installation  manual.  Users  must  be  aware  that  updates  and  amendments  will  be  made  from  time  to  time  to  the  manual.  It  is  the  user's  responsibility  to  determine  whether  there  have  been  any  such  updates  or  amendments.  Neither  SilverWood  Stone  nor  any  of  its  directors,  officers,  employees  or  agents  shall  be  liable  in  contract,  tort  or  in  any  other  manner  whatsoever  to  any  person  for  any  loss,  damage,  injury,  liability,  cost  or  expense  of  any  nature,  including  without  limitation  incidental,  special,  direct  or  consequential  damages  arising  out  of  or  in  connection  with  the  use  of  this  manual.  

SilverWood Stone Corporation

819 Royal Rd Fredericton, N.B. Canada, E3G 6M1

www.silverwoodstone.com