  • 8/9/2019 SignBoard 3rd Party

    1/2

    may 2012

    Annx C3

    modl for of crticatfor typ S tporary works1

    Na of Projct _________________________________

    Na of Structur _________________________________Structur Rf No _________________________________

    1. We certify that reasonable professional skill and care has been used in the checking of the design for

    the temporary works comprising (description of temporary works)2listed in the attached schedule.

    We also certify, but without undertaking any responsibility other than towards (name of organisationprocuring the temporary works) that in our opinion the erection proposals and proposed temporary

    works details specied in the attached schedule for the execution of (project title) are satisfactory for

    the proper discharge of his responsibilities, for the safety of the said part of the Works and for theirsafe execution in accordance with the drawings and specication and without detriment to the related

    permanent works3, 4

    .

    Signed ________________________________

    Name ________________________________

    Temporary Works Checker

    Engineering Qualications ________________________________ 5

    Name of Organisation ________________________________

    Date ________________________________

    Signed ________________________________

    Name ________________________________

    Position held ________________________________

    Name of Organisation ________________________________

    procuring the temporary works

    Date ________________________________

    2. The permanent works Designer is satised that the temporary works have no detrimental effectson the permanent works6

    Signed ________________________________

    Name ________________________________Permanent Works Designer

    Engineering Qualications ________________________________ 5

    Name of Organisation ________________________________

    Date ________________________________

    C/6

    DeSIGN AND CHeCK CeRTIFICATe

    (Typ S Tporary Works)

    Na of Projct

    Na of Structur

    Structur Rf No

    Dat

  • 8/9/2019 SignBoard 3rd Party

    2/2

    may 2012

    Nots

    1. A copy of this certicate should be forwarded to the TAA for retention with the AIP, except for Category 0, for the permanent

    structure to which it relates.

    2. The description to be inserted must dene unambiguously the extent of the structure to which the check is to be applied.Where necessary the extent of the Works must be shown on the drawings and the relevant Drawing numbers stated.

    3 Delete and without detriment to the related permanent works if the check is carried out by permanent works Designer.

    4. If there is a detrimental effect on the permanent works, an Addendum to the permanent works AIP must be submitted to the TAA

    for review.

    5. Engineer with appropriate qualication and experience for Categories 0 and 1, and with CEng, MICE, MIStructE or equivalent

    for Categories 2 and 3.

    6. This clause is not required if the check is carried out by permanent works Designer.